VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 01/22/14 -- B2Gold Corp. (TSX: BTO)(NYSE MKT: BTG)(NAMIBIAN: B2G) ("B2Gold" or the "Company"), is pleased to announce an initial inferred resource estimate for the recently discovered Wolfshag zone at the Otjikoto gold project in Namibia of 6.8 million tonnes at 3.2 grams per tonne ("g/t") gold containing 703,000 ounces gold. The Wolfshag zone occurs directly adjacent to the east and northeast portion of the planned Otjikoto deposit open pit which has an average grade of 1.42 g/t gold. The initial high grade inferred resource estimate for the Wolfshag zone indicates the potential for future expansion of gold production and/or increase in the mine life of the Otjikoto gold project. The Otjikoto mine construction is on budget and on schedule to commence production in the fourth quarter of 2014.

Wolfshag Zone Mineral Resource

The Wolfshag zone is comprised of a series of en-echelon stacked, shallow easterly dipping mineralized shoots which plunge at 10 to 15 degrees to the southwest. The shoots sub-crop below calcrete cover to the north and have been traced to the south down plunge for 1,600 metres strike length. Mineralization consists of pyrite-magnetite-calcite in veins, steep tension gashes and replacement zones hosted within albite + calcite + clay altered metasediments and marble lenses. The Wolfshag mineralized zone is bounded by folded, recrystallized and sheared marbles within a sheared thrust ramp duplex. The highest grades occur in the western and central portion of the WA shoot, the uppermost mineralized shoot within the Wolfshag zone. The WA shoot ranges in thickness from 10 to 35 metres over widths of 70 to 110 metres. The WB shoot is situated 5 to 15 metres below the WA shoot and varies from 3 to 15 metres thickness over 50 to 75 metres widths. Several additional stacked shoots occur below the WA and WB shoots but are not as well defined at the present.

The initial inferred mineral resource of the Wolfshag zone is reported within a US$1,550 per ounce gold optimized Whittle pit shell above a cut-off grade of 0.5 g/t gold. The estimated inferred mineral resource for the Wolfshag zone is 6.8 million tonnes at 3.2 g/t gold containing 703,000 ounces of gold.

Wolfshag Inferred Mineral Resource as at December 31, 2013 1,2,3

(Reported within a US$1,550 per ounce gold optimized pit shell - 100% basis)


----------------------------------------------------------------------------
                                                Inferred
                           -------------------------------------------------
                    Cut-Off
Gold price      Grade (g/t)         Tonnes   Gold Grade (g/t)  Gold (Ounces)
----------------------------------------------------------------------------
$1,550                  0.5      6,800,000               3.20        703,000
----------------------------------------------------------------------------

1.  Economic assumption parameters used for pit optimization includes:
    exchange rate N$8 to US$1, plant throughput of 2.4 million tonnes per
    annum, mining cost of US$2.1 per tonne, processing cost of US$15.18 per
    tonne, G&A cost of US$9 million per annum, gold recovery of 95.6%,
    mining recovery of 98%, royalties of 3% and pit slope of 40 degrees in
    weathered material and 50 degrees in fresh rock.
2.  The estimate represents100% of the inferred resource, of which B2Gold's
    attributable share is 90%
3.  Mineral resources that are not mineral reserves do not have a
    demonstrated economic viability

The Wolfshag zone is located immediately east and northeast of the Otjikoto deposit pit with the Wolfshag preliminary pit outline contiguous with the Otjikoto pit. The average grade of the Otjikoto deposit probable reserve is 1.42 g/t gold (see news release dated January 10, 2013). With the average grade of the Wolfshag zone inferred resource estimate being considerably higher, the potential exists for future expansion of the production and/or an increase in the mine life of the Otjikoto Project.

With the completion of the initial inferred resource from the Wolfshag zone, B2Gold engineers will develop conceptual mine plans to determine when Wolfshag material could be fed to the Otjikoto mills.

The Wolfshag zone remains open down plunge to the southwest but insufficient drilling has been completed to date to allow for classification within a resource. Wide spaced drilling to the south of section line 7700N, including, for example, diamond drill hole OT13-376, on section line 7300N, which intersected 16.30 metres at 9.37 g/t gold (3.45 g/t cut with individual assays cut to 45 g/t gold) (see news release dated November 5, 2013), indicates that there is potential to outline additional mineral resources in the Wolfshag zone.

The 2014 Otjikoto exploration program is budgeted for $8 million USD. The exploration drilling program will focus primarily on infill drilling on the northern portion of the Wolfshag zone to increase the drilling density to 50 x 25 metres, and will further test the extension of the Wolfshag zone to the South. The Company anticipates being in a position to upgrade the mineral resource classification to the indicated category by the end of 2014. The 2014 program will also include metallurgical and geotechnical test work for the Wolfshag zone.

Construction of the Otjikoto mine continues on schedule and on budget. The Otjikoto mine is scheduled to commence production in fourth quarter of 2014. The current mine plan is based on probable open pit mineral reserves of 29.4 million tonnes at a grade of 1.42 g/t gold containing 1.34 million ounces of gold (see news release dated January 10, 2013). The life of the mine, based on the probable reserves, is estimated to be 12 years, with annual forecast gold production of approximately 141,000 ounces gold per year for the first five years at an average operating cash cost of $524 per ounce of gold and for the life of mine approximately 112,000 ounces of gold per year at an average operating cash cost of $689 per ounce. Based on the positive drill results from the Wolfshag zone to date, the Company plans to expand the Otjikoto Mine in 2015, increasing ore throughput from 2.5 million tonnes per year to 3 million tonnes. The increased throughput will be achieved through the installation of a pebble crusher, additional leach tanks and mining equipment at a total cost of approximately $15 million. Once the expansion is completed at the end of 2015, annual gold production from the main Otjikoto pit alone would increase to approximately 170,000 ounces.

The mineral resource estimate was prepared under the supervision of Tom Garagan, P. Geo., a Qualified Person under National Instrument 43-101. The qualified person reviewed and approved the contents of this news release.

ON BEHALF OF B2GOLD CORP.

Tom Garagan, Senior Vice President Exploration

The Toronto Stock Exchange neither approves nor disapproves the information contained in this News Release.

Cautionary Statements on Forward-Looking Information: Statements in this news release are forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of Canadian securities laws (collectively "forward-looking statements"). All statements, other than statements of historical fact, are forward-looking statements. Generally, forward-looking statements can be identified by the use of words or phrases such as; "expects", "anticipates", "plans", projects", "estimates", "assumes", "intends", " "objectives", "potential" or variations thereof, or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms or similar expressions. These forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied, including, without limitation, risks relating to: changes in economic conditions or financial markets; changes in prices for the Company's mineral products or increases in input costs; uncertainty of production and cost estimates for the Otjikoto Project; risks and uncertainties associated with new mining operations including start-up delays and operational issues; litigation, legislative, tax (including employee profit sharing arrangements), environmental and other judicial, regulatory, political and competitive developments in Canada, Namibia and other jurisdictions in which the Company may carry on business; labour relations matters; and foreign exchange rate fluctuations, as well as other factors described in the Company's most recent annual information form filed with Canadian regulatory authorities.

This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements. The Company's forward-looking statements are based on what the Company's management considers to be reasonable assumptions, beliefs, expectations and opinions based on information currently available to management. We cannot assure you that actual events, performance or results will be consistent with these forward looking statements, and management's assumptions may prove to be incorrect. You are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. The Company's forward looking statements reflect current expectations regarding future events and operating performance and speak only as of the date hereof and the Company does not assume any obligation to update forward-looking statements if circumstances or management's beliefs, expectations or opinions should change other than as required by applicable law. For the reasons set forth above, you should not place undue reliance on forward-looking statements.

Resource Estimation Notes

The resource estimate is based on 119 diamond drill holes (33,015 metres) which intersected the Wolfshag zone mineralized stratigraphy within a preliminary open pit as defined by Whittle pit optimization software and based on mining parameters similar to the Otjikoto deposit open pit, immediately adjacent to the zone. Drill holes were completed on 100 metres spaced sections with 25 metres spacing on section lines with the inferred resource defined between sections 7650N and 8800N. Wire frames were created for high and low grades domains with these domains based on a combination of mineralization and gold grade (approx. 0.3 g/t gold for low grade shell and 1-2 g/t gold for high grade shell). Individual assays were capped at 13-32 g/t gold in the high grade domains 3.5-10 g/t gold in the low grade domains depending on mineralized zone. Grade shells were filled with parent blocks with a dimension of 12.5 x 25 x 5 metres. Smaller sub-blocks were created along the margins of the zones as needed. Grade was estimated with 2 metre composites into parent blocks using ID3. Limited initial metallurgical test work indicates the Wolfshag style of mineralization is compatible with the Otjikoto process plant design.

A database of 1699 wax immersion specific gravity measurements was used to estimate tonnages within the four waste and two mineralized zones. The specific gravity measurement program uses a set of glass standards to monitor quality control.

B2Gold's Quality Assurance/Quality Control

Quality assurance and quality control procedures include the systematic insertion of blanks, standards and duplicates into the core sample strings. The primary laboratories for the Otjikoto gold project are ALS Minerals in Vancouver, Canada, and Johannesburg, South Africa, where samples are analysed by metallic screen fire assay and/or fire assay with atomic absorption finish and/or gravimetric finish using one assay tonne. Samples were prepared at Intertek Genalysis in Walvis Bay and ALS Minerals in Swakopmund, Namibia. Bureau Vertitas, Swakopmund, Namibia, is the umpire laboratory. All results stated in this announcement have passed B2Gold's quality assurance and quality control ("QA/QC") protocols. Tom Garagan is the Qualified Person as defined under National Instrument 43-101.

The Otjikoto gold project is located approximately 300 kilometres north of Windhoek, the capital of Namibia, and is owned 90% by B2Gold and 10% by EVI Gold (Pty) Ltd, a Namibian empowerment group.

Contacts:
B2Gold Corp.
Ian MacLean
Vice President, Investor Relations
604-681-8371

B2Gold Corp.
Shaun Johnson
Associate, Investor Relations
604-681-8371
www.b2gold.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
"We host and fully manage cloud data services, whether we store, the data, move the data, or run analytics on the data," stated Kamal Shannak, Senior Development Manager, Cloud Data Services, IBM, in this SYS-CON.tv interview at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York City, NY.
As cloud adoption continues to transform business, today's global enterprises are challenged with managing a growing amount of information living outside of the data center. The rapid adoption of IoT and increasingly mobile workforce are exacerbating the problem. Ensuring secure data sharing and efficient backup poses capacity and bandwidth considerations as well as policy and regulatory compliance issues.
Many private cloud projects were built to deliver self-service access to development and test resources. While those clouds delivered faster access to resources, they lacked visibility, control and security needed for production deployments. In their session at 18th Cloud Expo, Steve Anderson, Product Manager at BMC Software, and Rick Lefort, Principal Technical Marketing Consultant at BMC Software, discussed how a cloud designed for production operations not only helps accelerate developer inno...
Almost two-thirds of companies either have or soon will have IoT as the backbone of their business. Though, IoT is far more complex than most firms expected with a majority of IoT projects having failed. How can you not get trapped in the pitfalls? In his session at @ThingsExpo, Tony Shan, Chief IoTologist at Wipro, will introduce a holistic method of IoTification, which is the process of IoTifying the existing technology portfolios and business models to adopt and leverage IoT. He will delve in...
SYS-CON Events announced today that Conference Guru has been named “Media Sponsor” of SYS-CON's 20th International Cloud Expo, which will take place on June 6–8, 2017, at the Javits Center in New York City, NY. A valuable conference experience generates new contacts, sales leads, potential strategic partners and potential investors; helps gather competitive intelligence and even provides inspiration for new products and services. Conference Guru works with conference organizers to pass great dea...
SYS-CON Events announced today that LeaseWeb USA, a cloud Infrastructure-as-a-Service (IaaS) provider, will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. LeaseWeb is one of the world's largest hosting brands. The company helps customers define, develop and deploy IT infrastructure tailored to their exact business needs, by combining various kinds cloud solutions.
"When you think about the data center today, there's constant evolution, The evolution of the data center and the needs of the consumer of technology change, and they change constantly," stated Matt Kalmenson, VP of Sales, Service and Cloud Providers at Veeam Software, in this SYS-CON.tv interview at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York City, NY.
Data is the fuel that drives the machine learning algorithmic engines and ultimately provides the business value. In his session at Cloud Expo, Ed Featherston, a director and senior enterprise architect at Collaborative Consulting, discussed the key considerations around quality, volume, timeliness, and pedigree that must be dealt with in order to properly fuel that engine.
Zerto exhibited at SYS-CON's 18th International Cloud Expo®, which took place at the Javits Center in New York City, NY, in June 2016. Zerto is committed to keeping enterprise and cloud IT running 24/7 by providing innovative, simple, reliable and scalable business continuity software solutions. Through the Zerto Cloud Continuity Platform™, organizations can seamlessly move and protect virtualized workloads between public, private and hybrid clouds. The company’s flagship product, Zerto Virtual...
WebRTC defines no default signaling protocol, causing fragmentation between WebRTC silos. SIP and XMPP provide possibilities, but come with considerable complexity and are not designed for use in a web environment. In his session at @ThingsExpo, Matthew Hodgson, technical co-founder of the Matrix.org, discussed how Matrix is a new non-profit Open Source Project that defines both a new HTTP-based standard for VoIP & IM signaling and provides reference implementations.
The Internet of Things is clearly many things: data collection and analytics, wearables, Smart Grids and Smart Cities, the Industrial Internet, and more. Cool platforms like Arduino, Raspberry Pi, Intel's Galileo and Edison, and a diverse world of sensors are making the IoT a great toy box for developers in all these areas. In this Power Panel at @ThingsExpo, moderated by Conference Chair Roger Strukhoff, panelists discussed what things are the most important, which will have the most profound e...
We all know that data growth is exploding and storage budgets are shrinking. Instead of showing you charts on about how much data there is, in his General Session at 17th Cloud Expo, Scott Cleland, Senior Director of Product Marketing at HGST, showed how to capture all of your data in one place. After you have your data under control, you can then analyze it in one place, saving time and resources.
Cognitive Computing is becoming the foundation for a new generation of solutions that have the potential to transform business. Unlike traditional approaches to building solutions, a cognitive computing approach allows the data to help determine the way applications are designed. This contrasts with conventional software development that begins with defining logic based on the current way a business operates. In her session at 18th Cloud Expo, Judith S. Hurwitz, President and CEO of Hurwitz & ...
910Telecom exhibited at the 19th International Cloud Expo, which took place at the Santa Clara Convention Center in Santa Clara, CA, in November 2016. Housed in the classic Denver Gas & Electric Building, 910 15th St., 910Telecom is a carrier-neutral telecom hotel located in the heart of Denver. Adjacent to CenturyLink, AT&T, and Denver Main, 910Telecom offers connectivity to all major carriers, Internet service providers, Internet backbones and exchanges.
SYS-CON Events announced today that Linux Academy, the foremost online Linux and cloud training platform and community, will exhibit at SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. Linux Academy was founded on the belief that providing high-quality, in-depth training should be available at an affordable price. Industry leaders in quality training, provided services, and student certification passes, its goal is to c...