Welcome!

News Feed Item

Antioquia Gold Completes 2012 Drilling Program at Cisneros

Final Results include 27.0 g/t Au / 2.6 m at Guaico and 8.9 g/t Au / 3.3 m at Guayabito

CALGARY, ALBERTA -- (Marketwire) -- 11/29/12 -- Antioquia Gold Inc. ("Antioquia Gold" or the "Company") (TSX VENTURE:AGD)(OTCQX:AGDXF) is pleased to announce all final drill hole results have been received thus completing the 2012 Drilling Program at its flagship Cisneros Project in Colombia. The Company is currently compiling, interpreting and modeling the results of the program to be used in the preparation of an NI 43-101 compliant resource report and an accompanying Preliminary Economic Assessment ("PEA"). It is anticipated that both reports will be released in the first part of 2013.

2012 Drilling Highlights:


--  Drilling at the Guaico deposit extended high grade mineralization to a
    vertical depth of 400 metres. 
--  Drilling at the Guayabito deposit successfully extended the strike
    length an additional 150 metres to the north and to a vertical depth of
    500 metres. 
--  Both deposits consist of multiple en-echelon vein systems and both
    deposits remain open along strike and to depth. 
--  In all, forty-six (46) holes were completed amounting to 13,111 metres
    of drilling, including ten (10) drill holes (2.434 m) at the Papi /
    Ivana prospect. 

Guaico Deposit Final Results:

Drill hole GCO12-036 intersected 8.7 metres of 8.2 g/t Au including 2.6 metres of 26.9 g/t Au and has confirmed high-grade gold mineralization at Guaico to a vertical depth of 400 metres. This mineralization is seventy (70) metres vertically below previously announced drill result from drill hole GCO12-029 which included 6.6 metres of 10.2 g/t Au including 1.8 metres of 33.2 g/t Au (See Press Release dated September 27, 2012). The mineralization defined above is a new discovery made in 2012 and confirms additional mineralized en-echelon vein systems occurring in the footwall and at depth relative to the original Guaico discovery. Highlights of drill results for the final five (5) drill holes drilled at Guaico in 2012 can be found in Table 1 below. The 2012 drill hole locations are illustrated in Figure 1 and a Section view illustrating results of drill hole GCO12-036 and previously released GCO12-029 (Figure 2) are attached and can be found on the company's website; link to www.antioquiagoldinc.com.

Table-1 Highlights of Final Drill Hole Results; Guaico Deposit


Drill Hole                 From             To  Length (m)(i)       Au (g/t)
GCO12-033                  69.5           70.8            1.3            2.5
GCO12-033                 164.5          166.0            1.5            5.8
GCO12-035                  85.5           86.8            1.3            2.6
GCO12-035                 121.9          126.5            4.6            1.1
  including               125.5          126.5            1.0            3.4
GCO12-036                 259.2          260.7            1.5            2.9
GCO12-036                 390.2          398.9            8.7            8.2
  including               395.5          398.1            2.6           27.0
GCO12-036                 525.5          527.0            1.5            1.7
Note: (i) Intervals reported are drilled thickness and may not represent    
true width.                                                                 
Drill holes GCO12-032 and GCO12-034 intersected the intended alteration     
envelopes but did not intersect significant mineralization.                 

Guayabito Deposit Final Results:

The final four (4) drill holes at Guayabito were designed to extend the Guayabito deposit further to the north along strike and to depth. All four (4) drill holes intersected the intended mineralization. Drill hole GYB12-086 intersected 6.2 metres of 6.3 g/t Au including 2.5 metres of 15.0 g/t Au. Results of the final four drill holes at Guayabito confirm the deposit extends to the north and to depth and remains open further along strike to the north and to depth. Highlights of the final four drill holes at Guayabito are listed in Table 2 below and all 2012 drill hole locations are illustrated in Figure 3.

Table-2 Highlights of Final Drill Hole Results; Guayabito Deposit


Drill Hole                 From             To  Length (m)(i)       Au (g/t)
GYB12-085                  99.3          100.4            1.1            4.4
GYB12-085                 238.6          240.1            1.5            6.9
GYB12-086                 180.8          187.0            6.2            6.3
  including               180.8          183.3            2.5           15.0
GYB12-086                 196.4          198.2            1.8            6.9
GYB12-087                 125.4          127.3            1.9            2.2
GYB12-088                 289.0          296.8            7.8            3.9
  including               289.0          292.3            3.3            9.0
Note: (i) Intervals reported are drilled thickness and may not represent    
true width.                                                                 

"The 2012 drilling program at Cisneros has been very successful" comments Rick Thibault, President and CEO; "We have greatly increased our knowledge base of the Guayabito and Guaico deposits and are extremely encouraged with the improving grade with depth at Guaico. We have been able to significantly increase the overall size of these deposits through effective drilling along strike and to depth".

About Antioquia Gold Inc.

Antioquia Gold has been exploring for precious metals in Colombia since 2007 and has accumulated a land package of close to 40,000 hectares located throughout Colombia. Antioquia Gold's principal asset, which is being actively explored, is its 5,630 hectare Cisneros Project, located 55 kilometres northeast of Medellin in the Department of Antioquia, Colombia. At the Cisneros Project the Company has conducted extensive geochemical and geophysical programs over the entire property and has identified to date eleven (11) exploration zones. On the original discovery zone it has drilled over 43,000 metres and is well versed in the understanding of the deposit type and the project's path to resource definition and production.

To ensure reliable sample results Antioquia Gold has a rigorous QA/QC program in place that monitors the chain of custody of the samples and includes the insertion of blanks, preparation duplicates, field duplicates, and certified reference standards in each batch of samples. Core is photographed and sawed in half with one half retained in a secured facility for future reference if needed. Sample preparation (crushing and pulverizing) is performed at ACME laboratories in Medellin, Colombia. Samples prepared by ACME (Medellin) are direct shipped to ACME Laboratories in Vancouver Canada, an ISO certified laboratory for analysis. Assay for gold (36 elements) is performed initially by 1Dx30g Agua Regia Digestion. Au values greater than 100,000 ppb are automatically checked by Gravimetric finish and Antioquia Gold further checks all assay values greater than or equal to 10,000 ppb by Metallic Assay. Furthermore, as part of the QA/QC program, Antioquia Gold has sent to SGS laboratory in Medellin Colombia batches of pulp samples for check Fire Assay's.

This press release has been prepared under the supervision of Ian Fraser, P. Geol., Chief Geologist for Antioquia Gold Inc. and a Qualified Person as defined by National Instrument 43-101.

On behalf of Antioquia Gold Inc.

Richard Thibault, President & CEO

You can also follow Antioquia Gold on twitter: @AntioquiaAGD.

To receive Company news by email, contact [email protected] and mention "Antioquia Gold" news in the subject line.

Forward-Looking Statements:

This news release contains certain forward-looking statements, including any plans regarding the preparation and timing of a National Instrument 43-101 compliant resource report and accompanying PEA. Forward-looking statements are based on management's current assumptions and are subject to risks and uncertainties. There can be no assurance that any forward-looking statement will prove to be accurate, and actual results and future events could differ materially from those anticipated in such information due to a number of factors beyond the Company's control. These assumptions, risks and uncertainties include, among other things, management's assumptions about government permitting, equipment procurement and the availability of the necessary consultants and capital, as well as the risks of delay in any of these activities and the risks inherent in Antioquia Gold's operations, including the risks that the Company may not find any minerals in commercially feasible quantity or raise enough money to continue to fund its exploration plans. These and other risks are described in the Company's public disclosure documents filed on the SEDAR website maintained by the Canadian Securities Administrators. The Company does not undertake to update any forward-looking information except as may be required by applicable securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Events announced today that MobiDev, a client-oriented software development company, will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place October 31-November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. MobiDev is a software company that develops and delivers turn-key mobile apps, websites, web services, and complex software systems for startups and enterprises. Since 2009 it has grown from a small group of passionate engineers and business...
SYS-CON Events announced today that GrapeUp, the leading provider of rapid product development at the speed of business, will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place October 31-November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Grape Up is a software company, specialized in cloud native application development and professional services related to Cloud Foundry PaaS. With five expert teams that operate in various sectors of the market acr...
"We are a monitoring company. We work with Salesforce, BBC, and quite a few other big logos. We basically provide monitoring for them, structure for their cloud services and we fit into the DevOps world" explained David Gildeh, Co-founder and CEO of Outlyer, in this SYS-CON.tv interview at DevOps Summit at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
SYS-CON Events announced today that Enzu will exhibit at SYS-CON's 21st Int\ernational Cloud Expo®, which will take place October 31-November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Enzu’s mission is to be the leading provider of enterprise cloud solutions worldwide. Enzu enables online businesses to use its IT infrastructure to their competitive advantage. By offering a suite of proven hosting and management services, Enzu wants companies to focus on the core of their ...
DevOps at Cloud Expo, taking place October 31 - November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with 21st Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to w...
New competitors, disruptive technologies, and growing expectations are pushing every business to both adopt and deliver new digital services. This ‘Digital Transformation’ demands rapid delivery and continuous iteration of new competitive services via multiple channels, which in turn demands new service delivery techniques – including DevOps. In this power panel at @DevOpsSummit 20th Cloud Expo, moderated by DevOps Conference Co-Chair Andi Mann, panelists examined how DevOps helps to meet the de...
While DevOps most critically and famously fosters collaboration, communication, and integration through cultural change, culture is more of an output than an input. In order to actively drive cultural evolution, organizations must make substantial organizational and process changes, and adopt new technologies, to encourage a DevOps culture. Moderated by Andi Mann, panelists discussed how to balance these three pillars of DevOps, where to focus attention (and resources), where organizations might...
Cloud Expo, Inc. has announced today that Andi Mann and Aruna Ravichandran have been named Co-Chairs of @DevOpsSummit at Cloud Expo Silicon Valley which will take place Oct. 31-Nov. 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. "DevOps is at the intersection of technology and business-optimizing tools, organizations and processes to bring measurable improvements in productivity and profitability," said Aruna Ravichandran, vice president, DevOps product and solutions marketing...
Automation is enabling enterprises to design, deploy, and manage more complex, hybrid cloud environments. Yet the people who manage these environments must be trained in and understanding these environments better than ever before. A new era of analytics and cognitive computing is adding intelligence, but also more complexity, to these cloud environments. How smart is your cloud? How smart should it be? In this power panel at 20th Cloud Expo, moderated by Conference Chair Roger Strukhoff, pane...
SYS-CON Events announced today that Cloud Academy named "Bronze Sponsor" of 21st International Cloud Expo which will take place October 31 - November 2, 2017 at the Santa Clara Convention Center in Santa Clara, CA. Cloud Academy is the industry’s most innovative, vendor-neutral cloud technology training platform. Cloud Academy provides continuous learning solutions for individuals and enterprise teams for Amazon Web Services, Microsoft Azure, Google Cloud Platform, and the most popular cloud com...
We build IoT infrastructure products - when you have to integrate different devices, different systems and cloud you have to build an application to do that but we eliminate the need to build an application. Our products can integrate any device, any system, any cloud regardless of protocol," explained Peter Jung, Chief Product Officer at Pulzze Systems, in this SYS-CON.tv interview at @ThingsExpo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA
What's the role of an IT self-service portal when you get to continuous delivery and Infrastructure as Code? This general session showed how to create the continuous delivery culture and eight accelerators for leading the change. Don Demcsak is a DevOps and Cloud Native Modernization Principal for Dell EMC based out of New Jersey. He is a former, long time, Microsoft Most Valuable Professional, specializing in building and architecting Application Delivery Pipelines for hybrid legacy, and cloud ...
SYS-CON Events announced today that IBM has been named “Diamond Sponsor” of SYS-CON's 21st Cloud Expo, which will take place on October 31 through November 2nd 2017 at the Santa Clara Convention Center in Santa Clara, California.
In his session at Cloud Expo, Alan Winters, an entertainment executive/TV producer turned serial entrepreneur, presented a success story of an entrepreneur who has both suffered through and benefited from offshore development across multiple businesses: The smart choice, or how to select the right offshore development partner Warning signs, or how to minimize chances of making the wrong choice Collaboration, or how to establish the most effective work processes Budget control, or how to ma...
In the world of DevOps there are ‘known good practices’ – aka ‘patterns’ – and ‘known bad practices’ – aka ‘anti-patterns.' Many of these patterns and anti-patterns have been developed from real world experience, especially by the early adopters of DevOps theory; but many are more feasible in theory than in practice, especially for more recent entrants to the DevOps scene. In this power panel at @DevOpsSummit at 18th Cloud Expo, moderated by DevOps Conference Chair Andi Mann, panelists discussed...