Welcome!

News Feed Item

Probe Mines Announces High-Grade Infill Drill Intercepts, Including 7.0 g/t Gold Over 39.5 Metres, for its Borden Gold Project, Ontario

TORONTO, ONTARIO -- (Marketwired) -- 02/18/14 -- Probe Mines Limited (TSX VENTURE:PRB)

Highlights:


--  Infill drilling within High-Grade Zone ("HGZ") returned significant gold
    mineralization in Hole BL14-583on Section 1000mSE. This drill hole is
    located near the northwest end of the HGZ and demonstrates higher grades
    than previously encountered, returning: 
    --  39.5 metres averaging 7.0 g/t gold 
        --  including 28.5 metres grading 9.1 g/t gold 
        --  including 16.0 metres grading 12.4 g/t gold

--  Infill Hole BL14-584 on Section 1050mSE (50m southeast of BL14-583)
    returned a significant intersection of: 
    --  34.8 metres averaging 5.1 g/t gold 
        --  including 12.6 metres of 11.4 g/t gold

--  Infill Hole BL14-582 on Section 950mSE (50m northwest of BL14-583)
    returned a thick gold intercept, consisting of: 
    --  30.1 metres averaging 3.5 g/t gold 
        --  including 2.9 metres grading 14.1 g/t gold 
        --  also including 7.2 metres grading 4.4 g/t gold

--  Results continue to confirm the importance of the infill drill program
    through the identification of higher grades within the deposit, and
    particularly in the HGZ

Probe Mines Limited (TSX VENTURE:PRB) ("Probe" or the "Company") is pleased to announce that it has received further results for its on-going drill program on the Company's Borden Gold project near Chapleau, Ontario. Results are for the last nine (9) holes completed from the land-based infill drilling program on the High-Grade Zone ("HGZ") before the start of the on-ice drilling, which is currently underway. Diamond drill holes BL14-578 to BL14-586 were received and were successful in demonstrating the continuity and consistency of the high-grade gold mineralization. Holes BL14-583, -584, -582 and -586 are of particular importance as they demonstrate increasing grades at shallow depths (220-250 metres) within the northwest end of the HGZ (Sections 950mSE to 1100mSE) and indicate that the HGZ is still improving within its known strike length. Significantly, all four drill holes are located northwest of the original HGZ discovery hole, BL12-256, on Section 1200mSE (see News Release dated December 12, 2012).

Diamond drill hole BL14-583 returned a thick intersection of high-grade gold on Section 1000mSE consisting of 39.5 metres averaging 7.0 g/t gold ("Au"), which includes a higher-grade interval of 16 metres averaging 12.4 g/t Au. Fifty metres to the southeast (Section 1050mSE), Hole BL14-584 returned an equally significant 34.8 metres grading 5.1 g/t Au, including 12.6 metres of 11.4 g/t Au, while fifty metres to the northwest (Section 950mSE), Hole BL14-582 displayed an notable section of 30.1 metres averaging 3.5 g/t Au, which includes a 7.2 metre interval of 4.4 g/t Au. These results confirm the importance of the infill program and its contribution to the overall increase in the gold grades observed within the deposit.

The following table shows selected drill results for the HGZ infill drilling, which includes the shallow and deep holes necessary to bracket the gold mineralized structure in order to more accurately define its boundaries. No top-cut was used in calculating the gold intervals. Depths of the mineralized zones in Holes BL14-582, -583, -584 and -586, on sections 950mSE to 1100mSE are between 220 and 250 metres vertical depth. Mineralized intervals from holes to the southeast, on sections 1850mSE to 1950mSE, are between 420 and 570 metres vertical depth. All intervals approximate true width. Updated plan and section maps for all holes are also available on the Company's website at www.probemines.com:

High-Grade Zone Drill Results


----------------------------------------------------------------------------
                              From            To         Width            Au
DDH       Section              (m)           (m)           (m)         (g/t)
----------------------------------------------------------------------------
BL14-578  1900mSE            426.3         429.0           2.7           6.9
----------------------------------------------------------------------------
          1900mSE            534.0         549.0          15.0           1.8
----------------------------------------------------------------------------
          including          540.0         549.0           9.0           2.4
----------------------------------------------------------------------------
BL14-579  1850mSE            554.0         565.8          11.8           1.0
----------------------------------------------------------------------------
BL14-580  1950mSE            586.7         612.0          25.3           1.4
----------------------------------------------------------------------------
          including          597.4         606.0           8.6           2.3
----------------------------------------------------------------------------
BL14-581  1900mSE            459.1         464.4           5.3           1.3
----------------------------------------------------------------------------
          1900mSE            557.9         563.9           6.0           1.7
----------------------------------------------------------------------------
BL14-582  950mSE             237.9         268.0          30.1           3.5
----------------------------------------------------------------------------
          including          237.9         240.8           2.9          14.1
----------------------------------------------------------------------------
          also including     253.3         260.5           7.2           4.4
----------------------------------------------------------------------------
BL14-583  1000mSE            232.0         271.5          39.5           7.0
----------------------------------------------------------------------------
          including          243.0         271.5          28.5           9.1
----------------------------------------------------------------------------
          including          243.0         259.0          16.0          12.4
----------------------------------------------------------------------------
BL14-584  1050SE             237.0         271.8          34.8           5.1
----------------------------------------------------------------------------
          including          247.0         259.6          12.6          11.4
----------------------------------------------------------------------------
BL14-585  Lost Hole            ---           ---           ---           ---
----------------------------------------------------------------------------
BL14-586  1100SE             223.0         260.0          37.0           2.5
----------------------------------------------------------------------------
          including          244.1         260.0          15.9           4.6
----------------------------------------------------------------------------
          including          244.1         248.0           3.9           8.7
----------------------------------------------------------------------------

Dr. David Palmer, President and CEO of Probe, comments, "It is encouraging to see continued improvement within the high grade zone, and more importantly at its northwest end where mineralization tends to be shallowest. The increasing grade observed in the northwest between Sections 950mSE and 1100mSE suggests that there are still improvements to be made within the current strike length of the high-grade zone, in addition to the strong potential for expansion now being tested out on the ice. These results re-affirm the value of the infill program, which will continue to be one area of focus for the 2014 exploration program."

Probe has instituted a strict quality assurance and quality control ("QA-QC") program for the Borden Gold drill core sampling, with each fire assay furnace batch of 40 samples including two certified reference materials (standards), one blank sample and one core duplicate sample. Quality control guidelines and ongoing QAQC monitoring are being carried out by Probe personnel.

About Probe Mines:

Probe Mines Limited is a Canadian precious metals exploration company whose key asset is the Borden Gold Zone in Ontario, Canada. As of October 31, 2013, the Company is well-positioned with approximately $33.4 million in treasury. The Company is actively exploring a significant new gold resource on its Borden Gold Zone near Chapleau, Ontario and has 100% interest in the Black Creek chromite deposit located in Northern Ontario. The Company's shares trade on the TSX Venture Exchange under the symbol PRB.

David Palmer, Ph.D., P.Geo., is the qualified person for all technical information in this release. To find out more about Probe Mines Limited, visit our website at www.probemines.com.

On behalf of Probe Mines Limited,

Dr. David Palmer, President & Chief Executive Officer

Forward-Looking Statements

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This News Release includes certain "forward-looking statements". These statements are based on information currently available to the Company and the Company provides no assurance that actual results will meet management's expectations. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Actual results relating to, among other things, results of exploration, project development, reclamation and capital costs of the Company's mineral properties, and the Company's financial condition and prospects, could differ materially from those currently anticipated in such statements for many reasons such as: changes in general economic conditions and conditions in the financial markets; changes in demand and prices for minerals; litigation, legislative, environmental and other judicial, regulatory, political and competitive developments; technological and operational difficulties encountered in connection with the activities of the Company; and other matters discussed in this news release. This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements. These and other factors should be considered carefully and readers should not place undue reliance on the Company's forward-looking statements. The Company does not undertake to update any forward-looking statement that may be made from time to time by the Company or on its behalf, except in accordance with applicable securities laws.

Shares Issued: 75,684,727

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Enterprise networks are complex. Moreover, they were designed and deployed to meet a specific set of business requirements at a specific point in time. But, the adoption of cloud services, new business applications and intensifying security policies, among other factors, require IT organizations to continuously deploy configuration changes. Therefore, enterprises are looking for better ways to automate the management of their networks while still leveraging existing capabilities, optimizing perf...
SYS-CON Events announced today that Tintri Inc., a leading producer of VM-aware storage (VAS) for virtualization and cloud environments, will exhibit at the 18th International CloudExpo®, which will take place on June 7-9, 2016, at the Javits Center in New York City, New York, and the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
SYS-CON Events announced today that ContentMX, the marketing technology and services company with a singular mission to increase engagement and drive more conversations for enterprise, channel and SMB technology marketers, has been named “Sponsor & Exhibitor Lounge Sponsor” of SYS-CON's 18th Cloud Expo, which will take place on June 7-9, 2016, at the Javits Center in New York City, New York. “CloudExpo is a great opportunity to start a conversation with new prospects, but what happens after the...
In the rush to compete in the digital age, a successful digital transformation is essential, but many organizations are setting themselves up for failure. There’s a common misconception that the process is just about technology, but it’s not. It’s about your business. It shouldn’t be treated as an isolated IT project; it should be driven by business needs with the committed involvement of a range of stakeholders.
The IoTs will challenge the status quo of how IT and development organizations operate. Or will it? Certainly the fog layer of IoT requires special insights about data ontology, security and transactional integrity. But the developmental challenges are the same: People, Process and Platform. In his session at @ThingsExpo, Craig Sproule, CEO of Metavine, will demonstrate how to move beyond today's coding paradigm and share the must-have mindsets for removing complexity from the development proc...
SYS-CON Events announced today that EastBanc Technologies will exhibit at SYS-CON's 18th International Cloud Expo®, which will take place on June 7-9, 2016, at the Javits Center in New York City, NY. EastBanc Technologies has been working at the frontier of technology since 1999. Today, the firm provides full-lifecycle software development delivering flexible technology solutions that seamlessly integrate with existing systems – whether on premise or cloud. EastBanc Technologies partners with p...
SYS-CON Events announced today that AppNeta, the leader in performance insight for business-critical web applications, will exhibit and present at SYS-CON's @DevOpsSummit at Cloud Expo New York, which will take place on June 7-9, 2016, at the Javits Center in New York City, NY. AppNeta is the only application performance monitoring (APM) company to provide solutions for all applications – applications you develop internally, business-critical SaaS applications you use and the networks that deli...
The cloud era has reached the stage where it is no longer a question of whether a company should migrate, but when. Enterprises have embraced the outsourcing of where their various applications are stored and who manages them, saving significant investment along the way. Plus, the cloud has become a defining competitive edge. Companies that fail to successfully adapt risk failure. The media, of course, continues to extol the virtues of the cloud, including how easy it is to get there. Migrating...
As organizations shift towards IT-as-a-service models, the need for managing and protecting data residing across physical, virtual, and now cloud environments grows with it. Commvault can ensure protection, access and E-Discovery of your data – whether in a private cloud, a Service Provider delivered public cloud, or a hybrid cloud environment – across the heterogeneous enterprise. In his general session at 18th Cloud Expo, Randy De Meno, Chief Technologist - Windows Products and Microsoft Part...
WebRTC is bringing significant change to the communications landscape that will bridge the worlds of web and telephony, making the Internet the new standard for communications. Cloud9 took the road less traveled and used WebRTC to create a downloadable enterprise-grade communications platform that is changing the communication dynamic in the financial sector. In his session at @ThingsExpo, Leo Papadopoulos, CTO of Cloud9, will discuss the importance of WebRTC and how it enables companies to fo...
As machines are increasingly connected to the internet, it’s becoming easier to discover the numerous ways Industrial IoT (IIoT) is helping to shape the business world. This is exactly why we have decided to take a closer look at this pervasive movement and to examine the desire to connect more things! Now if you need a refresher on IIoT and how it is changing the world, take a moment and listen to Greg Gorbach with ARC Advisory Group. Gorbach believes, "IIoT will significantly change the worl...
SYS-CON Events announced today the Docker Meets Kubernetes – Intro into the Kubernetes World, being held June 9, 2016, in conjunction with 18th Cloud Expo | @ThingsExpo, at the Javits Center in New York, NY. Register for 'Docker Meets Kubernetes Workshop' Here! This workshop led by Sebastian Scheele, co-founder of Loodse, introduces participants to Kubernetes (container orchestration). Through a combination of instructor-led presentations, demonstrations, and hands-on labs, participants learn ...
The IoT is changing the way enterprises conduct business. In his session at @ThingsExpo, Eric Hoffman, Vice President at EastBanc Technologies, discuss how businesses can gain an edge over competitors by empowering consumers to take control through IoT. We'll cite examples such as a Washington, D.C.-based sports club that leveraged IoT and the cloud to develop a comprehensive booking system. He'll also highlight how IoT can revitalize and restore outdated business models, making them profitable...
SYS-CON Events announced today that MangoApps will exhibit at SYS-CON's 18th International Cloud Expo®, which will take place on June 7-9, 2016, at the Javits Center in New York City, NY. MangoApps provides modern company intranets and team collaboration software, allowing workers to stay connected and productive from anywhere in the world and from any device. For more information, please visit https://www.mangoapps.com/.
In his session at 18th Cloud Expo, Andrew Cole, Director of Solutions Engineering at Peak 10, will discuss how the newest technology advances are reducing the cost and complexity of traditional business continuity and disaster recovery solutions. Attendees will: Learn why having a full disaster recovery strategy is more important now than ever before Explore the key drivers of a successful disaster recovery solution Achieve measurable operational and business value from a disaster recovery ...