Welcome!

News Feed Item

Inca One Acquires 100% Option on Corizona Gold Mining Concession

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 02/07/13 -- INCA ONE RESOURCES CORP. (TSX VENTURE:IO) -

Highlights include:


--  Authorized by Peruvian Government to produce up to 350 tons per day
    while working on formalizing commercial operating permits 
--  200+ meters of previous workings and underground tunnels 
--  Great infrastructure including roads, mine buildings, grid power &
    running water on site 
--  Five potential high-grade gold veins on the Project show evidence of
    1,200m strike

INCA ONE RESOURCES CORP. ("the Company" or "Inca One") is pleased to announce that it has entered into an Option Agreement ("Agreement") with Canadian Mining S.A., pursuant to which it has been assigned an option to acquire 100% of the Corizona Mining Concession ("Corizona Project" or "the Project").

The Project is located in the Lahuaytambo District, Huarochiri province in the Department of Lima, the area is known as Cruz de Laya and La Mina, approximately 85 kilometers from the city of Lima or a 2.5 hour drive. The Corizona Mining Concession consists of 259 hectares recorded in the Public Registry Office of Lima.

The Corizona Project is subject to a formalization process, which allows exploration and production of up to 350 tons per day while working towards formal operating permits and authorizations. Canadian Mining S.A. is a private Peruvian company which has an option to acquire the Project from the underlying property owner. It is submitting an IGAC (Corrective Environmental Management Instrument) to the Ministry of Energy and Mines as due procedure to obtain commercial operating permits.

Previous work on infrastructure, exploration and engineered mine development has been performed on the Project. Roads and an office have been built to the Project, while running water and electricity is on site.

The Corizona Project contains a large hydrothermal system with gold hosted in a hematite-chlorite-quartz structurally controlled en echelon veins. The veins intruded with rhyo-dacitic dykes in parallel fractures along andesite-dacite tuff volcaniclastic bedding planes. The high grades of gold referenced below are associated with quartz-iron oxide and argillic-kaolinitic alteration. An extensive network of artisan working and pits that span the width of the Project, over one kilometer in strike, suggest the potential for multiple veins.

There are eight known veins on the Corizona Project, two of which (Veins B and C) have been partially mined previously from over 200meters of tunneling and underground workings. Previous work and sampling from these veins have reported very consistent grades of more than 10g/t gold over vein widths of 0.5 to 1.5 meters. Inca One intends to thoroughly resample and map the historical workings, timber the tunnels and commence bulk sampling of the known veins as soon as possible.

In 2010, Mr. Elard Zegarra, a Peruvian engineer, wrote a report on the Corizona Project and although it was not written to 43-101 specifications, the study is consistent with previous mining engineering practices. This study produced an accurate survey of the main existing mine workings on Veins B and C. From the historic sampling (non 43-101 compliant) grades averaged 7.57 g/t gold for Vein B and 11.49 g/t gold for Vein C over a width of 0.7 meters, from samples taken every 2 meters along the 80 meter length of the previous mine workings. Several samples from this previous work reported over 100 g/t gold.

Known veins confirm evidence for up to 200 meters vertical above the level of the main adit while remaining open at depth with 1200 meters strike on 5 separate veins. With further study and diamond drilling to evaluate the resource, under the applicable formalization laws, a near term bulk sample program could potentially be realized by re-opening and modernizing the existing workings using narrow vein, cut and timber, shrinkage stoping methods.

It should be noted that the potential quantity and grade above remains conceptual in nature, and that there has been insufficient exploration to define a mineral resource and that it is uncertain if further exploration will result in Veins B and C on the Project being delineated as a mineral resource.

The Agreement calls for an initial payment of US$50,000 to Canadian Mining for the assignment. To acquire the Project, Inca One must pay Canadian Mining US$1,950,000 (which includes the payment due to the underlying property owner) on or before December 19, 2014.

"We are very excited to have been able to acquire this option on the Corizona Project," stated Edward Kelly, President and CEO of Inca One. "Our internal geological and financial models suggest it is a low capital risk project with great upside potential."

Inca One intends to work closely with Canadian Mining S.A. and in the near future enter into an agreement for the exploration and development of the Project.

The technical information on the Corizona Project in this news release has been prepared in accordance with the Canadian regulatory requirements set up in NI 43-101 and reviewed on behalf of the Company by John Buckle, P.Geo., an independent Qualified Person under NI 43-101.

About Inca One:

Inca One Resources Corp. (TSX VENTURE:IO) is focused on acquiring and advancing properties in Peru with an option to acquire a 100% interest in the Las Huaquillas Gold- Copper project and an option to earn 100% of the Corizona Gold Mining Concession.

In 1998, Sulliden Resources estimated a geological resource on Las Huaquillas of 6.57 million tons grading 2.09 g/t Au and 25.2 g/t Ag (equivalent to 443,000 ounces of gold and 5.3 million ounces of silver)(i). The historical estimate used a cut-off of 1.5 g/t gold and remains open at depth and along its 2.2 Km strike.

(i) Note: The historic resource was calculated in 1998 and the Company has not completed the work necessary to have the historical estimate verified by a Qualified Person. The Company is not treating the estimate as a current NI 43-101 defined resource and the historical estimate should not be relied upon. The Project will require considerable future exploration which the Company intends to carry out in due course.

More information on the project and Inca one can be found on its web site at www.incaone.com.

On behalf of the Board,

INCA ONE RESOURCES CORP.

Edward Kelly, President& CEO

Statements in this press release regarding the Company which are not historical facts are "forward-looking statements" that involve risks and uncertainties. Such information can generally be identified by the use of forwarding-looking wording such as "may", "expect", "estimate", "anticipate", "intend", "believe" and "continue" or the negative thereof or similar variations. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties such as the risk that the closing may not occur for any reason. Actual results in each case could differ materially from those currently anticipated in such statements due to factors such as: (i) the inability of the parties to consummate the definitive letter agreement; (ii) fluctuation of mineral prices; (iii) a change in market conditions; (iv) the inability to produce the technical report for any reason whatsoever; and (v) the refusal of the Exchange to accept the proposed transaction for any reason whatsoever. Except as required by law, the Company does not intend to update any changes to such statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
"Avere Systems is a hybrid cloud solution provider. We have customers that want to use cloud storage and we have customers that want to take advantage of cloud compute," explained Rebecca Thompson, VP of Marketing at Avere Systems, in this SYS-CON.tv interview at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York City, NY.
Large scale deployments present unique planning challenges, system commissioning hurdles between IT and OT and demand careful system hand-off orchestration. In his session at @ThingsExpo, Jeff Smith, Senior Director and a founding member of Incenergy, will discuss some of the key tactics to ensure delivery success based on his experience of the last two years deploying Industrial IoT systems across four continents.
Ovum, a leading technology analyst firm, has published an in-depth report, Ovum Decision Matrix: Selecting a DevOps Release Management Solution, 2016–17. The report focuses on the automation aspects of DevOps, Release Management and compares solutions from the leading vendors.
Keeping pace with advancements in software delivery processes and tooling is taxing even for the most proficient organizations. Point tools, platforms, open source and the increasing adoption of private and public cloud services requires strong engineering rigor – all in the face of developer demands to use the tools of choice. As Agile has settled in as a mainstream practice, now DevOps has emerged as the next wave to improve software delivery speed and output. To make DevOps work, organization...
"This week we're really focusing on scalability, asset preservation and how do you back up to the cloud and in the cloud with object storage, which is really a new way of attacking dealing with your file, your blocked data, where you put it and how you access it," stated Jeff Greenwald, Senior Director of Market Development at HGST, in this SYS-CON.tv interview at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York City, NY.
When it comes to cloud computing, the ability to turn massive amounts of compute cores on and off on demand sounds attractive to IT staff, who need to manage peaks and valleys in user activity. With cloud bursting, the majority of the data can stay on premises while tapping into compute from public cloud providers, reducing risk and minimizing need to move large files. In his session at 18th Cloud Expo, Scott Jeschonek, Director of Product Management at Avere Systems, discussed the IT and busin...
There will be new vendors providing applications, middleware, and connected devices to support the thriving IoT ecosystem. This essentially means that electronic device manufacturers will also be in the software business. Many will be new to building embedded software or robust software. This creates an increased importance on software quality, particularly within the Industrial Internet of Things where business-critical applications are becoming dependent on products controlled by software. Qua...
"We formed Formation several years ago to really address the need for bring complete modernization and software-defined storage to the more classic private cloud marketplace," stated Mark Lewis, Chairman and CEO of Formation Data Systems, in this SYS-CON.tv interview at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York City, NY.
SYS-CON Events has announced today that Roger Strukhoff has been named conference chair of Cloud Expo and @ThingsExpo 2016 Silicon Valley. The 19th Cloud Expo and 6th @ThingsExpo will take place on November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. "The Internet of Things brings trillions of dollars of opportunity to developers and enterprise IT, no matter how you measure it," stated Roger Strukhoff. "More importantly, it leverages the power of devices and the Interne...
"There's a growing demand from users for things to be faster. When you think about all the transactions or interactions users will have with your product and everything that is between those transactions and interactions - what drives us at Catchpoint Systems is the idea to measure that and to analyze it," explained Leo Vasiliou, Director of Web Performance Engineering at Catchpoint Systems, in this SYS-CON.tv interview at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York Ci...
Redis is not only the fastest database, but it is the most popular among the new wave of databases running in containers. Redis speeds up just about every data interaction between your users or operational systems. In his session at 19th Cloud Expo, Dave Nielsen, Developer Advocate, Redis Labs, will share the functions and data structures used to solve everyday use cases that are driving Redis' popularity.
Predictive analytics tools monitor, report, and troubleshoot in order to make proactive decisions about the health, performance, and utilization of storage. Most enterprises combine cloud and on-premise storage, resulting in blended environments of physical, virtual, cloud, and other platforms, which justifies more sophisticated storage analytics. In his session at 18th Cloud Expo, Peter McCallum, Vice President of Datacenter Solutions at FalconStor, discussed using predictive analytics to mon...
Most organizations prioritize data security only after their data has already been compromised. Proactive prevention is important, but how can you accomplish that on a small budget? Learn how the cloud, combined with a defense and in-depth approach, creates efficiencies by transferring and assigning risk. Security requires a multi-defense approach, and an in-house team may only be able to cherry pick from the essential components. In his session at 19th Cloud Expo, Vlad Friedman, CEO/Founder o...
"We host and fully manage cloud data services, whether we store, the data, move the data, or run analytics on the data," stated Kamal Shannak, Senior Development Manager, Cloud Data Services, IBM, in this SYS-CON.tv interview at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York City, NY.
With the proliferation of both SQL and NoSQL databases, organizations can now target specific fit-for-purpose database tools for their different application needs regarding scalability, ease of use, ACID support, etc. Platform as a Service offerings make this even easier now, enabling developers to roll out their own database infrastructure in minutes with minimal management overhead. However, this same amount of flexibility also comes with the challenges of picking the right tool, on the right ...