Click here to close now.

Welcome!

News Feed Item

Canadian Zinc Reports Results of 2012 Exploration Program

- Richest silver intercept of 2,059 g/t Ag over 1.3 metres

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 11/22/12 -- Canadian Zinc Corporation (TSX:CZN)(OTCQB:CZICF) ("the Company" or "Canadian Zinc") is pleased to report results from the 2012 Exploration Program at the Company's 100% owned Prairie Creek Minesite property in the Northwest Territories.

The results include assays from drillhole PC-12-216 which returned a grade of 2,059 g/t silver (or 60 oz./ton silver) over 1.3 metres and is the highest grade silver intercept ever reported from the property. In addition, a significant coincident electromagnetic ("EM") and gravity geophysical anomaly was delineated proximal to the Prairie Creek Minesite property.

Diamond Drill Exploration Program

The 2012 diamond drilling program at Prairie Creek completed 5,629 m of coring in 12 holes. Exploration focused on two areas: at the Minesite area, where further shallow testing and extension of the current resources was completed, and at.Casket Creek where the deep-hole program continued from the previous year.

Alan Taylor, Vice President Exploration and Chief Operating Officer commented that "The 2012 drill program close to the Prairie Creek Minesite was designed to fill in a number of open areas and also to test for extensions of the known resource and the drill results continued to confirm the grade and extent of the deposit. Drillhole PC-12-216, with an intercept of 1.3 metres grading 2059 g/t or 60 oz./ton Ag, returned the highest grades of silver ever reported from a drillhole on the Prairie Creek property",

"The delineation of a new strong coincident EM and gravity geophysical anomaly approximately one kilometre from the Minesite is particularly encouraging and testing this anomaly will be a high priority of the 2013 exploration program" added Mr. Taylor.

Minesite Area Drill Program

Infill drilling focused close to the Minesite and within the defined resource was carried out with the Company's Longyear #1 drill rig. Drilling commenced in June 2012 and was completed in September. Most of these holes were drilled at depth and along strike in the proximity of the known underground workings. Targeted areas included locations that have the potential to be upgraded from the inferred category to the indicated resource category. A total of 3,366 metres over nine holes were drilled, with seven holes completed to target in 2012, six of which intersected significant mineralization and many with multiple intercepts.

Drillhole PC-12-216 returned the highest grades of silver ever reported from a drillhole on the Prairie Creek property with an intercept of 1.3 metres grading 2059 g/t or 60 oz./ton Ag. The same hole also returned a combined grade of 51.3% lead+ zinc over a different intercept of 1.0 metres. Many other intercepts returned multi-ounce silver assays with high lead and zinc values, with Hole PC-12-214 reporting double intercepts of 44% and 23% combined lead+zinc, and Hole PC-12-215 also reporting double intercepts of 43% and 16.2% combined lead+zinc Results are now being incorporated into the mine model and assessed for future exploration planning. Significant results are as follows:


----------------------------------------------------------------------------
                                   Minerali                                 
                                     zation                                 
                             Length   style                                 
Hole ID    From (m)  To (m)  (m)(i)     (i)  Pb (%)  Zn (%) Ag (g/t)  Cu (%)
----------------------------------------------------------------------------
PC-12-217    459.50  460.50    1.00     STK    4.43   15.60       60    0.08
----------------------------------------------------------------------------
             463.60  465.60    2.00     STK    9.09   10.68      141    0.31
----------------------------------------------------------------------------
             469.90  470.90    1.00     STK    0.03    6.42        2    0.01
----------------------------------------------------------------------------
             473.10  474.10    1.00     STK    0.00   12.00        4    0.02
----------------------------------------------------------------------------
             475.95  476.95    1.00     STK    1.69    5.22       33    0.07
----------------------------------------------------------------------------
PC-12-216    418.28  419.59    1.31     STK    4.02   10.30     2059    9.37
----------------------------------------------------------------------------
             431.90  438.00    6.10     STK    2.04    6.12       19    0.03
----------------------------------------------------------------------------
             447.14  448.14    1.00     STK   31.10   20.20      184    0.56
----------------------------------------------------------------------------
PC-12-215    507.34  508.34    1.00     STK    1.35    2.88      126    0.27
----------------------------------------------------------------------------
             517.20  518.46    1.26     STK    0.86   18.48       16    0.04
----------------------------------------------------------------------------
             527.55  528.05    0.50     STK    3.83    2.08       82    0.20
----------------------------------------------------------------------------
             575.59  576.34    0.75     STK   14.02    1.40      103    0.03
----------------------------------------------------------------------------
             578.51  579.35    0.84     STK   36.90    6.30      268    0.04
----------------------------------------------------------------------------
PC-12-214    129.06  130.45    1.39       S    0.13   10.70        2    0.00
----------------------------------------------------------------------------
             152.84  153.74    0.90       S    9.07   19.50      TBD    0.45
----------------------------------------------------------------------------
             191.00  191.60    0.60       S   13.88   30.17        4    0.69
----------------------------------------------------------------------------
             305.00  306.80    1.80     MQV   18.67    4.61      TBD    0.22
----------------------------------------------------------------------------
PC-12-212    210.43  214.26    3.83     SMS    4.20   10.65       28    0.02
----------------------------------------------------------------------------
             217.77  219.94    2.17     SMS    3.10    1.43       20    0.00
----------------------------------------------------------------------------
PC-12-211    215.62  216.39    0.77     MQV    3.87    4.66       47    0.13
----------------------------------------------------------------------------
                                                                            

--  Mineralization styles are defined as mineralized quartz vein (MQV),
    stratabound massive sulphides (SMS), stockwork (STK), or sulphides (S). 

--  Drill intercepts are not true widths 

The Company's Longyear #2 drill rig was rehabilitated during 2012 and used as a training drill on one short hole.

Casket Creek Deep-Hole Program

The deep-hole diamond drill exploration program at Casket Creek, 1.6 kilometres north of the current mineral resource, utilized the Company's TM-2500 coring rig. Following encouraging results from this area in 2011, drilling at Casket Creek commenced in May 2012 to search below PC-11-187W2, which intersected 5% Pb and 11% Zn over 3.5 metres. A total of 2,182 metres over two drillholes (with wedging) was completed. Assay results for the 2012 deep drill program are as follows:


----------------------------------------------------------------------------
                                  Length                                    
Hole          From (m)   To (m)   (m)(i)   Pb (%)   Zn (%) Ag (g/t)   Cu (%)
----------------------------------------------------------------------------
PC-12-206      1763.14  1764.04     0.90     4.23     2.97     31.4    0.001
----------------------------------------------------------------------------
PC-12-206      1831.90  1832.74     0.84     0.26     0.11     31.9    0.148
----------------------------------------------------------------------------
                                                                            

--  Drill intercepts are not true widths 

The drill core confirmed stratigraphy and contained a number of significant structural zones that are weakly mineralized and likely correlate with the previous years' intercept. A third hole, PC-12-213 was halted due to drilling difficulties within a significant fault structure, believed to be the main structural target. After completing this phase of drilling at Casket Creek the drill rig was moved back to the Prairie Creek Minesite for maintenance and winter storage. Further exploration work in this area is being planned for 2013.

Geophysical Program

A geophysical program involving surface and downhole EM and surface gravity surveys was completed in the proximity of the Mine in August 2012. Geophysical surveys at Prairie Creek are somewhat impeded by mountainous terrain, variable amounts of conductive background minerals, and unknown electrical conductivity properties. The last previous geophysical survey was conducted at Prairie Creek in 1995. A short geophysical exploration program was designed in 2012 to test the applicability of modern geophysical survey techniques on the property. A ground-based approach was selected in order to maximize survey sensitivity.

The results define a strong multi-channel EM anomaly located approximately one kilometre from the Minesite, located outside but adjacent to the defined mineral resource. A coincident gravity anomaly was also identified over the same area by a loose-grid gravity survey. This multi-stacked geophysical anomaly has an estimated depth to the source between 200 and 450 metres below surface and remains untested by drilling. Further interpretation and analysis is underway to test this anomaly in 2013.

Mapping Program

The Prairie Creek property contains numerous metal showings throughout its 16 kilometre strike length, some of which have been sampled and drilled in previous years. Showings are referred to as Zones and are generally separated by approximately one kilometre spacings, including Zones 1-3 which contain the current defined resource at the Minesite, then extending 10 kilometres to the south to Zone 12. Mostly, only historical analyses are available in this area and so a new property-wide comprehensive 1:2,000 scale geological map was compiled in September 2012 along with an up-to-date trench sampling program.

The existing Prairie Creek Mining Leases were the focus of the program and were accessed by the network of existing roads in the area with additional traversing as needed. LIDAR and orthophoto surveys were flown earlier in 2012, and provided an accurate base to plot observations from a total of 225 kilometres of traverses. Previously mapped areas were incorporated and infill mapping and resampling of trenches was completed. A georeferenced photographic dataset was also acquired throughout the property.

Select results from trench sampling in some of the southern Zones are as follows:


----------------------------------------------------------------------------
Zone      Sample Type Length (m)     Pb (%)     Zn (%)   Ag (g/t)     Cu (%)
----------------------------------------------------------------------------
Zone 5           Chip       0.40       16.7       11.7        279       0.86
----------------------------------------------------------------------------
Zone 5           Grab        N/A       74.1        1.6        697       0.60
----------------------------------------------------------------------------
Zone 5           Grab        N/A       66.3        0.7       1038       1.80
----------------------------------------------------------------------------
Zone 5           Grab        N/A       42.2        8.1        489       0.63
----------------------------------------------------------------------------
Zone 5           Grab        N/A       45.5        2.6        633       0.77
----------------------------------------------------------------------------
Zone 5           Grab        N/A       41.4        0.2        440       0.08
----------------------------------------------------------------------------
Zone 5           Grab        N/A         34        1.2        491       0.68
----------------------------------------------------------------------------
Zone 6        Channel       0.69        8.6        9.4        145       0.23
----------------------------------------------------------------------------
Zone 6           Chip       2.00       20.5       11.3        274       0.35
----------------------------------------------------------------------------
Zone 6           Grab        N/A       12.2       12.9        194       0.40
----------------------------------------------------------------------------
Zone 6           Grab        N/A       12.8        4.7        188       0.24
----------------------------------------------------------------------------
Zone 7        Channel       1.10       15.5       26.5        233       0.85
----------------------------------------------------------------------------
Zone 7        Channel       1.70       15.3        7.2        223       0.19
----------------------------------------------------------------------------
Zone 7           Chip       1.90        6.9       17.7        102       0.38
----------------------------------------------------------------------------
Zone 7           Chip       2.00        7.3       13.8        208       0.54
----------------------------------------------------------------------------
Zone 7           Grab        N/A       50.4        0.4        965       0.92
----------------------------------------------------------------------------
Zone 8        Channel       1.40       10.7       17.2        214       0.19
----------------------------------------------------------------------------
Zone 8        Channel       0.88        7.8       10.7        395       0.60
----------------------------------------------------------------------------
Zone 8           Chip       2.00       20.6       29.6        321       0.45
----------------------------------------------------------------------------
Zone 8           Chip       2.85       17.1       17.4        250       0.25
----------------------------------------------------------------------------
Zone 8           Chip       1.90       16.8       11.8        342       0.39
----------------------------------------------------------------------------
Zone 10       Channel       0.66       10.5        9.1        266       0.60
----------------------------------------------------------------------------
Zone 10          Chip       4.00       21.2       14.3        279       0.40
----------------------------------------------------------------------------
Zone 10          Chip       4.00        5.5        8.4        118       0.31
----------------------------------------------------------------------------
Zone 10          Grab        N/A         21        6.6        176       0.13
----------------------------------------------------------------------------
Zone 11          Chip       0.42        7.3       23.2         80       0.26
----------------------------------------------------------------------------

The mapping database is presently being compiled from more than 1,300 field observations in a Geographic Information System and will provide a solid basis for planning future exploration of the extensive length of the Prairie Creek property.

Quality Assurance and Quality Control

The drill core samples were cut by diamond saw and securely, through chain of custody, shipped to AGAT Laboratories for initial multi-element assay by ICP-OES analysis. Further assays and analysis was completed where appropriate and standards, duplicates and blanks were inserted and included within the analysis. Alan Taylor, P. Geo., Chief Operating Officer & Vice President Exploration and a Director of Canadian Zinc Corporation, is responsible for the exploration program, and is a Qualified Person for the purposes of NI 43-101 and has approved this press release.

About Canadian Zinc

Canadian Zinc is a Toronto-listed exploration and development company. The company's main project is the 100%-owned Prairie Creek zinc, silver and lead project located in the Northwest Territories, Canada. The Prairie Creek Project contains a Mineral Reserve of 5.2 million tonnes averaging 9.4% zinc, 9.5% lead and 151 g/t silver. In addition, Prairie Creek hosts an Inferred Resource averaging 14.5% zinc, 11.5% lead, 0.57% copper and 229 g/t silver. (AMC Mining Consultants (Canada) Ltd. J M Shannon and D Nussipakynova, Qualified Persons, June 2012).

A Pre-Feasibility study completed by SNC Lavalin in June 2012 indicates a pre-tax net present value ("NPV") of $253 million using an 8% discount, with an internal rate of return ("IRR") of 40.4% and payback period of 3 years using long-term metal price projections of $1.00/lb zinc, $1.00/lb lead and $26.00/oz. silver, based on the Mineral Reserve alone.

Canadian Zinc also holds the South Tally Pond VMS exploration project in Newfoundland, where a winter drilling program is planned.

Cautionary Statement - Forward-Looking Information

This press release contains certain forward-looking information, including, among other things, the expected completion of acquisitions and the advancement of mineral properties. This forward looking information includes, or may be based upon, estimates, forecasts, and statements as to management's expectations with respect to, among other things, the completion of transactions, the issue of permits, the size and quality of mineral resources, future trends for the company, progress in development of mineral properties, future production and sales volumes, capital costs, mine production costs, demand and market outlook for metals, future metal prices and treatment and refining charges, the outcome of legal proceedings, the timing of exploration, development and mining activities, acquisition of shares in other companies and the financial results of the company. There can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. The Company does not currently hold a permit for the operation of the Prairie Creek Mine. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Inferred mineral resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that mineral resources will be converted into mineral reserves.

Cautionary Note to United States Investors

The United States Securities and Exchange Commission ("SEC") permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We use certain terms in this press release, such as "measured," "indicated," and "inferred" "resources," which the SEC guidelines prohibit U.S. registered companies from including in their filings with the SEC.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
The 17th International Cloud Expo has announced that its Call for Papers is open. 17th International Cloud Expo, to be held November 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA, brings together Cloud Computing, APM, APIs, Microservices, Security, Big Data, Internet of Things, DevOps and WebRTC to one location. With cloud computing driving a higher percentage of enterprise IT budgets every year, it becomes increasingly important to plant your flag in this fast-expanding bu...
The 5th International DevOps Summit, co-located with 17th International Cloud Expo – being held November 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA – announces that its Call for Papers is open. Born out of proven success in agile development, cloud computing, and process automation, DevOps is a macro trend you cannot afford to miss. From showcase success stories from early adopters and web-scale businesses, DevOps is expanding to organizations of all sizes, including the ...
SYS-CON Events announced today that Alert Logic, the leading provider of Security-as-a-Service solutions for the cloud, has been named “Bronze Sponsor” of SYS-CON's 17th International Cloud Expo® and DevOps Summit 2015 Silicon Valley, which will take place November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. Alert Logic provides Security-as-a-Service for on-premises, cloud, and hybrid IT infrastructures, delivering deep security insight and continuous protection for cust...
17th Cloud Expo, taking place Nov 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA, will feature technical sessions from a rock star conference faculty and the leading industry players in the world. Cloud computing is now being embraced by a majority of enterprises of all sizes. Yesterday's debate about public vs. private has transformed into the reality of hybrid cloud: a recent survey shows that 74% of enterprises have a hybrid cloud strategy. Meanwhile, 94% of enterprises ar...
While DevOps most critically and famously fosters collaboration, communication, and integration through cultural change, culture is more of an output than an input. In order to actively drive cultural evolution, organizations must make substantial organizational and process changes, and adopt new technologies, to encourage a DevOps culture. Moderated by Andi Mann, panelists discussed how to balance these three pillars of DevOps, where to focus attention (and resources), where organizations migh...
Containers have changed the mind of IT in DevOps. They enable developers to work with dev, test, stage and production environments identically. Containers provide the right abstraction for microservices and many cloud platforms have integrated them into deployment pipelines. DevOps and Containers together help companies to achieve their business goals faster and more effectively. In his session at DevOps Summit, Ruslan Synytsky, CEO and Co-founder of Jelastic, reviewed the current landscape of...
The 4th International Internet of @ThingsExpo, co-located with the 17th International Cloud Expo - to be held November 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA - announces that its Call for Papers is open. The Internet of Things (IoT) is the biggest idea since the creation of the Worldwide Web more than
Agile, which started in the development organization, has gradually expanded into other areas downstream - namely IT and Operations. Teams – then teams of teams – have streamlined processes, improved feedback loops and driven a much faster pace into IT departments which have had profound effects on the entire organization. In his session at DevOps Summit, Anders Wallgren, Chief Technology Officer of Electric Cloud, will discuss how DevOps and Continuous Delivery have emerged to help connect dev...
SYS-CON Events announced today that Harbinger Systems will exhibit at SYS-CON's 17th International Cloud Expo®, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. Harbinger Systems is a global company providing software technology services. Since 1990, Harbinger has developed a strong customer base worldwide. Its customers include software product companies ranging from hi-tech start-ups in Silicon Valley to leading product companies in the US a...
Explosive growth in connected devices. Enormous amounts of data for collection and analysis. Critical use of data for split-second decision making and actionable information. All three are factors in making the Internet of Things a reality. Yet, any one factor would have an IT organization pondering its infrastructure strategy. How should your organization enhance its IT framework to enable an Internet of Things implementation? In his session at @ThingsExpo, James Kirkland, Red Hat's Chief Arch...
SYS-CON Events announced today that Secure Infrastructure & Services will exhibit at SYS-CON's 17th International Cloud Expo®, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. Secure Infrastructure & Services (SIAS) is a managed services provider of cloud computing solutions for the IBM Power Systems market. The company helps mid-market firms built on IBM hardware platforms to deploy new levels of reliable and cost-effective computing and hig...
DevOps Summit, taking place Nov 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with 17th Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to wait for long development...
To many people, IoT is a buzzword whose value is not understood. Many people think IoT is all about wearables and home automation. In his session at @ThingsExpo, Mike Kavis, Vice President & Principal Cloud Architect at Cloud Technology Partners, discussed some incredible game-changing use cases and how they are transforming industries like agriculture, manufacturing, health care, and smart cities. He will discuss cool technologies like smart dust, robotics, smart labels, and much more. Prepare...
SYS-CON Events announced today that ProfitBricks, the provider of painless cloud infrastructure, will exhibit at SYS-CON's 17th International Cloud Expo®, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. ProfitBricks is the IaaS provider that offers a painless cloud experience for all IT users, with no learning curve. ProfitBricks boasts flexible cloud servers and networking, an integrated Data Center Designer tool for visual control over the...
The cloud has transformed how we think about software quality. Instead of preventing failures, we must focus on automatic recovery from failure. In other words, resilience trumps traditional quality measures. Continuous delivery models further squeeze traditional notions of quality. Remember the venerable project management Iron Triangle? Among time, scope, and cost, you can only fix two or quality will suffer. Only in today's DevOps world, continuous testing, integration, and deployment upend...