IMX Resources Files Revised Preliminary Economic Assessment (PEA) Technical Report on Ntaka Hill Project

WEST PERTH, AUSTRALIA -- (Marketwire) -- 11/14/12 -- IMX Resources Limited (ASX:IXR)(TSX:IXR)(TSX:IXR.WT) -

Highlights

--  Estimated C1 cash costs of USD 5.00 per pound of payable nickel which is
    mid range for global nickel producers 
--  Clear cash operating margin demonstrated over various metal price
    assumptions, including current spot price  
--  Estimated mine life of approximately 15 years 
--  Average annual contained nickel production of 10,000 to 15,000 tonnes
    per annum 
--  Confirmed modest pre-production capital investment of USD 227M 
--  NPV of USD 212M after tax based on 2011 PEA metal pricing (compared to
    USD 207M) 
--  NPV of USD 147M using three-year trailing average prices in line with US
    SEC guidelines which compares favourably to the 2011 PEA analysis (USD
    122M) using these same metal prices 

Upside

--  Potential increase in both grade and tonnage at Sleeping Giant from: (i)
    in-fill drilling of near surface hanging wall mineralisation to the
    north, and (ii) extension drilling targeting down plunge higher grade
    core 
--  Potential for delineation of new near surface mineralised zones close to
    the existing resources, currently being drill-tested 
--  Optimisation of flotation conditions is likely to improve the already
    excellent metallurgical performance. A definitive test work program,
    which includes extensive variability testing, is currently underway 
--  Future optimisation of the mining plan as part of a PFS, has potential
    to reduce up-front stripping requirements and defer cash flow for mining
    activities 

IMX Resources Limited ('IMX' or the 'Company') reports the filing of the NI 43-101 Technical Report for the updated preliminary economic assessment (PEA; Scoping Study) for the development of the Ntaka Hill Nickel Sulphide Project ('Ntaka Hill' or the 'Project'). The Project is located approximately 250km west of the port town of Mtwara, and is part of the 100% owned Nachingwea property in south eastern Tanzania.

Managing Director Neil Meadows said "The Technical Report provides the details on the economic assessment and other technical investigations that have been carried out to date. The next stage of evaluation of the project is to incorporate the results of this year's drilling program at Ntaka Hill into an updated Resource estimate and to assess the potential for discovery of new mineralised resources at the broader Ntaka Hill intrusion."

Table 1 provides a summary of the project and economic outcomes with more details provided in the appended tables. Additional details are provided in the announcement of 1 October 2012 and the full technical report that is available on SEDAR and at www.imxresources.com.au.

Table 1 - Highlights of Project and Economic Outcomes

----------------------------------------------------------------------------
----------------------------------------------------------------------------
                                                               Open Pit with
Parameter                                        All Open Pit    Underground
----------------------------------------------------------------------------
Mining                                                                      
Initial processing rate, Mtpa                             1.0            1.0
Expanded processing rate, Mtpa                            4.8           1.85
Total mill feed, Mt                                      57.3           21.1
Total open pit material mined, Mt                       410.0          142.2
Total underground material mined, Mt                        -            4.7
----------------------------------------------------------------------------
Strip ratio                                              6.16           5.95
----------------------------------------------------------------------------
Production                                                                  
Average Feed Grade, %Ni                                  0.48           0.79
Average Ni Recovery, %                                   75.2           79.7
Average Concentrate Grade, %Ni                           16.2           16.2
Concentrate Contained Ni, lbs'000                     454,036        293,486
----------------------------------------------------------------------------
Capital Costs                                                               
Initial Capital Cost, US$M                              225.1          227.0
Total Capital Cost, US$M                                551.1          450.3
----------------------------------------------------------------------------
Unit Production Costs, C1(1) US$/lb. payable                                
 Ni                                                      5.77           5.00
----------------------------------------------------------------------------
Metal Price Assumption                                                      
(based on 3 year trailing average)                                          
Nickel, USD/t                                          20,826         20,826
Copper, USD/t                                           7,976          7,976
----------------------------------------------------------------------------
Economic Outcomes, US$M                                                     
Net after-tax cash flow                                   532            406
After-tax internal rate of return, %                     12.1           19.2
After-tax NPV(2) @ 8% discount rate                        90            147
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Note: All cases in this Preliminary Economic Assessment are preliminary in  
nature and include both Indicated and Inferred Mineral Resources. Inferred  
Mineral Resources are considered too speculative geologically to have the   
economic considerations applied to them that would enable them to be        
categorized as Mineral Reserves. There is no certainty that the Preliminary 
Economic Assessment will be realised.                                       

Ongoing Work and Next Steps

Based on the results of the updated PEA, IMX's board and management are committed to continuing with the evaluation and long lead development activities for the Project in order to reduce the project risk profile. The following work program is currently underway:

--  Continued investigation and discussion with the Tanzanian government
    departments and other groups to secure access to key project
    infrastructure such as power, roads and port facilities. 
--  Completion of the environmental and social impact assessment (ESIA) that
    is already well advanced with the aim of receiving environmental
    approval by the end of the first quarter of 2013. 
--  The definitive metallurgical test work program that is currently
    underway on approximately 12t of sample at G&T Metallurgical
    Laboratories in Kamloops, Canada is expected to be completed during
    early 2013. 
--  A Mineral Resource update based on the recent drilling program
    (20,940m), is expected in the first quarter of 2013. 
--  Optimisation of the mining options for the project will continue in
    order to identify a single development plan based on the updated
    resource, ready for consideration at the end of the first quarter of
    2013. 

Subject to the outcomes of the work programs and prevailing market conditions, a PFS/DFS(3) will be commenced in mid-2013. If the study is positive, a final investment decision is expected to be made in early 2014 with production commencing in late 2015 / early 2016.

NEIL MEADOWS, Managing Director

Competent Persons / Qualified Person / NI 43-101 Statement

The Company is not aware of any environmental, permitting, legal, title, taxation, socio-political, marketing or other issue that might materially affect this estimate of Mineral Resources. The projections, forecasts and estimates presented in the PEA constitute forward-looking statements, and readers are urged not to place undue reliance on such statements. Additional cautionary and forward-looking statement information is provided below.

The Qualified Persons for the purpose of National Instrument 43-101 "Standards of Disclosure for Mineral Projects" for the PEA are shown below.

----------------------------------------------------------------------------
Section                                 Company             Qualified Person
----------------------------------------------------------------------------
Mineral Resources                           RPA       Chester Moore, P. Eng.
Mining and Mine Capital and                                                 
 Operating Costs                    Mining Plus   Neil Schunke, MAusIMM (CP)
Metallurgy, flowsheet design,                                               
 performance predictions            Mineralurgy         Peter Munro, FAusIMM
Process plant and infrastructure                                            
 operating/capital costs             Lycopodium     Jacqueline McAra,P. Eng.
Concentrate marketing and freight   Mining Plus   Neil Schunke, MAusIMM (CP)
Financial modelling and general                                             
 aspects                            Mining Plus   Neil Schunke, MAusIMM (CP)
----------------------------------------------------------------------------

All Qualified Persons have reviewed this press release and consented to the inclusion of the data in the form and context in which it appears, and approves this disclosure. Each Qualified Person is independent of IMX within the meaning of NI 43-101.

About IMX Resources Limited

IMX Resources Limited is an Australian based mining and base & precious metal exploration company dual-listed on the Australian and Toronto stock exchanges (ASX:IXR)(TSX:IXR)(TSX:IXR.WT) with exploration projects located in Australia, Africa and North America.

In Africa, IMX owns and operates the highly prospective Nachingwea Exploration Project in southeast Tanzania, which includes the potentially word-class Ntaka Hill Nickel Sulphide project. Nachingwea is highly prospective for nickel and copper sulphide, gold and graphite mineralisation. The Ntaka Hill Nickel Sulphide Project is one of the world's best un-developed nickel sulphide projects and has the potential to produce a very clean, high quality premium nickel concentrate.

In Australia, IMX operates and owns 51% of the Cairn Hill Mining Operation, located 55 kilometres south-east of Coober Pedy in South Australia, where it produces a premium coarse-grained magnetite-copper-gold DSO product at a rate of 1.8Mtpa.

IMX is actively developing the Mt Woods Magnetite Project on the highly prospective Mt Woods Inlier in South Australia. IMX currently has a JORC Inferred Resource of 569Mt @ 27% Fe at the Snaefell Magnetite Deposit and a Global Exploration Target of between 200-380Mt @ 25-35% Fe elsewhere in the project. Studies indicate that coarse grained concentrates that could be produced at Snaefell have the potential to produce a direct sinter feed product which has the potential to attract a significant price premium.

IMX has also entered into a joint venture with OZ Minerals (the Mt Woods Copper-Gold JV Project) to explore the Mt Woods tenements for copper and gold. OZ Minerals is spending a minimum of $20M for a 51% interest in the non-iron rights, with IMX retaining a 49% interest in the non-iron rights and 100% of the iron ore rights.

IMX owns 25.65% of Uranex (ASX:UNX), which is a dedicated uranium exploration company, which is developing the Mkuju Uranium project in southern Tanzania.

Visit: www.imxresources.com.au

FORWARD-LOOKING STATEMENTS: This News Release includes certain "forward-looking statements". Forward-looking statements and forward-looking information are frequently characterized by words such as "plan," "expect," "project," "intend," "believe," "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may", "will" or "could" occur. All statements other than statements of historical fact included in this release are forward-looking statements or constitute forward-looking information. Such statements and information in this news release include statements regarding mining parameters (including processing rates and mill feed), concentrate production, estimates of capital costs, internal rates of return, net present values, completion of environmental and social impact assessments in Q1 2013, completion of definitive metallurgical test work in early 2013, completion of a mineral resource upgrade in Q1 2013, completion of a preliminary or definitive feasibility study in late 2013, life of mine estimate of 15 years, and annual production rates of 10,000 to 15,000 tpa. There can be no assurance that such information of statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such information. Important factors could cause actual results to differ materially from IMX's expectations. Exploration Target tonnage quantity and grades estimates are conceptual in nature only. These figures are not resource estimates as defined by the JORC (2004) or NI 43-101, as insufficient exploration has been conducted to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource.

These forward-looking statements are based on certain assumptions, the opinions and estimates of management and qualified persons at the date the statements are made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements or information. These factors include the inherent risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drilling results and other geological data, fluctuating metal prices, the possibility of project cost overruns or unanticipated costs and expenses, the ability of contracted parties (including laboratories and drill companies to provide services as contracted); uncertainties relating to the availability and costs of financing needed in the future and other factors. IMX undertakes no obligation to update forward-looking statements or information if circumstances should change. The reader is cautioned not to place undue reliance on forward-looking statements or information.

Readers are also cautioned to review the risk factors identified by IMX in its regulatory filings made from time to time with the ASX, TSX and applicable Canadian securities regulators.

To view the tables associated with this press release, please visit the following link: http://media3.marketwire.com/docs/834297_tables.pdf.

(1) C1 cash costs are the costs of mining, milling and concentrating, onsite administration and general expenses, property and production royalties not related to revenues or profits, metal concentrate treatment charges, and freight and marketing costs less the net value of the by-product credits.

(2) NPV - Net Present Value

(3) PFS - Pre-Feasibility Study, DFS - Definitive Feasibility Study

CAUTIONARY STATEMENT: The TSX does not accept responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

Contacts:
IMX Resources Limited
Neil Meadows
Managing Director
+61 8 9388 7877
[email protected]
www.imxresources.com.au

Professional Public Relations
Tony Dawe
Investor Relations
+61 8 9388 0944
[email protected]

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
"Storpool does only block-level storage so we do one thing extremely well. The growth in data is what drives the move to software-defined technologies in general and software-defined storage," explained Boyan Ivanov, CEO and co-founder at StorPool, in this SYS-CON.tv interview at 16th Cloud Expo, held June 9-11, 2015, at the Javits Center in New York City.
A strange thing is happening along the way to the Internet of Things, namely far too many devices to work with and manage. It has become clear that we'll need much higher efficiency user experiences that can allow us to more easily and scalably work with the thousands of devices that will soon be in each of our lives. Enter the conversational interface revolution, combining bots we can literally talk with, gesture to, and even direct with our thoughts, with embedded artificial intelligence, whic...
ChatOps is an emerging topic that has led to the wide availability of integrations between group chat and various other tools/platforms. Currently, HipChat is an extremely powerful collaboration platform due to the various ChatOps integrations that are available. However, DevOps automation can involve orchestration and complex workflows. In his session at @DevOpsSummit at 20th Cloud Expo, Himanshu Chhetri, CTO at Addteq, will cover practical examples and use cases such as self-provisioning infra...
As DevOps methodologies expand their reach across the enterprise, organizations face the daunting challenge of adapting related cloud strategies to ensure optimal alignment, from managing complexity to ensuring proper governance. How can culture, automation, legacy apps and even budget be reexamined to enable this ongoing shift within the modern software factory? In her Day 2 Keynote at @DevOpsSummit at 21st Cloud Expo, Aruna Ravichandran, VP, DevOps Solutions Marketing, CA Technologies, was jo...
As Marc Andreessen says software is eating the world. Everything is rapidly moving toward being software-defined – from our phones and cars through our washing machines to the datacenter. However, there are larger challenges when implementing software defined on a larger scale - when building software defined infrastructure. In his session at 16th Cloud Expo, Boyan Ivanov, CEO of StorPool, provided some practical insights on what, how and why when implementing "software-defined" in the datacent...
Blockchain. A day doesn’t seem to go by without seeing articles and discussions about the technology. According to PwC executive Seamus Cushley, approximately $1.4B has been invested in blockchain just last year. In Gartner’s recent hype cycle for emerging technologies, blockchain is approaching the peak. It is considered by Gartner as one of the ‘Key platform-enabling technologies to track.’ While there is a lot of ‘hype vs reality’ discussions going on, there is no arguing that blockchain is b...
Blockchain is a shared, secure record of exchange that establishes trust, accountability and transparency across business networks. Supported by the Linux Foundation's open source, open-standards based Hyperledger Project, Blockchain has the potential to improve regulatory compliance, reduce cost as well as advance trade. Are you curious about how Blockchain is built for business? In her session at 21st Cloud Expo, René Bostic, Technical VP of the IBM Cloud Unit in North America, discussed the b...
You know you need the cloud, but you’re hesitant to simply dump everything at Amazon since you know that not all workloads are suitable for cloud. You know that you want the kind of ease of use and scalability that you get with public cloud, but your applications are architected in a way that makes the public cloud a non-starter. You’re looking at private cloud solutions based on hyperconverged infrastructure, but you’re concerned with the limits inherent in those technologies.
Is advanced scheduling in Kubernetes achievable?Yes, however, how do you properly accommodate every real-life scenario that a Kubernetes user might encounter? How do you leverage advanced scheduling techniques to shape and describe each scenario in easy-to-use rules and configurations? In his session at @DevOpsSummit at 21st Cloud Expo, Oleg Chunikhin, CTO at Kublr, answered these questions and demonstrated techniques for implementing advanced scheduling. For example, using spot instances and co...
The use of containers by developers -- and now increasingly IT operators -- has grown from infatuation to deep and abiding love. But as with any long-term affair, the honeymoon soon leads to needing to live well together ... and maybe even getting some relationship help along the way. And so it goes with container orchestration and automation solutions, which are rapidly emerging as the means to maintain the bliss between rapid container adoption and broad container use among multiple cloud host...
The cloud era has reached the stage where it is no longer a question of whether a company should migrate, but when. Enterprises have embraced the outsourcing of where their various applications are stored and who manages them, saving significant investment along the way. Plus, the cloud has become a defining competitive edge. Companies that fail to successfully adapt risk failure. The media, of course, continues to extol the virtues of the cloud, including how easy it is to get there. Migrating...
Imagine if you will, a retail floor so densely packed with sensors that they can pick up the movements of insects scurrying across a store aisle. Or a component of a piece of factory equipment so well-instrumented that its digital twin provides resolution down to the micrometer.
The need for greater agility and scalability necessitated the digital transformation in the form of following equation: monolithic to microservices to serverless architecture (FaaS). To keep up with the cut-throat competition, the organisations need to update their technology stack to make software development their differentiating factor. Thus microservices architecture emerged as a potential method to provide development teams with greater flexibility and other advantages, such as the abili...
In his keynote at 18th Cloud Expo, Andrew Keys, Co-Founder of ConsenSys Enterprise, provided an overview of the evolution of the Internet and the Database and the future of their combination – the Blockchain. Andrew Keys is Co-Founder of ConsenSys Enterprise. He comes to ConsenSys Enterprise with capital markets, technology and entrepreneurial experience. Previously, he worked for UBS investment bank in equities analysis. Later, he was responsible for the creation and distribution of life settle...
Product connectivity goes hand and hand these days with increased use of personal data. New IoT devices are becoming more personalized than ever before. In his session at 22nd Cloud Expo | DXWorld Expo, Nicolas Fierro, CEO of MIMIR Blockchain Solutions, will discuss how in order to protect your data and privacy, IoT applications need to embrace Blockchain technology for a new level of product security never before seen - or needed.