Welcome!

News Feed Item

Timberline Announces Hard Rock Operating Permit Update for Butte Highlands Gold Project

COEUR D'ALENE, IDAHO -- (Marketwired) -- 02/17/14 -- Timberline Resources Corporation (NYSE MKT: TLR)(TSX VENTURE: TBR) ("Timberline" or the "Company") announced today that the Montana Department of Environmental Quality ("MDEQ") has provided an updated schedule anticipated for completion of the Final Environmental Impact Statement ("Final EIS") for the Butte Highlands Joint Venture ("BHJV")'s proposed underground gold mine in the Highland Mountains south of Butte, Montana. The Final EIS is a critical remaining step toward receipt of a Final Hard Rock Operating Permit (HROP) for the Project. The Company also announced recently received assay results from drilling completed in preparation for advancement of mining to the proposed bulk sample area.

The MDEQ has provided the Company a revised estimate that completion of the Final EIS will be before the end of March. The agency currently continues evaluation and response to public comments provided following release of the Draft EIS in October, 2013. Two weeks after release of the Final EIS, the MDEQ will prepare a Record of Decision document after which the project bond can be issued. The Final HROP would be signed by the Director of the MDEQ immediately thereafter allowing commencement of production.

Timberline also announced additional results from underground drill holes completed in 2013. Hole BHUG13-003 was drilled to confirm continuity of mineralization within the main zone in the proposed bulk sample area. The hole also intercepted the lower, footwall zone where assays confirm significant mineralization. Assay highlights include:


----------------------------------------------------------------------------
                             Gold                     Gold
              From  Length   (opt)    From   Length   (g/t)
Drill Hole   (feet)  (feet)    (i) (metres) (metres)   (ii) Zone
----------------------------------------------------------------------------
BHUG11-003   182.1    22.3   0.32    55.50     6.80  10.96  Bulk Sample Area
----------------------------------------------------------------------------
BHUG11-003   255.0    20.4   0.19    77.72     6.22   6.50
----------------------------------------------------------  Lower Footwall
 including   262.4    13.0   0.28    79.98     3.96   9.59
----------------------------------------------------------------------------
(i)ounces/ton, (ii)grams/tonne

On-going development activities under the existing exploration license continue at the site and are now focused on completion of a new dewatering well which will be important to initiating mining. The well has been drilled and is currently being prepared for pump installation.

Timberline President and CEO, Paul Dircksen, commented, "We look forward to completion of the Final EIS as a major milestone in permitting of the Butte Highlands Project. Steady progress continues toward reaching production on this important project for the Company."

Timberline owns a 50-percent carried-to-production interest in BHJV, which owns the Butte Highlands Gold Project where mining is expected to commence following the issuance of the HROP and the U.S. Forest Service approval of a road-use plan of operations for material haulage. Timberline's joint venture partner is funding all mine development costs through to commercial production with Timberline's share of those costs to be repaid from proceeds of future mine production.

About Timberline Resources

Timberline Resources Corporation is exploring and developing advanced-stage gold properties in the western United States. Timberline holds a 50-percent carried interest ownership stake in the Butte Highlands Joint Venture in Montana. Timberline's exploration is primarily focused on the major gold districts of Nevada, where it is advancing its flagship Lookout Mountain Project toward a production decision while exploring a pipeline of quality earlier-stage projects at its South Eureka Property and elsewhere. Timberline management has a proven track record of discovering economic mineral deposits that are developed into profitable mines.

Timberline is listed on the NYSE MKT where it trades under the symbol "TLR" and on the TSX Venture Exchange where it trades under the symbol "TBR".

Cautionary Note

The Company clarifies that BHJV has decided to advance the Butte Highlands Gold Project into production without first establishing NI 43-101 compliant mineral resources supported by an independent technical report or completing a feasibility study. A production decision without the benefit of a technical report independently establishing mineral resources or reserves and any feasibility study demonstrating economic and technical viability creates increased uncertainty and heightens economic and technical risks of failure associated with the Butte Highlands Project.

Forward-looking Statements

Statements contained herein that are not based upon current or historical fact are forward-looking in nature and constitute forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Such forward-looking statements reflect the Company's expectations about its future operating results, performance and opportunities that involve substantial risks and uncertainties. These statements include but are not limited to statements regarding the timing and results of the Company's continued exploration and drill program at South Eureka and Lookout Mountain, the timing of assay results from such drilling program being released, the Company's ability to expand and upgrade the South Eureka resource, the timing or results of the Company's exploration and development plans and programs at Butte Highlands, including the timing of obtaining necessary permits, the development of and production at the Company's Butte Highlands project and projects on its South Eureka property, the potential life of the mine at the Butte Highlands project, the targeted production date for the Butte Highlands project, targeted date for production at South Eureka, the potential for a heap-leach mine at South Eureka, and possible growth of the Company and the Company's expected operations, including potential development of an open pit extraction and heap leach processing and operation at South Eureka. When used herein, the words "anticipate", "believe", "estimate", "upcoming", "plan", "target", "intend" and "expect" and similar expressions, as they relate to Timberline Resources Corporation, its subsidiaries, or its management, are intended to identify such forward-looking statements. These forward-looking statements are based on information currently available to the Company and are subject to a number of risks, uncertainties, and other factors that could cause the Company's actual results, performance, prospects, and opportunities to differ materially from those expressed in, or implied by, these forward-looking statements. Factors that could cause or contribute to such differences include, but are not limited to, risks related to the timing and completion of the drilling programs at Butte Highlands and South Eureka, risks and uncertainties related to mineral estimates, risks related to the inherently dangerous activity of mining, and other such factors, including risk factors discussed in the Company's Annual Report on Form 10-K for the year ended September 30, 2013. Except as required by Federal Securities law, the Company does not undertake any obligation to release publicly any revisions to any forward-looking statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts:
Timberline Resources Corporation
Paul Dircksen
CEO
208.664.4859

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
In his keynote at 19th Cloud Expo, Sheng Liang, co-founder and CEO of Rancher Labs, discussed the technological advances and new business opportunities created by the rapid adoption of containers. With the success of Amazon Web Services (AWS) and various open source technologies used to build private clouds, cloud computing has become an essential component of IT strategy. However, users continue to face challenges in implementing clouds, as older technologies evolve and newer ones like Docker c...
SYS-CON Events announced today that Twistlock, the leading provider of cloud container security solutions, will exhibit at SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. Twistlock is the industry's first enterprise security suite for container security. Twistlock's technology addresses risks on the host and within the application of the container, enabling enterprises to consistently enforce security policies, monitor...
The Internet of Things is clearly many things: data collection and analytics, wearables, Smart Grids and Smart Cities, the Industrial Internet, and more. Cool platforms like Arduino, Raspberry Pi, Intel's Galileo and Edison, and a diverse world of sensors are making the IoT a great toy box for developers in all these areas. In this Power Panel at @ThingsExpo, moderated by Conference Chair Roger Strukhoff, panelists discussed what things are the most important, which will have the most profound e...
Automation is enabling enterprises to design, deploy, and manage more complex, hybrid cloud environments. Yet the people who manage these environments must be trained in and understanding these environments better than ever before. A new era of analytics and cognitive computing is adding intelligence, but also more complexity, to these cloud environments. How smart is your cloud? How smart should it be? In this power panel at 20th Cloud Expo, moderated by Conference Chair Roger Strukhoff, pane...
The goal of Continuous Testing is to shift testing left to find defects earlier and release software faster. This can be achieved by integrating a set of open source functional and performance testing tools in the early stages of your software delivery lifecycle. There is one process that binds all application delivery stages together into one well-orchestrated machine: Continuous Testing. Continuous Testing is the conveyor belt between the Software Factory and production stages. Artifacts are ...
Blockchain is a shared, secure record of exchange that establishes trust, accountability and transparency across supply chain networks. Supported by the Linux Foundation's open source, open-standards based Hyperledger Project, Blockchain has the potential to improve regulatory compliance, reduce cost and time for product recall as well as advance trade. Are you curious about Blockchain and how it can provide you with new opportunities for innovation and growth? In her session at 20th Cloud Exp...
@ThingsExpo has been named the Most Influential ‘Smart Cities - IIoT' Account and @BigDataExpo has been named fourteenth by Right Relevance (RR), which provides curated information and intelligence on approximately 50,000 topics. In addition, Right Relevance provides an Insights offering that combines the above Topics and Influencers information with real time conversations to provide actionable intelligence with visualizations to enable decision making. The Insights service is applicable to eve...
SYS-CON Events announced today that Grape Up will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct. 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Grape Up is a software company specializing in cloud native application development and professional services related to Cloud Foundry PaaS. With five expert teams that operate in various sectors of the market across the U.S. and Europe, Grape Up works with a variety of customers from emergi...
SYS-CON Events announced today that Hitachi, the leading provider the Internet of Things and Digital Transformation, will exhibit at SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. Hitachi Data Systems, a wholly owned subsidiary of Hitachi, Ltd., offers an integrated portfolio of services and solutions that enable digital transformation through enhanced data management, governance, mobility and analytics. We help globa...
SYS-CON Events announced today that Juniper Networks (NYSE: JNPR), an industry leader in automated, scalable and secure networks, will exhibit at SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. Juniper Networks challenges the status quo with products, solutions and services that transform the economics of networking. The company co-innovates with customers and partners to deliver automated, scalable and secure network...
SYS-CON Events announced today that CA Technologies has been named "Platinum Sponsor" of SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, New York, and 21st International Cloud Expo, which will take place in November in Silicon Valley, California.
Developers want to create better apps faster. Static clouds are giving way to scalable systems, with dynamic resource allocation and application monitoring. You won't hear that chant from users on any picket line, but helping developers to create better apps faster is the mission of Lee Atchison, principal cloud architect and advocate at New Relic Inc., based in San Francisco. His singular job is to understand and drive the industry in the areas of cloud architecture, microservices, scalability ...
Back in February of 2017, Andrew Clay Schafer of Pivotal tweeted the following: “seriously tho, the whole software industry is stuck on deployment when we desperately need architecture and telemetry.” Intrigue in a 140 characters. For me, I hear Andrew saying, “we’re jumping to step 5 before we’ve successfully completed steps 1-4.”
DevOps is being widely accepted (if not fully adopted) as essential in enterprise IT. But as Enterprise DevOps gains maturity, expands scope, and increases velocity, the need for data-driven decisions across teams becomes more acute. DevOps teams in any modern business must wrangle the ‘digital exhaust’ from the delivery toolchain, "pervasive" and "cognitive" computing, APIs and services, mobile devices and applications, the Internet of Things, and now even blockchain.
@DevOpsSummit has been named the ‘Top DevOps Influencer' by iTrend. iTred processes millions of conversations, tweets, interactions, news articles, press releases, blog posts - and extract meaning form them and analyzes mobile and desktop software platforms used to communicate, various metadata (such as geo location), and automation tools. In overall placement, @DevOpsSummit ranked as the number one ‘DevOps Influencer' followed by @CloudExpo at third, and @MicroservicesE at 24th.