Welcome!

News Feed Item

Coro Announces Drilling Results from its El Desesperado Project, Chile

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 02/27/14 -- Coro Mining Corp. ("Coro" or the "Company") (TSX: COP) Coro has recently completed a 5 hole, 1191m diamond drilling program (EDH-01 to 05) and a 7 hole, 950m reverse circulation drilling program (CED-R-9 to 15) at its El Desesperado copper project, located 7 km NW of the city of Calama in the II Region of Chile, and immediately west of Codelco's Toki Cluster of copper deposits (Figure 1: http://media3.marketwire.com/docs/COP0227a.pdf).

The objective of this drilling program was to confirm the presence of significant near surface leachable copper mineralization contained within a partially oxidized chalcocite blanket, similar to that intersected in our 2012 drilling. Assay results and drill description for the program are summarized below;

Table 1; Drill Intersections

------------------------------------------------------------
Hole            From        To         m      CuT%      CuS%
------------------------------------------------------------
EDH-01          12.8        28      15.2      0.26      0.19
------------------------------------------------------------
EDH-03            16        40        24      0.26      0.25

                  46        52         6      0.38      0.35
                  56        68        12      3.03      2.22
------------------------------------------------------------
EDH-04            20        30        10      0.39      0.28
------------------------------------------------------------
CED-R-11          32        68        36      0.32      0.24
------------------------------------------------------------
CED-R-12           6        32        26      0.40      0.38
------------------------------------------------------------

EDH-01, 03 & 04 and CED-R-11 & 12 intersected the same partially oxidized and leached chalcocite blanket as CED-R-04, but significantly thinner. EDH-05 was a diamond tail of RC hole CED-R-04 drilled in November 2012 which intersected 204m at 0.55%CuT from surface before the hole was lost. Core logging of EDH-05 indicates that the RC hole was lost in a major fault and only sporadic mineralization was encountered at depth. EDH-02 was targeted at intersecting primary mineralization at depth beneath the old workings; trace amounts of bornite and chalcopyrite were intersected over a 48m width, but this mineralization did not return copper assays in excess of 0.2%CuT. CED-R-9, 10, 13, 14 and 15 were drilled to test possible extensions to the N and E but did not intersect significant mineralization and were not assayed.

Alan Stephens, President and CEO of Coro commented, "These results indicate that the supergene mineralization is of more reduced dimensions than we had expected, due to a more pronounced structural control; a greater degree of leaching; and the presence of a post mineral porphyry and breccia complex which has invaded the prospective area (Figure 2: http://media3.marketwire.com/docs/COP0227b.pdf). A major NNE oriented fault, as well as NW oriented structures, appear to have influenced blanket thickness, and the NNE Main Fault may also be controlling the emplacement of primary mineralization. Finally, the copper oxides are present partly in the form of water soluble copper sulphates and it is possible that some of this copper may have been washed away during diamond drilling, particularly in more heavily fractured core.

The area drilled is some 200-300m topographically higher than the adjacent Toki deposits and this is reflected in the higher level alteration assemblage at El Desesperado. Mineralization identified so far is almost entirely supergene in nature and is associated with quartz-sericite-pyrite (QSP) alteration of Triassic sediments, particularly where these have been converted to a crackle breccia; and of a hydrothermal breccia emplaced in the Main Fault. The primary driver for this QSP alteration and supergene chalcocite has not yet been found, but may be a Toki style porphyry copper system located at depth. The trace amounts of bornite intersected in EDH-02 support this concept.

As recently announced, Coro has agreed a three month extension to the February 17th 2014 option payment with the property owners, at a cost of US$20,000 per month. During this period, we will evaluate all of the available data and determine our next course of action."

Table 2; Collar Coordinates

--------------------------------------------------------------------------
Hole                  East        North    Elev       Az      Inc       TD
--------------------------------------------------------------------------
EDH-01              501103      7520475    2515      260      -60   249.25
EDH-02              501230      7520546    2468      260      -55      351
EDH-03              501047      7520478    2517      240      -60      218
EDH-04              501019      7520563    2529      240      -60      220
EDH-05              501061      7520473    2513        0      -90      153
CED-R-9             501051      7520803    2535        0      -90      240
CED-R-10            501138      7520744    2531        0      -90      160
CED-R-11            501052      7520509    2522        0      -90      120
CED-R-12            501002      7520503    2499        0      -90      120
CED-R-13            501048      7520616    2506        0      -90      120
CED-R-14            501100      7520622    2505        0      -90      120
CED-R-15            501145      7520652    2502        0      -90       70
--------------------------------------------------------------------------

Sampling and Assay Protocol

The mineralized sections of diamond drill holes were sampled on a 2m continuous basis, with core samples split on site and one half delivered to the Andes Analytical Assaying ("AAA") prep lab by Coro personnel. The remaining core was stored at a Coro facility for reference. Pulp samples were transported to the AAA assay laboratory in Santiago by AAA personnel. RC holes CED-R-11 & 12 were sampled on a 2 m continuous basis, with dry samples riffle split on site and one quarter sent to the Andes Analytical Assaying prep lab by Coro personnel. A second quarter was stored on site for reference.

Samples were prepared using the following standard protocol: drying, crushing to better than 80% passing -10#, homogenizing, splitting and pulverizing a 400 g subsample to 95% passing -150#. All samples were assayed for CuT, CuS and Mo by AAS. A full QA/QC program, involving insertion of appropriate blanks, standards and duplicates was employed for the diamond drill core sampling with acceptable results. True widths have not been determined.

About El Desesperado:

The El Desesperado copper project, is located 7 km NW of the city of Calama in the II Region of Chile, and immediately west of Codelco's Toki Cluster of copper deposits.

Sergio Rivera, Vice President of Exploration, Coro Mining Corp, a geologist with more than 31 years of experience and a member of the Colegio de Geologos de Chile and of the Instituto de Ingenieros de Minas de Chile, was responsible for the design and execution of the exploration program and is the Qualified Person for the purposes of NI 43-101. Alan Stephens, FIMMM, President and CEO, of Coro Mining Corp, a geologist with more than 38 years of experience, and a Qualified Person for the purposes of NI 43-101, is responsible for the contents of this news release.

CORO MINING CORP.

Alan Stephens, President and CEO

About Coro Mining Corp.:

The Company was founded with the goal of building a mining company focused on medium-sized base and precious metals deposits in Latin America. The Company intends to achieve this through the exploration for, and acquisition of, projects that can be developed and placed into production. Coro's properties include the Berta, El Desesperado, and Payen copper properties located in Chile and the advanced San Jorge copper-gold project, in Argentina.

This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Such forward-looking statements or information, including but not limited to those with respect to potential mineralization and geological comparisons involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. Such factors include, among others, the actual prices of copper, the factual results of current exploration, development and mining activities, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company's documents filed from time to time with the securities regulators in the Provinces of British Columbia, Alberta, Saskatchewan, Manitoba, Ontario, New Brunswick, Nova Scotia, Prince Edward Island and Newfoundland and Labrador.

Contacts:
Coro Mining Corp.
Michael Philpot
Executive Vice-President
(604) 682 5546
[email protected]
www.coromining.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
"ZeroStack is a startup in Silicon Valley. We're solving a very interesting problem around bringing public cloud convenience with private cloud control for enterprises and mid-size companies," explained Kamesh Pemmaraju, VP of Product Management at ZeroStack, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
In his session at 21st Cloud Expo, Carl J. Levine, Senior Technical Evangelist for NS1, will objectively discuss how DNS is used to solve Digital Transformation challenges in large SaaS applications, CDNs, AdTech platforms, and other demanding use cases. Carl J. Levine is the Senior Technical Evangelist for NS1. A veteran of the Internet Infrastructure space, he has over a decade of experience with startups, networking protocols and Internet infrastructure, combined with the unique ability to it...
"Codigm is based on the cloud and we are here to explore marketing opportunities in America. Our mission is to make an ecosystem of the SW environment that anyone can understand, learn, teach, and develop the SW on the cloud," explained Sung Tae Ryu, CEO of Codigm, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
High-velocity engineering teams are applying not only continuous delivery processes, but also lessons in experimentation from established leaders like Amazon, Netflix, and Facebook. These companies have made experimentation a foundation for their release processes, allowing them to try out major feature releases and redesigns within smaller groups before making them broadly available. In his session at 21st Cloud Expo, Brian Lucas, Senior Staff Engineer at Optimizely, discussed how by using ne...
"CA has been doing a lot of things in the area of DevOps. Now we have a complete set of tool sets in order to enable customers to go all the way from planning to development to testing down to release into the operations," explained Aruna Ravichandran, Vice President of Global Marketing and Strategy at CA Technologies, in this SYS-CON.tv interview at DevOps Summit at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
"There's plenty of bandwidth out there but it's never in the right place. So what Cedexis does is uses data to work out the best pathways to get data from the origin to the person who wants to get it," explained Simon Jones, Evangelist and Head of Marketing at Cedexis, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
Large industrial manufacturing organizations are adopting the agile principles of cloud software companies. The industrial manufacturing development process has not scaled over time. Now that design CAD teams are geographically distributed, centralizing their work is key. With large multi-gigabyte projects, outdated tools have stifled industrial team agility, time-to-market milestones, and impacted P&L stakeholders.
"Cloud Academy is an enterprise training platform for the cloud, specifically public clouds. We offer guided learning experiences on AWS, Azure, Google Cloud and all the surrounding methodologies and technologies that you need to know and your teams need to know in order to leverage the full benefits of the cloud," explained Alex Brower, VP of Marketing at Cloud Academy, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clar...
Gemini is Yahoo’s native and search advertising platform. To ensure the quality of a complex distributed system that spans multiple products and components and across various desktop websites and mobile app and web experiences – both Yahoo owned and operated and third-party syndication (supply), with complex interaction with more than a billion users and numerous advertisers globally (demand) – it becomes imperative to automate a set of end-to-end tests 24x7 to detect bugs and regression. In th...
Enterprises are moving to the cloud faster than most of us in security expected. CIOs are going from 0 to 100 in cloud adoption and leaving security teams in the dust. Once cloud is part of an enterprise stack, it’s unclear who has responsibility for the protection of applications, services, and data. When cloud breaches occur, whether active compromise or a publicly accessible database, the blame must fall on both service providers and users. In his session at 21st Cloud Expo, Ben Johnson, C...
"Infoblox does DNS, DHCP and IP address management for not only enterprise networks but cloud networks as well. Customers are looking for a single platform that can extend not only in their private enterprise environment but private cloud, public cloud, tracking all the IP space and everything that is going on in that environment," explained Steve Salo, Principal Systems Engineer at Infoblox, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Conventio...
Data scientists must access high-performance computing resources across a wide-area network. To achieve cloud-based HPC visualization, researchers must transfer datasets and visualization results efficiently. HPC clusters now compute GPU-accelerated visualization in the cloud cluster. To efficiently display results remotely, a high-performance, low-latency protocol transfers the display from the cluster to a remote desktop. Further, tools to easily mount remote datasets and efficiently transfer...
"Akvelon is a software development company and we also provide consultancy services to folks who are looking to scale or accelerate their engineering roadmaps," explained Jeremiah Mothersell, Marketing Manager at Akvelon, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
"MobiDev is a software development company and we do complex, custom software development for everybody from entrepreneurs to large enterprises," explained Alan Winters, U.S. Head of Business Development at MobiDev, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
"We're developing a software that is based on the cloud environment and we are providing those services to corporations and the general public," explained Seungmin Kim, CEO/CTO of SM Systems Inc., in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.