Welcome!

News Feed Item

Integra Gold Expands South Triangle Zone, Intersects 13.14 g/t Gold Over 2.0 Meters

Press Release Highlights:

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 01/23/14 -- Integra Gold Corp. (TSX VENTURE:ICG) ("Integra" or the "Company") is pleased to announce final results of its 2013 fall drill program on the South Triangle zone at its Lamaque Gold Project located in Val-d'Or, Quebec. The Company completed 6,966 m in 13 drill holes on this target in 2013. Results disclosed today confirm the eastern extension of the South Triangle zone. The discovery of gold mineralization to the South and South-East of the existing Triangle Zone provide significant potential for resource expansion at Triangle.

"The Triangle Zone contains the highest grade indicated resource on the Lamaque Project, so to be intersecting mineralized veins hundreds of meters from the current resource limit is very encouraging. Drilling will now test the area in between the Triangle and South Triangle Zones to determine if mineralization is continuous throughout," commented Company President and CEO Stephen de Jong. "The 20,000 meter Triangle drill program announced last week is focused on defining resources above the 400 meter vertical level in order to advance the project, but as drilling has intersected high grade mineralized veins as deep as 1,200 meters, there remains substantial potential to expand known resources at depth."

Click on the following link to view the project plan map and zones location:

http://www.integragold.com/i/maps/Integra-Plan-Map-and-Idealized-Cross-Section-1.pdf

South Triangle Drilling Program

South Triangle results disclosed today have re-confirmed the presence of gold mineralized shear hosted veins in volcanic rocks south of the Triangle zone, returning, among others, an intercept of 13.14 g/t Au over 2.0 m in hole TMS-13-09. This new intercept is the eastern extension, some 60 m to the east, of the mineralized zone previously disclosed in hole TMS-13-07 which graded 13.29 g/t Au over 7.0 m (see press release dated November 18, 2013). As intercepts from hole TMS-13-07 and TMS-13-09 are also 175 m down-dip from the closest Triangle Zone intersections, there is potential to build upon the current resource base.

Other holes reported today (TMS-13-08 and TMS-13-10 to TMS-13-13) were testing the down dip extensions (between 50 and 100 m down-dip) of the new zones reported from holes TMS-13-07 and TMS-13-09A. Although all holes intersected shear zones with local quartz-tourmaline veining, no significant values are reported.

To view a complete table of composited assay results for South Triangle drilling click on the following link:

http://www.integragold.com/i/pdf/2013_Composites_Compilation_South_Triangle.pdf

To view a drill hole location map, please click on the following link:

http://www.integragold.com/i/pdf/Triangle-Zone-Plan-view-drilling-v3.pdf

Due to accessibility issues, the new South Triangle zones could not be tested up-dip towards the Triangle Zone during the Company's 2013 program. These zones will be tested as part of the 2014 drill program.

Project and Company Profile

Integra's Lamaque Gold Project is located in the heart of the Val-d'Or gold camp in the Province of Quebec, Canada, approximately 550 km northwest of Montreal. Quebec is rated one of the best mining jurisdictions in the world. Infrastructure, human resources and mining expertise are readily available.

The Company's primary objective is to continue to prove up additional resources while advancing the existing resource towards production. The project is split into two main clusters, the North and the South Clusters, which are located approximately 1 kilometer ("km") from each other. The South Cluster consists of the No. 4 Plug, Triangle and Triangle South zones, and is located 3 km from the City of Val-d'Or. The North Cluster consists of the Parallel, Fortune, No. 5 Plug, and No. 3 Mine zones, and is located 1 km from Val d'Or.

Qualified Person

The Lamaque exploration project is under the direct supervision of Herve Thiboutot, P.Eng. and Senior Vice-President of the company, a Qualified Person ("QP") as defined by National Instrument 43-101, Alain-Jean Beauregard, P.Geo., and Daniel Gaudreault, P.Eng., Geo. of Geologica Inc., both independent QP as defined by National Instrument 43-101. The Company's QP has reviewed the technical content of this release.

Quality Assurance - Quality Control ("QA/QC")

Thorough QA/QC protocols are followed on the project including insertion of duplicate, blank and standard samples in all drill holes. The core samples are submitted directly to ALS Laboratory Group and Bourlamaque Labs in Val-d'Or for preparation and analysis. Analysis is conducted on 1 assay-ton aliquots. Analysis of Au is performed using fire assay method with atomic absorption finish, with a gravimetric finish completed for samples exceeding 5 g/t Au, or a metallic sieve assay for samples containing visible gold. When available the gravimetric or metallic sieve assay results are used for the reported composite intervals.

ON BEHALF OF THE BOARD OF DIRECTORS

Stephen de Jong, CEO & President

Follow Integra Gold On:

--  Twitter: http://twitter.com/integragoldcorp

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward Looking Statements: Certain disclosure in this release constitutes forward-looking statements. In making the forward-looking statements in this release, the Company has applied certain factors and assumptions that are based on the Company's current beliefs as well as assumptions made by and information currently available to the Company, including that the Company is able to obtain any government or other regulatory approvals required to complete the private placement and Company's planned exploration activities, that the Company is able to complete the private placement, that the Company is able to procure personnel, equipment and supplies required for its exploration activities in sufficient quantities and on a timely basis and that actual results of exploration activities are consistent with management's expectations. Although the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect, and the forward-looking statements in this release are subject to numerous risks, uncertainties and other factors that may cause future results to differ materially from those expressed or implied in such forward-looking statements. Such risk factors include, among others, that the private placement will not be completed, that actual results of the Company's exploration activities will be different than those expected by management and that the Company will be unable to obtain or will experience delays in obtaining any required government approvals or be unable to procure required equipment and supplies in sufficient quantities and on a timely basis. Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

Contacts:
Corporate Inquiries:
Chris Gordon
[email protected]
www.integragold.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Cloud Expo | DXWorld Expo have announced the conference tracks for Cloud Expo 2018. Cloud Expo will be held June 5-7, 2018, at the Javits Center in New York City, and November 6-8, 2018, at the Santa Clara Convention Center, Santa Clara, CA. Digital Transformation (DX) is a major focus with the introduction of DX Expo within the program. Successful transformation requires a laser focus on being data-driven and on using all the tools available that enable transformation if they plan to survive ov...
Digital transformation is about embracing digital technologies into a company's culture to better connect with its customers, automate processes, create better tools, enter new markets, etc. Such a transformation requires continuous orchestration across teams and an environment based on open collaboration and daily experiments. In his session at 21st Cloud Expo, Alex Casalboni, Technical (Cloud) Evangelist at Cloud Academy, explored and discussed the most urgent unsolved challenges to achieve f...
Continuous Delivery makes it possible to exploit findings of cognitive psychology and neuroscience to increase the productivity and happiness of our teams. In his session at 22nd Cloud Expo | DXWorld Expo, Daniel Jones, CTO of EngineerBetter, will answer: How can we improve willpower and decrease technical debt? Is the present bias real? How can we turn it to our advantage? Can you increase a team’s effective IQ? How do DevOps & Product Teams increase empathy, and what impact does empath...
DevOps promotes continuous improvement through a culture of collaboration. But in real terms, how do you: Integrate activities across diverse teams and services? Make objective decisions with system-wide visibility? Use feedback loops to enable learning and improvement? With technology insights and real-world examples, in his general session at @DevOpsSummit, at 21st Cloud Expo, Andi Mann, Chief Technology Advocate at Splunk, explored how leading organizations use data-driven DevOps to close th...
As many know, the first generation of Cloud Management Platform (CMP) solutions were designed for managing virtual infrastructure (IaaS) and traditional applications. But that's no longer enough to satisfy evolving and complex business requirements. In his session at 21st Cloud Expo, Scott Davis, Embotics CTO, explored how next-generation CMPs ensure organizations can manage cloud-native and microservice-based application architectures, while also facilitating agile DevOps methodology. He expla...
To get the most out of their data, successful companies are not focusing on queries and data lakes, they are actively integrating analytics into their operations with a data-first application development approach. Real-time adjustments to improve revenues, reduce costs, or mitigate risk rely on applications that minimize latency on a variety of data sources. In his session at @BigDataExpo, Jack Norris, Senior Vice President, Data and Applications at MapR Technologies, reviewed best practices to ...
"Digital transformation - what we knew about it in the past has been redefined. Automation is going to play such a huge role in that because the culture, the technology, and the business operations are being shifted now," stated Brian Boeggeman, VP of Alliances & Partnerships at Ayehu, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
You know you need the cloud, but you're hesitant to simply dump everything at Amazon since you know that not all workloads are suitable for cloud. You know that you want the kind of ease of use and scalability that you get with public cloud, but your applications are architected in a way that makes the public cloud a non-starter. You're looking at private cloud solutions based on hyperconverged infrastructure, but you're concerned with the limits inherent in those technologies. What do you do?
"I focus on what we are calling CAST Highlight, which is our SaaS application portfolio analysis tool. It is an extremely lightweight tool that can integrate with pretty much any build process right now," explained Andrew Siegmund, Application Migration Specialist for CAST, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
SYS-CON Events announced today that Synametrics Technologies will exhibit at SYS-CON's 22nd International Cloud Expo®, which will take place on June 5-7, 2018, at the Javits Center in New York, NY. Synametrics Technologies is a privately held company based in Plainsboro, New Jersey that has been providing solutions for the developer community since 1997. Based on the success of its initial product offerings such as WinSQL, Xeams, SynaMan and Syncrify, Synametrics continues to create and hone inn...
"We started a Master of Science in business analytics - that's the hot topic. We serve the business community around San Francisco so we educate the working professionals and this is where they all want to be," explained Judy Lee, Associate Professor and Department Chair at Golden Gate University, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
"Evatronix provides design services to companies that need to integrate the IoT technology in their products but they don't necessarily have the expertise, knowledge and design team to do so," explained Adam Morawiec, VP of Business Development at Evatronix, in this SYS-CON.tv interview at @ThingsExpo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
The 22nd International Cloud Expo | 1st DXWorld Expo has announced that its Call for Papers is open. Cloud Expo | DXWorld Expo, to be held June 5-7, 2018, at the Javits Center in New York, NY, brings together Cloud Computing, Digital Transformation, Big Data, Internet of Things, DevOps, Machine Learning and WebRTC to one location. With cloud computing driving a higher percentage of enterprise IT budgets every year, it becomes increasingly important to plant your flag in this fast-expanding busin...
There is a huge demand for responsive, real-time mobile and web experiences, but current architectural patterns do not easily accommodate applications that respond to events in real time. Common solutions using message queues or HTTP long-polling quickly lead to resiliency, scalability and development velocity challenges. In his session at 21st Cloud Expo, Ryland Degnan, a Senior Software Engineer on the Netflix Edge Platform team, will discuss how by leveraging a reactive stream-based protocol,...
In his Opening Keynote at 21st Cloud Expo, John Considine, General Manager of IBM Cloud Infrastructure, led attendees through the exciting evolution of the cloud. He looked at this major disruption from the perspective of technology, business models, and what this means for enterprises of all sizes. John Considine is General Manager of Cloud Infrastructure Services at IBM. In that role he is responsible for leading IBM’s public cloud infrastructure including strategy, development, and offering m...