Welcome!

News Feed Item

Integra Gold Expands South Triangle Zone, Intersects 13.14 g/t Gold Over 2.0 Meters

Press Release Highlights:

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 01/23/14 -- Integra Gold Corp. (TSX VENTURE: ICG) ("Integra" or the "Company") is pleased to announce final results of its 2013 fall drill program on the South Triangle zone at its Lamaque Gold Project located in Val-d'Or, Quebec. The Company completed 6,966 m in 13 drill holes on this target in 2013. Results disclosed today confirm the eastern extension of the South Triangle zone. The discovery of gold mineralization to the South and South-East of the existing Triangle Zone provide significant potential for resource expansion at Triangle.

"The Triangle Zone contains the highest grade indicated resource on the Lamaque Project, so to be intersecting mineralized veins hundreds of meters from the current resource limit is very encouraging. Drilling will now test the area in between the Triangle and South Triangle Zones to determine if mineralization is continuous throughout," commented Company President and CEO Stephen de Jong. "The 20,000 meter Triangle drill program announced last week is focused on defining resources above the 400 meter vertical level in order to advance the project, but as drilling has intersected high grade mineralized veins as deep as 1,200 meters, there remains substantial potential to expand known resources at depth."

Click on the following link to view the project plan map and zones location:

http://www.integragold.com/i/maps/Integra-Plan-Map-and-Idealized-Cross-Section-1.pdf

South Triangle Drilling Program

South Triangle results disclosed today have re-confirmed the presence of gold mineralized shear hosted veins in volcanic rocks south of the Triangle zone, returning, among others, an intercept of 13.14 g/t Au over 2.0 m in hole TMS-13-09. This new intercept is the eastern extension, some 60 m to the east, of the mineralized zone previously disclosed in hole TMS-13-07 which graded 13.29 g/t Au over 7.0 m (see press release dated November 18, 2013). As intercepts from hole TMS-13-07 and TMS-13-09 are also 175 m down-dip from the closest Triangle Zone intersections, there is potential to build upon the current resource base.

Other holes reported today (TMS-13-08 and TMS-13-10 to TMS-13-13) were testing the down dip extensions (between 50 and 100 m down-dip) of the new zones reported from holes TMS-13-07 and TMS-13-09A. Although all holes intersected shear zones with local quartz-tourmaline veining, no significant values are reported.

To view a complete table of composited assay results for South Triangle drilling click on the following link:

http://www.integragold.com/i/pdf/2013_Composites_Compilation_South_Triangle.pdf

To view a drill hole location map, please click on the following link:

http://www.integragold.com/i/pdf/Triangle-Zone-Plan-view-drilling-v3.pdf

Due to accessibility issues, the new South Triangle zones could not be tested up-dip towards the Triangle Zone during the Company's 2013 program. These zones will be tested as part of the 2014 drill program.

Project and Company Profile

Integra's Lamaque Gold Project is located in the heart of the Val-d'Or gold camp in the Province of Quebec, Canada, approximately 550 km northwest of Montreal. Quebec is rated one of the best mining jurisdictions in the world. Infrastructure, human resources and mining expertise are readily available.

The Company's primary objective is to continue to prove up additional resources while advancing the existing resource towards production. The project is split into two main clusters, the North and the South Clusters, which are located approximately 1 kilometer ("km") from each other. The South Cluster consists of the No. 4 Plug, Triangle and Triangle South zones, and is located 3 km from the City of Val-d'Or. The North Cluster consists of the Parallel, Fortune, No. 5 Plug, and No. 3 Mine zones, and is located 1 km from Val d'Or.

Qualified Person

The Lamaque exploration project is under the direct supervision of Herve Thiboutot, P.Eng. and Senior Vice-President of the company, a Qualified Person ("QP") as defined by National Instrument 43-101, Alain-Jean Beauregard, P.Geo., and Daniel Gaudreault, P.Eng., Geo. of Geologica Inc., both independent QP as defined by National Instrument 43-101. The Company's QP has reviewed the technical content of this release.

Quality Assurance - Quality Control ("QA/QC")

Thorough QA/QC protocols are followed on the project including insertion of duplicate, blank and standard samples in all drill holes. The core samples are submitted directly to ALS Laboratory Group and Bourlamaque Labs in Val-d'Or for preparation and analysis. Analysis is conducted on 1 assay-ton aliquots. Analysis of Au is performed using fire assay method with atomic absorption finish, with a gravimetric finish completed for samples exceeding 5 g/t Au, or a metallic sieve assay for samples containing visible gold. When available the gravimetric or metallic sieve assay results are used for the reported composite intervals.

ON BEHALF OF THE BOARD OF DIRECTORS

Stephen de Jong, CEO & President

Follow Integra Gold On:


--  Twitter: http://twitter.com/integragoldcorp

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward Looking Statements: Certain disclosure in this release constitutes forward-looking statements. In making the forward-looking statements in this release, the Company has applied certain factors and assumptions that are based on the Company's current beliefs as well as assumptions made by and information currently available to the Company, including that the Company is able to obtain any government or other regulatory approvals required to complete the private placement and Company's planned exploration activities, that the Company is able to complete the private placement, that the Company is able to procure personnel, equipment and supplies required for its exploration activities in sufficient quantities and on a timely basis and that actual results of exploration activities are consistent with management's expectations. Although the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect, and the forward-looking statements in this release are subject to numerous risks, uncertainties and other factors that may cause future results to differ materially from those expressed or implied in such forward-looking statements. Such risk factors include, among others, that the private placement will not be completed, that actual results of the Company's exploration activities will be different than those expected by management and that the Company will be unable to obtain or will experience delays in obtaining any required government approvals or be unable to procure required equipment and supplies in sufficient quantities and on a timely basis. Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
IoT is at the core or many Digital Transformation initiatives with the goal of re-inventing a company's business model. We all agree that collecting relevant IoT data will result in massive amounts of data needing to be stored. However, with the rapid development of IoT devices and ongoing business model transformation, we are not able to predict the volume and growth of IoT data. And with the lack of IoT history, traditional methods of IT and infrastructure planning based on the past do not app...
Enterprise architects are increasingly adopting multi-cloud strategies as they seek to utilize existing data center assets, leverage the advantages of cloud computing and avoid cloud vendor lock-in. This requires a globally aware traffic management strategy that can monitor infrastructure health across data centers and end-user experience globally, while responding to control changes and system specification at the speed of today’s DevOps teams. In his session at 20th Cloud Expo, Josh Gray, Chie...
Internet-of-Things discussions can end up either going down the consumer gadget rabbit hole or focused on the sort of data logging that industrial manufacturers have been doing forever. However, in fact, companies today are already using IoT data both to optimize their operational technology and to improve the experience of customer interactions in novel ways. In his session at @ThingsExpo, Gordon Haff, Red Hat Technology Evangelist, shared examples from a wide range of industries – including en...
In IT, we sometimes coin terms for things before we know exactly what they are and how they’ll be used. The resulting terms may capture a common set of aspirations and goals – as “cloud” did broadly for on-demand, self-service, and flexible computing. But such a term can also lump together diverse and even competing practices, technologies, and priorities to the point where important distinctions are glossed over and lost.
To get the most out of their data, successful companies are not focusing on queries and data lakes, they are actively integrating analytics into their operations with a data-first application development approach. Real-time adjustments to improve revenues, reduce costs, or mitigate risk rely on applications that minimize latency on a variety of data sources. Jack Norris reviews best practices to show how companies develop, deploy, and dynamically update these applications and how this data-first...
Intelligent Automation is now one of the key business imperatives for CIOs and CISOs impacting all areas of business today. In his session at 21st Cloud Expo, Brian Boeggeman, VP Alliances & Partnerships at Ayehu, will talk about how business value is created and delivered through intelligent automation to today’s enterprises. The open ecosystem platform approach toward Intelligent Automation that Ayehu delivers to the market is core to enabling the creation of the self-driving enterprise.
"At the keynote this morning we spoke about the value proposition of Nutanix, of having a DevOps culture and a mindset, and the business outcomes of achieving agility and scale, which everybody here is trying to accomplish," noted Mark Lavi, DevOps Solution Architect at Nutanix, in this SYS-CON.tv interview at @DevOpsSummit at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
"We're here to tell the world about our cloud-scale infrastructure that we have at Juniper combined with the world-class security that we put into the cloud," explained Lisa Guess, VP of Systems Engineering at Juniper Networks, in this SYS-CON.tv interview at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
"We're a cybersecurity firm that specializes in engineering security solutions both at the software and hardware level. Security cannot be an after-the-fact afterthought, which is what it's become," stated Richard Blech, Chief Executive Officer at Secure Channels, in this SYS-CON.tv interview at @ThingsExpo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
In his session at 20th Cloud Expo, Mike Johnston, an infrastructure engineer at Supergiant.io, discussed how to use Kubernetes to set up a SaaS infrastructure for your business. Mike Johnston is an infrastructure engineer at Supergiant.io with over 12 years of experience designing, deploying, and maintaining server and workstation infrastructure at all scales. He has experience with brick and mortar data centers as well as cloud providers like Digital Ocean, Amazon Web Services, and Rackspace. H...
Consumers increasingly expect their electronic "things" to be connected to smart phones, tablets and the Internet. When that thing happens to be a medical device, the risks and benefits of connectivity must be carefully weighed. Once the decision is made that connecting the device is beneficial, medical device manufacturers must design their products to maintain patient safety and prevent compromised personal health information in the face of cybersecurity threats. In his session at @ThingsExpo...
All organizations that did not originate this moment have a pre-existing culture as well as legacy technology and processes that can be more or less amenable to DevOps implementation. That organizational culture is influenced by the personalities and management styles of Executive Management, the wider culture in which the organization is situated, and the personalities of key team members at all levels of the organization. This culture and entrenched interests usually throw a wrench in the work...
Detecting internal user threats in the Big Data eco-system is challenging and cumbersome. Many organizations monitor internal usage of the Big Data eco-system using a set of alerts. This is not a scalable process given the increase in the number of alerts with the accelerating growth in data volume and user base. Organizations are increasingly leveraging machine learning to monitor only those data elements that are sensitive and critical, autonomously establish monitoring policies, and to detect...
SYS-CON Events announced today that Grape Up will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct. 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Grape Up is a software company specializing in cloud native application development and professional services related to Cloud Foundry PaaS. With five expert teams that operate in various sectors of the market across the U.S. and Europe, Grape Up works with a variety of customers from emergi...
You know you need the cloud, but you’re hesitant to simply dump everything at Amazon since you know that not all workloads are suitable for cloud. You know that you want the kind of ease of use and scalability that you get with public cloud, but your applications are architected in a way that makes the public cloud a non-starter. You’re looking at private cloud solutions based on hyperconverged infrastructure, but you’re concerned with the limits inherent in those technologies.