Welcome!

News Feed Item

Orex Commences 2014 Field Operations in Sinaloa State, Mexico; Previously Unanalyzed Drill Core at Los Crestones Returns New Mineralized Intercepts

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 01/15/14 -- Orex Minerals Inc. - (TSX VENTURE: REX) ("Orex"), is pleased to announce that it has compiled all available historical data from the Los Crestones Project 100km north of the Sinaloa state capital, Culiacan, Mexico. Work included analysis of previously sampled but not assayed intervals from diamond drilling by the previous owner. Work has now begun on the 2014 exploration programme which is planned to include surface mapping, sampling and trenching and air/ground geophysics in preparation for a campaign of diamond drilling. Community negotiations are continuing and expected to run in parallel with the exploration work.

Los Crestones Project

The Project was acquired in 2013 by merger with junior explorer Astral Mining Corporation. Astral optioned the property in early 2011 and had completed a 12 month exploration programme culminating in an 18 hole, 2,618m diamond drilling program late in that year. Reported results from the first pass drilling, returned a best intercept of 5m averaging 39.1 g/t Au, 93.3 g/t Ag and 2.13% Cu from 55m depth in HQ drillhole 11LD011. True width of this interval from the Bohemia structure is approximately 3.53m. The project has been maintained but not worked since Astral's drilling programme. During 2013 Orex was active in the area, reinforcing positive relations with local communities and is confident of strong community support in the resumption of work.

The Los Crestones project totals 4,168 hectares and is prospective for economic gold, silver and copper mineralization. The present interpretation of mineralization is that of north-south oriented structural zones hosting quartz veins, quartz stockworks and breccia fill. Three main structural zones were targeted in the first phases of work. Corona, Bohemia and Indio are elongate structures recognized on surface as erosion-resistant silicified ribs or "crestons". In addition several other sub-parallel structures are known on the property and will be further investigated in the coming months. Maximum length on the individual structures to date is 900m. Current geological maps are available at Orex's website here.

Los Crestones is located within the highly prospective Gold-Silver Trend of the Sierra Madre Occidental, Western Mexico. Orex recognizes the favourable structural setting of known showings. During 2014 Orex plans to significantly enhance geological and structural understanding before drilling commences.

2014 Exploration Programme

The updated project database includes previously unreported drilling results. During 2013, Orex commissioned the analysis of drill core samples previously submitted to ALS Chemex but cancelled due to lack of available funds.

Results from this work reveal new significant intercepts from Astral's drilling with a best result of 0.45m grading 45.8 g/t Au, 87 g/t Ag and 2.41% Cu from 32.8m depth in hole 11LD014 (estimated true width 0.35m). This interval upgrades the significance of the hole which was previously reported with a best value of 1m grading 2.65 g/t Au, 1.7g/t Ag and 0.05% Cu from 60m (estimated true width 0.77m). In addition, 1.5m grading 5.79 g/t Au, 3 g/t Ag and 0.01% Cu from 36m depth in the hole 11LD011 was also returned (estimated true width 1.06m), further enhancing the best hole of the original drilling programme. A full breakdown of updated assay results from the 2011 diamond drilling program is supplied on Orex's website here.

According to Orex's President, Gary Cope, "Los Crestones is a prime example of an underexplored, early-stage project located on a highly prospective and proven mineral trend. The project had seen no modern exploration before Astral, and Orex is very excited to have the chance to make a significant discovery here."

Full details of previous sampling and a drilling location map have been prepared for the Orex website, www.orexminerals.com.

Dale Brittliffe, P.Geo, is a Qualified Person as defined in NI 43-101 and takes responsibility for the technical disclosure contained within this news release. Mr. Brittliffe oversaw the QA/QC protocols on behalf of Astral Mining during the diamond drilling program in 2011 which included the systematic insertion of analytical standards, blanks and duplicates. Analyses were performed by ALS Chemex. The updated drill data are in agreement with the general tenor of mineralization originally sampled from surface on the main mineralized structures outcropping at Los Crestones.

ABOUT OREX MINERALS INC.

Orex Minerals Inc. (TSX VENTURE: REX) is a Canadian-based junior exploration company comprised of highly qualified mining professionals. The Company has several current projects: its flagship property, the Barsele Gold Project in Sweden, the Los Crestones Gold-Silver Project in Sinaloa, Mexico, the Persistence Gold-Copper Project and Jumping Josephine Gold-Silver Project in British Columbia, and the Coneto Gold-Silver Project in Durango, Mexico, which is currently under option to Fresnillo PLC.

ON BEHALF OF THE BOARD OF DIRECTORS

Gary Cope, President

FORWARD-LOOKING INFORATION

This News Release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements and Orex undertakes no obligation to update such statements, except as required by law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

---------------------------------------------------------------------------
                                                    Core Length  True Width
HOLEID         Target          From (m)      To (m)         (m)         (m)
---------------------------------------------------------------------------
11LD001        Corona             64.25        65.1        0.85        0.77
---------------------------------------------------------------------------
and            Corona              71.1        72.1           1        0.91
---------------------------------------------------------------------------
11LD002        Corona                  no significant intercepts
---------------------------------------------------------------------------
11LD003        Indio               9.15       24.16       15.01        13.6
---------------------------------------------------------------------------
Incl                               12.3        17.7         5.4        4.89
---------------------------------------------------------------------------
Incl                              23.11       24.16        1.05        0.95
---------------------------------------------------------------------------
And            Indio              26.16       27.16           1        0.91
---------------------------------------------------------------------------
And            Bohemia            109.6      110.58        0.98        0.89
---------------------------------------------------------------------------
And            Bohemia           115.25         116        0.75        0.68
---------------------------------------------------------------------------
11LD004        Indio                6.1       15.25        9.15        7.01
---------------------------------------------------------------------------
Incl                                6.1        6.85        0.75        0.57
---------------------------------------------------------------------------
And            Indio                 18        24.4         6.4         4.9
---------------------------------------------------------------------------
Incl                                 18       22.12        4.12        3.16
---------------------------------------------------------------------------
Incl                              21.35        24.4        3.05        2.34
---------------------------------------------------------------------------
Incl                              21.35       22.27        0.92         0.7
---------------------------------------------------------------------------
And            Indio               25.8       26.06        0.26         0.2
---------------------------------------------------------------------------
11LD005        Indio               9.15        14.4        5.25        4.72
---------------------------------------------------------------------------
Incl                              13.15        14.4        1.25        1.12
---------------------------------------------------------------------------
11LD006        Indio             138.15      141.24        3.09         1.3
---------------------------------------------------------------------------
incl                             138.15      139.24        1.09        0.46
---------------------------------------------------------------------------
11LD007        Indio             126.65      127.05         0.4        0.17
---------------------------------------------------------------------------
11LD007        Indio             134.07      135.67         1.6        0.68
---------------------------------------------------------------------------
11LD008(ii)    Indio              54.48       56.48           2        1.82
---------------------------------------------------------------------------
11LD008        Indio              57.42          58        0.58        0.53
---------------------------------------------------------------------------
11LD008        Indio                 62          63           1        0.91
---------------------------------------------------------------------------
11LD008        Indio                 64          65           1        0.91
---------------------------------------------------------------------------
11LD008        Indio              71.06       71.41        0.35        0.32
---------------------------------------------------------------------------
11LD008        Indio              73.05       75.54        2.49        2.26
---------------------------------------------------------------------------
incl                              73.05       74.05           1        0.91
---------------------------------------------------------------------------
11LD009(ii)    Bohemia             1.25        3.05         1.8        1.64
---------------------------------------------------------------------------
11LD009        Bohemia             20.2        20.9         0.7        0.63
---------------------------------------------------------------------------
11LD010        Bohemia               50          54           4        3.43
---------------------------------------------------------------------------
incl                                 50          51           1        0.86
---------------------------------------------------------------------------
11LD010        Bohemia               56          61           5        4.29
---------------------------------------------------------------------------
11LD011(ii)    Bohemia               36        37.5         1.5        1.06
---------------------------------------------------------------------------
11LD011(i)     Bohemia               39          43     4.00(i)     2.83(i)
---------------------------------------------------------------------------
Incl(i)                           39.85       40.25     0.40(i)     0.28(i)
---------------------------------------------------------------------------
Incl(i)                              41          42     1.00(i)     0.71(i)
---------------------------------------------------------------------------
11LD011        Bohemia             46.3          47         0.7        0.49
---------------------------------------------------------------------------
11LD011        Bohemia               55          60           5        3.53
---------------------------------------------------------------------------
incl                                 55          56           1        0.71
---------------------------------------------------------------------------
incl                                 58          59           1        0.71
---------------------------------------------------------------------------
incl                                 59          60           1        0.71
---------------------------------------------------------------------------
11LD012        Bohemia               57        60.6         3.6        2.06
---------------------------------------------------------------------------
incl                                 57          58           1        0.57
---------------------------------------------------------------------------
11LD013        Bohemia            rods stuck - hole abandoned at 32m
---------------------------------------------------------------------------
11LD014(ii)    Bohemia             32.8       33.25        0.45        0.35
---------------------------------------------------------------------------
11LD014        Bohemia               60          61           1        0.77
---------------------------------------------------------------------------
11LD015        Bohemia            72.58       73.51        0.93        0.53
---------------------------------------------------------------------------
incl                              72.58        73.1        0.52         0.3
---------------------------------------------------------------------------
incl                               73.1       73.51        0.41        0.24
---------------------------------------------------------------------------
11LD016        Indio              19.65        21.6        1.95        1.49
---------------------------------------------------------------------------
Incl                              19.65        20.6        0.95        0.73
---------------------------------------------------------------------------
Incl                               20.6        21.6           1        0.77
---------------------------------------------------------------------------
11LD017        Indio               22.7       23.55        0.85        0.65
---------------------------------------------------------------------------
11LD018        Indio                 30        30.6         0.6        0.46
---------------------------------------------------------------------------
(i) interval strongly fractured, up to 0.65m of core lost between the 39m
and 43m downhole
---------------------------------------------------------------------------
(ii) Previously unreported results from analysis of un-assayed 2011 diamond
drilling sampling
---------------------------------------------------------------------------

---------------------------------------------------------------------------
HOLEID             Au (g/t)    Ag (g/t)      Cu (%) Au Eq (g/t) Ag Eq (g/t)
---------------------------------------------------------------------------
11LD001                0.26           1        0.01        0.28          17
---------------------------------------------------------------------------
and                    1.31           1        0.01        1.32          79
---------------------------------------------------------------------------
11LD002                          no significant intercepts
---------------------------------------------------------------------------
11LD003                0.35           8        0.44        0.48          29
---------------------------------------------------------------------------
Incl                    0.6           2        0.13        0.64          38
---------------------------------------------------------------------------
Incl                   0.15          34        2.43        0.72          43
---------------------------------------------------------------------------
And                    0.63           3        0.04        0.68          41
---------------------------------------------------------------------------
And                    0.39          59         0.1        1.37          82
---------------------------------------------------------------------------
And                    0.53           7        0.06        0.64          39
---------------------------------------------------------------------------
11LD004                0.11           8        0.45        0.24          14
---------------------------------------------------------------------------
Incl                   0.55          49        0.61        1.37          82
---------------------------------------------------------------------------
And                    0.53          16        0.77         0.8          48
---------------------------------------------------------------------------
Incl                   0.82          16        0.81        1.09          66
---------------------------------------------------------------------------
Incl                   0.13          28        1.16        0.59          36
---------------------------------------------------------------------------
Incl                   0.39          64        2.65        1.45          87
---------------------------------------------------------------------------
And                    0.07         120        3.19        2.07         124
---------------------------------------------------------------------------
11LD005                1.06           2        0.14         1.1          66
---------------------------------------------------------------------------
Incl                    2.7           3        0.22        2.75         165
---------------------------------------------------------------------------
11LD006                0.14         479         3.5        8.12         487
---------------------------------------------------------------------------
incl                   0.24        1230        8.91       20.74        1244
---------------------------------------------------------------------------
11LD007                0.03          50        0.09        0.87          52
---------------------------------------------------------------------------
11LD007                0.03          59        0.89        1.01          61
---------------------------------------------------------------------------
11LD008(ii)            1.22           1        0.01        1.24          75
---------------------------------------------------------------------------
11LD008                0.53          94        2.75         2.1         126
---------------------------------------------------------------------------
11LD008                1.71           1        0.06        1.73         104
---------------------------------------------------------------------------
11LD008                2.93           2        0.08        2.96         178
---------------------------------------------------------------------------
11LD008                0.03          51        1.67        0.87          52
---------------------------------------------------------------------------
11LD008                20.4          22        0.82       20.77       1,246
---------------------------------------------------------------------------
incl                   49.9          33        1.35       50.45       3,027
---------------------------------------------------------------------------
11LD009(ii)            0.76           5        0.28        0.85          51
---------------------------------------------------------------------------
11LD009                0.56          12        0.43        0.76          45
---------------------------------------------------------------------------
11LD010                9.13          42        0.55        9.83         590
---------------------------------------------------------------------------
incl                     30         150        1.06        32.5       1,950
---------------------------------------------------------------------------
11LD010                1.32           4        0.22        1.39          83
---------------------------------------------------------------------------
11LD011(ii)            5.79           3        0.01        5.84         350
---------------------------------------------------------------------------
11LD011(i)               30         259        3.06       34.32       2,059
---------------------------------------------------------------------------
Incl(i)                22.8         347        5.28       28.58       1,715
---------------------------------------------------------------------------
Incl(i)                93.4         657        6.33      104.35       6,261
---------------------------------------------------------------------------
11LD011                41.6         256        5.24       45.87       2,752
---------------------------------------------------------------------------
11LD011                39.1          93        2.13       40.66       2,439
---------------------------------------------------------------------------
incl                   13.2          88        2.77       14.67         880
---------------------------------------------------------------------------
incl                  13.85          61        3.06       14.87         892
---------------------------------------------------------------------------
incl                  162.5         270        3.02         167      10,020
---------------------------------------------------------------------------
11LD012                2.41          30        0.02        2.91         175
---------------------------------------------------------------------------
incl                   4.47          34        0.19        5.03         302
---------------------------------------------------------------------------
11LD013                     rods stuck - hole abandoned at 32m
---------------------------------------------------------------------------
11LD014(ii)            45.8          87        2.41       47.25       2,835
---------------------------------------------------------------------------
11LD014                2.65           2        0.05        2.68         161
---------------------------------------------------------------------------
11LD015                1.26          37        2.01        1.87         112
---------------------------------------------------------------------------
incl                   0.32          64        3.57        1.39          83
---------------------------------------------------------------------------
incl                   2.46           2        0.03        2.49         149
---------------------------------------------------------------------------
11LD016                0.07         104        0.75         1.8         108
---------------------------------------------------------------------------
Incl                   0.06         170        0.88        2.89         174
---------------------------------------------------------------------------
Incl                   0.08          32        0.57        0.62          37
---------------------------------------------------------------------------
11LD017                0.76          34        1.15        1.33          80
---------------------------------------------------------------------------
11LD018                0.27          22         0.7        0.64          38
---------------------------------------------------------------------------
(i) interval strongly fractured, up to 0.65m of core lost between the 39m
and 43m downhole
---------------------------------------------------------------------------
(ii) Previously unreported results from analysis of un-assayed 2011 diamond
drilling sampling
---------------------------------------------------------------------------

Contacts:
Orex Minerals Inc.
(604) 687-8566 x227
[email protected]
www.orexminerals.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Transforming cloud-based data into a reportable format can be a very expensive, time-intensive and complex operation. As a SaaS platform with more than 30 million global users, Cornerstone OnDemand’s challenge was to create a scalable solution that would improve the time it took customers to access their user data. Our Real-Time Data Warehouse (RTDW) process vastly reduced data time-to-availability from 24 hours to just 10 minutes. In his session at 21st Cloud Expo, Mark Goldin, Chief Technolo...
The next XaaS is CICDaaS. Why? Because CICD saves developers a huge amount of time. CD is an especially great option for projects that require multiple and frequent contributions to be integrated. But… securing CICD best practices is an emerging, essential, yet little understood practice for DevOps teams and their Cloud Service Providers. The only way to get CICD to work in a highly secure environment takes collaboration, patience and persistence. Building CICD in the cloud requires rigorous ar...
In this strange new world where more and more power is drawn from business technology, companies are effectively straddling two paths on the road to innovation and transformation into digital enterprises. The first path is the heritage trail – with “legacy” technology forming the background. Here, extant technologies are transformed by core IT teams to provide more API-driven approaches. Legacy systems can restrict companies that are transitioning into digital enterprises. To truly become a lead...
SYS-CON Events announced today that CAST Software will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 - Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. CAST was founded more than 25 years ago to make the invisible visible. Built around the idea that even the best analytics on the market still leave blind spots for technical teams looking to deliver better software and prevent outages, CAST provides the software intelligence that matter ...
SYS-CON Events announced today that Daiya Industry will exhibit at the Japanese Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Ruby Development Inc. builds new services in short period of time and provides a continuous support of those services based on Ruby on Rails. For more information, please visit https://github.com/RubyDevInc.
When it comes to cloud computing, the ability to turn massive amounts of compute cores on and off on demand sounds attractive to IT staff, who need to manage peaks and valleys in user activity. With cloud bursting, the majority of the data can stay on premises while tapping into compute from public cloud providers, reducing risk and minimizing need to move large files. In his session at 18th Cloud Expo, Scott Jeschonek, Director of Product Management at Avere Systems, discussed the IT and busine...
As businesses evolve, they need technology that is simple to help them succeed today and flexible enough to help them build for tomorrow. Chrome is fit for the workplace of the future — providing a secure, consistent user experience across a range of devices that can be used anywhere. In her session at 21st Cloud Expo, Vidya Nagarajan, a Senior Product Manager at Google, will take a look at various options as to how ChromeOS can be leveraged to interact with people on the devices, and formats th...
Is advanced scheduling in Kubernetes achievable? Yes, however, how do you properly accommodate every real-life scenario that a Kubernetes user might encounter? How do you leverage advanced scheduling techniques to shape and describe each scenario in easy-to-use rules and configurations? In his session at @DevOpsSummit at 21st Cloud Expo, Oleg Chunikhin, CTO at Kublr, will answer these questions and demonstrate techniques for implementing advanced scheduling. For example, using spot instances ...
First generation hyperconverged solutions have taken the data center by storm, rapidly proliferating in pockets everywhere to provide further consolidation of floor space and workloads. These first generation solutions are not without challenges, however. In his session at 21st Cloud Expo, Wes Talbert, a Principal Architect and results-driven enterprise sales leader at NetApp, will discuss how the HCI solution of tomorrow will integrate with the public cloud to deliver a quality hybrid cloud e...
SYS-CON Events announced today that Yuasa System will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Yuasa System is introducing a multi-purpose endurance testing system for flexible displays, OLED devices, flexible substrates, flat cables, and films in smartphones, wearables, automobiles, and healthcare.
Companies are harnessing data in ways we once associated with science fiction. Analysts have access to a plethora of visualization and reporting tools, but considering the vast amount of data businesses collect and limitations of CPUs, end users are forced to design their structures and systems with limitations. Until now. As the cloud toolkit to analyze data has evolved, GPUs have stepped in to massively parallel SQL, visualization and machine learning.
DevOps is under attack because developers don’t want to mess with infrastructure. They will happily own their code into production, but want to use platforms instead of raw automation. That’s changing the landscape that we understand as DevOps with both architecture concepts (CloudNative) and process redefinition (SRE). Rob Hirschfeld’s recent work in Kubernetes operations has led to the conclusion that containers and related platforms have changed the way we should be thinking about DevOps and...
The session is centered around the tracing of systems on cloud using technologies like ebpf. The goal is to talk about what this technology is all about and what purpose it serves. In his session at 21st Cloud Expo, Shashank Jain, Development Architect at SAP, will touch upon concepts of observability in the cloud and also some of the challenges we have. Generally most cloud-based monitoring tools capture details at a very granular level. To troubleshoot problems this might not be good enough.
When it comes to cloud computing, the ability to turn massive amounts of compute cores on and off on demand sounds attractive to IT staff, who need to manage peaks and valleys in user activity. With cloud bursting, the majority of the data can stay on premises while tapping into compute from public cloud providers, reducing risk and minimizing need to move large files. In his session at 18th Cloud Expo, Scott Jeschonek, Director of Product Management at Avere Systems, discussed the IT and busine...
SYS-CON Events announced today that Dasher Technologies will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 - Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Dasher Technologies, Inc. ® is a premier IT solution provider that delivers expert technical resources along with trusted account executives to architect and deliver complete IT solutions and services to help our clients execute their goals, plans and objectives. Since 1999, we'v...