Welcome!

News Feed Item

Copper Mountain announces production results for 2013

Web Site: www.CuMtn.com
TSX: CUM

VANCOUVER, Jan. 15, 2014 /PRNewswire/ - Copper Mountain Mining Corporation (TSX: CUM) (the "Company" or "Copper Mountain") announces production results for the year ended December 2013 from the Copper Mountain mine located in southern British Columbia.

In 2013 the mine produced 66.2 million pounds of copper, 21.6 thousand ounces of gold, and 320.4 thousand ounces of silver.  The mill averaged 87.8% operating time for the year and a total of 10.1 million tonnes of ore was milled at an average grade of 0.35 % Copper.  The mill exited the year on a positive note with a throughput rate averaging 32,767 tpd for the month of December, a significant improvement over an average daily throughput rate of 26,000 tpd achieved during the 2012 year.

Improvements in mill throughput are attributable to the short term secondary crushing strategies which included increased powder factor in the mine and the installation of portable crushing plants ahead of the SAG mill. The combination of these activities is designed to create approximately 12,000 tpd of minus two inch ore feed for the SAG mill.  Mill tonnage from these short term strategies in December averaged about 10,000 tpd or 30 percent of the mill feed being crushed to an average size of minus two inch.  These short term measures have had positive results towards increasing mill throughput and activities are progressing to further increase mill throughput to 35,000 tpd by installing a permanent crusher to crush 100 percent of the mill feed to the 2 inch range.

The mine exited the quarter on a very positive note with a mill availability of 94.7% and copper production of 6.8 million pounds for the month of December.  Mine production for the quarter ended December 31, 2013 was 18.6 million pounds of copper, 4,300 ounces of gold, and 105,800 ounces of silver, which is the highest production quarter since the mine commenced operations, despite having a transformer interruption during the quarter.  The 4th quarter's production numbers were based on a recovery of 85% and an ore head grade of 0.375% Copper. 

Mining activities continued from both the Pit 2 and Pit 3 areas and averaged approximately 166,000 tonnes per day.  During the 2013 year a total of 56.7 million tonnes of material was mined, including 16.6 million tonnes of ore and 40.1 million tonnes of waste. The projected life of mine strip ratio is 2 to 1 but higher in the early years.

About Copper Mountain Mining Corporation:
Copper Mountain's flagship asset is the 75% owned Copper Mountain mine located in southern British Columbia near the town of Princeton. The Company has a strategic alliance with Mitsubishi Materials Corporation who owns the remaining 25%. The Copper Mountain mine commenced production in the summer of 2011 and has continued to improve its operations during the current year. The 18,000 acre site has a large resource of copper that remains open laterally and at depth. The mine has significant exploration potential that will need to be explored over the next few years to fully appreciate the properties full development potential.  Additional information is available on the Company's web page at www.CuMtn.com.

On behalf of the Board of
COPPER MOUNTAIN MINING CORPORATION

"Jim O'Rourke" 

Jim O'Rourke, P.Eng.
Chief Executive Officer

Note:  This release contains forward-looking statements that involve risks and uncertainties.  These statements may differ materially from actual future events or results.  Readers are referred to the documents, filed by the Company on SEDAR at www.sedar.com, specifically the most recent reports which identify important risk factors that could cause actual results to differ from those contained in the forward-looking statements.  The Company undertakes no obligation to review or confirm analysts' expectations or estimates or to release publicly any revisions to any forward-looking statement.

SOURCE Copper Mountain Mining Corporation

More Stories By PR Newswire

Copyright © 2007 PR Newswire. All rights reserved. Republication or redistribution of PRNewswire content is expressly prohibited without the prior written consent of PRNewswire. PRNewswire shall not be liable for any errors or delays in the content, or for any actions taken in reliance thereon.

Latest Stories
Redis is not only the fastest database, but it is the most popular among the new wave of databases running in containers. Redis speeds up just about every data interaction between your users or operational systems. In his session at 19th Cloud Expo, Dave Nielsen, Developer Advocate, Redis Labs, will share the functions and data structures used to solve everyday use cases that are driving Redis' popularity.
UpGuard has become a member of the Center for Internet Security (CIS), and will continue to help businesses expand visibility into their cyber risk by providing hardening benchmarks to all customers. By incorporating these benchmarks, UpGuard's CSTAR solution builds on its lead in providing the most complete assessment of both internal and external cyber risk. CIS benchmarks are a widely accepted set of hardening guidelines that have been publicly available for years. Numerous solutions exist t...
"We're bringing out a new application monitoring system to the DevOps space. It manages large enterprise applications that are distributed throughout a node in many enterprises and we manage them as one collective," explained Kevin Barnes, President of eCube Systems, in this SYS-CON.tv interview at DevOps at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York City, NY.
Choosing the right cloud for your workloads is a balancing act that can cost your organization time, money and aggravation - unless you get it right the first time. Economics, speed, performance, accessibility, administrative needs and security all play a vital role in dictating your approach to the cloud. Without knowing the right questions to ask, you could wind up paying for capacity you'll never need or underestimating the resources required to run your applications.
SYS-CON Events announced today that LeaseWeb USA, a cloud Infrastructure-as-a-Service (IaaS) provider, will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. LeaseWeb is one of the world's largest hosting brands. The company helps customers define, develop and deploy IT infrastructure tailored to their exact business needs, by combining various kinds cloud solutions.
Adding public cloud resources to an existing application can be a daunting process. The tools that you currently use to manage the software and hardware outside the cloud aren’t always the best tools to efficiently grow into the cloud. All of the major configuration management tools have cloud orchestration plugins that can be leveraged, but there are also cloud-native tools that can dramatically improve the efficiency of managing your application lifecycle. In his session at 18th Cloud Expo, ...
The competitive landscape of the global cloud computing market in the healthcare industry is crowded due to the presence of a large number of players. The large number of participants has led to the fragmented nature of the market. Some of the major players operating in the global cloud computing market in the healthcare industry are Cisco Systems Inc., Carestream Health Inc., Carecloud Corp., AGFA Healthcare, IBM Corp., Cleardata Networks, Merge Healthcare Inc., Microsoft Corp., Intel Corp., an...
SYS-CON Events announced today the Kubernetes and Google Container Engine Workshop, being held November 3, 2016, in conjunction with @DevOpsSummit at 19th Cloud Expo at the Santa Clara Convention Center in Santa Clara, CA. This workshop led by Sebastian Scheele introduces participants to Kubernetes and Google Container Engine (GKE). Through a combination of instructor-led presentations, demonstrations, and hands-on labs, students learn the key concepts and practices for deploying and maintainin...
StackIQ has announced the release of Stacki 3.2. Stacki is an easy-to-use Linux server provisioning tool. Stacki 3.2 delivers new capabilities that simplify the automation and integration of site-specific requirements. StackIQ is the commercial entity behind this open source bare metal provisioning tool. Since the release of Stacki in June of 2015, the Stacki core team has been focused on making the Community Edition meet the needs of members of the community, adding features and value, while ...
Using new techniques of information modeling, indexing, and processing, new cloud-based systems can support cloud-based workloads previously not possible for high-throughput insurance, banking, and case-based applications. In his session at 18th Cloud Expo, John Newton, CTO, Founder and Chairman of Alfresco, described how to scale cloud-based content management repositories to store, manage, and retrieve billions of documents and related information with fast and linear scalability. He addres...
Is your aging software platform suffering from technical debt while the market changes and demands new solutions at a faster clip? It’s a bold move, but you might consider walking away from your core platform and starting fresh. ReadyTalk did exactly that. In his General Session at 19th Cloud Expo, Michael Chambliss, Head of Engineering at ReadyTalk, will discuss why and how ReadyTalk diverted from healthy revenue and over a decade of audio conferencing product development to start an innovati...
Amazon has gradually rolled out parts of its IoT offerings in the last year, but these are just the tip of the iceberg. In addition to optimizing their back-end AWS offerings, Amazon is laying the ground work to be a major force in IoT – especially in the connected home and office. Amazon is extending its reach by building on its dominant Cloud IoT platform, its Dash Button strategy, recently announced Replenishment Services, the Echo/Alexa voice recognition control platform, the 6-7 strategic...
Ovum, a leading technology analyst firm, has published an in-depth report, Ovum Decision Matrix: Selecting a DevOps Release Management Solution, 2016–17. The report focuses on the automation aspects of DevOps, Release Management and compares solutions from the leading vendors.
Continuous testing helps bridge the gap between developing quickly and maintaining high quality products. But to implement continuous testing, CTOs must take a strategic approach to building a testing infrastructure and toolset that empowers their team to move fast. Download our guide to laying the groundwork for a scalable continuous testing strategy.
SYS-CON Events announced today that Venafi, the Immune System for the Internet™ and the leading provider of Next Generation Trust Protection, will exhibit at @DevOpsSummit at 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. Venafi is the Immune System for the Internet™ that protects the foundation of all cybersecurity – cryptographic keys and digital certificates – so they can’t be misused by bad guys in attacks...