Welcome!

News Feed Item

Klondex Mines Drilling Details Three Mineralized Structures in the West Zone

RENO, NEVADA and VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 01/20/14 -- Klondex Mines Ltd. (TSX:KDX)(OTCQX:KLNDF), a Nevada gold exploration and development company, today announces assay results from its exploration drill program being conducted west of the main decline at its Fire Creek gold project near Elko, Nevada (Table 1).

Drill hole FC-13-120U (Figure 1) drilled from Muckbay 5 (MB5) and located approximately 30.5 m (100 ft) north of the vent raise access discovery (January 21, 2013) encountered three significant intervals of mineralization starting approximately 39.6 m (130 ft) west of the main decline and 67.1 m (220 ft) west of the Joyce Vein. Previously drilled surface holes, underground drill holes, and underground rib sampling suggests continuity of mineralization of three distinct structures in this west zone, ranging in strike length from 243.8 m (800 ft) to 335.8 m (1,100 ft) and are open along strike and up and down dip.

These structures are all parallel to the Joyce and Vonnie veins with similar distances between each. All three structures were crosscut during development work. The current drill program continues to focus on drilling to increase the confidence in the mineralization along these three structures. Future drilling will also step out to the north and south, along the main decline, to continue testing the extensions of all mineralized structures.

----------------------------------------------------------------------------
Hole No.   AZI DIP  Drill Station  Length  LENGTH     From       To   Length
                                      (m)    (ft) (meters) (meters) (meters)
----------------------------------------------------------------------------
FC-13-120U 260   0  DDS 20 / MB 5   147.6   484.2     14.1     14.6     0.55
----------------------------------------------------------------------------
and                                                   18.2     18.5     0.30
----------------------------------------------------------------------------
and                                                   49.7     51.9     2.19
----------------------------------------------------------------------------
and                                                  102.7    103.6     0.91
----------------------------------------------------------------------------
Table 1: Drill Hole FC-13-120U, true widths are unknown                     

----------------------------------------------------------------------------
Hole No.   AZI DIP  Drill Station From    To Length         Grade      Grade
                                  (ft)  (ft)   (ft) (g Au/ Tonne) (oz Au/st)
----------------------------------------------------------------------------
FC-13-120U 260   0  DDS 20 / MB 5 46.2    48    1.8          96.1      2.803
----------------------------------------------------------------------------
and                               59.8  60.8      1          11.6      0.338
----------------------------------------------------------------------------
and                                163 170.2    7.2          14.8      0.430
----------------------------------------------------------------------------
and                                337   340      3          28.4      0.828
----------------------------------------------------------------------------
Table 1: Drill Hole FC-13-120U, true widths are unknown                     

Mike Doolin, Klondex General Manager stated, "We are very excited with the recent results from Fire Creek's drill program. This drilling demonstrates the potential of the Fire Creek deposit to host multiple parallel mineralized structures. Our 2014 program is designed to strengthen our knowledge of the deposit and to expand the current resources."

The technical information contained in this press release has been approved and approved by Marc Odell. He is the Klondex acting Independent Qualified Person (Nevada PE 13708 and SME 2402150) for Practical Mining LLC, and has reviewed and approved the contents of the press release, for the purposes of National Instrument 43-101.

Assays were performed by SGS Minerals Services of Elko, Nevada (an independent laboratory), under the supervision of Klondex staff. For additional sampling parameters, please see the press release dated September 30, 2013.

About Klondex Mines Ltd. (www.klondexmines.com)

Klondex Mines is focused on the exploration and development of its high-grade Fire Creek gold deposit in north central Nevada. Fire Creek is a compelling gold project located in a mining-friendly jurisdiction, near major producers, power, transportation, mining infrastructure and its toll milling facility. As at January 20, 2014, following the closing of the Offering, the Company had 103 million shares issued and outstanding and 135 million shares fully diluted. This news release contains certain information that may constitute forward-looking information under applicable Canadian securities legislation, including information about the magnitude and quality of the Fire Creek Project the results of exploration and metallurgical sampling at the Fire Creek Project, the Company's intention and ability to monetize mineralized material, timing of the updated mineral resource estimate at the Fire Creek Project and the bulk sampling program. This forward-looking information entails various risks and uncertainties are based on current expectations, and actual results may differ materially from those contained in such information. These risks and uncertainties include, but are not limited to the risks and hazards associated with environmental compliance and permitting for its underground operations, the strength of the global economy; the price of gold; operational, funding and liquidity risks; the degree to which mineral resource estimates are reflective of actual mineral resources; the degree to which factors which would make a mineral deposit commercially viable are present. Risks and uncertainties about the Company's business are more fully discussed in the Company's disclosure materials filed with the securities regulatory authorities in Canada and available at www.sedar.com. Readers are urged to read these materials. Klondex assumes no obligation to update any forward-looking information or to update the reasons why actual results could differ from such information unless required by law.

Contacts:
Klondex Mines Ltd.
Paul Huet
President & CEO
1-775-284-5757
[email protected]

Klondex Mines Ltd.
Alison Tullis
Manager, Investor Relations
1-647-233-4348
[email protected]
www.klondexmines.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
DevOps with IBMz? You heard right. Maybe you're wondering what a developer can do to speed up the entire development cycle--coding, testing, source code management, and deployment-? In this session you will learn about how to integrate z application assets into a DevOps pipeline using familiar tools like Jenkins and UrbanCode Deploy, plus z/OSMF workflows, all of which can increase deployment speeds while simultaneously improving reliability. You will also learn how to provision mainframe syste...
CloudEXPO New York 2018, colocated with DXWorldEXPO New York 2018 will be held November 11-13, 2018, in New York City and will bring together Cloud Computing, FinTech and Blockchain, Digital Transformation, Big Data, Internet of Things, DevOps, AI, Machine Learning and WebRTC to one location.
The best way to leverage your Cloud Expo presence as a sponsor and exhibitor is to plan your news announcements around our events. The press covering Cloud Expo and @ThingsExpo will have access to these releases and will amplify your news announcements. More than two dozen Cloud companies either set deals at our shows or have announced their mergers and acquisitions at Cloud Expo. Product announcements during our show provide your company with the most reach through our targeted audiences.
DevOpsSummit New York 2018, colocated with CloudEXPO | DXWorldEXPO New York 2018 will be held November 11-13, 2018, in New York City. Digital Transformation (DX) is a major focus with the introduction of DXWorldEXPO within the program. Successful transformation requires a laser focus on being data-driven and on using all the tools available that enable transformation if they plan to survive over the long term.
Traditional on-premises data centers have long been the domain of modern data platforms like Apache Hadoop, meaning companies who build their business on public cloud were challenged to run Big Data processing and analytics at scale. But recent advancements in Hadoop performance, security, and most importantly cloud-native integrations, are giving organizations the ability to truly gain value from all their data. In his session at 19th Cloud Expo, David Tishgart, Director of Product Marketing ...
Machine Learning helps make complex systems more efficient. By applying advanced Machine Learning techniques such as Cognitive Fingerprinting, wind project operators can utilize these tools to learn from collected data, detect regular patterns, and optimize their own operations. In his session at 18th Cloud Expo, Stuart Gillen, Director of Business Development at SparkCognition, discussed how research has demonstrated the value of Machine Learning in delivering next generation analytics to impr...
The challenges of aggregating data from consumer-oriented devices, such as wearable technologies and smart thermostats, are fairly well-understood. However, there are a new set of challenges for IoT devices that generate megabytes or gigabytes of data per second. Certainly, the infrastructure will have to change, as those volumes of data will likely overwhelm the available bandwidth for aggregating the data into a central repository. Ochandarena discusses a whole new way to think about your next...
Andi Mann, Chief Technology Advocate at Splunk, is an accomplished digital business executive with extensive global expertise as a strategist, technologist, innovator, marketer, and communicator. For over 30 years across five continents, he has built success with Fortune 500 corporations, vendors, governments, and as a leading research analyst and consultant.
Extreme Computing is the ability to leverage highly performant infrastructure and software to accelerate Big Data, machine learning, HPC, and Enterprise applications. High IOPS Storage, low-latency networks, in-memory databases, GPUs and other parallel accelerators are being used to achieve faster results and help businesses make better decisions. In his session at 18th Cloud Expo, Michael O'Neill, Strategic Business Development at NVIDIA, focused on some of the unique ways extreme computing is...
CI/CD is conceptually straightforward, yet often technically intricate to implement since it requires time and opportunities to develop intimate understanding on not only DevOps processes and operations, but likely product integrations with multiple platforms. This session intends to bridge the gap by offering an intense learning experience while witnessing the processes and operations to build from zero to a simple, yet functional CI/CD pipeline integrated with Jenkins, Github, Docker and Azure...
"We do one of the best file systems in the world. We learned how to deal with Big Data many years ago and we implemented this knowledge into our software," explained Jakub Ratajczak, Business Development Manager at MooseFS, in this SYS-CON.tv interview at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
Today, we have more data to manage than ever. We also have better algorithms that help us access our data faster. Cloud is the driving force behind many of the data warehouse advancements we have enjoyed in recent years. But what are the best practices for storing data in the cloud for machine learning and data science applications?
The hierarchical architecture that distributes "compute" within the network specially at the edge can enable new services by harnessing emerging technologies. But Edge-Compute comes at increased cost that needs to be managed and potentially augmented by creative architecture solutions as there will always a catching-up with the capacity demands. Processing power in smartphones has enhanced YoY and there is increasingly spare compute capacity that can be potentially pooled. Uber has successfully ...
All zSystem customers have a significant new business opportunity to extend their reach to new customers and markets with new applications and services, and to improve the experience of existing customers. This can be achieved by exposing existing z assets (which have been developed over time) as APIs for accessing Systems of Record, while leveraging mobile and cloud capabilities with new Systems of Engagement applications. In this session, we will explore business drivers with new Node.js apps ...
Using new techniques of information modeling, indexing, and processing, new cloud-based systems can support cloud-based workloads previously not possible for high-throughput insurance, banking, and case-based applications. In his session at 18th Cloud Expo, John Newton, CTO, Founder and Chairman of Alfresco, described how to scale cloud-based content management repositories to store, manage, and retrieve billions of documents and related information with fast and linear scalability. He addres...