Welcome!

News Feed Item

GTA Updates Progress on the Auden Graphite Project; Identifies Three Priority EM Targets

BURLINGTON, ONTARIO -- (Marketwired) -- 01/15/14 -- GTA Resources and Mining Inc. (TSX VENTURE: GTA) announces the continuation of its graphite exploration program on the Auden Property, located northwest of Hearst, Ontario. A drill program, which commenced in mid December, was temporarily postponed to allow for the Christmas break and for more effective frost conditions allowing better access to other target areas. Prior to the Christmas break, one hole totaling 70 metres was completed targeting a weak EM anomaly located in the west central portion of the property and easily accessible from existing roads. The hole intersected a clay filled fault zone near the interpreted conductor axis, however, no graphite was encountered.

Ground geophysics is continuing and has resulted in the delineation of three additional isolated Electro-Magnetic (EM) conductors in the central "Hockey Puck" target area. The anomalies can be described as isolated, moderately strong bedrock conductors, and all are located within or proximal to the southern extension of the alkaline intrusive complex that hosts Zenyatta's Albany graphite deposits. All three anomalies appear to be non-magnetic, are accessible by winter trail and will be the initial focus once drilling resumes later this month. GTA is continuing its ground geophysical program of locating and evaluating the EM conductors identified from the airborne surveys and anticipates drill testing the priority targets as weather allows.

"The Auden Property has taken on a much higher priority for GTA since mid 2013 and we look forward to starting up the drill again in late January," stated GTA President Wayne Reid. "The ground geophysics is continuing to identify additional targets and as the work progresses, the quality of conductors appears to be improving. This is demonstrated by the recently identified EM targets described above, whose potential is also enhanced by their proximity to the carbonatite/alkaline complex associated with Zenyatta's discoveries. Our understanding of the parameters associated with this new type of graphite deposit is limited and we expect a few surprises going forward."

GTA is the largest land holder in the emerging graphite "camp" and holds the mineral rights to over 69,000 acres. The Albany graphite deposits, located 5.5 km north of GTA's property, were initially discovered by Zenyatta, while testing electromagnetic (EM) targets, and have been described as breccia pipes (diatremes) with dimensions in the order of 200 m by 400 m. GTA's management and geological consultants believe that the graphite breccia pipes that exist on Zenyatta's Albany Project are similar to kimberlite pipes and are likely to occur in clusters along structural corridors that may extend onto GTA's Auden Property.

Previous work by GTA has identified a number of electromagnetic anomalies (conductive zones), on the Auden Property from an in-house airborne geophysical survey which was recently extended to cover the entire property. The anomalies are the focus of the current exploration program. Most targets are accessible via existing logging roads and bush trails originating from Hwy 11 located 15 km to the south. An Ontario exploration permit is in place and a recently signed exploration agreement with Constance Lake First Nation allows for a co-operative continuous field program to evaluate the graphite potential on the Auden Property.

Robert Duess, P. Geo, VP Exploration for GTA and a qualified person as defined in National Instrument 43-101, is responsible for this release, and supervised the preparation of the information forming the basis for this release.

About GTA

GTA is a well funded publicly traded mineral exploration company. It is led by an experienced and successful management team and is focused on gold and graphite exploration in Canada. GTA currently has two exploration focused projects in its portfolio. Its flagship project, the Northshore Property, located near Schreiber, Ontario, is subject to an option agreement with Balmoral Resources Ltd. (TSX VENTURE: BAR) whereby GTA can earn up to a 70% interest. The second project, the 100% owned Auden Property, is located near Hearst, Ontario and consists of 1748 claim units covering virtually an entire greenstone belt and hosting a number of graphite, gold, base metal and PGE targets.

GTA has 26,731,855 shares outstanding of which insiders control approximately 30% of the outstanding shares. The Company's shares trade on the TSX Venture Exchange under the symbol "GTA."

On behalf of the board of directors, GTA Resources and Mining Inc.

Wayne Reid, President and CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

This press release contains forward-looking statements and forward-looking information (collectively, "forward looking statements") within the meaning of applicable Canadian and United States securities laws. All statements, other than statements of historical fact, included herein, including statements regarding the anticipated content, commencement, duration and cost of exploration programs, anticipated exploration program results, the discovery and delineation of mineral deposits/resources/reserves, the timing of the receipt of assay results, and business and financing plans and trends, are forward-looking statements. Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions or are those which, by their nature, refer to future events. Although the Company believes that such statements are reasonable, there can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. The Company cautions investors that any forward-looking statements by the Company are not guarantees of future performance, and that actual results may differ materially from those in forward-looking statements. Important factors that could cause actual events and results to differ materially from the Company's expectations include those related to weather, equipment and staff availability; performance of third parties; risks related to the exploration stage of the Company's projects; market fluctuations in prices for securities of exploration stage companies and in commodity prices; and uncertainties about the availability of additional financing; risks related to the Company's ability to identify one or more economic deposits on the properties, and variations in the nature, quality and quantity of any mineral deposits that may be located on the properties; risks related to the Company's ability to obtain any necessary permits, consents or authorizations required for its activities on the properties; and risks related to the Company's ability to produce minerals from the properties successfully or profitably. Trading in the securities of the Company should be considered highly speculative. All of the Company's public disclosure filings may be accessed via www.sedar.com and readers are urged to review these materials, including the latest technical reports filed with respect to the Company's mineral properties.

This press release is not, and is not to be construed in any way as, an offer to buy or sell securities in the United States.

Contacts:
GTA Resources and Mining Inc.
Wayne Reid
President and CEO
709 699 1733
www.gtaresources.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
You know you need the cloud, but you’re hesitant to simply dump everything at Amazon since you know that not all workloads are suitable for cloud. You know that you want the kind of ease of use and scalability that you get with public cloud, but your applications are architected in a way that makes the public cloud a non-starter. You’re looking at private cloud solutions based on hyperconverged infrastructure, but you’re concerned with the limits inherent in those technologies.
SYS-CON Events announced today that Massive Networks will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Massive Networks mission is simple. To help your business operate seamlessly with fast, reliable, and secure internet and network solutions. Improve your customer's experience with outstanding connections to your cloud.
DevOps is under attack because developers don’t want to mess with infrastructure. They will happily own their code into production, but want to use platforms instead of raw automation. That’s changing the landscape that we understand as DevOps with both architecture concepts (CloudNative) and process redefinition (SRE). Rob Hirschfeld’s recent work in Kubernetes operations has led to the conclusion that containers and related platforms have changed the way we should be thinking about DevOps and...
SYS-CON Events announced today that SkyScale will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. SkyScale is a world-class provider of cloud-based, ultra-fast multi-GPU hardware platforms for lease to customers desiring the fastest performance available as a service anywhere in the world. SkyScale builds, configures, and manages dedicated systems strategically located in maximum-security...
SYS-CON Events announced today that Grape Up will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct. 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Grape Up is a software company specializing in cloud native application development and professional services related to Cloud Foundry PaaS. With five expert teams that operate in various sectors of the market across the U.S. and Europe, Grape Up works with a variety of customers from emergi...
Detecting internal user threats in the Big Data eco-system is challenging and cumbersome. Many organizations monitor internal usage of the Big Data eco-system using a set of alerts. This is not a scalable process given the increase in the number of alerts with the accelerating growth in data volume and user base. Organizations are increasingly leveraging machine learning to monitor only those data elements that are sensitive and critical, autonomously establish monitoring policies, and to detect...
Everything run by electricity will eventually be connected to the Internet. Get ahead of the Internet of Things revolution and join Akvelon expert and IoT industry leader, Sergey Grebnov, in his session at @ThingsExpo, for an educational dive into the world of managing your home, workplace and all the devices they contain with the power of machine-based AI and intelligent Bot services for a completely streamlined experience.
Because IoT devices are deployed in mission-critical environments more than ever before, it’s increasingly imperative they be truly smart. IoT sensors simply stockpiling data isn’t useful. IoT must be artificially and naturally intelligent in order to provide more value In his session at @ThingsExpo, John Crupi, Vice President and Engineering System Architect at Greenwave Systems, will discuss how IoT artificial intelligence (AI) can be carried out via edge analytics and machine learning techn...
With tough new regulations coming to Europe on data privacy in May 2018, Calligo will explain why in reality the effect is global and transforms how you consider critical data. EU GDPR fundamentally rewrites the rules for cloud, Big Data and IoT. In his session at 21st Cloud Expo, Adam Ryan, Vice President and General Manager EMEA at Calligo, will examine the regulations and provide insight on how it affects technology, challenges the established rules and will usher in new levels of diligence a...
FinTechs use the cloud to operate at the speed and scale of digital financial activity, but are often hindered by the complexity of managing security and compliance in the cloud. In his session at 20th Cloud Expo, Sesh Murthy, co-founder and CTO of Cloud Raxak, showed how proactive and automated cloud security enables FinTechs to leverage the cloud to achieve their business goals. Through business-driven cloud security, FinTechs can speed time-to-market, diminish risk and costs, maintain continu...
When shopping for a new data processing platform for IoT solutions, many development teams want to be able to test-drive options before making a choice. Yet when evaluating an IoT solution, it’s simply not feasible to do so at scale with physical devices. Building a sensor simulator is the next best choice; however, generating a realistic simulation at very high TPS with ease of configurability is a formidable challenge. When dealing with multiple application or transport protocols, you would be...
An increasing number of companies are creating products that combine data with analytical capabilities. Running interactive queries on Big Data requires complex architectures to store and query data effectively, typically involving data streams, an choosing efficient file format/database and multiple independent systems that are tied together through custom-engineered pipelines. In his session at @BigDataExpo at @ThingsExpo, Tomer Levi, a senior software engineer at Intel’s Advanced Analytics ...
Existing Big Data solutions are mainly focused on the discovery and analysis of data. The solutions are scalable and highly available but tedious when swapping in and swapping out occurs in disarray and thrashing takes place. The resolution for thrashing through machine learning algorithms and support nomenclature is through simple techniques. Organizations that have been collecting large customer data are increasingly seeing the need to use the data for swapping in and out and thrashing occurs ...
As many know, the first generation of Cloud Management Platform (CMP) solutions were designed for managing virtual infrastructure (IaaS) and traditional applications. But that’s no longer enough to satisfy evolving and complex business requirements. In his session at 21st Cloud Expo, Scott Davis, Embotics CTO, will explore how next-generation CMPs ensure organizations can manage cloud-native and microservice-based application architectures, while also facilitating agile DevOps methodology. He wi...
When you focus on a journey from up-close, you look at your own technical and cultural history and how you changed it for the benefit of the customer. This was our starting point: too many integration issues, 13 SWP days and very long cycles. It was evident that in this fast-paced industry we could no longer afford this reality. We needed something that would take us beyond reducing the development lifecycles, CI and Agile methodologies. We made a fundamental difference, even changed our culture...