Welcome!

News Feed Item

Lundin Petroleum Updates Its 2P Reserves and Provides Production Guidance for 2013

STOCKHOLM, SWEDEN -- (Marketwire) -- 02/04/13 -- Lundin Petroleum AB (TSX:LUP)(OMX:LUPE) ("Lundin Petroleum") is pleased to announce that as at 31 December 2012 its net proven and probable working interest reserves ("2P reserves") are 201.5 million barrels of oil equivalent (MMboe) and that the production forecast for 2013 is between 33,000 and 38,000 barrels of oil equivalent per day (boepd).

                                                MMboe(1)
Proven and Probable Reserves at 31.12.2011         210.7
2012 Production (forecast)                         -13.0
Reserve Additions (excl Sales/Acquisitions)         -0.2
-Sales/+Acquisition                                  4.1
Proven and Probable Reserves at 31.12.2012         201.5
                                                        
Reserves increase                                     2%
Reserve replacement ratio(2)                         -2%

Lundin Petroleum is predominantly an oil company with 91 percent of its 2P reserves being oil(3) and 89 percent of the 2P reserves being located in OECD regions.

The 2P reserves have been positively impacted by the Bertam field, offshore peninsular Malaysia, which has been added to 2P reserves. Further increases result from Lundin Petroleum's main producing assets, the Alvheim and Volund fields offshore Norway which yet again delivered better than expected reservoir performance, as well as the Brynhild field offshore Norway which gained reserves through the addition of one extra production well and an equity increase in the field from 70 percent to 90 percent. These additions were offset by reserves reductions predominantly on the Gaupe gas/condensate field offshore Norway and producing assets in the Komi Republic in northern Russia.

Lundin Petroleum's forecast production for 2013 is between 33,000 to 38,000 boepd. The production from Norway represents approximately 74 percent of forecast 2013 production and oil represents approximately 81 percent.

The reserves are based upon a third party independent audit conducted by ERC Equipoise Limited ("ERCE"). The Proven and Probable Reserves have been calculated using 2007 Petroleum Resources Management System (SPE PRMS) Guidelines of the Society of Petroleum Engineers (SPE), World Petroleum Congress (WPC), American Association of Petroleum Geologists (AAPG) and Society of Petroleum Evaluation Engineers (SPEE) and have been reviewed for compliance with the Canadian Oil and Gas Evaluation Handbook (COGEH) and the Canadian National Instrumental 51-101 Standards of Disclosure for Oil and Gas Activities. The reserves were calculated using an oil price of USD 100 per barrel in 2013, with prices and costs escalating at 2 percent per annum.

Ashley Heppenstall, President and CEO of Lundin Petroleum, comments as follows; "I am pleased that our Malaysian business is now contributing to our 2P reserves through the inclusion of the Bertam field. I am confident that our reserves will continue to increase particularly when the Johan Sverdrup resource is booked as reserves and hope that our continued exploration program will result in further resource additions. We have been very pleased with the continued outperformance from the Alvheim and Volund fields and we expect these two fields again to be the main production contributors during 2013. We forecast to exit 2013 with a production rate in excess of 40,000 boepd with the Brynhild field coming onstream late in 2013."

Lundin Petroleum is a Swedish independent oil and gas exploration and production company with a well balanced portfolio of world-class assets primarily located in Europe and South East Asia. The Company is listed at the NASDAQ OMX, Stockholm (ticker "LUPE") and at the Toronto Stock Exchange (TSX) (Ticker "LUP"). Lundin Petroleum has proven and probable reserves of 202 million barrels of oil equivalent (MMboe).

This information has been made public in accordance with the Securities Market Act (SFS 2007:528) and/or the Financial Instruments Trading Act (SFS 1991:980).

Forward-Looking Statements

Certain statements made and information contained herein constitute "forward-looking information" (within the meaning of applicable securities legislation). Such statements and information (together, "forward-looking statements") relate to future events, including the Company's future performance, business prospects or opportunities. Forward-looking statements include, but are not limited to, statements with respect to estimates of reserves and/or resources, future production levels, future capital expenditures and their allocation to exploration and development activities, future drilling and other exploration and development activities. Ultimate recovery of reserves or resources are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management.

All statements other than statements of historical fact may be forward-looking statements. Statements concerning proven and probable reserves and resource estimates may also be deemed to constitute forward-looking statements and reflect conclusions that are based on certain assumptions that the reserves and resources can be economically exploited. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "seek", "anticipate", "plan", "continue", "estimate", "expect", "may", "will", "project", "predict", "potential", "targeting", "intend", "could", "might", "should", "believe" and similar expressions) are not statements of historical fact and may be "forward-looking statements". Forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements. No assurance can be given that these expectations and assumptions will prove to be correct and such forward-looking statements should not be relied upon. These statements speak only as on the date of the information and the Company does not intend, and does not assume any obligation, to update these forward-looking statements, except as required by applicable laws. These forward-looking statements involve risks and uncertainties relating to, among other things, operational risks (including exploration and development risks), productions costs, availability of drilling equipment, reliance on key personnel, reserve estimates, health, safety and environmental issues, legal risks and regulatory changes, competition, geopolitical risk, and financial risks. These risks and uncertainties are described in more detail under the heading "Risks and Risk Management" and elsewhere in the Company's annual report. Readers are cautioned that the foregoing list of risk factors should not be construed as exhaustive. Actual results may differ materially from those expressed or implied by such forward-looking statements. Forward-looking statements are expressly qualified by this cautionary statement.

Reserves and Resources

Unless otherwise stated, Lundin Petroleum's reserve and resource estimates are as at 31 December 2011, and have been prepared and audited in accordance with National Instrument 51-101 Standards of Disclosure for Oil and Gas Activities ("NI 51-101") and the Canadian Oil and Gas Evaluation Handbook ("COGE Handbook"). Unless otherwise stated, all reserves estimates contained herein are the aggregate of "Proved Reserves" and "Probable Reserves", together also known as "2P Reserves". For further information on reserve and resource classifications, see "Reserves and Resources" in the Company's annual report.

Contingent Resources

Contingent Resources are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations using established technology or technology under development, but are not currently considered to be commercially recoverable due to one or more contingencies. Contingencies may include factors such as economic, legal, environmental, political and regulatory matters or a lack of markets. There is no certainty that it will be commercially viable for the Company to produce any portion of the Contingent Resources.

Prospective Resources

Prospective Resources are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from undiscovered accumulations by application of future development projects. Prospective Resources have both a chance of discovery and a chance of development. There is no certainty that any portion of the Prospective Resources will be discovered. If discovered, there is no certainty that it will be commercially viable to produce any portion of the Prospective Resources.

BOEs

BOEs may be misleading, particularly if used in isolation. A BOE conversion ratio of 6 Mcf : 1 Bbl is based on an energy equivalency conversion method primarily applicable at the burner tip and does not represent a value equivalency at the wellhead.

(1) BOEs may be misleading, particularly if used in isolation. A BOE conversion ratio of 6 Mcf: 1 Bbl is based on an energy equivalency conversion method primarily applicable at the burner tip and does not represent a value equivalency at the wellhead.

(2) As per industry standards the reserve replacement ratio is defined as the ratio of reserve additions to production during the year, excluding acquisitions/sales. The reserves increase is calculated as the ratio of the 31.12.2012 reserves additions over the 31.12.2011 reserves adjusted for sales and production.

(3) Includes NGL volumes

Contacts:
Lundin Petroleum AB
Maria Hamilton, Head of Corporate Communications
+41 22 595 10 00
+46 8 440 54 50
Mobile: +41 79 63 53 641
[email protected]

Lundin Petroleum AB
Teitur Poulsen
VP Corporate Planning & Investor Relations
+41 22 595 10 00
www.lundin-petroleum.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Blockchain. A day doesn’t seem to go by without seeing articles and discussions about the technology. According to PwC executive Seamus Cushley, approximately $1.4B has been invested in blockchain just last year. In Gartner’s recent hype cycle for emerging technologies, blockchain is approaching the peak. It is considered by Gartner as one of the ‘Key platform-enabling technologies to track.’ While there is a lot of ‘hype vs reality’ discussions going on, there is no arguing that blockchain is b...
No hype cycles or predictions of a gazillion things here. IoT is here. You get it. You know your business and have great ideas for a business transformation strategy. What comes next? Time to make it happen. In his session at @ThingsExpo, Jay Mason, an Associate Partner of Analytics, IoT & Cybersecurity at M&S Consulting, presented a step-by-step plan to develop your technology implementation strategy. He also discussed the evaluation of communication standards and IoT messaging protocols, data...
ChatOps is an emerging topic that has led to the wide availability of integrations between group chat and various other tools/platforms. Currently, HipChat is an extremely powerful collaboration platform due to the various ChatOps integrations that are available. However, DevOps automation can involve orchestration and complex workflows. In his session at @DevOpsSummit at 20th Cloud Expo, Himanshu Chhetri, CTO at Addteq, will cover practical examples and use cases such as self-provisioning infra...
You know you need the cloud, but you’re hesitant to simply dump everything at Amazon since you know that not all workloads are suitable for cloud. You know that you want the kind of ease of use and scalability that you get with public cloud, but your applications are architected in a way that makes the public cloud a non-starter. You’re looking at private cloud solutions based on hyperconverged infrastructure, but you’re concerned with the limits inherent in those technologies.
In his keynote at 18th Cloud Expo, Andrew Keys, Co-Founder of ConsenSys Enterprise, provided an overview of the evolution of the Internet and the Database and the future of their combination – the Blockchain. Andrew Keys is Co-Founder of ConsenSys Enterprise. He comes to ConsenSys Enterprise with capital markets, technology and entrepreneurial experience. Previously, he worked for UBS investment bank in equities analysis. Later, he was responsible for the creation and distribution of life settle...
Coca-Cola’s Google powered digital signage system lays the groundwork for a more valuable connection between Coke and its customers. Digital signs pair software with high-resolution displays so that a message can be changed instantly based on what the operator wants to communicate or sell. In their Day 3 Keynote at 21st Cloud Expo, Greg Chambers, Global Group Director, Digital Innovation, Coca-Cola, and Vidya Nagarajan, a Senior Product Manager at Google, discussed how from store operations and ...
In his session at 21st Cloud Expo, Raju Shreewastava, founder of Big Data Trunk, provided a fun and simple way to introduce Machine Leaning to anyone and everyone. He solved a machine learning problem and demonstrated an easy way to be able to do machine learning without even coding. Raju Shreewastava is the founder of Big Data Trunk (www.BigDataTrunk.com), a Big Data Training and consulting firm with offices in the United States. He previously led the data warehouse/business intelligence and B...
"IBM is really all in on blockchain. We take a look at sort of the history of blockchain ledger technologies. It started out with bitcoin, Ethereum, and IBM evaluated these particular blockchain technologies and found they were anonymous and permissionless and that many companies were looking for permissioned blockchain," stated René Bostic, Technical VP of the IBM Cloud Unit in North America, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Conventi...
A strange thing is happening along the way to the Internet of Things, namely far too many devices to work with and manage. It has become clear that we'll need much higher efficiency user experiences that can allow us to more easily and scalably work with the thousands of devices that will soon be in each of our lives. Enter the conversational interface revolution, combining bots we can literally talk with, gesture to, and even direct with our thoughts, with embedded artificial intelligence, whic...
The cloud era has reached the stage where it is no longer a question of whether a company should migrate, but when. Enterprises have embraced the outsourcing of where their various applications are stored and who manages them, saving significant investment along the way. Plus, the cloud has become a defining competitive edge. Companies that fail to successfully adapt risk failure. The media, of course, continues to extol the virtues of the cloud, including how easy it is to get there. Migrating...
The need for greater agility and scalability necessitated the digital transformation in the form of following equation: monolithic to microservices to serverless architecture (FaaS). To keep up with the cut-throat competition, the organisations need to update their technology stack to make software development their differentiating factor. Thus microservices architecture emerged as a potential method to provide development teams with greater flexibility and other advantages, such as the abili...
Product connectivity goes hand and hand these days with increased use of personal data. New IoT devices are becoming more personalized than ever before. In his session at 22nd Cloud Expo | DXWorld Expo, Nicolas Fierro, CEO of MIMIR Blockchain Solutions, will discuss how in order to protect your data and privacy, IoT applications need to embrace Blockchain technology for a new level of product security never before seen - or needed.
Leading companies, from the Global Fortune 500 to the smallest companies, are adopting hybrid cloud as the path to business advantage. Hybrid cloud depends on cloud services and on-premises infrastructure working in unison. Successful implementations require new levels of data mobility, enabled by an automated and seamless flow across on-premises and cloud resources. In his general session at 21st Cloud Expo, Greg Tevis, an IBM Storage Software Technical Strategist and Customer Solution Architec...
The use of containers by developers -- and now increasingly IT operators -- has grown from infatuation to deep and abiding love. But as with any long-term affair, the honeymoon soon leads to needing to live well together ... and maybe even getting some relationship help along the way. And so it goes with container orchestration and automation solutions, which are rapidly emerging as the means to maintain the bliss between rapid container adoption and broad container use among multiple cloud host...
Blockchain is a shared, secure record of exchange that establishes trust, accountability and transparency across business networks. Supported by the Linux Foundation's open source, open-standards based Hyperledger Project, Blockchain has the potential to improve regulatory compliance, reduce cost as well as advance trade. Are you curious about how Blockchain is built for business? In her session at 21st Cloud Expo, René Bostic, Technical VP of the IBM Cloud Unit in North America, discussed the b...