Click here to close now.




















Welcome!

News Feed Item

Integra Gold Expands South Triangle Zone, Intersects 13.14 g/t Gold Over 2.0 Meters

Press Release Highlights:

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 01/23/14 -- Integra Gold Corp. (TSX VENTURE: ICG) ("Integra" or the "Company") is pleased to announce final results of its 2013 fall drill program on the South Triangle zone at its Lamaque Gold Project located in Val-d'Or, Quebec. The Company completed 6,966 m in 13 drill holes on this target in 2013. Results disclosed today confirm the eastern extension of the South Triangle zone. The discovery of gold mineralization to the South and South-East of the existing Triangle Zone provide significant potential for resource expansion at Triangle.

"The Triangle Zone contains the highest grade indicated resource on the Lamaque Project, so to be intersecting mineralized veins hundreds of meters from the current resource limit is very encouraging. Drilling will now test the area in between the Triangle and South Triangle Zones to determine if mineralization is continuous throughout," commented Company President and CEO Stephen de Jong. "The 20,000 meter Triangle drill program announced last week is focused on defining resources above the 400 meter vertical level in order to advance the project, but as drilling has intersected high grade mineralized veins as deep as 1,200 meters, there remains substantial potential to expand known resources at depth."

Click on the following link to view the project plan map and zones location:

http://www.integragold.com/i/maps/Integra-Plan-Map-and-Idealized-Cross-Section-1.pdf

South Triangle Drilling Program

South Triangle results disclosed today have re-confirmed the presence of gold mineralized shear hosted veins in volcanic rocks south of the Triangle zone, returning, among others, an intercept of 13.14 g/t Au over 2.0 m in hole TMS-13-09. This new intercept is the eastern extension, some 60 m to the east, of the mineralized zone previously disclosed in hole TMS-13-07 which graded 13.29 g/t Au over 7.0 m (see press release dated November 18, 2013). As intercepts from hole TMS-13-07 and TMS-13-09 are also 175 m down-dip from the closest Triangle Zone intersections, there is potential to build upon the current resource base.

Other holes reported today (TMS-13-08 and TMS-13-10 to TMS-13-13) were testing the down dip extensions (between 50 and 100 m down-dip) of the new zones reported from holes TMS-13-07 and TMS-13-09A. Although all holes intersected shear zones with local quartz-tourmaline veining, no significant values are reported.

To view a complete table of composited assay results for South Triangle drilling click on the following link:

http://www.integragold.com/i/pdf/2013_Composites_Compilation_South_Triangle.pdf

To view a drill hole location map, please click on the following link:

http://www.integragold.com/i/pdf/Triangle-Zone-Plan-view-drilling-v3.pdf

Due to accessibility issues, the new South Triangle zones could not be tested up-dip towards the Triangle Zone during the Company's 2013 program. These zones will be tested as part of the 2014 drill program.

Project and Company Profile

Integra's Lamaque Gold Project is located in the heart of the Val-d'Or gold camp in the Province of Quebec, Canada, approximately 550 km northwest of Montreal. Quebec is rated one of the best mining jurisdictions in the world. Infrastructure, human resources and mining expertise are readily available.

The Company's primary objective is to continue to prove up additional resources while advancing the existing resource towards production. The project is split into two main clusters, the North and the South Clusters, which are located approximately 1 kilometer ("km") from each other. The South Cluster consists of the No. 4 Plug, Triangle and Triangle South zones, and is located 3 km from the City of Val-d'Or. The North Cluster consists of the Parallel, Fortune, No. 5 Plug, and No. 3 Mine zones, and is located 1 km from Val d'Or.

Qualified Person

The Lamaque exploration project is under the direct supervision of Herve Thiboutot, P.Eng. and Senior Vice-President of the company, a Qualified Person ("QP") as defined by National Instrument 43-101, Alain-Jean Beauregard, P.Geo., and Daniel Gaudreault, P.Eng., Geo. of Geologica Inc., both independent QP as defined by National Instrument 43-101. The Company's QP has reviewed the technical content of this release.

Quality Assurance - Quality Control ("QA/QC")

Thorough QA/QC protocols are followed on the project including insertion of duplicate, blank and standard samples in all drill holes. The core samples are submitted directly to ALS Laboratory Group and Bourlamaque Labs in Val-d'Or for preparation and analysis. Analysis is conducted on 1 assay-ton aliquots. Analysis of Au is performed using fire assay method with atomic absorption finish, with a gravimetric finish completed for samples exceeding 5 g/t Au, or a metallic sieve assay for samples containing visible gold. When available the gravimetric or metallic sieve assay results are used for the reported composite intervals.

ON BEHALF OF THE BOARD OF DIRECTORS

Stephen de Jong, CEO & President

Follow Integra Gold On:


--  Twitter: http://twitter.com/integragoldcorp

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward Looking Statements: Certain disclosure in this release constitutes forward-looking statements. In making the forward-looking statements in this release, the Company has applied certain factors and assumptions that are based on the Company's current beliefs as well as assumptions made by and information currently available to the Company, including that the Company is able to obtain any government or other regulatory approvals required to complete the private placement and Company's planned exploration activities, that the Company is able to complete the private placement, that the Company is able to procure personnel, equipment and supplies required for its exploration activities in sufficient quantities and on a timely basis and that actual results of exploration activities are consistent with management's expectations. Although the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect, and the forward-looking statements in this release are subject to numerous risks, uncertainties and other factors that may cause future results to differ materially from those expressed or implied in such forward-looking statements. Such risk factors include, among others, that the private placement will not be completed, that actual results of the Company's exploration activities will be different than those expected by management and that the Company will be unable to obtain or will experience delays in obtaining any required government approvals or be unable to procure required equipment and supplies in sufficient quantities and on a timely basis. Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Scrum Alliance has announced the release of its 2015 State of Scrum Report. Almost 5,000 individuals and companies worldwide participated in this year's survey. Most organizations in the market today are still leading and managing under an Industrial Age model. Not only is the speed of change growing exponentially, Agile and Scrum frameworks are showing companies how to draw on the full talents and capabilities of those doing the work in order to continue innovating for success.
SYS-CON Events announced today that MobiDev, a software development company, will exhibit at the 17th International Cloud Expo®, which will take place November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. MobiDev is a software development company with representative offices in Atlanta (US), Sheffield (UK) and Würzburg (Germany); and development centers in Ukraine. Since 2009 it has grown from a small group of passionate engineers and business managers to a full-scale mobi...
Between the compelling mockups and specs produced by your analysts and designers, and the resulting application built by your developers, there is a gulf where projects fail, costs spiral out of control, and applications fall short of requirements. In his session at @DevOpsSummit, Charles Kendrick, CTO and Chief Architect at Isomorphic Software, presented a new approach where business and development users collaborate – each using tools appropriate to their goals and expertise – to build mocku...
Container technology is sending shock waves through the world of cloud computing. Heralded as the 'next big thing,' containers provide software owners a consistent way to package their software and dependencies while infrastructure operators benefit from a standard way to deploy and run them. Containers present new challenges for tracking usage due to their dynamic nature. They can also be deployed to bare metal, virtual machines and various cloud platforms. How do software owners track the usag...
SYS-CON Events announced today that VividCortex, the monitoring solution for the modern data system, will exhibit at the 17th International Cloud Expo®, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. The database is the heart of most applications, but it’s also the part that’s hardest to scale, monitor, and optimize even as it’s growing 50% year over year. VividCortex is the first unified suite of database monitoring tools specifically desi...
Graylog, Inc., has added the capability to collect, centralize and analyze application container logs from within Docker. The Graylog logging driver for Docker addresses the challenges of extracting intelligence from within Docker containers, where most workloads are dynamic and log data is not persisted or stored. Using Graylog, DevOps and IT Ops teams can pinpoint the root cause of problems to deliver new applications faster and minimize downtime.
As Marc Andreessen says software is eating the world. Everything is rapidly moving toward being software-defined – from our phones and cars through our washing machines to the datacenter. However, there are larger challenges when implementing software defined on a larger scale - when building software defined infrastructure. In his session at 16th Cloud Expo, Boyan Ivanov, CEO of StorPool, provided some practical insights on what, how and why when implementing "software-defined" in the datacent...
Learn how you can use the CoSN SEND II Decision Tree for Education Technology to make sure that your K–12 technology initiatives create a more engaging learning experience that empowers students, teachers, and administrators alike.
Mobile, social, Big Data, and cloud have fundamentally changed the way we live. “Anytime, anywhere” access to data and information is no longer a luxury; it’s a requirement, in both our personal and professional lives. For IT organizations, this means pressure has never been greater to deliver meaningful services to the business and customers.
In a recent research, analyst firm IDC found that the average cost of a critical application failure is $500,000 to $1 million per hour and the average total cost of unplanned application downtime is $1.25 billion to $2.5 billion per year for Fortune 1000 companies. In addition to the findings on the cost of the downtime, the research also highlighted best practices for development, testing, application support, infrastructure, and operations teams.
"We've just seen a huge influx of new partners coming into our ecosystem, and partners building unique offerings on top of our API set," explained Seth Bostock, Chief Executive Officer at IndependenceIT, in this SYS-CON.tv interview at 16th Cloud Expo, held June 9-11, 2015, at the Javits Center in New York City.
SYS-CON Events announced today that HPM Networks will exhibit at the 17th International Cloud Expo®, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. For 20 years, HPM Networks has been integrating technology solutions that solve complex business challenges. HPM Networks has designed solutions for both SMB and enterprise customers throughout the San Francisco Bay Area.
As organizations shift towards IT-as-a-service models, the need for managing and protecting data residing across physical, virtual, and now cloud environments grows with it. CommVault can ensure protection and E-Discovery of your data – whether in a private cloud, a Service Provider delivered public cloud, or a hybrid cloud environment – across the heterogeneous enterprise. In his session at 17th Cloud Expo, Randy De Meno, Chief Technologist - Windows Products and Microsoft Partnerships at Com...
The Software Defined Data Center (SDDC), which enables organizations to seamlessly run in a hybrid cloud model (public + private cloud), is here to stay. IDC estimates that the software-defined networking market will be valued at $3.7 billion by 2016. Security is a key component and benefit of the SDDC, and offers an opportunity to build security 'from the ground up' and weave it into the environment from day one. In his session at 16th Cloud Expo, Reuven Harrison, CTO and Co-Founder of Tufin,...
In their session at 17th Cloud Expo, Hal Schwartz, CEO of Secure Infrastructure & Services (SIAS), and Chuck Paolillo, CTO of Secure Infrastructure & Services (SIAS), provide a study of cloud adoption trends and the power and flexibility of IBM Power and Pureflex cloud solutions. In his role as CEO of Secure Infrastructure & Services (SIAS), Hal Schwartz provides leadership and direction for the company.