VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 11/19/12 -- IMPACT Silver Corp. ("IMPACT") (TSX VENTURE:IPT) is pleased to announce first phase drill results from multiple veins at the La Condesa Prospect in the Royal Mines of Zacualpan District in Mexico. La Condesa area can be accessed from the underground workings of the historic Cuchara Mine, which are currently being refurbished to mine IMPACT's nearby high grade Oscar silver zone (see IMPACT news releases dated August 22, 2012 and April 23, 2012).

It was the intention of this La Condesa drill program to outline sufficient mineralization that would augment the planned production from the Oscar Veins. Access to La Condesa Veins would be through a different part of the historic Cuchara Mine underground workings than the access to Oscar, thereby creating separate mining areas and multiple mining faces. An exploration crosscut from the Cuchara underground workings dating from the 1980s, now provides initial underground access to La Condesa. Mine engineering studies are now required to confirm the resource.

Summarized below are the more significant intersections from La Condesa first phase drill program:


                   La Condesa - First Phase Drill Results                   
                                                                            
                                                True                       
                                       Inter- Thick-                       
Hole   Drill               From     To    val   ness  Silver  Gold Lead Zinc
Number Section Vein Name meters meters meters meters     g/t   g/t    %    %
----------------------------------------------------------------------------
Z12-28 21+50 N Resguardo  14.75  16.80   2.05   1.94   157.2 0.019 0.02 0.13
----------------------------------------------------------------------------
Z12-29 21+50 N Maria de   85.80  87.30   1.50   1.43    98.5 0.014 0.04 0.09
               Jesus                                                        
----------------------------------------------------------------------------
Z12-30 21+50 N Resguardo  53.50  56.00   2.50   2.37   201.6 0.026 0.07 0.80
----------------------------------------------------------------------------
Z12-32 23+50 N Maria de  124.83 126.88   2.05   1.52   204.0 0.108 0.33 2.32
               Jesus                                                       
and    23+00 N Trans-     61.85  63.30   1.45   0.89 1,773.1 0.068 0.20 1.48
               verse Vein                                                  
----------------------------------------------------------------------------
Z12-36 23+00 N Maria de  156.80 158.15   1.35   0.90   294.4 0.054 0.13 0.62
               Jesus                                                       
----------------------------------------------------------------------------
Z12-38 24+00 N Yerb-     106.60 109.35   2.75   1.94   152.0  0.38 2.90 0.09
               abuena                                                      
----------------------------------------------------------------------------
Z12-39 23+00 N Resguardo 167.30 171.00   3.70   2.87   312.0 0.029 0.27 0.90
and    23+00 N Trans-    180.00 181.00   1.00   0.80   100.0 0.010 0.16 0.11
               verse 1                                                     
and    23+00 N Maria de  185.00 187.00   2.00   1.78    94.2 0.010 0.13 0.11
               Jesus                                                       
----------------------------------------------------------------------------
Z12-40 22+00 N Maria de  164.00 168.00   4.00   3.96   127.0 0.005 0.05 0.16
               Jesus                                                       
----------------------------------------------------------------------------
Z12-42 21+50 N Maria de  136.00 139.78   3.78   3.59   214.0 0.269 0.15 0.37
               Jesus                                                       
----------------------------------------------------------------------------
Z12-43 21+00 N Maria de  123.85 129.50   5.65   5.64   129.8 0.021 0.09 0.08
               Jesus A                                                     
----------------------------------------------------------------------------
Z12-44 24+00 N Yerba-    136.43 140.40   3.97   3.47   116.0 0.001 0.10 0.29
               buena 3                                                     
----------------------------------------------------------------------------
Z12-45 24+00 N Yerba-    177.90 179.00   1.10   0.98 1,655.0 0.010 0.25 0.08
               buena 3                                                     
----------------------------------------------------------------------------
Z12-46 24+50 N Maria de  151.40 154.25   2.85   2.67   255.0 0.111 0.22 0.46
               Jesus                                                       
----------------------------------------------------------------------------
Z12-47 23+50 N Resguardo  22.10  23.00   0.90   0.88   141.0 0.010 0.02 0.06
and    23+50 N Trans-    109.00 110.50   1.05   0.90   720.0 0.030 0.25 0.52
               verse 1                                                     
----------------------------------------------------------------------------
Z12-49 24+50 N Maria de  185.00 186.45   1.45   1.36   200.2 0.038 0.19 0.79
               Jesus A                                                     
and    24+50 N Maria de  194.95 196.47   1.52   1.42   149.6 0.864 0.82 2.13
               Jesus B                                                     
----------------------------------------------------------------------------
Z12-54 24+50 N Maria de  242.70 243.30   0.60   0.56   320.0 0.260 0.18 0.95
               Jesus B                                                     
----------------------------------------------------------------------------
Z12-55 21+00 N Resguardo  57.80  59.60   1.80   1.76   245.3 0.030 0.12 0.36
----------------------------------------------------------------------------
Z12-58 25+00 N Maria de  199.10 201.00   1.90   1.78   186.4 0.108 0.41 1.15
               Jesus                                                       
----------------------------------------------------------------------------
Z12-61 20+50 N Maria de   50.00  51.20   1.20   1.12   137.8 0.051 0.08 0.17
               Jesus                                                       
----------------------------------------------------------------------------
Z12-62 20+50 N Resguardo  24.70  25.75   1.05   0.74   297.0 0.020 0.04 0.06
and    20+50 N Trans-     54.80  56.80   2.00   1.28    70.5 0.015 0.06 0.11
               verse 3                                                     
and    20+50 N Maria de   79.05  79.90   0.85   0.54   198.2 0.018 0.11 0.25
               Jesus                                                       
----------------------------------------------------------------------------
Z12-63 20+50 N Maria de  106.50 108.85   2.35   2.22   230.9 0.010 0.16 0.26
               Jesus                                                       
----------------------------------------------------------------------------
Z12-64 20+50 N Maria de  101.10 105.55   4.45   3.99   199.8 0.035 0.21 0.49
               Jesus                                                       
----------------------------------------------------------------------------
Z12-65 20+50 N Maria de  137.15 138.40   1.25   1.24   242.6 0.018 0.17 0.41
               Jesus                                                       
----------------------------------------------------------------------------
Z12-67 23+00N  Maria de   51.57  53.00   1.43   1.04   116.2 0.017 0.07 0.13
               Jesus                                                       
----------------------------------------------------------------------------
Z12-68 23+50N  Maria de   46.40  50.30   3.90   3.66   249.6 0.009 0.07 0.16
               Jesus                                                       
----------------------------------------------------------------------------

The mineralization at La Condesa consists of two main northeasterly dipping structures (Maria de Jesus and Resguardo), plus a number of smaller northwesterly dipping transverse veins all of which occur 200 meters southwest of the Cuchara Mine workings.

To date, the Resguardo and Maria de Jesus Veins have been mapped on surface and in underground workings for a strike length in excess of 750 meters. Both remain open for extension to the southeast and to depth. To the southeast, one of the last drill holes (Z12-64) of this first phase program intersected 199.8 g/t silver over 3.99 meters true width (TW). La Condesa remains open to expansion at depth, where one of the deepest drill holes (Z12-39) intersected 312.0 g/t silver over 2.87 meters (TW). The locally high grade nature of the La Condesa mineralization is demonstrated by two intersections within the central portion (Z12-32 and Z12-45) which produced grades exceeding one kilogram per tonne of silver (1,773 g/t over 0.89 meters TW and 1,655 g/t over 0.98 meters TW, respectively). Native silver was also observed in three drill holes at La Condesa, which to date are the only holes IMPACT has drilled in which this mineralogy is clearly visible. To the southeast, both structures pass into the Santa Efigenia area, which is known to contain some of the higher silver grades in Zacualpan District (up to 3,700 g/t silver in old mine workings). Geological mapping and sampling was recently completed in this area in preparation for future drilling.

Future drilling at La Condesa will emphasize expanding the mineralization to the southeast and to depth. It is also anticipated that detailed definition drilling using underground drills, currently onsite, will be used to better define the La Condesa mineralization.

Future Plans for the Cuchara Mine Development Area

A surface drill program is planned for the Cuchara North area that lays 200 meters to the northeast of the La Condesa Veins and represents the northwesterly extension to the Oscar Veins that are currently slated for production. A second drill program is planned for the southwest dipping El Copal Veins located 175 meters to the west of La Condesa. A third drill program is planned for the Santa Efigenia area, located immediately to the southeast of La Condesa on the extensions to the Maria de Jesus and Resguardo Veins, after results of geological mapping and sampling have been interpreted. If results of this drilling prove successful, it is anticipated that these areas (Oscar, La Condesa, Cuchara North, El Copal and Santa Efigenia) would be connected by a series of underground workings, which in turn would represent separate mining areas, all of which originate from the same Cuchara Mine portal.

Brian Hall, M.Sc., P. Geo., Nigel Hulme, P. Geo. and Wojtek Jakubowski, P. Geo., Qualified Persons under the meaning of Canadian National Instrument 43-101, are responsible for the technical content of this news release.

IMPACT Silver Corp. is a precious metal mining and exploration company operating in central Mexico, with a producing silver operation at the 423-square-kilometer Royal Mines of Zacualpan Silver District which includes the La Condesa area, the adjoining 200-square-kilometer Mamatla VMS District which includes the advanced Capire Mine Development Project, and a 16.5% shareholding in Defiance Silver Corp. who are advancing IMPACT's 200 tpd mill and mineral concessions in the Zacatecas Silver District. Additional information including a map of the Cuchara/La Condesa vein systems can be found on the Company website at www.IMPACTSilver.com under Projects - Zacualpan.

On behalf of the Directors of IMPACT Silver Corp.

Frederick W. Davidson, President & CEO

Forward-Looking Statements

This IMPACT News Release may contain certain "forward-looking" statements and information relating to IMPACT that is based on the beliefs of IMPACT management, as well as assumptions made by and information currently available to IMPACT management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including but not limited to, without limitations, exploration and development risks, expenditure and financing requirements, title matters, operating hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, and one-time events. Should any one or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein. IMPACT does not assume the obligation to update any forward-looking statement.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
The Software Defined Data Center (SDDC), which enables organizations to seamlessly run in a hybrid cloud model (public + private cloud), is here to stay. IDC estimates that the software-defined networking market will be valued at $3.7 billion by 2016. Security is a key component and benefit of the SDDC, and offers an opportunity to build security 'from the ground up' and weave it into the environment from day one. In his session at 16th Cloud Expo, Reuven Harrison, CTO and Co-Founder of Tufin,...
SYS-CON Events announced today that MobiDev, a software development company, will exhibit at the 17th International Cloud Expo®, which will take place November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. MobiDev is a software development company with representative offices in Atlanta (US), Sheffield (UK) and Würzburg (Germany); and development centers in Ukraine. Since 2009 it has grown from a small group of passionate engineers and business managers to a full-scale mobi...
There are many considerations when moving applications from on-premise to cloud. It is critical to understand the benefits and also challenges of this migration. A successful migration will result in lower Total Cost of Ownership, yet offer the same or higher level of robustness. In his session at 15th Cloud Expo, Michael Meiner, an Engineering Director at Oracle, Corporation, analyzed a range of cloud offerings (IaaS, PaaS, SaaS) and discussed the benefits/challenges of migrating to each offe...
Chuck Piluso presented a study of cloud adoption trends and the power and flexibility of IBM Power and Pureflex cloud solutions. Prior to Secure Infrastructure and Services, Mr. Piluso founded North American Telecommunication Corporation, a facilities-based Competitive Local Exchange Carrier licensed by the Public Service Commission in 10 states, serving as the company's chairman and president from 1997 to 2000. Between 1990 and 1997, Mr. Piluso served as chairman & founder of International Te...
Mobile, social, Big Data, and cloud have fundamentally changed the way we live. “Anytime, anywhere” access to data and information is no longer a luxury; it’s a requirement, in both our personal and professional lives. For IT organizations, this means pressure has never been greater to deliver meaningful services to the business and customers.
In their session at 17th Cloud Expo, Hal Schwartz, CEO of Secure Infrastructure & Services (SIAS), and Chuck Paolillo, CTO of Secure Infrastructure & Services (SIAS), provide a study of cloud adoption trends and the power and flexibility of IBM Power and Pureflex cloud solutions. In his role as CEO of Secure Infrastructure & Services (SIAS), Hal Schwartz provides leadership and direction for the company.
In a recent research, analyst firm IDC found that the average cost of a critical application failure is $500,000 to $1 million per hour and the average total cost of unplanned application downtime is $1.25 billion to $2.5 billion per year for Fortune 1000 companies. In addition to the findings on the cost of the downtime, the research also highlighted best practices for development, testing, application support, infrastructure, and operations teams.
Puppet Labs has announced the next major update to its flagship product: Puppet Enterprise 2015.2. This release includes new features providing DevOps teams with clarity, simplicity and additional management capabilities, including an all-new user interface, an interactive graph for visualizing infrastructure code, a new unified agent and broader infrastructure support.
For IoT to grow as quickly as analyst firms’ project, a lot is going to fall on developers to quickly bring applications to market. But the lack of a standard development platform threatens to slow growth and make application development more time consuming and costly, much like we’ve seen in the mobile space. In his session at @ThingsExpo, Mike Weiner, Product Manager of the Omega DevCloud with KORE Telematics Inc., discussed the evolving requirements for developers as IoT matures and conducte...
Container technology is sending shock waves through the world of cloud computing. Heralded as the 'next big thing,' containers provide software owners a consistent way to package their software and dependencies while infrastructure operators benefit from a standard way to deploy and run them. Containers present new challenges for tracking usage due to their dynamic nature. They can also be deployed to bare metal, virtual machines and various cloud platforms. How do software owners track the usag...
Explosive growth in connected devices. Enormous amounts of data for collection and analysis. Critical use of data for split-second decision making and actionable information. All three are factors in making the Internet of Things a reality. Yet, any one factor would have an IT organization pondering its infrastructure strategy. How should your organization enhance its IT framework to enable an Internet of Things implementation? In his session at @ThingsExpo, James Kirkland, Red Hat's Chief Arch...
Providing the needed data for application development and testing is a huge headache for most organizations. The problems are often the same across companies - speed, quality, cost, and control. Provisioning data can take days or weeks, every time a refresh is required. Using dummy data leads to quality problems. Creating physical copies of large data sets and sending them to distributed teams of developers eats up expensive storage and bandwidth resources. And, all of these copies proliferating...
Malicious agents are moving faster than the speed of business. Even more worrisome, most companies are relying on legacy approaches to security that are no longer capable of meeting current threats. In the modern cloud, threat diversity is rapidly expanding, necessitating more sophisticated security protocols than those used in the past or in desktop environments. Yet companies are falling for cloud security myths that were truths at one time but have evolved out of existence.
Digital Transformation is the ultimate goal of cloud computing and related initiatives. The phrase is certainly not a precise one, and as subject to hand-waving and distortion as any high-falutin' terminology in the world of information technology. Yet it is an excellent choice of words to describe what enterprise IT—and by extension, organizations in general—should be working to achieve. Digital Transformation means: handling all the data types being found and created in the organizat...
Public Cloud IaaS started its life in the developer and startup communities and has grown rapidly to a $20B+ industry, but it still pales in comparison to how much is spent worldwide on IT: $3.6 trillion. In fact, there are 8.6 million data centers worldwide, the reality is many small and medium sized business have server closets and colocation footprints filled with servers and storage gear. While on-premise environment virtualization may have peaked at 75%, the Public Cloud has lagged in adop...