Welcome!

News Feed Item

Kombat Copper Defines the W800 Extension With Resource Calculation Underway

TORONTO, ONTARIO -- (Marketwired) -- 02/28/14 -- Kombat Copper Inc. ("Kombat Copper" or the "Company") (TSX VENTURE:KBT) has completed a detailed review of its extensive historical data base and verified material drill information to infill a previously unidentified zone of mineralization between the Asis Far West ("AFW") Sector and previous mine workings to the east of the Asis West Area a distance of some 300 meters known as the W800 Extension (Figure 1). The W800 Extension is up-plunge of the drilled defined AFW Sector in an area with no previous underground access and limited drill testing.

Approximately 90 meters west of the exploration-developed drift on the 12 level, a drill intersection (Au12/200) of 16.0 meters grading 10.35% Cu was defined. Another intersection (Au12/177) of 6.0 meters grading 3.59% Cu has been identified in the same zone. Historic assays are as follows:

----------------------------------------------------------------------------
              Table 1: Historic Results for Drill Hole Au12/200             
----------------------------------------------------------------------------
Hole ID           From (m)          To (m)        Length (m)            Cu %
----------------------------------------------------------------------------
Au12/200               105             107                 2            1.60
----------------------------------------------------------------------------
Au12/200               107             109                 2            2.79
----------------------------------------------------------------------------
Au12/200               109             111                 2           18.18
----------------------------------------------------------------------------
Au12/200               111             113                 2           20.10
----------------------------------------------------------------------------
Au12/200               113             116                 3           19.92
----------------------------------------------------------------------------
Au12/200               116             118                 2            6.56
----------------------------------------------------------------------------
Au12/200               118             121                 3            2.45
----------------------------------------------------------------------------
TOTAL                                                     16           10.35
----------------------------------------------------------------------------
----------------------------------------------------------------------------
              Table 2: Historic Results for Drill Hole Au12/177             
----------------------------------------------------------------------------
Hole ID           From (m)          To (m)        Length (m)            Cu %
----------------------------------------------------------------------------
Au12/177               115             118                 3            1.22
----------------------------------------------------------------------------
Au12/177               118             119                 1            7.17
----------------------------------------------------------------------------
Au12/177               119             120                 1            0.41
----------------------------------------------------------------------------
Au12/177               120             121                 1           10.27
----------------------------------------------------------------------------
TOTAL                                                      6            3.59
----------------------------------------------------------------------------

Several hundred meters further to the west of stopes on 12 level (Figure 1), surface drill holes have intersected 3.7 meters assaying 6.5% Cu (AW90A), 4.0 meters assaying 1.78% Cu (AW90C) and 2.5 meters assaying 2.58% Cu (AW115A). Due to the limited nature of the historic mineralized intersections the true width cannot be determined. Original assay files and drill logs have been found and the data has been verified.

In February of 2013, Kombat Copper completed a diamond drill core re-sampling program from the historic AFW Sector. The best result is from diamond drill hole AW101A located at the eastern edge of the AFW Sector, that returned 10 meters of 8% copper and 124 g/t silver. A resampling of hole AW90C, mentioned above, is located in the W800 Extension Sector and returned 7.66% Cu but over a core length of 3.2 meters. This is a significant upgrade to that historically reported.

From this information, it is now interpreted that significant widths of copper mineralization can be defined to within 150 meters of the AFW Sector and any future drilling will target the continuity of the mineralized system in an effort to join up the Asis West and Asis Far West Sectors.

Kombat Copper's recently completed geological reinterpretation for the area supports the concept of the emplacement of this historically defined copper mineralization and may ultimately expand its mineralization inventory as Kombat progresses with additional drill definition.

The Company anticipates publishing a mineral resource estimate for the AFW Sector by the end of the first quarter of this year. This mineral resource estimate shall contribute to the ongoing Preliminary Economic Assessment (PEA) of the Kombat Mine, targeted for release early third quarter of 2014.

The Company has also determined that the brownfields restart of the Kombat mine could be accomplished quickly and with relatively low capital cost if initial production rates of 500-700 tonnes per day are considered. Kombat's objective would be to ramp up to 1,100 tonnes per day (the design capacity of the current mill) over a 1 to 2 year period as more forward development is completed and the mill is returned to its proven design capacity. It appears that existing infrastructure will require minimal rehabilitation and existing underground development will allow a quick ramp up of production in the event economic viability is determined in the PEA.

PDAC Investor Exchange

Kombat Copper will be attending the PDAC Investor Exchange March 2nd and 3rd. The Company looks forward to updating its shareholders and interested investors in person at Booth #2221.

About Kombat Copper

Kombat Copper (TSX VENTURE:KBT) is a publicly traded Canadian exploration and development company with its core operations focused on copper resources in Namibia, one of the world's most prospective copper regions, where it has substantial assets in place with significant exploration upside.

The Company holds an 80% interest in five mining licenses in the Otavi Mountainlands, an area of Namibia particularly known for its high-grade copper deposits. Within these licenses are three past-producing mines including the Company's flagship property: the past-producing Kombat Mine. The Kombat Mine's extensive infrastructure includes an 800m production shaft which was opened in 2006, three recently-operational shafts, ramp systems, extensive underground workings, mine buildings, a tailings facility, a mill and concentrator all supported by the Company's local town site. The Kombat mine originally opened in 1962 and historically produced approx. 8.7 million tonnes of ore grading 3.1% copper and is linked to vital existing infrastructure, including power, water, roads, and rail with close proximity to the port of Walvis Bay and to one of only five commercial-grade smelters in Africa located in Tsumeb, located 100 road kilometers away from Kombat.

In addition to mining licenses, the Company holds an 80% interest in five Exclusive Prospecting Licenses ("EPLs") covering an area of more than 1550 km2. The EPLs are located also within the copper-rich Otavi Mountainlands and are in close proximity to Tsumeb.

Qualified Person

F. W. Nielsen, P.Geo., President and CEO of Kombat Copper, is a "qualified person" as such term is defined in National Instrument 43-101 and has reviewed and approved the technical information and data included in this press release.

Cautionary Notes

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain forward-looking statements. These statements include statements regarding the Company's plans for the Kombat Mine, its expectations for the Kombat Mine and the expected effect on the Company's financial and operating results. These statements are based on current expectations and assumptions that are subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the management discussion and analysis section of our interim and most recent annual financial statements or other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations. We do not assume any obligation to update any forward-looking statements, except as required by applicable laws.

To view Figure 1: Kombat Mine Longitudinal Section, please visit the following link: http://media3.marketwire.com/docs/KBT228-F1.pdf

Contacts:
Kombat Copper Inc.
Bill Nielsen
President and CEO
+1 (416) 861-1685

Kombat Copper Inc.
Rob Hopkins
Manager, Investor Relations
+1 (416) 861-5899
[email protected]
www.kombatcopper.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
DX World EXPO, LLC, a Lighthouse Point, Florida-based startup trade show producer and the creator of "DXWorldEXPO® - Digital Transformation Conference & Expo" has announced its executive management team. The team is headed by Levent Selamoglu, who has been named CEO. "Now is the time for a truly global DX event, to bring together the leading minds from the technology world in a conversation about Digital Transformation," he said in making the announcement.
"Space Monkey by Vivent Smart Home is a product that is a distributed cloud-based edge storage network. Vivent Smart Home, our parent company, is a smart home provider that places a lot of hard drives across homes in North America," explained JT Olds, Director of Engineering, and Brandon Crowfeather, Product Manager, at Vivint Smart Home, in this SYS-CON.tv interview at @ThingsExpo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
SYS-CON Events announced today that Conference Guru has been named “Media Sponsor” of the 22nd International Cloud Expo, which will take place on June 5-7, 2018, at the Javits Center in New York, NY. A valuable conference experience generates new contacts, sales leads, potential strategic partners and potential investors; helps gather competitive intelligence and even provides inspiration for new products and services. Conference Guru works with conference organizers to pass great deals to gre...
DevOps is under attack because developers don’t want to mess with infrastructure. They will happily own their code into production, but want to use platforms instead of raw automation. That’s changing the landscape that we understand as DevOps with both architecture concepts (CloudNative) and process redefinition (SRE). Rob Hirschfeld’s recent work in Kubernetes operations has led to the conclusion that containers and related platforms have changed the way we should be thinking about DevOps and...
The Internet of Things will challenge the status quo of how IT and development organizations operate. Or will it? Certainly the fog layer of IoT requires special insights about data ontology, security and transactional integrity. But the developmental challenges are the same: People, Process and Platform. In his session at @ThingsExpo, Craig Sproule, CEO of Metavine, demonstrated how to move beyond today's coding paradigm and shared the must-have mindsets for removing complexity from the develop...
In his Opening Keynote at 21st Cloud Expo, John Considine, General Manager of IBM Cloud Infrastructure, led attendees through the exciting evolution of the cloud. He looked at this major disruption from the perspective of technology, business models, and what this means for enterprises of all sizes. John Considine is General Manager of Cloud Infrastructure Services at IBM. In that role he is responsible for leading IBM’s public cloud infrastructure including strategy, development, and offering m...
Companies are harnessing data in ways we once associated with science fiction. Analysts have access to a plethora of visualization and reporting tools, but considering the vast amount of data businesses collect and limitations of CPUs, end users are forced to design their structures and systems with limitations. Until now. As the cloud toolkit to analyze data has evolved, GPUs have stepped in to massively parallel SQL, visualization and machine learning.
The next XaaS is CICDaaS. Why? Because CICD saves developers a huge amount of time. CD is an especially great option for projects that require multiple and frequent contributions to be integrated. But… securing CICD best practices is an emerging, essential, yet little understood practice for DevOps teams and their Cloud Service Providers. The only way to get CICD to work in a highly secure environment takes collaboration, patience and persistence. Building CICD in the cloud requires rigorous ar...
"Evatronix provides design services to companies that need to integrate the IoT technology in their products but they don't necessarily have the expertise, knowledge and design team to do so," explained Adam Morawiec, VP of Business Development at Evatronix, in this SYS-CON.tv interview at @ThingsExpo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
To get the most out of their data, successful companies are not focusing on queries and data lakes, they are actively integrating analytics into their operations with a data-first application development approach. Real-time adjustments to improve revenues, reduce costs, or mitigate risk rely on applications that minimize latency on a variety of data sources. In his session at @BigDataExpo, Jack Norris, Senior Vice President, Data and Applications at MapR Technologies, reviewed best practices to ...
Widespread fragmentation is stalling the growth of the IIoT and making it difficult for partners to work together. The number of software platforms, apps, hardware and connectivity standards is creating paralysis among businesses that are afraid of being locked into a solution. EdgeX Foundry is unifying the community around a common IoT edge framework and an ecosystem of interoperable components.
"ZeroStack is a startup in Silicon Valley. We're solving a very interesting problem around bringing public cloud convenience with private cloud control for enterprises and mid-size companies," explained Kamesh Pemmaraju, VP of Product Management at ZeroStack, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
Large industrial manufacturing organizations are adopting the agile principles of cloud software companies. The industrial manufacturing development process has not scaled over time. Now that design CAD teams are geographically distributed, centralizing their work is key. With large multi-gigabyte projects, outdated tools have stifled industrial team agility, time-to-market milestones, and impacted P&L stakeholders.
"Akvelon is a software development company and we also provide consultancy services to folks who are looking to scale or accelerate their engineering roadmaps," explained Jeremiah Mothersell, Marketing Manager at Akvelon, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
Enterprises are adopting Kubernetes to accelerate the development and the delivery of cloud-native applications. However, sharing a Kubernetes cluster between members of the same team can be challenging. And, sharing clusters across multiple teams is even harder. Kubernetes offers several constructs to help implement segmentation and isolation. However, these primitives can be complex to understand and apply. As a result, it’s becoming common for enterprises to end up with several clusters. Thi...