Welcome!

News Feed Item

Canacol Energy Ltd. Tests 590 BOPD From Fractured La Luna Formation Discovery at Mono Arana, Colombia

CALGARY, ALBERTA -- (Marketwired) -- 03/06/14 -- Canacol Energy Ltd. ("Canacol" or the "Corporation") (TSX: CNE)(OTCQX: CNNEF)(BVC: CNEC) is pleased to provide an update of the testing operations from the La Luna Formation in the Mono Arana 1 exploration well pursuant to the VMM2 Exploration and Production ("E&P") Contract covering the Middle Magdalena Basin of Colombia. Canacol has a 20% non-operated working interest in this Contract, with ExxonMobil Exploration Colombia having a 70.1% working interest and Vetra Exploracion y Produccion Colombia having the remaining 9.9%.

As reported on January 24, 2013, the Mono Arana 1 exploration well encountered 230 feet ("ft") of net oil pay within the naturally fractured Cretaceous La Luna Formation. The Corporation has a 20% working interest in this part of the VMM2 contract for the La Luna. Two flow periods have been completed in the La Luna naturally fractured reservoir within the well, with the final flow period yielding a gross rate of approximately 590 barrels of oil per day ("bopd") of 22 degrees API oil during the last hour of the 24 hour flow period.

Charle Gamba, President and CEO of the Corporation, commented "We are very pleased with the flow test results from the La Luna naturally fractured reservoir at the vertical Mono Arana 1 well. The flow test results from the La Luna in the Mono Arana 1 well demonstrate that the reservoir where it is naturally fractured is capable of good natural flow rates."

Mono Arana 1 Flow Test Results

The Mono Arana 1 well was spud on September 23, 2012, and was designed to test the oil potential of both the shallow Tertiary Lisama sandstone reservoir and deeper shale and carbonate reservoirs within the La Luna, Simiti, and Tablazo Formations. The well was drilled to a depth of 9,942 feet measured depth ("ft md"). Approximately 760 ft of La Luna Formation was encountered within the well, with good oil and gas shows encountered across the gross drilled interval. The La Luna Formation also exhibited high overpressure of up to 8146 psia. Based on Canacol's petrophysical analysis of the openhole logs run across the interval the part of the La Luna Formation penetrated in the well contains approximately 230 ft of net oil pay with an average porosity of 14% within naturally fractured shale and carbonate reservoirs.

Two flow periods were performed under natural flow conditions; the first consisted of a 48 hour ("hr") flow period, and the second a flow period of 24 hrs following an acidization procedure of the well. The first flow period yielded a gross production of approximately 130 bopd of 21 degrees API oil and 16 thousand standard cubic feet per day ("mscfpd") with a 0.4% water cut on a 16/64 inch choke and a final bottom hole flowing pressure of 3,707 pounds per square inch ("psi") under natural flow conditions during the last hour of the 48 hr test.

The second flow period was conducted after performing an acidization procedure and the gross production increased to approximately 590 bopd of 22 degrees API oil and 118 mscfpd and 0.4% water cut on a 24/64 inch choke with a final bottom hole flowing pressure of 4,081 psi achieved under natural flow conditions during the last hour of the 24 hour test.

The Corporation plans to commence a long term production test of the La Luna, subject to receipt of approval from the ANH.

Canacol's Acreage Position within the Magdalena Valley of Colombia

The Corporation holds interests in approximately 545,000 net acres within this play mainly in the Magdalena Valley of Colombia, the second largest position held by any operator after the State oil company.

Canacol is an exploration and production company with operations focused in Colombia and Ecuador. The Corporation's common stock trades on the Toronto Stock Exchange and the Colombia Stock Exchange under ticker symbol CNE and CNE.C, respectively.

This press release contains certain forward-looking statements within the meaning of applicable securities law. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur, including without limitation statements relating to estimated production rates from the Corporation's properties and intended work programs and associated timelines. Forward-looking statements are based on the opinions and estimates of management at the date the statements are made and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. The Corporation cannot assure that actual results will be consistent with these forward looking statements. They are made as of the date hereof and are subject to change and the Corporation assumes no obligation to revise or update them to reflect new circumstances, except as required by law. Prospective investors should not place undue reliance on forward looking statements. These factors include the inherent risks involved in the exploration for and development of crude oil and natural gas properties, the uncertainties involved in interpreting drilling results and other geological and geophysical data, fluctuating energy prices, the possibility of cost overruns or unanticipated costs or delays and other uncertainties associated with the oil and gas industry. Other risk factors could include risks associated with negotiating with foreign governments as well as country risk associated with conducting international activities, and other factors, many of which are beyond the control of the Corporation.

Data obtained from the initial testing results at the well identified in this press release, including barrels of oil produced and levels of water-cut, should be considered to be preliminary until a further and detailed analysis or interpretation has been done on such data. The well test results obtained and disclosed in this press release are not necessarily indicative of long-term performance or of ultimate recovery. The reader is cautioned not to unduly rely on such results as such results may not be indicative of future performance of the well or of expected production results for the Corporation in the future.

Contacts:
Canacol Energy Ltd.
Investor Relations
888-352-0555
[email protected]
www.canacolenergy.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Events announced today that N3N will exhibit at SYS-CON's @ThingsExpo, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. N3N’s solutions increase the effectiveness of operations and control centers, increase the value of IoT investments, and facilitate real-time operational decision making. N3N enables operations teams with a four dimensional digital “big board” that consolidates real-time live video feeds alongside IoT sensor data a...
Mobile device usage has increased exponentially during the past several years, as consumers rely on handhelds for everything from news and weather to banking and purchases. What can we expect in the next few years? The way in which we interact with our devices will fundamentally change, as businesses leverage Artificial Intelligence. We already see this taking shape as businesses leverage AI for cost savings and customer responsiveness. This trend will continue, as AI is used for more sophistica...
Today most companies are adopting or evaluating container technology - Docker in particular - to speed up application deployment, drive down cost, ease management and make application delivery more flexible overall. As with most new architectures, this dream takes significant work to become a reality. Even when you do get your application componentized enough and packaged properly, there are still challenges for DevOps teams to making the shift to continuous delivery and achieving that reducti...
Real IoT production deployments running at scale are collecting sensor data from hundreds / thousands / millions of devices. The goal is to take business-critical actions on the real-time data and find insights from stored datasets. In his session at @ThingsExpo, John Walicki, Watson IoT Developer Advocate at IBM Cloud, will provide a fast-paced developer journey that follows the IoT sensor data from generation, to edge gateway, to edge analytics, to encryption, to the IBM Bluemix cloud, to Wa...
What is the best strategy for selecting the right offshore company for your business? In his session at 21st Cloud Expo, Alan Winters, U.S. Head of Business Development at MobiDev, will discuss the things to look for - positive and negative - in evaluating your options. He will also discuss how to maximize productivity with your offshore developers. Before you start your search, clearly understand your business needs and how that impacts software choices.
Enterprises are moving to the cloud faster than most of us in security expected. CIOs are going from 0 to 100 in cloud adoption and leaving security teams in the dust. Once cloud is part of an enterprise stack, it’s unclear who has responsibility for the protection of applications, services, and data. When cloud breaches occur, whether active compromise or a publicly accessible database, the blame must fall on both service providers and users. In his session at 21st Cloud Expo, Ben Johnson, C...
Most of the time there is a lot of work involved to move to the cloud, and most of that isn't really related to AWS or Azure or Google Cloud. Before we talk about public cloud vendors and DevOps tools, there are usually several technical and non-technical challenges that are connected to it and that every company needs to solve to move to the cloud. In his session at 21st Cloud Expo, Stefano Bellasio, CEO and founder of Cloud Academy Inc., will discuss what the tools, disciplines, and cultural...
SYS-CON Events announced today that Massive Networks, that helps your business operate seamlessly with fast, reliable, and secure internet and network solutions, has been named "Exhibitor" of SYS-CON's 21st International Cloud Expo ®, which will take place on Oct 31 - Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. As a premier telecommunications provider, Massive Networks is headquartered out of Louisville, Colorado. With years of experience under their belt, their team of...
SYS-CON Events announced today that Fusic will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Fusic Co. provides mocks as virtual IoT devices. You can customize mocks, and get any amount of data at any time in your test. For more information, visit https://fusic.co.jp/english/.
21st International Cloud Expo, taking place October 31 - November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA, will feature technical sessions from a rock star conference faculty and the leading industry players in the world. Cloud computing is now being embraced by a majority of enterprises of all sizes. Yesterday's debate about public vs. private has transformed into the reality of hybrid cloud: a recent survey shows that 74% of enterprises have a hybrid cloud strategy. Me...
SYS-CON Events announced today that MIRAI Inc. will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. MIRAI Inc. are IT consultants from the public sector whose mission is to solve social issues by technology and innovation and to create a meaningful future for people.
With the rise of DevOps, containers are at the brink of becoming a pervasive technology in Enterprise IT to accelerate application delivery for the business. When it comes to adopting containers in the enterprise, security is the highest adoption barrier. Is your organization ready to address the security risks with containers for your DevOps environment? In his session at @DevOpsSummit at 21st Cloud Expo, Chris Van Tuin, Chief Technologist, NA West at Red Hat, will discuss: The top security r...
SYS-CON Events announced today that Enroute Lab will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Enroute Lab is an industrial design, research and development company of unmanned robotic vehicle system. For more information, please visit http://elab.co.jp/.
IBM helps FinTechs and financial services companies build and monetize cognitive-enabled financial services apps quickly and at scale. Hosted on IBM Bluemix, IBM’s platform builds in customer insights, regulatory compliance analytics and security to help reduce development time and testing. In his session at 21st Cloud Expo, Lennart Frantzell, a Developer Advocate with IBM, will discuss how these tools simplify the time-consuming tasks of selection, mapping and data integration, allowing devel...
SYS-CON Events announced today that Mobile Create USA will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Mobile Create USA Inc. is an MVNO-based business model that uses portable communication devices and cellular-based infrastructure in the development, sales, operation and mobile communications systems incorporating GPS capabi...