Welcome!

News Feed Item

International Enexco Hits 2.31% eU3O8 Over 5.1 Metres Including 10.92% eU3O8 Over 0.4 Metres on Mann Lake

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 03/10/14 -- International Enexco Ltd. (TSX VENTURE: IEC)(OTCQX: IEXCF)(FRANKFURT: I6E) (the "Company" or "Enexco"). Enexco is pleased to report drill results from the Mann Lake Uranium Project in the Athabasca Basin of Saskatchewan, operated by Cameco Corporation (Cameco). Down-hole gamma survey results in drill hole MN-060 (see "Table A") intersected 5.1 metres ("m") averaging 2.31% eU3O8, from 687.6m to 692.7m. The intersection includes a 0.4m interval, from 691.2m to 691.6m, averaging 10.92% eU3O8. The hole represents a new discovery footwall to the western conductor in the northern half of the Mann Lake property and is located 300m south of hole MN-047, drilled in 2013, which encountered elevated radioactivity. The Company holds a 30% interest in the project along with Cameco (52.5%) and AREVA (17.5%).

The intersection is the best returned in terms of thickness and grade from the Mann Lake property thus far, and accordingly, the 2014 three rig Winter Drill Program is being modified by Cameco to follow up on these results both along and across strike. A wedge hole from MN-060 is currently being drilled.

Table A

----------------------------------------------------------------------------
                                                 Grade
              Grade                       Thick- Cutt- Maximum Average    GT
              Calculation       From    To  ness   off   Grade   Grade  (m x
DDH MN-060    Method             (m)   (m)   (m)     % (%U308) (%U308)    %)
----------------------------------------------------------------------------
L42+25N 4+20E Equivalent %U308 687.6 692.7   5.1  0.10   12.77    2.31 11.78
              Gamma (High Flux
              Probe)
----------------------------------------------------------------------------
                    (includes) 689.2 690.6   1.4  1.00    5.12    2.26  3.16
----------------------------------------------------------------------------
                    (includes) 691.2 691.6   0.4  1.00   12.77   10.92  4.37
----------------------------------------------------------------------------
                    (includes) 689.2 691.9   2.7  1.00   12.77    4.20 11.34
----------------------------------------------------------------------------
(1) eU3O8 is the radiometric equivalent uranium from a total gamma down-hole
probe calibrated using an algorithm calculated from the comparison of probe
results. True widths of mineralized intervals have not yet been determined
or geochemical analyses performed to support the probe data.
(2) Average grades are composited from 5 centimetre intervals.

Arnold Armstrong, President and CEO of Enexco, commented: "We are extremely excited by the strong mineralized intercept from hole MN-060 at Mann Lake. This is one of most prospective areas of the eastern Athabasca Basin, and we look forward to receiving further results throughout the ongoing drill campaign."

MN-060 is the eighth hole drilled in the 2014 program targeting the C conductor a six-kilometre-long section of an anomalous regional trend. The C conductor on the Mann Lake property consists of three geophysical conductors designated the eastern, central and western conductors. Hole MN-060 was collared 300m south of 2013 hole MN-047, the initial test of the area footwall to the western conductor. MN-047 encountered mineralization at similar depths below an unconformity in semipelite, with 0.7m of 0.114% eU3O8, from 693.8m to 694.5m, and 2.0m of 0.272% eU3O8, from 696.0m to 698.0m.

The 2014, three-rig drill program on Mann Lake was planned as an 18-hole, 13,000 metre program. To date 8 holes have been completed, and 2 are in progress. The drill program is expected to be complete by early April. Drilling is still underway. A presentation on the Mann Lake Uranium Project can be found on the Company's website.

Qualified Person

William Willoughby, Ph.D., P.E. is the Company's Qualified Person for the purposes of National Instrument 43-101 and has prepared or supervised the preparation of the disclosure of any scientific and technical information contained in this news release.

About Mann Lake Uranium Project

The Mann Lake Uranium Project is located in the heart of what is indisputably the most prolific and highest grade uranium region in the world, the Athabasca Basin in Saskatchewan. The Project lies 25 kilometres southwest from Cameco's McArthur River Mine and is 20 kilometres northeast of Cameco's Millennium deposit. High-grade mineralization was intersected during the 2006 drill program in drill hole MN-013 which intersected 7.12% U3O8 over 0.25 metres and 5.53% U3O8 over 0.4 metres in the basement, 12 metres beneath the Athabasca unconformity surface.

About International Enexco Ltd.

International Enexco Ltd is a North American exploration and development company focused on the feasibility stage Contact Copper Project in northern Nevada and the Mann Lake and Bachman Lake Uranium Projects located in Saskatchewan's prolific Athabasca basin. The Mann Lake project is a joint venture with Cameco (52.5%) as operator, Enexco (30%) and AREVA (17.5%)-two of the world's largest uranium companies.

On behalf of the Board of Directors

G. Arnold Armstrong, President & CEO

Certain information regarding the Company including management's assessment of future plans and operations, may constitute forward-looking statements under applicable securities laws and necessarily involve risks associated with mining exploration and development, volatility of prices, currency fluctuations, imprecision of resource estimates, environmental and permitting risks, access to labour and services, competition from other companies and ability to access sufficient capital. Although the Company believe the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. For more information on the Company and the risks and challenges of its business, investors should review their annual filings that are available at www.sedar.com.

Neither The TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. We seek safe harbour.

Contacts:
International Enexco Limited
Spiros Cacos
+1 604 669 8368
[email protected]
www.enexco.ca

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
DX World EXPO, LLC, a Lighthouse Point, Florida-based startup trade show producer and the creator of "DXWorldEXPO® - Digital Transformation Conference & Expo" has announced its executive management team. The team is headed by Levent Selamoglu, who has been named CEO. "Now is the time for a truly global DX event, to bring together the leading minds from the technology world in a conversation about Digital Transformation," he said in making the announcement.
"Space Monkey by Vivent Smart Home is a product that is a distributed cloud-based edge storage network. Vivent Smart Home, our parent company, is a smart home provider that places a lot of hard drives across homes in North America," explained JT Olds, Director of Engineering, and Brandon Crowfeather, Product Manager, at Vivint Smart Home, in this SYS-CON.tv interview at @ThingsExpo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
DevOps is under attack because developers don’t want to mess with infrastructure. They will happily own their code into production, but want to use platforms instead of raw automation. That’s changing the landscape that we understand as DevOps with both architecture concepts (CloudNative) and process redefinition (SRE). Rob Hirschfeld’s recent work in Kubernetes operations has led to the conclusion that containers and related platforms have changed the way we should be thinking about DevOps and...
SYS-CON Events announced today that Conference Guru has been named “Media Sponsor” of the 22nd International Cloud Expo, which will take place on June 5-7, 2018, at the Javits Center in New York, NY. A valuable conference experience generates new contacts, sales leads, potential strategic partners and potential investors; helps gather competitive intelligence and even provides inspiration for new products and services. Conference Guru works with conference organizers to pass great deals to gre...
The Internet of Things will challenge the status quo of how IT and development organizations operate. Or will it? Certainly the fog layer of IoT requires special insights about data ontology, security and transactional integrity. But the developmental challenges are the same: People, Process and Platform. In his session at @ThingsExpo, Craig Sproule, CEO of Metavine, demonstrated how to move beyond today's coding paradigm and shared the must-have mindsets for removing complexity from the develop...
In his Opening Keynote at 21st Cloud Expo, John Considine, General Manager of IBM Cloud Infrastructure, led attendees through the exciting evolution of the cloud. He looked at this major disruption from the perspective of technology, business models, and what this means for enterprises of all sizes. John Considine is General Manager of Cloud Infrastructure Services at IBM. In that role he is responsible for leading IBM’s public cloud infrastructure including strategy, development, and offering m...
Companies are harnessing data in ways we once associated with science fiction. Analysts have access to a plethora of visualization and reporting tools, but considering the vast amount of data businesses collect and limitations of CPUs, end users are forced to design their structures and systems with limitations. Until now. As the cloud toolkit to analyze data has evolved, GPUs have stepped in to massively parallel SQL, visualization and machine learning.
The next XaaS is CICDaaS. Why? Because CICD saves developers a huge amount of time. CD is an especially great option for projects that require multiple and frequent contributions to be integrated. But… securing CICD best practices is an emerging, essential, yet little understood practice for DevOps teams and their Cloud Service Providers. The only way to get CICD to work in a highly secure environment takes collaboration, patience and persistence. Building CICD in the cloud requires rigorous ar...
"Evatronix provides design services to companies that need to integrate the IoT technology in their products but they don't necessarily have the expertise, knowledge and design team to do so," explained Adam Morawiec, VP of Business Development at Evatronix, in this SYS-CON.tv interview at @ThingsExpo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
To get the most out of their data, successful companies are not focusing on queries and data lakes, they are actively integrating analytics into their operations with a data-first application development approach. Real-time adjustments to improve revenues, reduce costs, or mitigate risk rely on applications that minimize latency on a variety of data sources. In his session at @BigDataExpo, Jack Norris, Senior Vice President, Data and Applications at MapR Technologies, reviewed best practices to ...
Widespread fragmentation is stalling the growth of the IIoT and making it difficult for partners to work together. The number of software platforms, apps, hardware and connectivity standards is creating paralysis among businesses that are afraid of being locked into a solution. EdgeX Foundry is unifying the community around a common IoT edge framework and an ecosystem of interoperable components.
"ZeroStack is a startup in Silicon Valley. We're solving a very interesting problem around bringing public cloud convenience with private cloud control for enterprises and mid-size companies," explained Kamesh Pemmaraju, VP of Product Management at ZeroStack, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
Large industrial manufacturing organizations are adopting the agile principles of cloud software companies. The industrial manufacturing development process has not scaled over time. Now that design CAD teams are geographically distributed, centralizing their work is key. With large multi-gigabyte projects, outdated tools have stifled industrial team agility, time-to-market milestones, and impacted P&L stakeholders.
"Akvelon is a software development company and we also provide consultancy services to folks who are looking to scale or accelerate their engineering roadmaps," explained Jeremiah Mothersell, Marketing Manager at Akvelon, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
Enterprises are adopting Kubernetes to accelerate the development and the delivery of cloud-native applications. However, sharing a Kubernetes cluster between members of the same team can be challenging. And, sharing clusters across multiple teams is even harder. Kubernetes offers several constructs to help implement segmentation and isolation. However, these primitives can be complex to understand and apply. As a result, it’s becoming common for enterprises to end up with several clusters. Thi...