Welcome!

News Feed Item

B2Gold Corp. Announces Positive Exploration Drill Results from the Otjikoto Gold Project in Namibia

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 12/11/12 -- B2Gold Corp. (TSX:BTO)(OTCQX:BGLPF)(PINKSHEETS:BGLPF)(NSX:B2G) ("B2Gold" or the "Company") is pleased to announce positive drilling results from the exploration programs at the Otjikoto Gold Project in Namibia. Of note, diamond drill hole number OTG25D returned 19.81 metres grading 15.00 grams per tonne ("g/t") gold, including 10.03 metres at 21.60 g/t gold from the recently discovered Wolfshag zone.

Otjikoto Gold Project, Namibia (B2Gold 92% / EVI Gold (Pty) Ltd 8%)

The Otjikoto gold project is located approximately 300 kilometres north of Windhoek, the capital of Namibia. B2Gold recently announced the receipt of a mining licence from the Namibian Ministry of Mines and Energy for the Otjikoto project (see news release dated December 05, 2012) and is nearing completion of the final feasibility study. Mine construction will commence in the first quarter of 2013 with gold production scheduled to commence in the fourth quarter of 2014.

The Otjikoto gold project has forecast average annual production of over 100,000 ounces of gold over a ten year mine life based on a Preliminary Economic Assessment released by Auryx Gold Corp. in September 2011. The B2Gold feasibility study that is nearing completion is expected to recommend a production Base Case that outlines significantly higher projected annual gold production in the first 5 years of the mine life based on the current resource.

The main Otjikoto deposit has an in-pit indicated mineral resource of 24.93 million tonnes at a grade of 1.74 "g/t" gold containing 1,392,690 ounces of gold on a 100% basis using a cut-off grade of 0.4 g/t gold (see news release dated April 5, 2012). The Otjikoto exploration budget for 2012 is US$8.9 million.

A total of 178 holes totalling 23,574 metres have been drilled on the Otjikoto Project this year. Of the 178 holes, 142 holes totalling 17,379 metres were drilled for Feasibility studies and the remainder for exploration. Feasibility drilling included 58 holes for condemnation of proposed infrastructure sites, 38 holes for collection of metallurgical test samples, 17 holes for geotechnical studies and the remainder as infill drilling and for geostatistical studies. There are currently three diamond core rigs active on the project with two rigs drilling at Otjikoto and a third rig drilling on regional exploration targets.

Exploration drilling in the Otjikoto area has principally focused on the exciting new Wolfshag zone (named after the Wolfshag Farm), previously announced as the K2 zone discovery by Auryx Gold (see Auryx Gold news release dated November 23, 2011) prior to B2Gold completing a Business Combination with Auryx Gold in December 2011. The zone is situated immediately to the northeast of the proposed open pit on the main Otjikoto deposit. The Wolfshag zone has been intersected for an additional 550 metres and now has a known minimum strike length of 950 metres. The mineralized shoot plunges at approximately 15 degrees to the south-southwest and remains open at depth. Significant new results from the Wolfshag zone drilling include:


--  OTG25D with 19.81 metres grading 15.00 g/t gold, including 10.03 metres
    at 21.60 g/t gold; 
--  WH31 with 16.00 metres grading 7.45 g/t gold; 
--  WH12-061 with 18.0 metres grading 5.90 g/t gold; and 
--  WH38 with 19.00 metres grading 1.88 g/t gold. 

The Wolfshag zone consists of a series of sheeted and tension gash fill pyrite-magnetite-calcite veins hosted within intense albite-carbonate + clay altered schists between folded coarse grained marbles. The zone is situated below the Main Otjikoto deposit and associated OTB marble marker horizon. The upper, high grade, western portion of the zone appears to be shallow easterly dipping and ranges in width from 50 to 75 metres and thickness from 6 to 31 metres. The eastern portion of the zone appears to have a steep eastward dip with the overall Wolfshag zone having an apparent sigmoidal shape. Drilling to date has been widely spaced with 100 to 200 metres drill section spacing and 25 to 50 metre drill hole spacing on section. More detailed drilling will be required to fully define the zone geometry.

The Wolfshag zone extends up dip to under the calcrete cover to the north and represents a potential near surface target. Given the high grades and significant thicknesses of mineralization there is potential for the southern portion of the zone to be exploited by underground mining. B2Gold management is excited about the potential of the Wolfshag zone and plans an aggressive exploration program in 2013 to further explore the zone and to provide definition to allow for an initial resource estimation. These results confirm our view that the Otjikoto property has the potential to yield significant additional gold resources.

A summary of the Wolfshag zone results to date are tabulated below:


---------------------------------------------------------------------------
                                                                   Gold g/t
                                                                    (cut to
           Section Station           FROM       TO   LENGTH    Gold  45 g/t
HoleID          (N)     (E)       (metres) (metres) (metres)   (g/t)   Gold)
---------------------------------------------------------------------------
OTG25D        7800    5050         287.74   307.55    19.81   15.00   14.91
---------------------------------------------------------------------------
OTG25D        7800    5050  incl.  289.74   299.77    10.03   21.60   21.41
---------------------------------------------------------------------------
OTG17D        7900    4975         279.00   280.00     1.00    3.39    3.39
---------------------------------------------------------------------------
OTG10D(i)     7900    5025         256.00   276.00    20.00    7.55    7.55
---------------------------------------------------------------------------
OTG18D(i)     7900    5075         279.00   285.00     6.00    1.73    1.73
---------------------------------------------------------------------------
OTG18D        7900    5075   and   312.00   320.00     8.00    1.83    1.83
---------------------------------------------------------------------------
OTG18D(i)     7900    5075   and   337.00   344.00     7.00    1.58    1.58
---------------------------------------------------------------------------
OTG23D        7900    5475         372.00   380.00     8.00    4.06    4.05
---------------------------------------------------------------------------
OTG23D        7900    5475  incl.  372.00   374.00     2.00   11.93   11.93
---------------------------------------------------------------------------
WH31          8100    4950         194.00   224.00    30.00    4.29    4.29
---------------------------------------------------------------------------
WH31          8100    4950  incl.  194.00   210.00    16.00    7.45    7.45
---------------------------------------------------------------------------
WH30          8100    5000         243.00   257.00    14.00    1.95    1.95
---------------------------------------------------------------------------
WH30          8100    5000   and   269.00   276.00     7.00    1.91    1.91
---------------------------------------------------------------------------
WH32          8100    5050         265.00   266.00     1.00    6.39    6.39
---------------------------------------------------------------------------
WH12-061      8300    4875         134.00   165.00    31.00    3.68    3.68
---------------------------------------------------------------------------
WH12-061      8300    4875  incl.  136.00   154.00    18.00    5.90    5.90
---------------------------------------------------------------------------
WH26          8300    4900         140.00   162.00    22.00    2.48    2.48
---------------------------------------------------------------------------
WH26          8300    4900  incl.  145.00   157.00    12.00    3.54    3.54
---------------------------------------------------------------------------
WH26          8300    4900   and   171.00   174.00     3.00    1.92    1.92
---------------------------------------------------------------------------
WH25(i)       8300    4925         189.00   200.00    11.00    3.95    3.95
---------------------------------------------------------------------------
WH20(i)       8300    4950         197.00   206.00     9.00    2.34    2.34
---------------------------------------------------------------------------
WH38          8500    4850          51.00    52.00     1.00    2.74    2.74
---------------------------------------------------------------------------
WH38          8500    4850   and    79.00    98.00    19.00    1.88    1.88
---------------------------------------------------------------------------
WH33          8500    4900         115.00   116.00     1.00    4.46    4.46
---------------------------------------------------------------------------
WH33          8500    4900   and   130.00   139.00     9.00    1.07    1.07
---------------------------------------------------------------------------
WH35          8500    5000         131.00   133.00     2.00    3.27    3.27
---------------------------------------------------------------------------
WH35          8500    5000   and   264.00   265.00     1.00    3.35    3.35
---------------------------------------------------------------------------
WH44          8500    5050         147.00   150.00     3.00    3.64    3.64
---------------------------------------------------------------------------
WH45          8700    4800          19.00    22.00     3.00    1.55    1.55
---------------------------------------------------------------------------
WH45          8700    4800   and    36.00    44.00     8.00    1.18    1.18
---------------------------------------------------------------------------
WH45          8700    4800   and    95.00   101.00     6.00    2.91    2.91
---------------------------------------------------------------------------
WH45          8700    4800  incl.   96.00    99.00     3.00    5.36    5.36
---------------------------------------------------------------------------
WH41          8700    5000          80.00    82.00     2.00   28.23   26.08
---------------------------------------------------------------------------

(i) Previously released (See Auryx Gold News Release Nov. 23, 2011)
Insufficient drilling to date to define true widths of all intersections.

Exploration drilling is ongoing. Further results will be released as they are available.

B2Gold's Quality Assurance / Quality Control

Quality assurance and quality control procedures include the systematic insertion of blanks, standards and duplicates into the rock sample strings. The primary laboratory for Otjikoto is ALS Minerals in Vancouver where samples are analysed by fire assay / gravimetric finish using one assay tonne. Samples are prepared at Intertek Genalysis, Walvis Bay. Bureau Vertitas, Swakopmund, Namibia, is the umpire laboratory. All results stated in this announcement have passed B2Gold's quality assurance and quality control ("QA/QC") protocols. Tom Garagan is the Qualified Person as defined under National Instrument 43-101.

ON BEHALF OF B2GOLD CORP.

Tom Garagan, Senior Vice President of Exploration

For more information on B2Gold please visit the Company web site at www.b2gold.com.

The securities described herein have not been and will not be registered under the United States Securities Act of 1933, as amended, and may not be offered or sold in the United States absent registration or an applicable exemption from registration requirements.

Some of the statements contained in this release are forward-looking statements, such as estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties. Actual results in each case could differ materially from those currently anticipated in such statements.

The Toronto Stock Exchange neither approves nor disapproves the information contained in this news release.

Contacts:
B2Gold Corp.
Ian MacLean
Vice President, Investor Relations
604-681-8371

B2Gold Corp.
Kerry Suffolk
Manager, Investor Relations
604-681-8371
www.b2gold.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
The many IoT deployments around the world are busy integrating smart devices and sensors into their enterprise IT infrastructures. Yet all of this technology – and there are an amazing number of choices – is of no use without the software to gather, communicate, and analyze the new data flows. Without software, there is no IT. In this power panel at @ThingsExpo, moderated by Conference Chair Roger Strukhoff, Dave McCarthy, Director of Products at Bsquare Corporation; Alan Williamson, Principal...
Businesses and business units of all sizes can benefit from cloud computing, but many don't want the cost, performance and security concerns of public cloud nor the complexity of building their own private clouds. Today, some cloud vendors are using artificial intelligence (AI) to simplify cloud deployment and management. In his session at 20th Cloud Expo, Ajay Gulati, Co-founder and CEO of ZeroStack, will discuss how AI can simplify cloud operations. He will cover the following topics: why clou...
Video experiences should be unique and exciting! But that doesn’t mean you need to patch all the pieces yourself. Users demand rich and engaging experiences and new ways to connect with you. But creating robust video applications at scale can be complicated, time-consuming and expensive. In his session at @ThingsExpo, Zohar Babin, Vice President of Platform, Ecosystem and Community at Kaltura, discussed how VPaaS enables you to move fast, creating scalable video experiences that reach your aud...
Cloud Expo, Inc. has announced today that Andi Mann returns to 'DevOps at Cloud Expo 2017' as Conference Chair The @DevOpsSummit at Cloud Expo will take place on June 6-8, 2017, at the Javits Center in New York City, NY. "DevOps is set to be one of the most profound disruptions to hit IT in decades," said Andi Mann. "It is a natural extension of cloud computing, and I have seen both firsthand and in independent research the fantastic results DevOps delivers. So I am excited to help the great t...
Rapid innovation, changing business landscapes, and new IT demands force businesses to make changes quickly. In the eyes of many, containers are at the brink of becoming a pervasive technology in enterprise IT to accelerate application delivery. In this presentation, attendees learned about the: The transformation of IT to a DevOps, microservices, and container-based architecture What are containers and how DevOps practices can operate in a container-based environment A demonstration of how ...
In this strange new world where more and more power is drawn from business technology, companies are effectively straddling two paths on the road to innovation and transformation into digital enterprises. The first path is the heritage trail – with “legacy” technology forming the background. Here, extant technologies are transformed by core IT teams to provide more API-driven approaches. Legacy systems can restrict companies that are transitioning into digital enterprises. To truly become a lead...
Without lifecycle traceability and visibility across the tool chain, stakeholders from Planning-to-Ops have limited insight and answers to who, what, when, why and how across the DevOps lifecycle. This impacts the ability to deliver high quality software at the needed velocity to drive positive business outcomes. In his general session at @DevOpsSummit at 19th Cloud Expo, Phil Hombledal, Solution Architect at CollabNet, discussed how customers are able to achieve a level of transparency that e...
WebRTC is the future of browser-to-browser communications, and continues to make inroads into the traditional, difficult, plug-in web communications world. The 6th WebRTC Summit continues our tradition of delivering the latest and greatest presentations within the world of WebRTC. Topics include voice calling, video chat, P2P file sharing, and use cases that have already leveraged the power and convenience of WebRTC.
"At ROHA we develop an app called Catcha. It was developed after we spent a year meeting with, talking to, interacting with senior citizens watching them use their smartphones and talking to them about how they use their smartphones so we could get to know their smartphone behavior," explained Dave Woods, Chief Innovation Officer at ROHA, in this SYS-CON.tv interview at 19th Cloud Expo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
"Venafi has a platform that allows you to manage, centralize and automate the complete life cycle of keys and certificates within the organization," explained Gina Osmond, Sr. Field Marketing Manager at Venafi, in this SYS-CON.tv interview at DevOps at 19th Cloud Expo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
20th Cloud Expo, taking place June 6-8, 2017, at the Javits Center in New York City, NY, will feature technical sessions from a rock star conference faculty and the leading industry players in the world. Cloud computing is now being embraced by a majority of enterprises of all sizes. Yesterday's debate about public vs. private has transformed into the reality of hybrid cloud: a recent survey shows that 74% of enterprises have a hybrid cloud strategy.
Application transformation and DevOps practices are two sides of the same coin. Enterprises that want to capture value faster, need to deliver value faster – time value of money principle. To do that enterprises need to build cloud-native apps as microservices by empowering teams to build, ship, and run in production. In his session at @DevOpsSummit at 19th Cloud Expo, Neil Gehani, senior product manager at HPE, discussed what every business should plan for how to structure their teams to delive...
"We analyze the video streaming experience. We are gathering the user behavior in real time from the user devices and we analyze how users experience the video streaming," explained Eric Kim, Founder and CEO at Streamlyzer, in this SYS-CON.tv interview at 19th Cloud Expo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
In his keynote at 18th Cloud Expo, Andrew Keys, Co-Founder of ConsenSys Enterprise, provided an overview of the evolution of the Internet and the Database and the future of their combination – the Blockchain. Andrew Keys is Co-Founder of ConsenSys Enterprise. He comes to ConsenSys Enterprise with capital markets, technology and entrepreneurial experience. Previously, he worked for UBS investment bank in equities analysis. Later, he was responsible for the creation and distribution of life sett...
Get deep visibility into the performance of your databases and expert advice for performance optimization and tuning. You can't get application performance without database performance. Give everyone on the team a comprehensive view of how every aspect of the system affects performance across SQL database operations, host server and OS, virtualization resources and storage I/O. Quickly find bottlenecks and troubleshoot complex problems.