Welcome!

News Feed Item

Kirkland Lake Gold Inc.: Surface Drill Hole AB-13-108 Assays 50.11 Ounces of Gold Per Ton (1,718.06 Grams of Gold Per Tonne) Over 1.4 Feet (0.6m) True Width; New High Grade Zone Discovered

KIRKLAND LAKE, ONTARIO -- (Marketwired) -- 02/25/14 -- Kirkland Lake Gold Inc. (the Company) (TSX:KGI) (AIM:KGI), an operating and exploration gold company, is pleased to announce recent drilling results from its ongoing surface diamond drilling exploration program. This latest program utilized one drill rig on the Macassa Property, west of the South Claims property boundary (See Figure 1), in a continuing effort to define potential near surface resources.

Mr. George Ogilvie, CEO commented, "We are very pleased with the results to date of this surface exploration program and are excited to shortly be able to announce a reserve and resource calculation on ounces close to surface for the first time in the Company's history. Intersections from the surface campaign to date have shown mineralization from surface to 1000-foot depth, which have the potential to be mined from a ramp or decline. The surface program will continue throughout the year as exploration continues both east and west from this area."

This phase of the surface exploration program was designed to follow up on the earlier success of drilling programs testing for near surface mineralization associated with the Amalgamated Break (see the Company's news releases dated February 28, 2012, September 5, 2012 and June 18, 2013). The Amalgamated Break had seen limited historic exploration prior to the recent drilling campaign initiated by the Company.

This phase of drilling has been successful on a number of fronts:

--  Numerous drill holes intersected a third, previously undiscovered, zone
    of continuous high grade gold mineralization (Zone 3) west of the
    current known mineralized area (See Figure 2). This mineralized zone
    lies footwall to the previously discovered Zone 1 and Zone 2 (See the
    Company's new release dated June 18, 2013). 

--  Recent drilling intersected high grade gold mineralization 950 feet
    below surface, which is 550 feet deeper than the previously defined 400
    foot elevation. 

--  Recent drilling has produced the highest grade intersection to date in
    the current surface drilling campaign (50.11 ounces of gold per ton
    (opt) over 1.4 feet true width). This phase of drilling also produced
    several sporadic high grade gold intercepts 

--  The broad zone of alteration and mineralization associated with the
    Amalgamated Break has now been defined at over 3,500 feet along strike
    and is open to drilling outside this current limit. 

The following are some of the highlights of the drilling program:

--  Drill hole AB-13-108 intersected Zone 3 and returned 50.11 opt uncut
    over 1.9 foot of core length (1.4 feet true width). This intersection is
    920 feet below surface and contained significant visible gold. This
    represents the highest grade intercept to date in the current surface
    exploration campaign, as well as one of the deepest intercepts of this
    program to date. 

--  Drill hole AB-13-106 intersected Zone 3 and returned 6.95 opt uncut over
    1.0 foot of core length (1.0 feet true width). This intersection is
    approximately 500 feet below surface and contained visible gold. 

--  Drill hole AB-13-151 intersected Zone 3 and returned 1.18 opt uncut over
    7.5 foot of core length (7.2 feet true width). This intersection is
    approximately 470 feet below surface and contained significant visible
    gold. 

--  Drill hole AB-13-151 also intersected a new zone hanging wall to Zone 3
    that returned 0.98 opt uncut over 3.3 feet of core length (true width
    unknown). This intersection is approximately 200 feet below surface and
    may be related to Zone 1 or Zone 2 which are currently defined to
    approximately 1000' feet east of this intersection. 

This drill program is being carried out utilizing one drill rig on surface and will continue to focus on defining gold mineralization both east and west of the current known limits of all three zones.

The following figures, referred to elsewhere in this release, may be viewed at the Company's website at www.klgold.com.

--  Figure 1 - plan view showing the location of the current surface drill
    program. 
--  Figure 2 - long section showing current Zone 3 intercepts. 

The following tables summarize the latest drilling results in imperial values:

SOUTH CLAIMS SURFACE EXPLORATION

----------------------------------------------------------------------------
                                       HOLE                                 
DRILL HOLE           FROM      TO       DIP   AZIMUTH                 ASSAY 
 No.         ZONE   (feet)  (feet) (degrees) (degrees)     (oz per ton/feet)
----------------------------------------------------------------------------
AB-13-108  Zone 3 1,009.7 1,011.6       -68       326    50.11/1.9' CL=1.4' 
                                                                     TW, VG 
                                                      3.50/1.9' CL=1.4' TW, 
                                                                     (i)CUT 
----------------------------------------------------------------------------
AB-13-106  Zone 3   813.4   814.4       -34       313 6.95/1.0' CL=1.0' TW, 
                                                                         VG 
                                                      3.50/1.0' CL=1.0' TW, 
                                                                     (i)CUT 
----------------------------------------------------------------------------
AB-13-151     New   262.5   265.8       -47       334  0.98/3.3' CL=??' TW, 
                                                                         VG 
           Zone 3   621.2   628.7                     1.18/7.5' CL=7.2' TW, 
                                                                         VG 
----------------------------------------------------------------------------
AB-13-90   Zone 3   741.8   743.5       -58       306   0.02/1.7' CL=??' TW 
----------------------------------------------------------------------------
AB-13-92   Zone 3   650.1   651.1       -42       305   0.17/1.0' CL=??' TW 
----------------------------------------------------------------------------
AB-13-97   Zone 3   962.8   963.9       -64       323   0.21/1.1' CL=??' TW 
----------------------------------------------------------------------------
AB-13-98   Zone 3   915.3   916.3       -57       324   0.22/1.0' CL=??' TW 
----------------------------------------------------------------------------
AB-13-103  Zone 3 1,020.9 1,021.9       -71       315   0.44/1.0' CL=??' TW 
----------------------------------------------------------------------------
AB-13-107  Zone 3   930.8   931.8       -56       310   0.15/1.0' CL=??' TW 
----------------------------------------------------------------------------
AB-13-109  Zone 3   863.5   864.5       -53       326   0.11/1.0' CL=??' TW 
----------------------------------------------------------------------------
AB-13-110  Zone 3                       -43       327                   NSV 
              New   848.5   849.5                       0.87/1.0' CL=??' TW 
----------------------------------------------------------------------------
AB-13-123                               -80       327                   NSV 
----------------------------------------------------------------------------
AB-13-124     New   938.1   939.1       -65       331  1.63/1.0' CL=??' TW, 
                                                                         VG 
           Zone 3   975.5   976.5                       0.56/1.0' CL=0.9'TW 
----------------------------------------------------------------------------
AB-13-125  Zone 3                       -69       308                   NSV 
----------------------------------------------------------------------------
AB-13-137  Zone 3   934.1   935.8       -62       327 0.46/1.7' CL=1.5' TW, 
                                                                         VG 
----------------------------------------------------------------------------
AB-13-138     New 1,033.0 1,035.0       -70       304   0.25/2.0' CL=??' TW 
           Zone 3                                                       NSV 
----------------------------------------------------------------------------
AB-13-139  Zone 3 1,045.9 1,047.1       -71       335  0.15/1.2' CL=1.8' TW 
----------------------------------------------------------------------------
AB-13-144A Zone 3                       -70       309                   NSV 
----------------------------------------------------------------------------
AB-13-145  Zone 3 1,019.2 1,021.5       -69       333  0.27/2.3' CL=1.9' TW 
----------------------------------------------------------------------------
AB-13-152A Zone 3                       -58       347                   NSV 
----------------------------------------------------------------------------
AB-13-153  Zone 3                       -45       343                   NSV 
----------------------------------------------------------------------------
AB-13-154A Zone 3   650.3   651.3       -47       353 2.86/1.0' CL=0.9' TW, 
                                                                         VG 
----------------------------------------------------------------------------
AB-13-155  Zone 3                       -45       356                   NSV 
----------------------------------------------------------------------------
AB-13-156  Zone 3   646.0   647.3       -40       319 0.55/1.3' CL=1.3' TW, 
                                                                         VG 
----------------------------------------------------------------------------
AB-13-162     New   230.5   232.1       -52       320  1.87/1.6' CL=??' TW, 
                                                                         VG 
           Zone 3   659.5   660.7                     1.16/1.2' CL=1.1' TW, 
                                                                         VG 
----------------------------------------------------------------------------
AB-13-166  Zone 3   637.2   640.2       -44       325 1.21/3.0' CL=3.0' TW, 
                                                                         VG 
----------------------------------------------------------------------------
AB-13-167  Zone 3   689.5   694.5       -39       306 1.04/5.0' CL=4.9' TW, 
                                                                         VG 
----------------------------------------------------------------------------
AB-13-168  Zone 3   692.5   693.5       -58       315 1.58/1.0' CL=0.9' TW, 
                                                                         VG 
----------------------------------------------------------------------------
AB-13-170     New   699.9   700.9       -66       316   1.08/1.0' CL=??' TW 
           Zone 2   764.0   765.0                        0.18/1.0' CL=?? TW 
----------------------------------------------------------------------------
AB-13-171A Zone 3   701.8   702.8       -51       001 2.24/1.0' CL=1.0' TW, 
                                                                         VG 
----------------------------------------------------------------------------
AB-13-172     New     270     271       -47       323  1.25/1.0' CL=??' TW, 
                                                                         VG 
           Zone 3   670.5   672.0                     3.39/1.5' CL=1.5' TW, 
                                                                         VG 
----------------------------------------------------------------------------
AB-13-173     New   581.8   583.2       -53       327  1.02/1.4' CL=??' TW, 
                                                                         VG 
           Zone 3   713.0   716.0                       0.11/3.0' CL=??' TW 
----------------------------------------------------------------------------

TW = True Width, CL = Core Length, VG = Visible Gold, ?? TW = True Width Unknown, NSV=No Significant Values (i)Cut = cut to 3.5 opt

The following tables summarize the latest drilling results in metric values:

SOUTH CLAIMS SURFACE EXPLORATION

----------------------------------------------------------------------------
                                   HOLE                                     
DRILL HOLE         FROM    TO       DIP   AZIMUTH                     ASSAY 
 No.         ZONE    (m)   (m) (degrees) (degrees)  (grams per tonne/metres)
----------------------------------------------------------------------------
AB-13-108  Zone 3 307.8 308.3       -68       326 1,718.06/0.6m CL=0.4m TW, 
                                                                         VG 
                                                    120.00/0.6m CL=0.4m TW, 
                                                                     (i)CUT 
----------------------------------------------------------------------------
AB-13-106  Zone 3 247.9 248.2       -34       313   283.29/0.3m CL=0.3m TW, 
                                                                         VG 
                                                    120.00/0.3m CL=0.3m TW, 
                                                                     (i)CUT 
----------------------------------------------------------------------------
AB-13-151     New  80.0  81.0       -47       334  33.60/1.0m CL=??m TW, VG 
           Zone 3 189.3 191.6                     40.46/2.3m CL=2.2m TW, VG 
----------------------------------------------------------------------------
AB-13-90   Zone 3 226.1 226.6       -58       306       0.51/0.5m CL=??m TW 
----------------------------------------------------------------------------
AB-13-92   Zone 3 198.2 198.5       -42       305       5.90/0.3m CL=??m TW 
----------------------------------------------------------------------------
AB-13-97   Zone 3 293.5 293.8       -64       323       7.03/0.3m CL=??m TW 
----------------------------------------------------------------------------
AB-13-98   Zone 3 279.0 279.3       -57       324       7.54/0.3m CL=??m TW 
----------------------------------------------------------------------------
AB-13-103  Zone 3 311.2 311.5       -71       315      15.02/0.3m CL=??m TW 
----------------------------------------------------------------------------
AB-13-107  Zone 3 283.7 284.0       -56       310       5.14/0.3m CL=??m TW 
----------------------------------------------------------------------------
AB-13-109  Zone 3 263.2 263.5       -53       326       3.77/0.3m CL=??m TW 
----------------------------------------------------------------------------
AB-13-110  Zone 3                   -43       327                       NSV 
              New 258.6 258.9                          29.83/0.3m CL=??m TW 
----------------------------------------------------------------------------
AB-13-123                           -80       327                       NSV 
----------------------------------------------------------------------------
AB-13-124     New 285.9 286.2       -65       331  55.89/0.3m CL=??m TW, VG 
           Zone 3 297.3 297.6                         19.20/0.3m CL=0.3m TW 
----------------------------------------------------------------------------
AB-13-125  Zone 3                   -69       308                       NSV 
----------------------------------------------------------------------------
AB-13-137  Zone 3 284.7 285.2       -62       327 15.77/0.5m CL=0.5m TW, VG 
----------------------------------------------------------------------------
AB-13-138     New 314.9 315.5       -70       304       8.57/0.6m CL=??m TW 
           Zone 3                                                       NSV 
----------------------------------------------------------------------------
AB-13-139  Zone 3 318.8 319.2       -71       335       5.14/0.4m CL=??m TW 
----------------------------------------------------------------------------
AB-13-144A Zone 3                   -70       309                       NSV 
----------------------------------------------------------------------------
AB-13-145  Zone 3 310.7 311.4       -69       333      9.26/0.7m CL=0.6m TW 
----------------------------------------------------------------------------
AB-13-152A Zone 3                   -58       347                       NSV 
----------------------------------------------------------------------------
AB-13-153  Zone 3                   -45       343                       NSV 
----------------------------------------------------------------------------
AB-13-154A Zone 3 198.2 198.5       -47       353  98.06/0.3m CL=??m TW, VG 
----------------------------------------------------------------------------
AB-13-155  Zone 3                   -45       356                       NSV 
----------------------------------------------------------------------------
AB-13-156  Zone 3 196.9 197.3       -40       319 18.86/0.4m CL=0.4m TW, VG 
----------------------------------------------------------------------------
AB-13-162     New  70.3  70.7       -52       320  64.11/0.5m CL=??m TW, VG 
           Zone 3 201.0 201.4                     39.77/0.4m CL=0.3m TW, VG 
----------------------------------------------------------------------------
AB-13-166  Zone 3 194.2 195.1       -44       325 41.49/0.9m CL=0.9m TW, VG 
----------------------------------------------------------------------------
AB-13-167  Zone 3 210.2 211.7       -39       306 35.66/1.5m CL=1.5m TW, VG 
----------------------------------------------------------------------------
AB-13-168  Zone 3 211.1 211.4       -58       315 54.17/0.3m CL=0.3m TW, VG 
----------------------------------------------------------------------------
AB-13-170     New 213.3 213.6       -66       316      37.03/0.3m CL=??m TW 
           Zone 2 232.9 233.2                           6.21/0.3m CL=??m TW 
----------------------------------------------------------------------------
AB-13-171A Zone 3 213.9 214.2       -51       001 76.80/0.3m CL=0.3m TW, VG 
----------------------------------------------------------------------------
AB-13-172     New  82.3  82.6       -47       323  42.69/0.3m CL=??m TW, VG 
           Zone 3 204.4 204.8                       116.23/0.5m CL=0.5m TW, 
                                                                         VG 
----------------------------------------------------------------------------
AB-13-173     New 177.3 177.8       -53       327  34.97/0.4m CL=??m TW, VG 
           Zone 3 217.3 218.2                           3.77/0.9m CL=??m TW 
----------------------------------------------------------------------------

TW = True Width, CL = Core Length, VG = Visible Gold, ?? TW = True Width Unknown, NSV=No Significant Values (i)Cut = cut to 120.0 grams/tonne

About the Company

Kirkland Lake Gold Inc.'s corporate goal is to create a self -sustaining and long lived intermediate gold mining company based in the historic Kirkland Lake Gold Camp. The Company plans to do this by mining to the reserve grade, generating profits and free cash flow for the shareholders. The Company will also look to take advantage of its increased infrastructure capacity in the appropriate gold price environment. At the same time, the Company is committed to maintaining a significant exploration program aimed at developing and maintaining a property wide reserve and resource base sufficient to sustain a mine life of more than ten years.

Over the last several years the Company has invested significant capital to improve the infrastructure of the business including upgrading the production hoist, skips, mill, underground mobile equipment and capital development.

From initial discovery to present day there have been over 24 million ounces of gold mined from the Kirkland Lake camp while the current reserve and resource provides for potentially 10 years of mining with significant exploration upside.

The results of the Company's underground diamond drilling program have been reviewed, verified (including sampling, analytical and test data) and compiled by the Company's geological staff (which includes a 'qualified person', Stewart Carmichael P.Geo., the Company's Chief Exploration Geologist, for the purpose of National Instrument 43-101, Standards of Disclosure for Mineral Projects, of the Canadian Securities Administrators). Mr. Carmichael also supervised the preparation of the information that forms the basis of the technical disclosure in this release.

The Company has implemented a quality assurance and control (QA/QC) program to ensure sampling and analysis of all exploration work is conducted in accordance with the best possible practices. The drill core is sawn in half with one half of the core samples shipped to Swastika Laboratories in Swastika, Ontario. The other half of the core is retained for future assay verification. Other QA/QC includes the insertion of blanks, and the regular re-assaying of pulps and rejects at alternate certified labs. Gold analysis is conducted by fire assay using atomic absorption or gravimetric finish. The laboratory re-assays at least 10% of all samples and additional checks may be run on anomalous values.

The Company's Macassa Mine Property is the subject of a reserve report prepared by Glenn R. Clark, P.Eng. entitled Review of Resources and Reserves of Macassa Mine, Kirkland Lake, Ontario at January 1, 2013 dated June 24, 2013, which has been filed on SEDAR (www.sedar.com) under the Company's filings.

Neither the Toronto Stock Exchange nor the AIM Market of the London Stock Exchange has reviewed and neither accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward Looking Statements

This Press Release contains statements which constitute "forward-looking statements", including statements regarding the plans, intentions, beliefs and current expectations of the Company with respect to the future business activities and operating performance of the Company. The words "may", "would", "could", "will", "intend", "plan", "anticipate", "believe", "estimate", "expect" and similar expressions, as they relate to the Company, are intended to identify such forward-looking statements. Forward-looking statements used in this Press Release include, but may not be limited to, statements regarding the acceptance of the Rights Plan by the TSX and the timing thereof, the approval of the Rights Plan by shareholders of the Company, the Company's production capacity and its exploration program. Investors are cautioned that forward-looking statements are based on the opinions, assumptions and estimates of management considered reasonable at the date the statements are made such as, without limitation, opinion, assumptions and estimates of management regarding the Company's business, its ability to complete the strategic and mine plan review and its ability to increase its production capacity and decrease its production cost. Such opinions, assumptions and estimates, are inherently subject to a variety of risks and uncertainties and other known and unknown factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. These factors include the outcome of the strategic review process the Board has implemented,

the Company's expectations in connection with the projects and exploration programs being met, the impact of general business and economic conditions, global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future conditions, fluctuating gold prices, currency exchange rates (such as the Canadian dollar versus the United States Dollar), possible variations in ore grade or recovery rates, changes in accounting policies, changes in the Company's corporate mineral resources, changes in project parameters as plans continue to be refined, changes in project development, construction, production and commissioning time frames, risks related to joint venture operations, the possibility of project cost overruns or unanticipated costs and expenses, higher prices for fuel, power, labour and other consumables contributing to higher costs and general risks of the mining industry, failure of plant, equipment or processes to operate as anticipated, unexpected changes in mine life, seasonality and unanticipated weather changes, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, and limitations on insurance, as well as those risk factors discussed or referred to in the Company's annual Management's Discussion and Analysis and Annual Information Form for the year ended April 30, 2013 and the Company's Management's Discussion and Analysis for the interim period ended October 31, 2013 filed with the securities regulatory authorities in certain provinces of Canada and available at www.sedar.com. Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking statements prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, believed, estimated or expected. Although the Company has attempted to identify important risks, uncertainties and factors which could cause actual results to differ materially, there may be others that cause results not be as anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update these forward-looking statements except as otherwise required by applicable law.

To view Figures 1 and 2 that are associated with this release, please visit the following link: http://media3.marketwire.com/docs/929319fig1-2.pdf

Contacts:
Kirkland Lake Gold Inc.
George Ogilvie
CEO
+1 705 567 5208
+1 705 568 6444 (FAX)
[email protected]

Kirkland Lake Gold Inc.
Lindsay Dunlop
Director of Investor Relations
+1 416-840-7884
+1 705 568 6444 (FAX)
[email protected]
www.klgold.com

NOMAD: Panmure Gordon (UK) Limited
Katherine Roe / Callum Stewart / Adam James
+44 (0) 20 7 886 2500

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Two weeks ago (November 3-5), I attended the Cloud Expo Silicon Valley as a speaker, where I presented on the security and privacy due diligence requirements for cloud solutions. Cloud security is a topical issue for every CIO, CISO, and technology buyer. Decision-makers are always looking for insights on how to mitigate the security risks of implementing and using cloud solutions. Based on the presentation topics covered at the conference, as well as the general discussions heard between sessio...
As organizations shift towards IT-as-a-service models, the need for managing and protecting data residing across physical, virtual, and now cloud environments grows with it. Commvault can ensure protection, access and E-Discovery of your data – whether in a private cloud, a Service Provider delivered public cloud, or a hybrid cloud environment – across the heterogeneous enterprise. In his general session at 18th Cloud Expo, Randy De Meno, Chief Technologist - Windows Products and Microsoft Part...
Andi Mann, Chief Technology Advocate at Splunk, is an accomplished digital business executive with extensive global expertise as a strategist, technologist, innovator, marketer, and communicator. For over 30 years across five continents, he has built success with Fortune 500 corporations, vendors, governments, and as a leading research analyst and consultant.
To Really Work for Enterprises, MultiCloud Adoption Requires Far Better and Inclusive Cloud Monitoring and Cost Management … But How? Overwhelmingly, even as enterprises have adopted cloud computing and are expanding to multi-cloud computing, IT leaders remain concerned about how to monitor, manage and control costs across hybrid and multi-cloud deployments. It’s clear that traditional IT monitoring and management approaches, designed after all for on-premises data centers, are falling short in ...
Without lifecycle traceability and visibility across the tool chain, stakeholders from Planning-to-Ops have limited insight and answers to who, what, when, why and how across the DevOps lifecycle. This impacts the ability to deliver high quality software at the needed velocity to drive positive business outcomes. In his general session at @DevOpsSummit at 19th Cloud Expo, Eric Robertson, General Manager at CollabNet, will discuss how customers are able to achieve a level of transparency that e...
It is ironic, but perhaps not unexpected, that many organizations who want the benefits of using an Agile approach to deliver software use a waterfall approach to adopting Agile practices: they form plans, they set milestones, and they measure progress by how many teams they have engaged. Old habits die hard, but like most waterfall software projects, most waterfall-style Agile adoption efforts fail to produce the results desired. The problem is that to get the results they want, they have to ch...
For far too long technology teams have lived in siloes. Not only physical siloes, but cultural siloes pushed by competing objectives. This includes informational siloes where business users require one set of data and tech teams require different data. DevOps intends to bridge these gaps to make tech driven operations more aligned and efficient.
Organizations planning enterprise data center consolidation and modernization projects are faced with a challenging, costly reality. Requirements to deploy modern, cloud-native applications simultaneously with traditional client/server applications are almost impossible to achieve with hardware-centric enterprise infrastructure. Compute and network infrastructure are fast moving down a software-defined path, but storage has been a laggard. Until now.
"Venafi has a platform that allows you to manage, centralize and automate the complete life cycle of keys and certificates within the organization," explained Gina Osmond, Sr. Field Marketing Manager at Venafi, in this SYS-CON.tv interview at DevOps at 19th Cloud Expo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
"We're focused on how to get some of the attributes that you would expect from an Amazon, Azure, Google, and doing that on-prem. We believe today that you can actually get those types of things done with certain architectures available in the market today," explained Steve Conner, VP of Sales at Cloudistics, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
DXWorldEXPO LLC announced today that the upcoming DXWorldEXPO | CloudEXPO New York event will feature 10 companies from Poland to participate at the "Poland Digital Transformation Pavilion" on November 12-13, 2018.
Without a clear strategy for cost control and an architecture designed with cloud services in mind, costs and operational performance can quickly get out of control. To avoid multiple architectural redesigns requires extensive thought and planning. Boundary (now part of BMC) launched a new public-facing multi-tenant high resolution monitoring service on Amazon AWS two years ago, facing challenges and learning best practices in the early days of the new service.
Digital Transformation is much more than a buzzword. The radical shift to digital mechanisms for almost every process is evident across all industries and verticals. This is often especially true in financial services, where the legacy environment is many times unable to keep up with the rapidly shifting demands of the consumer. The constant pressure to provide complete, omnichannel delivery of customer-facing solutions to meet both regulatory and customer demands is putting enormous pressure on...
The best way to leverage your CloudEXPO | DXWorldEXPO presence as a sponsor and exhibitor is to plan your news announcements around our events. The press covering CloudEXPO | DXWorldEXPO will have access to these releases and will amplify your news announcements. More than two dozen Cloud companies either set deals at our shows or have announced their mergers and acquisitions at CloudEXPO. Product announcements during our show provide your company with the most reach through our targeted audienc...
With 10 simultaneous tracks, keynotes, general sessions and targeted breakout classes, @CloudEXPO and DXWorldEXPO are two of the most important technology events of the year. Since its launch over eight years ago, @CloudEXPO and DXWorldEXPO have presented a rock star faculty as well as showcased hundreds of sponsors and exhibitors!