ZUG, Switzerland, Feb. 10, 2014 /CNW/ - Katanga Mining Limited (TSX: KAT) ("Katanga" or the "Company") is pleased to announce its ore reserve and mineral resource estimates as at December 31, 2013.

Key Updates: Mineral Resources

  • Overall, the measured and indicated mineral resource for Kamoto Copper Company ("KCC") (in which the Company has a 75% interest) decreased by 5.2 million tonnes.
    • Changes in the measured mineral resource for KTO, KOV Open Pit and T17 Open Pit is a decrease of 1.7 million tonnes at KTO, 2.2 million tonnes at KOV Open Pit and 0.2 million tonnes at T17 Open Pit based on the depletion of the mineral resource due to mining in 2013.
    • Changes in the indicated mineral resource for KOV Open Pit is a decrease of 1.1 million tonnes based on the depletion of the mineral resource due to mining in 2013.
    • Changes in the inferred mineral resource for KOV Open Pit is a decrease of 0.3 million tonnes based on the depletion of the mineral resource due to mining in 2013.
  • There are no changes in the mineral resources reported for Mashamba East Open Pit, Kananga Mine and Tilwezembe Open Pit, as mining was not undertaken in these areas in 2013 and no geological work was done on these areas in 2013.
  • A reconciliation table comparing the 2012 and 2013 mineral resource estimates is set out in Annexure A.

Key Updates: Ore Reserves

  • The outcome of the December 31, 2013 ore reserve estimate is a net increase of 3.9 million tonnes of ore reserves, the net increase in reserve is based on completion of T17 underground Pre-feasibility study, 4.7 million tonnes being mined in 2013 and minor, short-term ore definition changes and pit design adjustments undertaken in 2013.
  • A reconciliation table comparing the 2012 and 2013 ore reserves is set out in Annexure B and the key mining parameters which inform the ore reserve estimates are set out in Annexure C

KATANGA MINING LIMITED
CONSOLIDATED ORE RESERVES AND MINERAL RESOURCES 1, 2, 3, 4, 5, 6, 7, 8, 9
as at December 31, 2013

Ore Reserves Mt %TCu %Tco
Proved 11.5 3.40 0.72
Probable 83.4 4.05 0.45
Proved & Probable 94.8 3.97 0.48
       
Mineral Resources      
Measured 33.0 4.18 0.57
Indicated 244.4 3.98 0.45
Measured & Indicated 277.4 4.00 0.47
Inferred 168.7 2.41 0.31

More detailed ore reserve and mineral resource estimates are as follows:

KATANGA MINING LIMITED
PROVED AND PROBABLE ORE RESERVES 1, 2, 5, 6, 7, 9
as at December 31, 2013

Ore Reserves Mt %TCu %TCo
KTO 28.9 3.48 0.56
T-17 Open Pit 0.2 2.93 0.44
T-17 Underground 10.9 3.50 0.61
Mashamba East Open Pit 5.9 3.00 0.36
KOV Open Pit 48.9 4.49 0.42
TOTAL 94.8 3.97 0.48

KATANGA MINING LIMITED
MEASURED AND INDICATED MINERAL RESOURCES 1, 2, 3, 4, 5, 6, 8, 9
as at December 31, 2013

Measured and Indicated Mineral Resources Mt %TCu %TCo
KTO 61.6 4.61 0.58
T-17 Open Pit/T-17 Underground 13.7 3.89 0.61
Mashamba East Open Pit 75.0 1.80 0.38
KOV Open Pit/KOV Underground/KTE Underground 113.5 5.41 0.42
Kananga Mine 4.1 1.61 0.79
Tilwezembe Open Pit 9.5 1.89 0.60
TOTAL 277.4 4.00 0.47

KATANGA MINING LIMITED
INFERRED MINERAL RESOURCES 1, 2, 3, 4, 5, 6, 8, 9
as at December 31, 2013

Inferred Mineral Resources Mt %TCu %TCo
KTO 11.0 5.00 0.59
T-17 Open Pit/T-17 Underground 5.2 4.21 0.98
Mashamba East Open Pit 65.3 0.76 0.10
KOV Open Pit/KOV Underground/KTE Underground 69.4 3.58 0.32
Kananga Mine 4.0 2.00 0.98
Tilwezembe Open Pit 13.8 1.75 0.60
TOTAL 168.7 2.41 0.31

Notes:

  1. The ore reserve and mineral resource estimates have been prepared in accordance with the classification criteria of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves prepared by the Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia, as amended ("JORC Code").  If the definitions and classification standards adopted by the Canadian Securities Administrators' National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") had been used instead of those of the JORC Code, the estimates of mineral reserves and mineral resources would be substantially similar to the estimates of ore reserves and mineral resources presented here.
  2. The mineral resource estimates have been prepared by, or under the supervision of, Christiano Santos Goncalves, (MAusIMM CP (Geo) 306 079) and the ore reserve estimates have been prepared by, or under the supervision of, Jacobus Lotheringen, PrEng each of Golder Associates Africa Pty Ltd, who are each a qualified person under NI 43-101.
  3. Mineral resources are inclusive of ore reserves.
  4. Mineral resources which are not ore reserves do not have demonstrated economic viability.
  5. For KTO, the ore reserve and mineral resource estimates are for KCC's entire interest in such ore reserves and mineral resources, whereas the Company owns 75% of KCC.  La Generale des Carrieres et des Mines and La Société Immobilière du Congo, state-owned mining companies in the Democratic Republic of Congo, own the remaining 25% of KCC.
  6. Numbers may not add due to rounding.
  7. Unless otherwise noted, the Company's ore reserves are estimated using appropriate cut-off grades based on an assumed long term price of $6 178 per tonne of copper and long term price of $25 062 per tonne of cobalt. Ore reserves are estimated using appropriate process recoveries, operating costs and mine plans that are unique to each property and include estimated allowances for dilution and mining recovery.
  8. Unless otherwise noted, the Company's mineral resources are estimated using appropriate lithological interpretations, grade compositing and grade estimation techniques for copper and cobalt.
  9. The Company's normal data verification procedures have been used in collecting, compiling, interpreting and processing the data used to estimate ore reserves and mineral resources. Independent data verification has not been performed. However the data has been independently validated.

Qualified Person and Technical Report
This press release was prepared under the supervision of Tim Henderson, Technical Consultant, Katanga and a 'qualified person' as such term is defined in NI 43-101. Mr. Henderson has reviewed and approved the contents of this press release.

The Company's technical report entitled "An Independent Technical Report on the Material Assets of Katanga Mining Limited, Katanga Province, Democratic Republic of Congo" dated March 30, 2012 prepared by Golder Associates Africa (Pty) Ltd under the supervision of Mr. Willem van der Schyff as the "qualified person" is in compliance with NI 43-101 is filed under the Company's profile on SEDAR at www.sedar.com.

Cautionary Note to US Investors concerning estimates of Measured, Indicated and Inferred Mineral Resources
The above tables uses the terms "Measured, Indicated and Inferred Mineral Resources" using the ore reserves and mineral resource categories of the JORC Code.  We advise US investors that while these terms are recognized and required by Canadian regulations, the US Securities and Exchange Commission does not recognize them.  "Inferred mineral resources" have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility.  It cannot be assumed that all or any part of inferred mineral resources will ever be upgraded to a higher category.  In accordance with Canadian rules, estimates of inferred mineral resources cannot form the basis of feasibility or other economic studies.  US investors are cautioned not to assume that any part or all of the inferred mineral resource exists, or is economically or legally mineable.

About Katanga Mining Limited
Katanga Mining Limited operates a major mine complex in the Democratic Republic of Congo producing refined copper and cobalt. The Company has the potential to become Africa's largest copper producer and the world's largest cobalt producer. Katanga is listed on the Toronto Stock Exchange under the symbol KAT.

Forward Looking Statements
This press release may contain forward-looking statements, including, but not limited to, the increase in mined volumes and grades of copper and cobalt , the potential for an underground mine at T17 Open Pit and the completion of the Phase 5 project. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.

All forward-looking statements reflect the Company's beliefs and assumptions based on information available at the time the statements were made. Actual results or events may differ from those predicted in these forward-looking statements. All of the Company's forward-looking statements are qualified by the assumptions that are stated or inherent in such forward-looking statements, including the assumptions listed below. Although the Company believes that these assumptions are reasonable, this list is not exhaustive of factors that may affect any of the forward-looking statements. The key assumptions that have been made in connection with the forward-looking statements include: there being no significant disruptions affecting the operations of the Company whether due to labour disruptions, supply disruptions, power disruptions, damage to equipment or otherwise; permitting and development, being consistent with the Company's current expectations; continued recognition of the Company's mining concessions and other assets, rights, titles and interests in the Democratic Republic of Congo ("DRC"); political and legal developments in the DRC being consistent with its current expectations; the continued provision or procurement of additional funding from Glencore Xstrata for the completion of the Phase 5 Project; prices for diesel, natural gas, fuel oil, electricity and other key supplies being approximately consistent with current levels; labour and material costs increasing on a basis consistent with the Company's current expectations; the increased backfill tonnes and the acceleration of primary and secondary development will provide access to higher grade zones at KTO Underground Mine, the successful resolution of the near-term underground chamber availability issues and all necessary equipment and parts will be delivered and installed on schedule for Phase 5.

Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, the actual results of current exploration activities; actual results and interpretation of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of copper and cobalt; possible variations in ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of exploration, development or construction activities, delays due to strikes or other work stoppage, both internal and external to the Company, as well as those factors disclosed in the Company's current annual information form and other publicly filed documents. Although Katanga has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events, or otherwise, except in accordance with applicable securities laws.

Annexure A

Katanga Mining Limited Mineral Resource Reconciliation at December 31, 2013
Classification Project Area 2013 2012 Variance
Mt %TCu %TCo Mt %TCu %TCo Mt
Measured KTO 28.7 4.41 0.58 30.4 4.36 0.58 (1.7)
Mashamba East Open Pit 0.0 0.00 0.00 0.0 0.00 0.00 0.0
T-17 Open Pit/T-17 Underground 4.3 2.68 0.52 4.5 2.71 0.54 (0.2)
KOV Open Pit/KOV Underground/KTE Underground 0.0 0.00 0.00 2.2 4.07 0.22 (2.2)
Kananga Mine 0.0 0.00 0.00 0.0 0.00 0.00 0.0
Tilwezembe Open Pit 0.0 0.00 0.00 0.0 0.00 0.00 0.0
Subtotal 33.0 4.18 0.57 37.1 4.14 0.55 (4.1)
Indicated KTO 32.9 4.78 0.58 32.9 4.78 0.58 0.0
Mashamba East Open Pit 75.0 1.80 0.38 75.0 1.80 0.38 0.0
T-17 Open Pit/T-17 Underground 9.4 4.44 0.65 9.4 4.44 0.65 0.0
KOV Open Pit/KOV Underground/KTE Underground 113.5 5.41 0.42 114.6 5.42 0.42 (1.1)
Kananga Mine 4.1 1.61 0.79 4.1 1.61 0.79 0.0
Tilwezembe Open Pit 9.5 1.89 0.60 9.5 1.89 0.60 0.0
Subtotal 244.4 3.98 0.45 245.5 3.99 0.45 (1.1)
Measured and Indicated KTO 61.6 4.61 0.58 63.3 4.58 0.58 (1.7)
Mashamba East Open Pit 75.0 1.80 0.38 75.0 1.80 0.38 0.0
T-17 Open Pit/T-17 Underground 13.7 3.89 0.61 13.9 3.88 0.61 (0.2)
KOV Open Pit/KOV Underground/KTE Underground 113.5 5.41 0.42 116.8 5.39 0.42 (3.3)
Kananga Mine 4.1 1.61 0.79 4.1 1.61 0.79 0.0
Tilwezembe Open Pit 9.5 1.89 0.60 9.5 1.89 0.60 0.0
TOTAL 277.4 4.00 0.47 282.6 4.01 0.46 (5.2)
Inferred KTO 11.0 5.00 0.59 11.0 5.00 0.59 0.0
Mashamba East Open Pit 65.3 0.76 0.10 65.3 0.76 0.10 0.0
T-17 Open Pit/T-17 Underground 5.2 4.21 0.98 5.2 4.21 0.98 0.0
KOV Open Pit/KOV Underground/KTE Underground 69.4 3.58 0.32 69.7 3.58 0.32 (0.3)
Kananga Mine 4.0 2.00 0.98 4.0 2.00 0.98 0.0
Tilwezembe Open Pit 13.8 1.75 0.60 13.8 1.75 0.60 0.0
TOTAL 168.7 2.41 0.31 169.0 2.42 0.31 (0.3)

Annexure B

Katanga Mining Limited Ore Reserve Reconciliation as at December 31, 2013

Mining operation 2013 Reserve Estimate 2012 Reserve Estimate
Mt %TCu %TCo Mt %TCu %TCo
KTO 28.9 3.48 0.56 30.6 3.59 0.52
T-17 Underground 10.9 3.50 0.61 0.9 3.51 0.57
T-17 Open Pit 0.2 2.93 0.44 1.6 3.52 0.56
Mashamba East Open pit 5.9 3.00 0.36 5.9 3.00 0.36
KOV Open Pit 48.9 4.49 0.42 51.9 4.76 0.42
Total 94.8 3.97 0.48 90.9 4.18 0.45

Notes: See notes 1, 2, 5 to 7 and 9 on page 3 of this press release relating to ore reserve estimates.

Annexure C

Ore Reserve Estimation: Key Mining Parameters
Reference Mining Costs (USD $/t) 3.15
Reference Mining Processing (USD $/t) 47.58
Reference Mining Metal Price for Cu (USD $/t) 6,178
Reference Mining Metal Price for Co (USD $/t) 25,062

Operation Mining
Dilutions
Mining and
Pillar Losses
Geological
Losses
Cut-off
Grade
(Cu)
Processing
Recoveries
(Cu)
Processing
Recoveries
(Co)
KTO 5% to 10% 18% to 35% 5% 1.50% 90.5% 76.6%
KOV 9% 1% 0% 0.60% 85% 65%
T17 Underground 7% 5% to 35% 8% 1.40% 85% 65%
T17 Open Pit 10% 20% 5% 0.60% 85% 65%
Mashamba East 9% 39% 5% 0.60% 85% 65%

 

SOURCE Katanga Mining Limited

More Stories By PR Newswire

Copyright © 2007 PR Newswire. All rights reserved. Republication or redistribution of PRNewswire content is expressly prohibited without the prior written consent of PRNewswire. PRNewswire shall not be liable for any errors or delays in the content, or for any actions taken in reliance thereon.

Latest Stories
In his keynote at 18th Cloud Expo, Andrew Keys, Co-Founder of ConsenSys Enterprise, provided an overview of the evolution of the Internet and the Database and the future of their combination – the Blockchain. Andrew Keys is Co-Founder of ConsenSys Enterprise. He comes to ConsenSys Enterprise with capital markets, technology and entrepreneurial experience. Previously, he worked for UBS investment bank in equities analysis. Later, he was responsible for the creation and distribution of life settle...
The cloud era has reached the stage where it is no longer a question of whether a company should migrate, but when. Enterprises have embraced the outsourcing of where their various applications are stored and who manages them, saving significant investment along the way. Plus, the cloud has become a defining competitive edge. Companies that fail to successfully adapt risk failure. The media, of course, continues to extol the virtues of the cloud, including how easy it is to get there. Migrating...
Blockchain. A day doesn’t seem to go by without seeing articles and discussions about the technology. According to PwC executive Seamus Cushley, approximately $1.4B has been invested in blockchain just last year. In Gartner’s recent hype cycle for emerging technologies, blockchain is approaching the peak. It is considered by Gartner as one of the ‘Key platform-enabling technologies to track.’ While there is a lot of ‘hype vs reality’ discussions going on, there is no arguing that blockchain is b...
No hype cycles or predictions of a gazillion things here. IoT is here. You get it. You know your business and have great ideas for a business transformation strategy. What comes next? Time to make it happen. In his session at @ThingsExpo, Jay Mason, an Associate Partner of Analytics, IoT & Cybersecurity at M&S Consulting, presented a step-by-step plan to develop your technology implementation strategy. He also discussed the evaluation of communication standards and IoT messaging protocols, data...
ChatOps is an emerging topic that has led to the wide availability of integrations between group chat and various other tools/platforms. Currently, HipChat is an extremely powerful collaboration platform due to the various ChatOps integrations that are available. However, DevOps automation can involve orchestration and complex workflows. In his session at @DevOpsSummit at 20th Cloud Expo, Himanshu Chhetri, CTO at Addteq, will cover practical examples and use cases such as self-provisioning infra...
You know you need the cloud, but you’re hesitant to simply dump everything at Amazon since you know that not all workloads are suitable for cloud. You know that you want the kind of ease of use and scalability that you get with public cloud, but your applications are architected in a way that makes the public cloud a non-starter. You’re looking at private cloud solutions based on hyperconverged infrastructure, but you’re concerned with the limits inherent in those technologies.
Coca-Cola’s Google powered digital signage system lays the groundwork for a more valuable connection between Coke and its customers. Digital signs pair software with high-resolution displays so that a message can be changed instantly based on what the operator wants to communicate or sell. In their Day 3 Keynote at 21st Cloud Expo, Greg Chambers, Global Group Director, Digital Innovation, Coca-Cola, and Vidya Nagarajan, a Senior Product Manager at Google, discussed how from store operations and ...
In his session at 21st Cloud Expo, Raju Shreewastava, founder of Big Data Trunk, provided a fun and simple way to introduce Machine Leaning to anyone and everyone. He solved a machine learning problem and demonstrated an easy way to be able to do machine learning without even coding. Raju Shreewastava is the founder of Big Data Trunk (www.BigDataTrunk.com), a Big Data Training and consulting firm with offices in the United States. He previously led the data warehouse/business intelligence and B...
"IBM is really all in on blockchain. We take a look at sort of the history of blockchain ledger technologies. It started out with bitcoin, Ethereum, and IBM evaluated these particular blockchain technologies and found they were anonymous and permissionless and that many companies were looking for permissioned blockchain," stated René Bostic, Technical VP of the IBM Cloud Unit in North America, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Conventi...
A strange thing is happening along the way to the Internet of Things, namely far too many devices to work with and manage. It has become clear that we'll need much higher efficiency user experiences that can allow us to more easily and scalably work with the thousands of devices that will soon be in each of our lives. Enter the conversational interface revolution, combining bots we can literally talk with, gesture to, and even direct with our thoughts, with embedded artificial intelligence, whic...
The need for greater agility and scalability necessitated the digital transformation in the form of following equation: monolithic to microservices to serverless architecture (FaaS). To keep up with the cut-throat competition, the organisations need to update their technology stack to make software development their differentiating factor. Thus microservices architecture emerged as a potential method to provide development teams with greater flexibility and other advantages, such as the abili...
Product connectivity goes hand and hand these days with increased use of personal data. New IoT devices are becoming more personalized than ever before. In his session at 22nd Cloud Expo | DXWorld Expo, Nicolas Fierro, CEO of MIMIR Blockchain Solutions, will discuss how in order to protect your data and privacy, IoT applications need to embrace Blockchain technology for a new level of product security never before seen - or needed.
Leading companies, from the Global Fortune 500 to the smallest companies, are adopting hybrid cloud as the path to business advantage. Hybrid cloud depends on cloud services and on-premises infrastructure working in unison. Successful implementations require new levels of data mobility, enabled by an automated and seamless flow across on-premises and cloud resources. In his general session at 21st Cloud Expo, Greg Tevis, an IBM Storage Software Technical Strategist and Customer Solution Architec...
The use of containers by developers -- and now increasingly IT operators -- has grown from infatuation to deep and abiding love. But as with any long-term affair, the honeymoon soon leads to needing to live well together ... and maybe even getting some relationship help along the way. And so it goes with container orchestration and automation solutions, which are rapidly emerging as the means to maintain the bliss between rapid container adoption and broad container use among multiple cloud host...
Blockchain is a shared, secure record of exchange that establishes trust, accountability and transparency across business networks. Supported by the Linux Foundation's open source, open-standards based Hyperledger Project, Blockchain has the potential to improve regulatory compliance, reduce cost as well as advance trade. Are you curious about how Blockchain is built for business? In her session at 21st Cloud Expo, René Bostic, Technical VP of the IBM Cloud Unit in North America, discussed the b...