Welcome!

News Feed Item

Probe Mines Announces High-Grade Infill Drill Intercepts, Including 7.0 g/t Gold Over 39.5 Metres, for its Borden Gold Project, Ontario

TORONTO, ONTARIO -- (Marketwired) -- 02/18/14 -- Probe Mines Limited (TSX VENTURE:PRB)

Highlights:


--  Infill drilling within High-Grade Zone ("HGZ") returned significant gold
    mineralization in Hole BL14-583on Section 1000mSE. This drill hole is
    located near the northwest end of the HGZ and demonstrates higher grades
    than previously encountered, returning: 
    --  39.5 metres averaging 7.0 g/t gold 
        --  including 28.5 metres grading 9.1 g/t gold 
        --  including 16.0 metres grading 12.4 g/t gold

--  Infill Hole BL14-584 on Section 1050mSE (50m southeast of BL14-583)
    returned a significant intersection of: 
    --  34.8 metres averaging 5.1 g/t gold 
        --  including 12.6 metres of 11.4 g/t gold

--  Infill Hole BL14-582 on Section 950mSE (50m northwest of BL14-583)
    returned a thick gold intercept, consisting of: 
    --  30.1 metres averaging 3.5 g/t gold 
        --  including 2.9 metres grading 14.1 g/t gold 
        --  also including 7.2 metres grading 4.4 g/t gold

--  Results continue to confirm the importance of the infill drill program
    through the identification of higher grades within the deposit, and
    particularly in the HGZ

Probe Mines Limited (TSX VENTURE:PRB) ("Probe" or the "Company") is pleased to announce that it has received further results for its on-going drill program on the Company's Borden Gold project near Chapleau, Ontario. Results are for the last nine (9) holes completed from the land-based infill drilling program on the High-Grade Zone ("HGZ") before the start of the on-ice drilling, which is currently underway. Diamond drill holes BL14-578 to BL14-586 were received and were successful in demonstrating the continuity and consistency of the high-grade gold mineralization. Holes BL14-583, -584, -582 and -586 are of particular importance as they demonstrate increasing grades at shallow depths (220-250 metres) within the northwest end of the HGZ (Sections 950mSE to 1100mSE) and indicate that the HGZ is still improving within its known strike length. Significantly, all four drill holes are located northwest of the original HGZ discovery hole, BL12-256, on Section 1200mSE (see News Release dated December 12, 2012).

Diamond drill hole BL14-583 returned a thick intersection of high-grade gold on Section 1000mSE consisting of 39.5 metres averaging 7.0 g/t gold ("Au"), which includes a higher-grade interval of 16 metres averaging 12.4 g/t Au. Fifty metres to the southeast (Section 1050mSE), Hole BL14-584 returned an equally significant 34.8 metres grading 5.1 g/t Au, including 12.6 metres of 11.4 g/t Au, while fifty metres to the northwest (Section 950mSE), Hole BL14-582 displayed an notable section of 30.1 metres averaging 3.5 g/t Au, which includes a 7.2 metre interval of 4.4 g/t Au. These results confirm the importance of the infill program and its contribution to the overall increase in the gold grades observed within the deposit.

The following table shows selected drill results for the HGZ infill drilling, which includes the shallow and deep holes necessary to bracket the gold mineralized structure in order to more accurately define its boundaries. No top-cut was used in calculating the gold intervals. Depths of the mineralized zones in Holes BL14-582, -583, -584 and -586, on sections 950mSE to 1100mSE are between 220 and 250 metres vertical depth. Mineralized intervals from holes to the southeast, on sections 1850mSE to 1950mSE, are between 420 and 570 metres vertical depth. All intervals approximate true width. Updated plan and section maps for all holes are also available on the Company's website at www.probemines.com:

High-Grade Zone Drill Results


----------------------------------------------------------------------------
                              From            To         Width            Au
DDH       Section              (m)           (m)           (m)         (g/t)
----------------------------------------------------------------------------
BL14-578  1900mSE            426.3         429.0           2.7           6.9
----------------------------------------------------------------------------
          1900mSE            534.0         549.0          15.0           1.8
----------------------------------------------------------------------------
          including          540.0         549.0           9.0           2.4
----------------------------------------------------------------------------
BL14-579  1850mSE            554.0         565.8          11.8           1.0
----------------------------------------------------------------------------
BL14-580  1950mSE            586.7         612.0          25.3           1.4
----------------------------------------------------------------------------
          including          597.4         606.0           8.6           2.3
----------------------------------------------------------------------------
BL14-581  1900mSE            459.1         464.4           5.3           1.3
----------------------------------------------------------------------------
          1900mSE            557.9         563.9           6.0           1.7
----------------------------------------------------------------------------
BL14-582  950mSE             237.9         268.0          30.1           3.5
----------------------------------------------------------------------------
          including          237.9         240.8           2.9          14.1
----------------------------------------------------------------------------
          also including     253.3         260.5           7.2           4.4
----------------------------------------------------------------------------
BL14-583  1000mSE            232.0         271.5          39.5           7.0
----------------------------------------------------------------------------
          including          243.0         271.5          28.5           9.1
----------------------------------------------------------------------------
          including          243.0         259.0          16.0          12.4
----------------------------------------------------------------------------
BL14-584  1050SE             237.0         271.8          34.8           5.1
----------------------------------------------------------------------------
          including          247.0         259.6          12.6          11.4
----------------------------------------------------------------------------
BL14-585  Lost Hole            ---           ---           ---           ---
----------------------------------------------------------------------------
BL14-586  1100SE             223.0         260.0          37.0           2.5
----------------------------------------------------------------------------
          including          244.1         260.0          15.9           4.6
----------------------------------------------------------------------------
          including          244.1         248.0           3.9           8.7
----------------------------------------------------------------------------

Dr. David Palmer, President and CEO of Probe, comments, "It is encouraging to see continued improvement within the high grade zone, and more importantly at its northwest end where mineralization tends to be shallowest. The increasing grade observed in the northwest between Sections 950mSE and 1100mSE suggests that there are still improvements to be made within the current strike length of the high-grade zone, in addition to the strong potential for expansion now being tested out on the ice. These results re-affirm the value of the infill program, which will continue to be one area of focus for the 2014 exploration program."

Probe has instituted a strict quality assurance and quality control ("QA-QC") program for the Borden Gold drill core sampling, with each fire assay furnace batch of 40 samples including two certified reference materials (standards), one blank sample and one core duplicate sample. Quality control guidelines and ongoing QAQC monitoring are being carried out by Probe personnel.

About Probe Mines:

Probe Mines Limited is a Canadian precious metals exploration company whose key asset is the Borden Gold Zone in Ontario, Canada. As of October 31, 2013, the Company is well-positioned with approximately $33.4 million in treasury. The Company is actively exploring a significant new gold resource on its Borden Gold Zone near Chapleau, Ontario and has 100% interest in the Black Creek chromite deposit located in Northern Ontario. The Company's shares trade on the TSX Venture Exchange under the symbol PRB.

David Palmer, Ph.D., P.Geo., is the qualified person for all technical information in this release. To find out more about Probe Mines Limited, visit our website at www.probemines.com.

On behalf of Probe Mines Limited,

Dr. David Palmer, President & Chief Executive Officer

Forward-Looking Statements

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This News Release includes certain "forward-looking statements". These statements are based on information currently available to the Company and the Company provides no assurance that actual results will meet management's expectations. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Actual results relating to, among other things, results of exploration, project development, reclamation and capital costs of the Company's mineral properties, and the Company's financial condition and prospects, could differ materially from those currently anticipated in such statements for many reasons such as: changes in general economic conditions and conditions in the financial markets; changes in demand and prices for minerals; litigation, legislative, environmental and other judicial, regulatory, political and competitive developments; technological and operational difficulties encountered in connection with the activities of the Company; and other matters discussed in this news release. This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements. These and other factors should be considered carefully and readers should not place undue reliance on the Company's forward-looking statements. The Company does not undertake to update any forward-looking statement that may be made from time to time by the Company or on its behalf, except in accordance with applicable securities laws.

Shares Issued: 75,684,727

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
You have great SaaS business app ideas. You want to turn your idea quickly into a functional and engaging proof of concept. You need to be able to modify it to meet customers' needs, and you need to deliver a complete and secure SaaS application. How could you achieve all the above and yet avoid unforeseen IT requirements that add unnecessary cost and complexity? You also want your app to be responsive in any device at any time. In his session at 19th Cloud Expo, Mark Allen, General Manager of...
WebRTC is bringing significant change to the communications landscape that will bridge the worlds of web and telephony, making the Internet the new standard for communications. Cloud9 took the road less traveled and used WebRTC to create a downloadable enterprise-grade communications platform that is changing the communication dynamic in the financial sector. In his session at @ThingsExpo, Leo Papadopoulos, CTO of Cloud9, discussed the importance of WebRTC and how it enables companies to focus o...
Big Data engines are powering a lot of service businesses right now. Data is collected from users from wearable technologies, web behaviors, purchase behavior as well as several arbitrary data points we’d never think of. The demand for faster and bigger engines to crunch and serve up the data to services is growing exponentially. You see a LOT of correlation between “Cloud” and “Big Data” but on Big Data and “Hybrid,” where hybrid hosting is the sanest approach to the Big Data Infrastructure pro...
All organizations that did not originate this moment have a pre-existing culture as well as legacy technology and processes that can be more or less amenable to DevOps implementation. That organizational culture is influenced by the personalities and management styles of Executive Management, the wider culture in which the organization is situated, and the personalities of key team members at all levels of the organization. This culture and entrenched interests usually throw a wrench in the work...
Hardware virtualization and cloud computing allowed us to increase resource utilization and increase our flexibility to respond to business demand. Docker Containers are the next quantum leap - Are they?! Databases always represented an additional set of challenges unique to running workloads requiring a maximum of I/O, network, CPU resources combined with data locality.
In his General Session at DevOps Summit, Asaf Yigal, Co-Founder & VP of Product at Logz.io, will explore the value of Kibana 4 for log analysis and will give a real live, hands-on tutorial on how to set up Kibana 4 and get the most out of Apache log files. He will examine three use cases: IT operations, business intelligence, and security and compliance. This is a hands-on session that will require participants to bring their own laptops, and we will provide the rest.
"We're bringing out a new application monitoring system to the DevOps space. It manages large enterprise applications that are distributed throughout a node in many enterprises and we manage them as one collective," explained Kevin Barnes, President of eCube Systems, in this SYS-CON.tv interview at DevOps at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York City, NY.
In his General Session at 16th Cloud Expo, David Shacochis, host of The Hybrid IT Files podcast and Vice President at CenturyLink, investigated three key trends of the “gigabit economy" though the story of a Fortune 500 communications company in transformation. Narrating how multi-modal hybrid IT, service automation, and agile delivery all intersect, he will cover the role of storytelling and empathy in achieving strategic alignment between the enterprise and its information technology.
Buzzword alert: Microservices and IoT at a DevOps conference? What could possibly go wrong? In this Power Panel at DevOps Summit, moderated by Jason Bloomberg, the leading expert on architecting agility for the enterprise and president of Intellyx, panelists peeled away the buzz and discuss the important architectural principles behind implementing IoT solutions for the enterprise. As remote IoT devices and sensors become increasingly intelligent, they become part of our distributed cloud enviro...
In their general session at 16th Cloud Expo, Michael Piccininni, Global Account Manager - Cloud SP at EMC Corporation, and Mike Dietze, Regional Director at Windstream Hosted Solutions, reviewed next generation cloud services, including the Windstream-EMC Tier Storage solutions, and discussed how to increase efficiencies, improve service delivery and enhance corporate cloud solution development. Michael Piccininni is Global Account Manager – Cloud SP at EMC Corporation. He has been engaged in t...
With major technology companies and startups seriously embracing IoT strategies, now is the perfect time to attend @ThingsExpo 2016 in New York. Learn what is going on, contribute to the discussions, and ensure that your enterprise is as "IoT-Ready" as it can be! Internet of @ThingsExpo, taking place June 6-8, 2017, at the Javits Center in New York City, New York, is co-located with 20th Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry p...
@DevOpsSummit at Cloud taking place June 6-8, 2017, at Javits Center, New York City, is co-located with the 20th International Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to wait for long developm...
"LinearHub provides smart video conferencing, which is the Roundee service, and we archive all the video conferences and we also provide the transcript," stated Sunghyuk Kim, CEO of LinearHub, in this SYS-CON.tv interview at @ThingsExpo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
A look across the tech landscape at the disruptive technologies that are increasing in prominence and speculate as to which will be most impactful for communications – namely, AI and Cloud Computing. In his session at 20th Cloud Expo, Curtis Peterson, VP of Operations at RingCentral, will highlight the current challenges of these transformative technologies and share strategies for preparing your organization for these changes. This “view from the top” will outline the latest trends and developm...
When you focus on a journey from up-close, you look at your own technical and cultural history and how you changed it for the benefit of the customer. This was our starting point: too many integration issues, 13 SWP days and very long cycles. It was evident that in this fast-paced industry we could no longer afford this reality. We needed something that would take us beyond reducing the development lifecycles, CI and Agile methodologies. We made a fundamental difference, even changed our culture...