Welcome!

News Feed Item

Beaver Valley Power Station Unit 2 Returns to Service After Refueling Outage

AKRON, Ohio, Nov. 3, 2012 /PRNewswire/ -- FirstEnergy Nuclear Operating Company (FENOC), a subsidiary of FirstEnergy Corp. (NYSE: FE), announced its Beaver Valley Power Station Unit 2 in Shippingport, Penn., returned to service at 5:22 p.m. last night following a September 24, 2012, shutdown for refueling and maintenance.  The 904-megawatt plant is currently operating at 23 percent power and is expected to reach full power in the next week.

During the outage, 65 of the plant's 157 fuel assemblies were exchanged.  Numerous inspections and maintenance and improvement projects were completed to ensure continued safe and reliable operations, including replacement of the unit's two low pressure turbines.  The new, approximately 153-ton turbine rotors feature an enhanced blade design that is expected to increase plant efficiency.

Prior to the outage, Beaver Valley Unit 2 operated safely and reliably for 532 consecutive days and generated more than 12 million megawatt hours of electricity since the completion of its last refueling in April 2011.

FirstEnergy is a diversified energy company headquartered in Akron, Ohio. Its FENOC subsidiary also operates the Davis-Besse Nuclear Power Station in Oak Harbor, Ohio, and the Perry Nuclear Power Plant in Perry, Ohio.

Forward-Looking Statements:  This news release includes forward-looking statements based on information currently available to management. Such statements are subject to certain risks and uncertainties. These statements include declarations regarding management's intents, beliefs and current expectations. These statements typically contain, but are not limited to, the terms "anticipate," "potential," "expect," "believe," "estimate" and similar words. Forward-looking statements involve estimates, assumptions, known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Actual results may differ materially due to: the speed and nature of increased competition in the electric utility industry, the impact of the regulatory process on the pending matters before FERC and in the various states in which we do business including, but not limited to, matters related to rates, the status of the PATH project in light of the PJM Interconnection, L.L.C., (PJM) direction to suspend work on the project pending review of its planning process, its re-evaluation of the need for the project and the uncertainty of the timing and amounts of any related capital expenditures, the uncertainties of various cost recovery and cost allocation issues resulting from ATSI's realignment into PJM, economic or weather conditions affecting future sales and margins, changes in markets for energy services, changing energy and commodity market prices and availability, financial derivative reforms that could increase our liquidity needs and collateral costs, the continued ability of FirstEnergy's regulated utilities to collect transition and other costs, operation and maintenance costs being higher than anticipated, other legislative and regulatory changes, and revised environmental requirements, including possible GHG emission, water intake and coal combustion residual regulations, the potential impacts of any laws, rules or regulations that ultimately replace CAIR, including CSAPR which was stayed by the courts on December 30, 2011, and the effects of the EPA's MATS rules, the uncertainty of the timing and amounts of the capital expenditures that may arise in connection with any litigation including NSR litigation or potential regulatory initiatives or rulemakings (including that such expenditures could result in our decision to shut down or idle certain generating units), the uncertainties associated with the company's plan to retire its older unscrubbed regulated and competitive fossil units, including the impact on vendor commitments and PJM's review of the company's plans for, and timing of, those retirements, adverse regulatory or legal decisions and outcomes with respect to our nuclear operations (including, but not limited to the revocation or non-renewal of necessary licenses, approvals or operating permits by the NRC including as a result of the incident at Japan's Fukushima Daiichi Nuclear Plant), issues that could result from our continuing evaluation of the indications of cracking in the Davis-Besse plant shield building imposed by the Confirmatory Action Letter issued by the NRC, adverse legal decisions and outcomes related to Met-Ed's and Penelec's ability to recover certain transmission costs through their transmission service charge riders, the continuing availability of generating units and changes in their ability to operate at or near full capacity, replacement power costs being higher than anticipated or inadequately hedged, the ability to comply with applicable state and federal reliability standards and energy efficiency mandates, changes in customers' demand for power, including but not limited to, changes resulting from the implementation of state and federal energy efficiency mandates, the ability to accomplish or realize anticipated benefits from strategic goals, FirstEnergy's ability to improve electric commodity margins and the impact of, among other factors, the increased cost of fuel and fuel transportation on such margins, the ability to experience growth in the distribution business, the changing market conditions that could affect the value of assets held in FirstEnergy's NDTs, pension trusts and other trust funds, and cause FirstEnergy and its subsidiaries to make additional contributions sooner, or in amounts that are larger than currently anticipated, the impact of changes to material accounting policies, the ability to access the public securities and other capital and credit markets in accordance with FirstEnergy's financing plan, the cost of such capital and overall condition of the capital and credit markets affecting FirstEnergy and its subsidiaries, changes in general economic conditions affecting FirstEnergy and its subsidiaries, interest rates and any actions taken by credit rating agencies that could negatively affect FirstEnergy's and its subsidiaries' access to financing or their costs and increase requirements to post additional collateral to support outstanding commodity positions, LOCs and other financial guarantees, the state of the national and regional economy and its impact on major industrial and commercial customers of FirstEnergy and its subsidiaries, issues concerning the soundness of domestic and foreign financial institutions and counterparties with which FirstEnergy and its subsidiaries do business, the risks and other factors discussed from time to time in FirstEnergy's and its applicable subsidiaries' SEC filings, and other similar factors. The foregoing review of factors should not be construed as exhaustive. New factors emerge from time to time, and it is not possible for management to predict all such factors, nor assess the impact of any such factor on FirstEnergy's business or the extent to which any factor, or combination of factors, may cause results to differ materially from those contained in any forward-looking statements. FirstEnergy expressly disclaims any current intention to update, except as required by law, any forward-looking statements contained herein as a result of new information, future events or otherwise.

(110212)

SOURCE FirstEnergy Corp.

More Stories By PR Newswire

Copyright © 2007 PR Newswire. All rights reserved. Republication or redistribution of PRNewswire content is expressly prohibited without the prior written consent of PRNewswire. PRNewswire shall not be liable for any errors or delays in the content, or for any actions taken in reliance thereon.

Latest Stories
With more than 30 Kubernetes solutions in the marketplace, it's tempting to think Kubernetes and the vendor ecosystem has solved the problem of operationalizing containers at scale or of automatically managing the elasticity of the underlying infrastructure that these solutions need to be truly scalable. Far from it. There are at least six major pain points that companies experience when they try to deploy and run Kubernetes in their complex environments. In this presentation, the speaker will d...
While DevOps most critically and famously fosters collaboration, communication, and integration through cultural change, culture is more of an output than an input. In order to actively drive cultural evolution, organizations must make substantial organizational and process changes, and adopt new technologies, to encourage a DevOps culture. Moderated by Andi Mann, panelists discussed how to balance these three pillars of DevOps, where to focus attention (and resources), where organizations might...
The deluge of IoT sensor data collected from connected devices and the powerful AI required to make that data actionable are giving rise to a hybrid ecosystem in which cloud, on-prem and edge processes become interweaved. Attendees will learn how emerging composable infrastructure solutions deliver the adaptive architecture needed to manage this new data reality. Machine learning algorithms can better anticipate data storms and automate resources to support surges, including fully scalable GPU-c...
When building large, cloud-based applications that operate at a high scale, it's important to maintain a high availability and resilience to failures. In order to do that, you must be tolerant of failures, even in light of failures in other areas of your application. "Fly two mistakes high" is an old adage in the radio control airplane hobby. It means, fly high enough so that if you make a mistake, you can continue flying with room to still make mistakes. In his session at 18th Cloud Expo, Le...
Machine learning has taken residence at our cities' cores and now we can finally have "smart cities." Cities are a collection of buildings made to provide the structure and safety necessary for people to function, create and survive. Buildings are a pool of ever-changing performance data from large automated systems such as heating and cooling to the people that live and work within them. Through machine learning, buildings can optimize performance, reduce costs, and improve occupant comfort by ...
As Cybric's Chief Technology Officer, Mike D. Kail is responsible for the strategic vision and technical direction of the platform. Prior to founding Cybric, Mike was Yahoo's CIO and SVP of Infrastructure, where he led the IT and Data Center functions for the company. He has more than 24 years of IT Operations experience with a focus on highly-scalable architectures.
The explosion of new web/cloud/IoT-based applications and the data they generate are transforming our world right before our eyes. In this rush to adopt these new technologies, organizations are often ignoring fundamental questions concerning who owns the data and failing to ask for permission to conduct invasive surveillance of their customers. Organizations that are not transparent about how their systems gather data telemetry without offering shared data ownership risk product rejection, regu...
CI/CD is conceptually straightforward, yet often technically intricate to implement since it requires time and opportunities to develop intimate understanding on not only DevOps processes and operations, but likely product integrations with multiple platforms. This session intends to bridge the gap by offering an intense learning experience while witnessing the processes and operations to build from zero to a simple, yet functional CI/CD pipeline integrated with Jenkins, Github, Docker and Azure...
René Bostic is the Technical VP of the IBM Cloud Unit in North America. Enjoying her career with IBM during the modern millennial technological era, she is an expert in cloud computing, DevOps and emerging cloud technologies such as Blockchain. Her strengths and core competencies include a proven record of accomplishments in consensus building at all levels to assess, plan, and implement enterprise and cloud computing solutions. René is a member of the Society of Women Engineers (SWE) and a m...
Dhiraj Sehgal works in Delphix's product and solution organization. His focus has been DevOps, DataOps, private cloud and datacenters customers, technologies and products. He has wealth of experience in cloud focused and virtualized technologies ranging from compute, networking to storage. He has spoken at Cloud Expo for last 3 years now in New York and Santa Clara.
Enterprises are striving to become digital businesses for differentiated innovation and customer-centricity. Traditionally, they focused on digitizing processes and paper workflow. To be a disruptor and compete against new players, they need to gain insight into business data and innovate at scale. Cloud and cognitive technologies can help them leverage hidden data in SAP/ERP systems to fuel their businesses to accelerate digital transformation success.
Containers and Kubernetes allow for code portability across on-premise VMs, bare metal, or multiple cloud provider environments. Yet, despite this portability promise, developers may include configuration and application definitions that constrain or even eliminate application portability. In this session we'll describe best practices for "configuration as code" in a Kubernetes environment. We will demonstrate how a properly constructed containerized app can be deployed to both Amazon and Azure ...
Poor data quality and analytics drive down business value. In fact, Gartner estimated that the average financial impact of poor data quality on organizations is $9.7 million per year. But bad data is much more than a cost center. By eroding trust in information, analytics and the business decisions based on these, it is a serious impediment to digital transformation.
Digital Transformation: Preparing Cloud & IoT Security for the Age of Artificial Intelligence. As automation and artificial intelligence (AI) power solution development and delivery, many businesses need to build backend cloud capabilities. Well-poised organizations, marketing smart devices with AI and BlockChain capabilities prepare to refine compliance and regulatory capabilities in 2018. Volumes of health, financial, technical and privacy data, along with tightening compliance requirements by...
Predicting the future has never been more challenging - not because of the lack of data but because of the flood of ungoverned and risk laden information. Microsoft states that 2.5 exabytes of data are created every day. Expectations and reliance on data are being pushed to the limits, as demands around hybrid options continue to grow.