Click here to close now.




















Welcome!

News Feed Item

Foster Wheeler Awarded Study Contract by ETI to Assess Flexible Power Generation Systems in the UK

Foster Wheeler AG (Nasdaq: FWLT) announced today that its Global Engineering and Construction Group has been awarded a study contract by the Energy Technologies Institute (ETI).

The five-month-long study will assess the economics of flexible power generation systems which involve the production of hydrogen from coal, biomass or natural gas, the intermediate storage of hydrogen (for example in underground salt caverns) and the production of power in flexible turbines. Foster Wheeler will execute the study in collaboration with the British Geological Survey.

The value of Foster Wheeler’s contract was not disclosed and will be included in the company’s first-quarter 2013 bookings.

The study, commissioned and funded by the ETI, will look to map suitable hydrogen storage salt cavern sites in and around the UK. The sites, which tend to be located inland or up to 25 miles off the UK coastline, need to be of sufficient size, depth, location and quality to be considered for hydrogen storage.

According to ETI, flexible power generation systems, such as those to be studied, could provide a valuable contribution to the future energy mix in the UK, filling the gap between base-load nuclear plants and renewable power generation. Such systems would also capture and store carbon dioxide which would otherwise be released into the atmosphere.

This study is part of the ETI’s Carbon Capture & Storage (CCS) Programme and is intended to help the ETI develop a better understanding of the requirements for such energy systems and a more realistic and robust dataset of costs and efficiencies.

Andrew Green, ETI CCS Programme Manager, said, “ETI modelling shows that flexible power generation systems comprising hydrogen generation with CCS, intermediate hydrogen storage (particularly using salt caverns) and flexible turbines are potentially attractive components in any future UK energy system. This project is a first step in a long journey, which could ultimately see such systems as a key part of a future low carbon, flexible and affordable energy system. If successful, the benefits could potentially be huge.”

Umberto della Sala, President and Chief Operating Officer, Foster Wheeler AG, said, “Foster Wheeler has been working with ETI for four years and this latest award confirms ETI’s confidence in our technical expertise in the field of carbon capture and storage, and our ability to deliver high-quality studies. We are delighted to be contributing to the development of a low-carbon energy future in the UK.”

Foster Wheeler AG is a global engineering and construction company and power equipment supplier delivering technically advanced, reliable facilities and equipment. The company employs approximately 12,000 talented professionals with specialized expertise dedicated to serving its clients through one of its two primary business groups. The company’s Global Engineering and Construction Group designs and constructs leading-edge processing facilities for the upstream oil and gas, LNG and gas-to-liquids, refining, chemicals and petrochemicals, power, mining and metals, environmental, pharmaceuticals, biotechnology and healthcare industries. The company’s Global Power Group is a world leader in combustion and steam generation technology that designs, manufactures and erects steam generating and auxiliary equipment for power stations and industrial facilities and also provides a wide range of aftermarket services. The company is based in Zug, Switzerland, and its operational headquarters office is in Geneva, Switzerland. For more information about Foster Wheeler, please visit our Web site at www.fwc.com.

Safe Harbor Statement

Foster Wheeler AG news releases may contain forward-looking statements that are based on management’s assumptions, expectations and projections about the Company and the various industries within which the Company operates. These include statements regarding the Company’s expectations about revenues (including as expressed by its backlog), its liquidity, the outcome of litigation and legal proceedings and recoveries from customers for claims and the costs of current and future asbestos claims and the amount and timing of related insurance recoveries. Such forward-looking statements by their nature involve a degree of risk and uncertainty. The Company cautions that a variety of factors, including but not limited to the factors described in the Company’s most recent Annual Report on Form 10-K, which was filed with the U.S. Securities and Exchange Commission and the following, could cause the Company’s business conditions and results to differ materially from what is contained in forward-looking statements: benefits, effects or results of the Company’s redomestication to Switzerland; the benefits, effects or results of our strategic renewal initiative; further deterioration in global economic condition; changes in investment by the oil and gas, oil refining, chemical/petrochemical and power generation industries; changes in the financial condition of our customers; changes in regulatory environments; changes in project design or schedules; contract cancellations; changes in estimates made by the Company of costs to complete projects; changes in trade, monetary and fiscal policies worldwide; compliance with laws and regulations relating to our global operations; currency fluctuations; war, terrorist attacks and/or natural disasters affecting facilities either owned by the Company or where equipment or services are or may be provided by the Company; interruptions to shipping lanes or other methods of transit; outcomes of pending and future litigation, including litigation regarding the Company’s liability for damages and insurance coverage for asbestos exposure; protection and validity of its patents and other intellectual property rights; increasing global competition; compliance with debt covenants; recoverability of claims against customers and others by the Company and claims by third parties against the Company; and changes in estimates used in our critical accounting policies. Other factors and assumptions not identified above were also involved in the formation of these forward-looking statements and the failure of such other assumptions to be realized, as well as other factors, may also cause actual results to differ materially from those projected. Most of these factors are difficult to predict accurately and are generally beyond the Company’s control. You should consider the areas of risk described above in connection with any forward-looking statements that may be made by the Company. The Company undertakes no obligation to publicly update any forward-looking statements, whether as a result of new information, future events or otherwise. You are advised, however, to consult any additional disclosures the Company makes in proxy statements, quarterly reports on Form 10-Q, annual reports on Form 10-K and current reports on Form 8-K filed or furnished with the Securities and Exchange Commission.

More Stories By Business Wire

Copyright © 2009 Business Wire. All rights reserved. Republication or redistribution of Business Wire content is expressly prohibited without the prior written consent of Business Wire. Business Wire shall not be liable for any errors or delays in the content, or for any actions taken in reliance thereon.

Latest Stories
Learn how to solve the problem of keeping files in sync between multiple Docker containers. In his session at 16th Cloud Expo, Aaron Brongersma, Senior Infrastructure Engineer at Modulus, discussed using rsync, GlusterFS, EBS and Bit Torrent Sync. He broke down the tools that are needed to help create a seamless user experience. In the end, can we have an environment where we can easily move Docker containers, servers, and volumes without impacting our applications? He shared his results so yo...
Palerra, the cloud security automation company, announced enhanced support for Amazon AWS, allowing IT security and DevOps teams to automate activity and configuration monitoring, anomaly detection, and orchestrated remediation, thereby meeting compliance mandates within complex infrastructure deployments. "Monitoring and threat detection for AWS is a non-trivial task. While Amazon's flexible environment facilitates successful DevOps implementations, it adds another layer, which can become a ...
With SaaS use rampant across organizations, how can IT departments track company data and maintain security? More and more departments are commissioning their own solutions and bypassing IT. A cloud environment is amorphous and powerful, allowing you to set up solutions for all of your user needs: document sharing and collaboration, mobile access, e-mail, even industry-specific applications. In his session at 16th Cloud Expo, Shawn Mills, President and a founder of Green House Data, discussed h...
The Software Defined Data Center (SDDC), which enables organizations to seamlessly run in a hybrid cloud model (public + private cloud), is here to stay. IDC estimates that the software-defined networking market will be valued at $3.7 billion by 2016. Security is a key component and benefit of the SDDC, and offers an opportunity to build security 'from the ground up' and weave it into the environment from day one. In his session at 16th Cloud Expo, Reuven Harrison, CTO and Co-Founder of Tufin,...
SYS-CON Events announced today that MobiDev, a software development company, will exhibit at the 17th International Cloud Expo®, which will take place November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. MobiDev is a software development company with representative offices in Atlanta (US), Sheffield (UK) and Würzburg (Germany); and development centers in Ukraine. Since 2009 it has grown from a small group of passionate engineers and business managers to a full-scale mobi...
There are many considerations when moving applications from on-premise to cloud. It is critical to understand the benefits and also challenges of this migration. A successful migration will result in lower Total Cost of Ownership, yet offer the same or higher level of robustness. In his session at 15th Cloud Expo, Michael Meiner, an Engineering Director at Oracle, Corporation, analyzed a range of cloud offerings (IaaS, PaaS, SaaS) and discussed the benefits/challenges of migrating to each offe...
Chuck Piluso presented a study of cloud adoption trends and the power and flexibility of IBM Power and Pureflex cloud solutions. Prior to Secure Infrastructure and Services, Mr. Piluso founded North American Telecommunication Corporation, a facilities-based Competitive Local Exchange Carrier licensed by the Public Service Commission in 10 states, serving as the company's chairman and president from 1997 to 2000. Between 1990 and 1997, Mr. Piluso served as chairman & founder of International Te...
Mobile, social, Big Data, and cloud have fundamentally changed the way we live. “Anytime, anywhere” access to data and information is no longer a luxury; it’s a requirement, in both our personal and professional lives. For IT organizations, this means pressure has never been greater to deliver meaningful services to the business and customers.
In their session at 17th Cloud Expo, Hal Schwartz, CEO of Secure Infrastructure & Services (SIAS), and Chuck Paolillo, CTO of Secure Infrastructure & Services (SIAS), provide a study of cloud adoption trends and the power and flexibility of IBM Power and Pureflex cloud solutions. In his role as CEO of Secure Infrastructure & Services (SIAS), Hal Schwartz provides leadership and direction for the company.
In a recent research, analyst firm IDC found that the average cost of a critical application failure is $500,000 to $1 million per hour and the average total cost of unplanned application downtime is $1.25 billion to $2.5 billion per year for Fortune 1000 companies. In addition to the findings on the cost of the downtime, the research also highlighted best practices for development, testing, application support, infrastructure, and operations teams.
Puppet Labs has announced the next major update to its flagship product: Puppet Enterprise 2015.2. This release includes new features providing DevOps teams with clarity, simplicity and additional management capabilities, including an all-new user interface, an interactive graph for visualizing infrastructure code, a new unified agent and broader infrastructure support.
For IoT to grow as quickly as analyst firms’ project, a lot is going to fall on developers to quickly bring applications to market. But the lack of a standard development platform threatens to slow growth and make application development more time consuming and costly, much like we’ve seen in the mobile space. In his session at @ThingsExpo, Mike Weiner, Product Manager of the Omega DevCloud with KORE Telematics Inc., discussed the evolving requirements for developers as IoT matures and conducte...
Container technology is sending shock waves through the world of cloud computing. Heralded as the 'next big thing,' containers provide software owners a consistent way to package their software and dependencies while infrastructure operators benefit from a standard way to deploy and run them. Containers present new challenges for tracking usage due to their dynamic nature. They can also be deployed to bare metal, virtual machines and various cloud platforms. How do software owners track the usag...
Explosive growth in connected devices. Enormous amounts of data for collection and analysis. Critical use of data for split-second decision making and actionable information. All three are factors in making the Internet of Things a reality. Yet, any one factor would have an IT organization pondering its infrastructure strategy. How should your organization enhance its IT framework to enable an Internet of Things implementation? In his session at @ThingsExpo, James Kirkland, Red Hat's Chief Arch...
Providing the needed data for application development and testing is a huge headache for most organizations. The problems are often the same across companies - speed, quality, cost, and control. Provisioning data can take days or weeks, every time a refresh is required. Using dummy data leads to quality problems. Creating physical copies of large data sets and sending them to distributed teams of developers eats up expensive storage and bandwidth resources. And, all of these copies proliferating...