Click here to close now.


News Feed Item

Pilot Gold Files NI 43-101 Technical Report on Maiden Resource Estimate for the KCD Deposit, TV Tower

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 02/28/14 -- Pilot Gold Inc. (TSX:PLG) ("Pilot Gold" or the "Company") has filed a National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") technical report entitled "Independent Technical Report for the TV Tower Exploration Property, Canakkale, Western Turkey" (the "Report"), effective January 21, 2014 and dated February 20, 2014, on SEDAR at

The Report relates principally to the independent resource estimate for the Kucukdag ("KCD") gold-silver-copper deposit at TV Tower in northwestern Turkey, announced on January 23, 2014. KCD is the first of several targets on the 91 km2 TV Tower property slated for intensive drilling, exploration and resource estimation.

The Report also covers exploration results from the 2013 program at TV Tower, including acquisition, exploration and drilling at the Karaayi and Kayali targets ("K2"). Karaayi and Kayali host a four kilometre-long zone of silicified volcaniclastic rocks hosting oxide gold, underlain by a blanket of supergene copper mineralization and what appears to be two or more areas of copper-gold porphyry alteration.

There are no material differences between the results announced in the January 23, 2014 news release and results contained in the Report. The Report has also been posted on the Company's website at

The Report was prepared by Casey M. Hetman, P.Geo. with SRK Consulting (Canada) Inc.; James N. Gray, P. Geo. of Advantage Geoservices Ltd.; and Gary Simmons, BSc, Metallurgical Engineering, of G L Simmons Consulting, LLC. Mr. Hetman, Mr. Gray and Mr. Simmons are independent of Pilot Gold and are "Qualified Persons" as defined by NI 43-101. Moira Smith, Ph.D., P.Geo., Chief Geologist, Pilot Gold, is the Company's designated Qualified Person for this news release within the meaning of NI 43-101 and has approved the scientific and technical information contained herein.


TV Tower is a joint venture between Pilot Gold (40%) and Teck Madencilik Sanayi Ticaret A.S. (60%), a Turkish subsidiary of Teck Resources Limited ("Teck"). Pilot Gold is project operator at TV Tower and can increase its interest in the project to 60%, through sole funding of exploration over a three-year period.

TV Tower is an early stage exploration project and, except for the mineral resources at the KCD deposit as summarized in the Report, does not contain any mineral resource estimates as defined by NI 43-101. The potential to define a mineral resource at the copper-gold K2 zone of TV Tower is conceptual in nature and there has been insufficient exploration to define a mineral resource thereat. It is uncertain if further exploration at K2 or other targets at TV Tower will yield a mineral resource.


Pilot Gold is a well-funded gold exploration company led by a proven technical team that continues to discover and define high-quality projects featuring strong grades, meaningful size and mining-friendly addresses. Our three key assets include interests in the TV Tower and Halilaga projects in Turkey and the Kinsley Mountain project in Nevada, each of which has the ability to become a foundational asset. We also have a pipeline of projects characterized by large land positions and district-wide potential that can meet our growth needs for years to come.


Mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral resource estimates do not account for mineability, selectivity, mining loss and dilution. There is also no certainty that these inferred mineral resources will be converted to measured and indicated categories through further drilling, or into mineral reserves, once economic considerations are applied. The mineral resource estimates referenced in this press release use the terms "Indicated Mineral Resources" and "Inferred Mineral Resources". While these terms are defined in and required by Canadian regulations (under NI 43-101), these terms are not recognized by the U.S. Securities and Exchange Commission ("SEC"). "Inferred Mineral Resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. The SEC normally only permits issuers to report mineralization that does not constitute SEC Industry Guide 7 compliant "reserves" as in-place tonnage and grade without reference to unit measures. U.S. investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into reserves. Pilot Gold is not an SEC registered company.


All statements in this press release, other than statements of historical fact, are "forward-looking information" with respect to Pilot Gold within the meaning of applicable securities laws, including statements that address potential size and expansion of a mineralized zone and the timing of future resource estimates. Forward-looking information is often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "planned", "expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", and similar expressions, or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "should", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking information is based upon a number of assumptions of management, including among others, assumptions about future prices of gold, copper, silver and other metal prices, currency exchange rates and interest rates, favourable operating conditions, political stability, obtaining governmental approvals and financing on time, obtaining renewals for existing licences and permits and obtaining required licences and permits, labour stability, stability in market conditions, availability of equipment, accuracy of any mineral resources, successful resolution of disputes and anticipated costs and expenditures. Many assumptions are based on factors and events that are not within the control of Pilot Gold and there is no assurance they will prove to be correct.

Such forward-looking information, involves known and unknown risks, which may cause the actual results to be materially different from any future results expressed or implied by such forward-looking information, including risks related to TV Tower, reliance on technical information provided by our joint venture partner or other third parties as related to TV Tower; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; the costs and timing of exploration and development of new deposits; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; delays in permitting; satisfaction of Turkish requirements relating to the periodic submissions of Environmental Impact Assessments; possible claims against the Company or its joint venture partners; labour disputes; delays in obtaining governmental approvals or financing as well as those factors discussed in the Annual Information Form for the year ended December 31, 2012, dated March 27, 2013 in the section entitled "Risk Factors", under Pilot Gold's SEDAR profile at

Although Pilot Gold has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Pilot Gold disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise unless required by law.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Chris Van Tuin, Chief Technologist for the Western US at Red Hat, has over 20 years of experience in IT and Software. Since joining Red Hat in 2005, he has been architecting solutions for strategic customers and partners with a focus on emerging technologies including IaaS, PaaS, and DevOps. He started his career at Intel in IT and Managed Hosting followed by leadership roles in services and sales engineering at Loudcloud and Linux startups.
Saviynt Inc. has announced the availability of the next release of Saviynt for AWS. The comprehensive security and compliance solution provides a Command-and-Control center to gain visibility into risks in AWS, enforce real-time protection of critical workloads as well as data and automate access life-cycle governance. The solution enables AWS customers to meet their compliance mandates such as ITAR, SOX, PCI, etc. by including an extensive risk and controls library to detect known threats and b...
Recently announced Azure Data Lake addresses the big data 3V challenges; volume, velocity and variety. It is one more storage feature in addition to blobs and SQL Azure database. Azure Data Lake (should have been Azure Data Ocean IMHO) is really omnipotent. Just look at the key capabilities of Azure Data Lake:
As-a-service models offer huge opportunities, but also complicate security. It may seem that the easiest way to migrate to a new architectural model is to let others, experts in their field, do the work. This has given rise to many as-a-service models throughout the industry and across the entire technology stack, from software to infrastructure. While this has unlocked huge opportunities to accelerate the deployment of new capabilities or increase economic efficiencies within an organization, i...
Electric power utilities face relentless pressure on their financial performance, and reducing distribution grid losses is one of the last untapped opportunities to meet their business goals. Combining IoT-enabled sensors and cloud-based data analytics, utilities now are able to find, quantify and reduce losses faster – and with a smaller IT footprint. Solutions exist using Internet-enabled sensors deployed temporarily at strategic locations within the distribution grid to measure actual line lo...
For almost two decades, businesses have discovered great opportunities to engage with customers and even expand revenue through digital systems, including web and mobile applications. Yet, even now, the conversation between the business and the technologists that deliver these systems is strained, in large part due to misaligned objectives. In his session at DevOps Summit, James Urquhart, Senior Vice President of Performance Analytics at SOASTA, Inc., will discuss how measuring user outcomes –...
The Internet of Everything is re-shaping technology trends–moving away from “request/response” architecture to an “always-on” Streaming Web where data is in constant motion and secure, reliable communication is an absolute necessity. As more and more THINGS go online, the challenges that developers will need to address will only increase exponentially. In his session at @ThingsExpo, Todd Greene, Founder & CEO of PubNub, will explore the current state of IoT connectivity and review key trends an...
Docker is hot. However, as Docker container use spreads into more mature production pipelines, there can be issues about control of Docker images to ensure they are production-ready. Is a promotion-based model appropriate to control and track the flow of Docker images from development to production? In his session at DevOps Summit, Fred Simon, Co-founder and Chief Architect of JFrog, will demonstrate how to implement a promotion model for Docker images using a binary repository, and then show h...
SYS-CON Events announced today that IBM Cloud Data Services has been named “Bronze Sponsor” of SYS-CON's 17th Cloud Expo, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. IBM Cloud Data Services offers a portfolio of integrated, best-of-breed cloud data services for developers focused on mobile computing and analytics use cases.
As the world moves towards more DevOps and microservices, application deployment to the cloud ought to become a lot simpler. The microservices architecture, which is the basis of many new age distributed systems such as OpenStack, NetFlix and so on, is at the heart of Cloud Foundry - a complete developer-oriented Platform as a Service (PaaS) that is IaaS agnostic and supports vCloud, OpenStack and AWS. In his session at 17th Cloud Expo, Raghavan "Rags" Srinivas, an Architect/Developer Evangeli...
The Internet of Things (IoT) is growing rapidly by extending current technologies, products and networks. By 2020, Cisco estimates there will be 50 billion connected devices. Gartner has forecast revenues of over $300 billion, just to IoT suppliers. Now is the time to figure out how you’ll make money – not just create innovative products. With hundreds of new products and companies jumping into the IoT fray every month, there’s no shortage of innovation. Despite this, McKinsey/VisionMobile data...
Today air travel is a minefield of delays, hassles and customer disappointment. Airlines struggle to revitalize the experience. GE and M2Mi will demonstrate practical examples of how IoT solutions are helping airlines bring back personalization, reduce trip time and improve reliability. In their session at @ThingsExpo, Shyam Varan Nath, Principal Architect with GE, and Dr. Sarah Cooper, M2Mi's VP Business Development and Engineering, will explore the IoT cloud-based platform technologies driv...
DevOps is here to stay because it works. Most businesses using this methodology are already realizing a wide range of real, measurable benefits as a result of implementing DevOps, including the breakdown of inter-departmental silos, faster delivery of new features and more stable operating environments. To take advantage of the cloud’s improved speed and flexibility, development and operations teams need to work together more closely and productively. In his session at DevOps Summit, Prashanth...
DevOps has often been described in terms of CAMS: Culture, Automation, Measuring, Sharing. While we’ve seen a lot of focus on the “A” and even on the “M”, there are very few examples of why the “C" is equally important in the DevOps equation. In her session at @DevOps Summit, Lori MacVittie, of F5 Networks, will explore HTTP/1 and HTTP/2 along with Microservices to illustrate why a collaborative culture between Dev, Ops, and the Network is critical to ensuring success.
Containers have changed the mind of IT in DevOps. They enable developers to work with dev, test, stage and production environments identically. Containers provide the right abstraction for microservices and many cloud platforms have integrated them into deployment pipelines. DevOps and containers together help companies achieve their business goals faster and more effectively. In his session at DevOps Summit, Ruslan Synytsky, CEO and Co-founder of Jelastic, will review the current landscape of...