Welcome!

News Feed Item

Mega Uranium Ltd.: High Grade Assay Results and Continuing Success on the Northwest Athabasca Property, Saskatchewan

TORONTO, ONTARIO -- (Marketwire) -- 11/26/12 -- Mega Uranium Ltd. (TSX:MGA) ("Mega") and Forum Uranium Corp. (TSX VENTURE:FDC) ("Forum") are pleased to announce assay results from the first drill target at the Northwest Athabasca property under option from Cameco Corporation. Uranium mineralization was encountered at shallow depths in two holes drilled on Zone 2A (see news release dated November 8, 2012).

Drillhole NWA-35 - 2.48% U3O8 over 1.5 metres at a vertical depth of 26 metres with a 0.5 metre interval grading 5.77% U3O8.

Drillhole NWA-34 - 20 centimetres grading 0.27% U3O8 at a vertical depth of 50 metres, located only 20 metres west of the historic Zone 2A mineralization.

Further drilling is recommended in the Zone 2A area where additional targets have been delineated including an EM conductor 40 metres to the west, along strike from the known mineralization at Zone 2A.

The drill rig is currently investigating the Barney target, a gravity low west, and on strike from, the Maurice Bay deposit. Uranium mineralization within zones of strong basement alteration has been intercepted in several holes. This is the third target that has encountered uranium mineralization on the property. A full description of the results will be released upon completion of drilling at the Barney zone.

The Northwest Athabasca property hosts the Maurice Bay deposit (historical resource(i) of 1.5 million pounds uranium at a grade of 0.6% U3O8). A winter drill program is planned for the first quarter 2013. All targets are similar to Cameco's Millennium deposit and Rio Tinto's Roughrider deposit at much shallower depths (less than 100 metres).

Quality Assurance and Quality Control

Core samples are collected and shipped in sealed containers to the Saskatchewan Research Council, an ISO/IEC 17025:2005 (CAN-P-4E) certified laboratory for geochemical analysis using the Uranium ICP Package. This package is the preferred analytical technique for detecting uranium and pathfinder elements in the alteration halos of unconformity-type uranium deposits in the Athabasca Basin.

Michael Downes Ph.D., P.Geo., Vice President North America and Qualified Person for Mega, has reviewed the technical content of this news release.

Forum and Mega Option with Cameco

Forum and Mega Uranium have entered into a 50/50 Joint Venture Agreement to manage the exploration program during the earn-in period with Forum as initial Operator. Forum and Mega can earn a 60% interest in the Northwest Athabasca project, a joint venture between Cameco Corporation and Areva Resources Canada, by completing $4 million in exploration over four years and making cash payments totaling $400,000 over three years, of which $140,000 has been paid. It is anticipated that Forum and Mega will vest their joint 60% interest in the property upon completion of the current program.

The Northwest Athabasca project will form part of the Mega projects being sold to NexGen Energy Ltd., as announced August 9, 2012 and November 15, 2012. That transaction is expected to close in the fourth quarter of 2012.

To view "Figure 1: Northwest Athabasca Project Gravity Survey", please visit the following link: http://media3.marketwire.com/docs/mega1126.pdf

(i)Historical resource for the Maurice Bay deposit, as reported by Saskatchewan Industry and Resources, Miscellaneous Report 2003-7, has not been calculated or classified under the specifications of National Instrument 43-101 and should not be relied upon.

ABOUT MEGA URANIUM

Mega Uranium Ltd. is a Toronto-based mineral resources company with a focus on uranium properties in Australia, Canada and Cameroon. Further information on Mega can be found on the company's website at www.megauranium.com.

NOTE REGARDING FORWARD-LOOKING INFORMATION

Certain information contained in this press release may constitute "forward-looking information", which is information regarding possible events, conditions or results of operations that is based upon assumptions about future economic conditions and courses of action. All information other than matters of historical fact may be forward-looking information. In some cases, forward-looking information can be identified by the use of words such as "seek", "expect", "anticipate", "budget", "plan", "estimate", "continue", "forecast", "intend", "believe", "predict", "potential", "target", "may", "could", "would", "might", "will" and similar words or phrases (including negative variations) suggesting future outcomes or statements regarding an outlook. Forward-looking information in this press release includes, but is not limited to, statements about our plans regarding future acquisitions and property development, our expectations regarding the uranium market, global growth and the use of nuclear power, our drill results, commodity prices and core intersection lengths, in that they constitute estimates, based on certain assumptions of mineralization that may be encountered if a deposit were to be mined.

By its nature, forward-looking information involves known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or industry results, to differ materially from those expressed or implied by such forward-looking information. Some of the risks and other factors that could cause actual results to differ materially from those expressed in the forward-looking information contained in this release include, but are not limited to: risks and uncertainties relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits and conclusions of economic evaluations; results of initial feasibility, pre-feasibility and feasibility studies, and the possibility that future exploration, development or mining results will not be consistent with the Company's expectations; risks relating to possible variations in reserves, grade, planned mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined; mining and development risks, including risks related to accidents, equipment breakdowns, labour disputes (including work stoppages and strikes) or other unanticipated difficulties with or interruptions in exploration and development; the potential for delays in exploration or development activities or the completion of feasibility studies; risks related to the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses; risks related to commodity price and foreign exchange rate fluctuations; the uncertainty of profitability based upon the cyclical nature of the industry in which the Company operates; risks related to failure to obtain adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental approvals or in the completion of development or construction activities; risks related to environmental regulation and liability; political and regulatory risks associated with mining and exploration; and other risks and uncertainties related to the Company's prospects, properties and business strategy.

Although we have attempted to identify important factors that could cause actual results or events to differ materially from those described in the forward-looking information, readers are cautioned that this list is not exhaustive and there may be other factors that we have not identified. Readers are cautioned not to place undue reliance on forward-looking information contained in this release. Forward-looking information is based upon our beliefs, estimates and opinions as at the date of this release, which we believe are reasonable, but no assurance can be given that these will prove to be correct. Furthermore, we undertake no obligation to update or revise forward-looking information if these beliefs, estimates and opinions or other circumstances should change, except as otherwise required by applicable law.

All forward-looking information contained in this release is expressly qualified by this cautionary note.

Contacts:
Investor Relations
Mega Uranium Ltd.
Richard Patricio, EVP Corporate Affairs
(416) 643-7630
[email protected]
www.megauranium.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Events announced today that SourceForge has been named “Media Sponsor” of SYS-CON's 21st International Cloud Expo, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. SourceForge is the largest, most trusted destination for Open Source Software development, collaboration, discovery and download on the web serving over 32 million viewers, 150 million downloads and over 460,000 active development projects each and every month.
Today most companies are adopting or evaluating container technology - Docker in particular - to speed up application deployment, drive down cost, ease management and make application delivery more flexible overall. As with most new architectures, this dream takes significant work to become a reality. Even when you do get your application componentized enough and packaged properly, there are still challenges for DevOps teams to making the shift to continuous delivery and achieving that reducti...
Today traditional IT approaches leverage well-architected compute/networking domains to control what applications can access what data, and how. DevOps includes rapid application development/deployment leveraging concepts like containerization, third-party sourced applications and databases. Such applications need access to production data for its test and iteration cycles. Data Security? That sounds like a roadblock to DevOps vs. protecting the crown jewels to those in IT.
SYS-CON Events announced today that Interface Corporation will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Interface Corporation is a company developing, manufacturing and marketing high quality and wide variety of industrial computers and interface modules such as PCIs and PCI express. For more information, visit http://www.i...
SYS-CON Events announced today that mruby Forum will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. mruby is the lightweight implementation of the Ruby language. We introduce mruby and the mruby IoT framework that enhances development productivity. For more information, visit http://forum.mruby.org/.
DevOps at Cloud Expo, taking place October 31 - November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with 21st Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to w...
In his session at @ThingsExpo, Greg Gorman is the Director, IoT Developer Ecosystem, Watson IoT, will provide a short tutorial on Node-RED, a Node.js-based programming tool for wiring together hardware devices, APIs and online services in new and interesting ways. It provides a browser-based editor that makes it easy to wire together flows using a wide range of nodes in the palette that can be deployed to its runtime in a single-click. There is a large library of contributed nodes that help so...
What is the best strategy for selecting the right offshore company for your business? In his session at 21st Cloud Expo, Alan Winters, U.S. Head of Business Development at MobiDev, will discuss the things to look for - positive and negative - in evaluating your options. He will also discuss how to maximize productivity with your offshore developers. Before you start your search, clearly understand your business needs and how that impacts software choices.
IBM helps FinTechs and financial services companies build and monetize cognitive-enabled financial services apps quickly and at scale. Hosted on IBM Bluemix, IBM’s platform builds in customer insights, regulatory compliance analytics and security to help reduce development time and testing. In his session at 21st Cloud Expo, Lennart Frantzell, a Developer Advocate with IBM, will discuss how these tools simplify the time-consuming tasks of selection, mapping and data integration, allowing devel...
SYS-CON Events announced today that Cedexis will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Cedexis is the leader in data-driven enterprise global traffic management. Whether optimizing traffic through datacenters, clouds, CDNs, or any combination, Cedexis solutions drive quality and cost-effectiveness.
SYS-CON Events announced today that Mobile Create USA will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Mobile Create USA Inc. is an MVNO-based business model that uses portable communication devices and cellular-based infrastructure in the development, sales, operation and mobile communications systems incorporating GPS capabi...
While some developers care passionately about how data centers and clouds are architected, for most, it is only the end result that matters. To the majority of companies, technology exists to solve a business problem, and only delivers value when it is solving that problem. 2017 brings the mainstream adoption of containers for production workloads. In his session at 21st Cloud Expo, Ben McCormack, VP of Operations at Evernote, will discuss how data centers of the future will be managed, how th...
There is huge complexity in implementing a successful digital business that requires efficient on-premise and cloud back-end infrastructure, IT and Internet of Things (IoT) data, analytics, Machine Learning, Artificial Intelligence (AI) and Digital Applications. In the data center alone, there are physical and virtual infrastructures, multiple operating systems, multiple applications and new and emerging business and technological paradigms such as cloud computing and XaaS. And then there are pe...
Why Federal cloud? What is in Federal Clouds and integrations? This session will identify the process and the FedRAMP initiative. But is it sufficient? What is the remedy for keeping abreast of cutting-edge technology? In his session at 21st Cloud Expo, Rasananda Behera will examine the proposed solutions: Private or public or hybrid cloud Responsible governing bodies How can we accomplish?
SYS-CON Events announced today that MIRAI Inc. will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. MIRAI Inc. are IT consultants from the public sector whose mission is to solve social issues by technology and innovation and to create a meaningful future for people.