Welcome!

News Feed Item

Lundin Petroleum Updates Its 2P Reserves and Provides Production Guidance for 2013

STOCKHOLM, SWEDEN -- (Marketwire) -- 02/04/13 -- Lundin Petroleum AB (TSX:LUP)(OMX:LUPE) ("Lundin Petroleum") is pleased to announce that as at 31 December 2012 its net proven and probable working interest reserves ("2P reserves") are 201.5 million barrels of oil equivalent (MMboe) and that the production forecast for 2013 is between 33,000 and 38,000 barrels of oil equivalent per day (boepd).

                                                MMboe(1)
Proven and Probable Reserves at 31.12.2011         210.7
2012 Production (forecast)                         -13.0
Reserve Additions (excl Sales/Acquisitions)         -0.2
-Sales/+Acquisition                                  4.1
Proven and Probable Reserves at 31.12.2012         201.5
                                                        
Reserves increase                                     2%
Reserve replacement ratio(2)                         -2%

Lundin Petroleum is predominantly an oil company with 91 percent of its 2P reserves being oil(3) and 89 percent of the 2P reserves being located in OECD regions.

The 2P reserves have been positively impacted by the Bertam field, offshore peninsular Malaysia, which has been added to 2P reserves. Further increases result from Lundin Petroleum's main producing assets, the Alvheim and Volund fields offshore Norway which yet again delivered better than expected reservoir performance, as well as the Brynhild field offshore Norway which gained reserves through the addition of one extra production well and an equity increase in the field from 70 percent to 90 percent. These additions were offset by reserves reductions predominantly on the Gaupe gas/condensate field offshore Norway and producing assets in the Komi Republic in northern Russia.

Lundin Petroleum's forecast production for 2013 is between 33,000 to 38,000 boepd. The production from Norway represents approximately 74 percent of forecast 2013 production and oil represents approximately 81 percent.

The reserves are based upon a third party independent audit conducted by ERC Equipoise Limited ("ERCE"). The Proven and Probable Reserves have been calculated using 2007 Petroleum Resources Management System (SPE PRMS) Guidelines of the Society of Petroleum Engineers (SPE), World Petroleum Congress (WPC), American Association of Petroleum Geologists (AAPG) and Society of Petroleum Evaluation Engineers (SPEE) and have been reviewed for compliance with the Canadian Oil and Gas Evaluation Handbook (COGEH) and the Canadian National Instrumental 51-101 Standards of Disclosure for Oil and Gas Activities. The reserves were calculated using an oil price of USD 100 per barrel in 2013, with prices and costs escalating at 2 percent per annum.

Ashley Heppenstall, President and CEO of Lundin Petroleum, comments as follows; "I am pleased that our Malaysian business is now contributing to our 2P reserves through the inclusion of the Bertam field. I am confident that our reserves will continue to increase particularly when the Johan Sverdrup resource is booked as reserves and hope that our continued exploration program will result in further resource additions. We have been very pleased with the continued outperformance from the Alvheim and Volund fields and we expect these two fields again to be the main production contributors during 2013. We forecast to exit 2013 with a production rate in excess of 40,000 boepd with the Brynhild field coming onstream late in 2013."

Lundin Petroleum is a Swedish independent oil and gas exploration and production company with a well balanced portfolio of world-class assets primarily located in Europe and South East Asia. The Company is listed at the NASDAQ OMX, Stockholm (ticker "LUPE") and at the Toronto Stock Exchange (TSX) (Ticker "LUP"). Lundin Petroleum has proven and probable reserves of 202 million barrels of oil equivalent (MMboe).

This information has been made public in accordance with the Securities Market Act (SFS 2007:528) and/or the Financial Instruments Trading Act (SFS 1991:980).

Forward-Looking Statements

Certain statements made and information contained herein constitute "forward-looking information" (within the meaning of applicable securities legislation). Such statements and information (together, "forward-looking statements") relate to future events, including the Company's future performance, business prospects or opportunities. Forward-looking statements include, but are not limited to, statements with respect to estimates of reserves and/or resources, future production levels, future capital expenditures and their allocation to exploration and development activities, future drilling and other exploration and development activities. Ultimate recovery of reserves or resources are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management.

All statements other than statements of historical fact may be forward-looking statements. Statements concerning proven and probable reserves and resource estimates may also be deemed to constitute forward-looking statements and reflect conclusions that are based on certain assumptions that the reserves and resources can be economically exploited. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "seek", "anticipate", "plan", "continue", "estimate", "expect", "may", "will", "project", "predict", "potential", "targeting", "intend", "could", "might", "should", "believe" and similar expressions) are not statements of historical fact and may be "forward-looking statements". Forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements. No assurance can be given that these expectations and assumptions will prove to be correct and such forward-looking statements should not be relied upon. These statements speak only as on the date of the information and the Company does not intend, and does not assume any obligation, to update these forward-looking statements, except as required by applicable laws. These forward-looking statements involve risks and uncertainties relating to, among other things, operational risks (including exploration and development risks), productions costs, availability of drilling equipment, reliance on key personnel, reserve estimates, health, safety and environmental issues, legal risks and regulatory changes, competition, geopolitical risk, and financial risks. These risks and uncertainties are described in more detail under the heading "Risks and Risk Management" and elsewhere in the Company's annual report. Readers are cautioned that the foregoing list of risk factors should not be construed as exhaustive. Actual results may differ materially from those expressed or implied by such forward-looking statements. Forward-looking statements are expressly qualified by this cautionary statement.

Reserves and Resources

Unless otherwise stated, Lundin Petroleum's reserve and resource estimates are as at 31 December 2011, and have been prepared and audited in accordance with National Instrument 51-101 Standards of Disclosure for Oil and Gas Activities ("NI 51-101") and the Canadian Oil and Gas Evaluation Handbook ("COGE Handbook"). Unless otherwise stated, all reserves estimates contained herein are the aggregate of "Proved Reserves" and "Probable Reserves", together also known as "2P Reserves". For further information on reserve and resource classifications, see "Reserves and Resources" in the Company's annual report.

Contingent Resources

Contingent Resources are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations using established technology or technology under development, but are not currently considered to be commercially recoverable due to one or more contingencies. Contingencies may include factors such as economic, legal, environmental, political and regulatory matters or a lack of markets. There is no certainty that it will be commercially viable for the Company to produce any portion of the Contingent Resources.

Prospective Resources

Prospective Resources are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from undiscovered accumulations by application of future development projects. Prospective Resources have both a chance of discovery and a chance of development. There is no certainty that any portion of the Prospective Resources will be discovered. If discovered, there is no certainty that it will be commercially viable to produce any portion of the Prospective Resources.

BOEs

BOEs may be misleading, particularly if used in isolation. A BOE conversion ratio of 6 Mcf : 1 Bbl is based on an energy equivalency conversion method primarily applicable at the burner tip and does not represent a value equivalency at the wellhead.

(1) BOEs may be misleading, particularly if used in isolation. A BOE conversion ratio of 6 Mcf: 1 Bbl is based on an energy equivalency conversion method primarily applicable at the burner tip and does not represent a value equivalency at the wellhead.

(2) As per industry standards the reserve replacement ratio is defined as the ratio of reserve additions to production during the year, excluding acquisitions/sales. The reserves increase is calculated as the ratio of the 31.12.2012 reserves additions over the 31.12.2011 reserves adjusted for sales and production.

(3) Includes NGL volumes

Contacts:
Lundin Petroleum AB
Maria Hamilton, Head of Corporate Communications
+41 22 595 10 00
+46 8 440 54 50
Mobile: +41 79 63 53 641
[email protected]

Lundin Petroleum AB
Teitur Poulsen
VP Corporate Planning & Investor Relations
+41 22 595 10 00
www.lundin-petroleum.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Events announced today that Synametrics Technologies will exhibit at SYS-CON's 22nd International Cloud Expo®, which will take place on June 5-7, 2018, at the Javits Center in New York, NY. Synametrics Technologies is a privately held company based in Plainsboro, New Jersey that has been providing solutions for the developer community since 1997. Based on the success of its initial product offerings such as WinSQL, Xeams, SynaMan and Syncrify, Synametrics continues to create and hone inn...
As many know, the first generation of Cloud Management Platform (CMP) solutions were designed for managing virtual infrastructure (IaaS) and traditional applications. But that's no longer enough to satisfy evolving and complex business requirements. In his session at 21st Cloud Expo, Scott Davis, Embotics CTO, explored how next-generation CMPs ensure organizations can manage cloud-native and microservice-based application architectures, while also facilitating agile DevOps methodology. He expla...
To get the most out of their data, successful companies are not focusing on queries and data lakes, they are actively integrating analytics into their operations with a data-first application development approach. Real-time adjustments to improve revenues, reduce costs, or mitigate risk rely on applications that minimize latency on a variety of data sources. In his session at @BigDataExpo, Jack Norris, Senior Vice President, Data and Applications at MapR Technologies, reviewed best practices to ...
"Evatronix provides design services to companies that need to integrate the IoT technology in their products but they don't necessarily have the expertise, knowledge and design team to do so," explained Adam Morawiec, VP of Business Development at Evatronix, in this SYS-CON.tv interview at @ThingsExpo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
DevOps promotes continuous improvement through a culture of collaboration. But in real terms, how do you: Integrate activities across diverse teams and services? Make objective decisions with system-wide visibility? Use feedback loops to enable learning and improvement? With technology insights and real-world examples, in his general session at @DevOpsSummit, at 21st Cloud Expo, Andi Mann, Chief Technology Advocate at Splunk, explored how leading organizations use data-driven DevOps to close th...
Digital Transformation (DX) is not a "one-size-fits all" strategy. Each organization needs to develop its own unique, long-term DX plan. It must do so by realizing that we now live in a data-driven age, and that technologies such as Cloud Computing, Big Data, the IoT, Cognitive Computing, and Blockchain are only tools. In her general session at 21st Cloud Expo, Rebecca Wanta explained how the strategy must focus on DX and include a commitment from top management to create great IT jobs, monitor ...
"WineSOFT is a software company making proxy server software, which is widely used in the telecommunication industry or the content delivery networks or e-commerce," explained Jonathan Ahn, COO of WineSOFT, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
In his Opening Keynote at 21st Cloud Expo, John Considine, General Manager of IBM Cloud Infrastructure, led attendees through the exciting evolution of the cloud. He looked at this major disruption from the perspective of technology, business models, and what this means for enterprises of all sizes. John Considine is General Manager of Cloud Infrastructure Services at IBM. In that role he is responsible for leading IBM’s public cloud infrastructure including strategy, development, and offering m...
No hype cycles or predictions of a gazillion things here. IoT is here. You get it. You know your business and have great ideas for a business transformation strategy. What comes next? Time to make it happen. In his session at @ThingsExpo, Jay Mason, an Associate Partner of Analytics, IoT & Cybersecurity at M&S Consulting, presented a step-by-step plan to develop your technology implementation strategy. He also discussed the evaluation of communication standards and IoT messaging protocols, data...
Recently, WebRTC has a lot of eyes from market. The use cases of WebRTC are expanding - video chat, online education, online health care etc. Not only for human-to-human communication, but also IoT use cases such as machine to human use cases can be seen recently. One of the typical use-case is remote camera monitoring. With WebRTC, people can have interoperability and flexibility for deploying monitoring service. However, the benefit of WebRTC for IoT is not only its convenience and interopera...
In a recent survey, Sumo Logic surveyed 1,500 customers who employ cloud services such as Amazon Web Services (AWS), Microsoft Azure, and Google Cloud Platform (GCP). According to the survey, a quarter of the respondents have already deployed Docker containers and nearly as many (23 percent) are employing the AWS Lambda serverless computing framework. It’s clear: serverless is here to stay. The adoption does come with some needed changes, within both application development and operations. Tha...
Product connectivity goes hand and hand these days with increased use of personal data. New IoT devices are becoming more personalized than ever before. In his session at 22nd Cloud Expo | DXWorld Expo, Nicolas Fierro, CEO of MIMIR Blockchain Solutions, will discuss how in order to protect your data and privacy, IoT applications need to embrace Blockchain technology for a new level of product security never before seen - or needed.
Recently, REAN Cloud built a digital concierge for a North Carolina hospital that had observed that most patient call button questions were repetitive. In addition, the paper-based process used to measure patient health metrics was laborious, not in real-time and sometimes error-prone. In their session at 21st Cloud Expo, Sean Finnerty, Executive Director, Practice Lead, Health Care & Life Science at REAN Cloud, and Dr. S.P.T. Krishnan, Principal Architect at REAN Cloud, discussed how they built...
Sanjeev Sharma Joins June 5-7, 2018 @DevOpsSummit at @Cloud Expo New York Faculty. Sanjeev Sharma is an internationally known DevOps and Cloud Transformation thought leader, technology executive, and author. Sanjeev's industry experience includes tenures as CTO, Technical Sales leader, and Cloud Architect leader. As an IBM Distinguished Engineer, Sanjeev is recognized at the highest levels of IBM's core of technical leaders.
Nordstrom is transforming the way that they do business and the cloud is the key to enabling speed and hyper personalized customer experiences. In his session at 21st Cloud Expo, Ken Schow, VP of Engineering at Nordstrom, discussed some of the key learnings and common pitfalls of large enterprises moving to the cloud. This includes strategies around choosing a cloud provider(s), architecture, and lessons learned. In addition, he covered some of the best practices for structured team migration an...