Welcome!

News Feed Item

Coro Announces Drilling Results from its El Desesperado Project, Chile

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 02/27/14 -- Coro Mining Corp. ("Coro" or the "Company") (TSX:COP) Coro has recently completed a 5 hole, 1191m diamond drilling program (EDH-01 to 05) and a 7 hole, 950m reverse circulation drilling program (CED-R-9 to 15) at its El Desesperado copper project, located 7 km NW of the city of Calama in the II Region of Chile, and immediately west of Codelco's Toki Cluster of copper deposits (Figure 1: http://media3.marketwire.com/docs/COP0227a.pdf).

The objective of this drilling program was to confirm the presence of significant near surface leachable copper mineralization contained within a partially oxidized chalcocite blanket, similar to that intersected in our 2012 drilling. Assay results and drill description for the program are summarized below;


Table 1; Drill Intersections                                
                                                            
------------------------------------------------------------
Hole            From        To         m      CuT%      CuS%
------------------------------------------------------------
EDH-01          12.8        28      15.2      0.26      0.19
------------------------------------------------------------
EDH-03            16        40        24      0.26      0.25
                                                            
                  46        52         6      0.38      0.35
                  56        68        12      3.03      2.22
------------------------------------------------------------
EDH-04            20        30        10      0.39      0.28
------------------------------------------------------------
CED-R-11          32        68        36      0.32      0.24
------------------------------------------------------------
CED-R-12           6        32        26      0.40      0.38
------------------------------------------------------------

EDH-01, 03 & 04 and CED-R-11 & 12 intersected the same partially oxidized and leached chalcocite blanket as CED-R-04, but significantly thinner. EDH-05 was a diamond tail of RC hole CED-R-04 drilled in November 2012 which intersected 204m at 0.55%CuT from surface before the hole was lost. Core logging of EDH-05 indicates that the RC hole was lost in a major fault and only sporadic mineralization was encountered at depth. EDH-02 was targeted at intersecting primary mineralization at depth beneath the old workings; trace amounts of bornite and chalcopyrite were intersected over a 48m width, but this mineralization did not return copper assays in excess of 0.2%CuT. CED-R-9, 10, 13, 14 and 15 were drilled to test possible extensions to the N and E but did not intersect significant mineralization and were not assayed.

Alan Stephens, President and CEO of Coro commented, "These results indicate that the supergene mineralization is of more reduced dimensions than we had expected, due to a more pronounced structural control; a greater degree of leaching; and the presence of a post mineral porphyry and breccia complex which has invaded the prospective area (Figure 2: http://media3.marketwire.com/docs/COP0227b.pdf). A major NNE oriented fault, as well as NW oriented structures, appear to have influenced blanket thickness, and the NNE Main Fault may also be controlling the emplacement of primary mineralization. Finally, the copper oxides are present partly in the form of water soluble copper sulphates and it is possible that some of this copper may have been washed away during diamond drilling, particularly in more heavily fractured core.

The area drilled is some 200-300m topographically higher than the adjacent Toki deposits and this is reflected in the higher level alteration assemblage at El Desesperado. Mineralization identified so far is almost entirely supergene in nature and is associated with quartz-sericite-pyrite (QSP) alteration of Triassic sediments, particularly where these have been converted to a crackle breccia; and of a hydrothermal breccia emplaced in the Main Fault. The primary driver for this QSP alteration and supergene chalcocite has not yet been found, but may be a Toki style porphyry copper system located at depth. The trace amounts of bornite intersected in EDH-02 support this concept.

As recently announced, Coro has agreed a three month extension to the February 17th 2014 option payment with the property owners, at a cost of US$20,000 per month. During this period, we will evaluate all of the available data and determine our next course of action."


Table 2; Collar Coordinates                                               
                                                                          
--------------------------------------------------------------------------
Hole                  East        North    Elev       Az      Inc       TD
--------------------------------------------------------------------------
EDH-01              501103      7520475    2515      260      -60   249.25
EDH-02              501230      7520546    2468      260      -55      351
EDH-03              501047      7520478    2517      240      -60      218
EDH-04              501019      7520563    2529      240      -60      220
EDH-05              501061      7520473    2513        0      -90      153
CED-R-9             501051      7520803    2535        0      -90      240
CED-R-10            501138      7520744    2531        0      -90      160
CED-R-11            501052      7520509    2522        0      -90      120
CED-R-12            501002      7520503    2499        0      -90      120
CED-R-13            501048      7520616    2506        0      -90      120
CED-R-14            501100      7520622    2505        0      -90      120
CED-R-15            501145      7520652    2502        0      -90       70
--------------------------------------------------------------------------

Sampling and Assay Protocol

The mineralized sections of diamond drill holes were sampled on a 2m continuous basis, with core samples split on site and one half delivered to the Andes Analytical Assaying ("AAA") prep lab by Coro personnel. The remaining core was stored at a Coro facility for reference. Pulp samples were transported to the AAA assay laboratory in Santiago by AAA personnel. RC holes CED-R-11 & 12 were sampled on a 2 m continuous basis, with dry samples riffle split on site and one quarter sent to the Andes Analytical Assaying prep lab by Coro personnel. A second quarter was stored on site for reference.

Samples were prepared using the following standard protocol: drying, crushing to better than 80% passing -10#, homogenizing, splitting and pulverizing a 400 g subsample to 95% passing -150#. All samples were assayed for CuT, CuS and Mo by AAS. A full QA/QC program, involving insertion of appropriate blanks, standards and duplicates was employed for the diamond drill core sampling with acceptable results. True widths have not been determined.

About El Desesperado:

The El Desesperado copper project, is located 7 km NW of the city of Calama in the II Region of Chile, and immediately west of Codelco's Toki Cluster of copper deposits.

Sergio Rivera, Vice President of Exploration, Coro Mining Corp, a geologist with more than 31 years of experience and a member of the Colegio de Geologos de Chile and of the Instituto de Ingenieros de Minas de Chile, was responsible for the design and execution of the exploration program and is the Qualified Person for the purposes of NI 43-101. Alan Stephens, FIMMM, President and CEO, of Coro Mining Corp, a geologist with more than 38 years of experience, and a Qualified Person for the purposes of NI 43-101, is responsible for the contents of this news release.

CORO MINING CORP.

Alan Stephens, President and CEO

About Coro Mining Corp.:

The Company was founded with the goal of building a mining company focused on medium-sized base and precious metals deposits in Latin America. The Company intends to achieve this through the exploration for, and acquisition of, projects that can be developed and placed into production. Coro's properties include the Berta, El Desesperado, and Payen copper properties located in Chile and the advanced San Jorge copper-gold project, in Argentina.

This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Such forward-looking statements or information, including but not limited to those with respect to potential mineralization and geological comparisons involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. Such factors include, among others, the actual prices of copper, the factual results of current exploration, development and mining activities, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company's documents filed from time to time with the securities regulators in the Provinces of British Columbia, Alberta, Saskatchewan, Manitoba, Ontario, New Brunswick, Nova Scotia, Prince Edward Island and Newfoundland and Labrador.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
The speed of software changes in growing and large scale rapid-paced DevOps environments presents a challenge for continuous testing. Many organizations struggle to get this right. Practices that work for small scale continuous testing may not be sufficient as the requirements grow. In his session at DevOps Summit, Marc Hornbeek, Sr. Solutions Architect of DevOps continuous test solutions at Spirent Communications, explained the best practices of continuous testing at high scale, which is rele...
Web Real-Time Communication APIs have quickly revolutionized what browsers are capable of. In addition to video and audio streams, we can now bi-directionally send arbitrary data over WebRTC's PeerConnection Data Channels. With the advent of Progressive Web Apps and new hardware APIs such as WebBluetooh and WebUSB, we can finally enable users to stitch together the Internet of Things directly from their browsers while communicating privately and securely in a decentralized way.
Hardware virtualization and cloud computing allowed us to increase resource utilization and increase our flexibility to respond to business demand. Docker Containers are the next quantum leap - Are they?! Databases always represented an additional set of challenges unique to running workloads requiring a maximum of I/O, network, CPU resources combined with data locality.
"Matrix is an ambitious open standard and implementation that's set up to break down the fragmentation problems that exist in IP messaging and VoIP communication," explained John Woolf, Technical Evangelist at Matrix, in this SYS-CON.tv interview at @ThingsExpo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.
"A lot of times people will come to us and have a very diverse set of requirements or very customized need and we'll help them to implement it in a fashion that you can't just buy off of the shelf," explained Nick Rose, CTO of Enzu, in this SYS-CON.tv interview at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York City, NY.
As software becomes more and more complex, we, as software developers, have been splitting up our code into smaller and smaller components. This is also true for the environment in which we run our code: going from bare metal, to VMs to the modern-day Cloud Native world of containers, schedulers and micro services. While we have figured out how to run containerized applications in the cloud using schedulers, we've yet to come up with a good solution to bridge the gap between getting your contain...
Web Real-Time Communication APIs have quickly revolutionized what browsers are capable of. In addition to video and audio streams, we can now bi-directionally send arbitrary data over WebRTC's PeerConnection Data Channels. With the advent of Progressive Web Apps and new hardware APIs such as WebBluetooh and WebUSB, we can finally enable users to stitch together the Internet of Things directly from their browsers while communicating privately and securely in a decentralized way.
"We host and fully manage cloud data services, whether we store, the data, move the data, or run analytics on the data," stated Kamal Shannak, Senior Development Manager, Cloud Data Services, IBM, in this SYS-CON.tv interview at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York City, NY.
Information technology (IT) advances are transforming the way we innovate in business, thereby disrupting the old guard and their predictable status-quo. It’s creating global market turbulence. Industries are converging, and new opportunities and threats are emerging, like never before. So, how are savvy chief information officers (CIOs) leading this transition? Back in 2015, the IBM Institute for Business Value conducted a market study that included the findings from over 1,800 CIO interviews ...
Who are you? How do you introduce yourself? Do you use a name, or do you greet a friend by the last four digits of his social security number? Assuming you don’t, why are we content to associate our identity with 10 random digits assigned by our phone company? Identity is an issue that affects everyone, but as individuals we don’t spend a lot of time thinking about it. In his session at @ThingsExpo, Ben Klang, Founder & President of Mojo Lingo, discussed the impact of technology on identity. Sho...
"Operations is sort of the maturation of cloud utilization and the move to the cloud," explained Steve Anderson, Product Manager for BMC’s Cloud Lifecycle Management, in this SYS-CON.tv interview at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York City, NY.
Due of the rise of Hadoop, many enterprises are now deploying their first small clusters of 10 to 20 servers. At this small scale, the complexity of operating the cluster looks and feels like general data center servers. It is not until the clusters scale, as they inevitably do, when the pain caused by the exponential complexity becomes apparent. We've seen this problem occur time and time again. In his session at Big Data Expo, Greg Bruno, Vice President of Engineering and co-founder of StackIQ...
"I think that everyone recognizes that for IoT to really realize its full potential and value that it is about creating ecosystems and marketplaces and that no single vendor is able to support what is required," explained Esmeralda Swartz, VP, Marketing Enterprise and Cloud at Ericsson, in this SYS-CON.tv interview at @ThingsExpo, held June 7-9, 2016, at the Javits Center in New York City, NY.
The buzz continues for cloud, data analytics and the Internet of Things (IoT) and their collective impact across all industries. But a new conversation is emerging - how do companies use industry disruption and technology enablers to lead in markets undergoing change, uncertainty and ambiguity? Organizations of all sizes need to evolve and transform, often under massive pressure, as industry lines blur and merge and traditional business models are assaulted and turned upside down. In this new da...
"We got started as search consultants. On the services side of the business we have help organizations save time and save money when they hit issues that everyone more or less hits when their data grows," noted Otis Gospodnetić, Founder of Sematext, in this SYS-CON.tv interview at @DevOpsSummit, held June 9-11, 2015, at the Javits Center in New York City.