Welcome!

News Feed Item

Denison Intersects High Grade Uranium at a New Target Area at Wheeler River

TORONTO, ONTARIO -- (Marketwired) -- 03/20/14 -- Denison Mines Corp. (TSX: DML)(NYSE MKT: DNN) ("Denison" or the "Company") is pleased to announce that high grade, basement hosted uranium mineralization averaging 9.7% eU3O8 over 4.6 metres has been intersected in drill hole WR-556 at the K North target area 3.0 kilometres northwest of the Phoenix deposit at Wheeler River. This new zone of mineralization has been named the Gryphon zone.

Gryphon Zone

Drill hole WR-556 targeted the down-dip extension of weak mineralization in two historic drill holes in the K North area. WR-556 intersected a basement wedge that has been faulted up into the sandstone, and then encountered a large interval of graphitic basement, within which is a zone of alteration and mineralization 140 metres down-dip of the old drill holes. From down-hole total gamma probe results, the high grade portion of the mineralization averages 9.7% eU3O8 over 4.6 meters, using a cut-off grade of 1% eU3O8. The high grade mineralization is flanked by lower grade mineralization on both sides, and the entire interval averages 3.7% eU3O8 over 12.6 metres, using a cut-off grade of 0.1% eU3O8. Figure 1 shows the location of WR-556 relative to the Phoenix deposit and other target areas at Wheeler River.

To view Figure 1, please visit the following link: http://media3.marketwire.com/docs/934493-F1.pdf.

Gryphon Zone Discovery Intersection


Hole-ID             From (m)          To (m)      Length (m)     eU3O8(1)(%)
----------------------------------------------------------------------------
WR-556(2)              691.0           703.6            12.6             3.7
(includes)(3)          696.1           700.7             4.6             9.7
----------------------------------------------------------------------------
Notes:

1.  eU3O8 is radiometric equivalent uranium from a total gamma down-hole
    probe
2.  Intersection interval is composited above a cut-off grade of 0.1% eU3O8
3.  Intersection interval is composited above a cut-off grade of 1.0% eU3O8

The mineralization at the Gryphon zone is approximately 200 metres beneath the sub-Athabasca unconformity and is open in both strike directions and down-dip. As WR-556 is a vertical drill hole and the mineralization is expected to dip moderately, the true thickness is approximately 70% of the intersection length.

The Wheeler River property lies between the McArthur River Mine and Key Lake mill complex in the Athabasca Basin in northern Saskatchewan. Denison is the operator and holds a 60% interest in the project. Cameco Corporation holds a 30% interest and JCU (Canada) Exploration Company, Limited holds the remaining 10% interest.

Qualified Person

The disclosure of a scientific or technical nature contained in this news release was prepared by Steve Blower, P.Geo., Denison's Vice President, Exploration, who is a Qualified Person in accordance with the requirements of NI 43-101. For a description of the quality assurance program and quality control measures applied by Denison, please see Denison's Annual Information Form dated March 14, 2014 filed under the Company's profile on SEDAR at www.sedar.com.

About Denison

Denison is a uranium exploration and development company with interests in exploration and development projects in Canada, Zambia, Namibia, and Mongolia. Including the high grade Phoenix deposits, located on its 60% owned Wheeler project, Denison's exploration project portfolio includes 43 projects and totals approximately 584,000 hectares in the Eastern Athabasca Basin region of Saskatchewan. Denison's interests in Saskatchewan also include a 22.5% ownership interest in the McClean Lake joint venture, which includes several uranium deposits and the McClean Lake uranium mill, one of the world's largest uranium processing facilities, plus a 25.17% interest in the Midwest deposit and a 60% interest in the J Zone deposit on the Waterbury property. Both the Midwest and J Zone deposits are located within 20 kilometres of the McClean Lake mill. Internationally, Denison owns 100% of the conventional heap leach Mutanga project in Zambia, 100% of the uranium/copper/silver Falea project in Mali, a 90% interest in the Dome project in Namibia, and an 85% interest in the in-situ recovery projects held by the Gurvan Saihan joint venture ("GSJV") in Mongolia.

Denison is engaged in mine decommissioning and environmental services through its DES division and is the manager of UPC, a publicly traded company which invests in uranium oxide and uranium hexafluoride.

Cautionary Statements

Certain information contained in this press release constitutes "forward-looking information", within the meaning of the United States Private Securities Litigation Reform Act of 1995 and similar Canadian legislation concerning the business, operations and financial performance and condition of Denison.

Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur", "be achieved" or "has the potential to".

Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made, and they are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Denison to be materially different from those expressed or implied by such forward-looking statements. Denison believes that the expectations reflected in this forward-looking information are reasonable but no assurance can be given that these expectations will prove to be correct and such forward-looking information included in this press release should not be unduly relied upon. This information speaks only as of the date of this press release. In particular, this press release may contain forward-looking information pertaining to the following: the likelihood of completing and benefits to be derived from corporate transactions; the estimates of Denison's mineral reserves and mineral resources; expectations regarding the toll milling of Cigar Lake ores; capital expenditure programs, estimated exploration and development expenditures and reclamation costs; expectations of market prices and costs; supply and demand for uranium ("U3O8"); possible impacts of litigation and regulatory actions on Denison; exploration, development and expansion plans and objectives; expectations regarding adding to its mineral reserves and resources through acquisitions and exploration; and receipt of regulatory approvals, permits and licenses under governmental regulatory regimes.

There can be no assurance that such statements will prove to be accurate, as Denison's actual results and future events could differ materially from those anticipated in this forward-looking information as a result of the factors discussed in or referred to under the heading "Risk Factors" in Denison's Annual Information Form dated March 14, 2014 available at http://www.sedar.com, and in its Form 40-F available at http://www.sec.gov/edgar.shtml.

Accordingly, readers should not place undue reliance on forward-looking statements. These factors are not, and should not be construed as being, exhaustive. Statements relating to "mineral reserves" or "mineral resources" are deemed to be forward-looking information, as they involve the implied assessment, based on certain estimates and assumptions that the mineral reserves and mineral resources described can be profitably produced in the future. The forward-looking information contained in this press release is expressly qualified by this cautionary statement. Denison does not undertake any obligation to publicly update or revise any forward-looking information after the date of this press release to conform such information to actual results or to changes in Denison's expectations except as otherwise required by applicable legislation.

Contacts:
Denison Mines Corp.
Ron Hochstein
President and Chief Executive Officer
(416) 979-1991 ext 232

Denison Mines Corp.
Sophia Shane
Investor Relations
(604) 689-7842
www.denisonmines.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
DX World EXPO, LLC., a Lighthouse Point, Florida-based startup trade show producer and the creator of "DXWorldEXPO® - Digital Transformation Conference & Expo" has announced its executive management team. The team is headed by Levent Selamoglu, who has been named CEO. "Now is the time for a truly global DX event, to bring together the leading minds from the technology world in a conversation about Digital Transformation," he said in making the announcement.
"I think DevOps is now a rambunctious teenager – it’s starting to get a mind of its own, wanting to get its own things but it still needs some adult supervision," explained Thomas Hooker, VP of marketing at CollabNet, in this SYS-CON.tv interview at DevOps Summit at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
"We are still a relatively small software house and we are focusing on certain industries like FinTech, med tech, energy and utilities. We help our customers with their digital transformation," noted Piotr Stawinski, Founder and CEO of EARP Integration, in this SYS-CON.tv interview at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
"We were founded in 2003 and the way we were founded was about good backup and good disaster recovery for our clients, and for the last 20 years we've been pretty consistent with that," noted Marc Malafronte, Territory Manager at StorageCraft, in this SYS-CON.tv interview at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
"We've been engaging with a lot of customers including Panasonic, we've been involved with Cisco and now we're working with the U.S. government - the Department of Homeland Security," explained Peter Jung, Chief Product Officer at Pulzze Systems, in this SYS-CON.tv interview at @ThingsExpo, held June 6-8, 2017, at the Javits Center in New York City, NY.
"We're here to tell the world about our cloud-scale infrastructure that we have at Juniper combined with the world-class security that we put into the cloud," explained Lisa Guess, VP of Systems Engineering at Juniper Networks, in this SYS-CON.tv interview at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
"Peak 10 is a hybrid infrastructure provider across the nation. We are in the thick of things when it comes to hybrid IT," explained , Chief Technology Officer at Peak 10, in this SYS-CON.tv interview at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
"I will be talking about ChatOps and ChatOps as a way to solve some problems in the DevOps space," explained Himanshu Chhetri, CTO of Addteq, in this SYS-CON.tv interview at @DevOpsSummit at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
"We are focused on SAP running in the clouds, to make this super easy because we believe in the tremendous value of those powerful worlds - SAP and the cloud," explained Frank Stienhans, CTO of Ocean9, Inc., in this SYS-CON.tv interview at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
While the focus and objectives of IoT initiatives are many and diverse, they all share a few common attributes, and one of those is the network. Commonly, that network includes the Internet, over which there isn't any real control for performance and availability. Or is there? The current state of the art for Big Data analytics, as applied to network telemetry, offers new opportunities for improving and assuring operational integrity. In his session at @ThingsExpo, Jim Frey, Vice President of S...
"As we've gone out into the public cloud we've seen that over time we may have lost a few things - we've lost control, we've given up cost to a certain extent, and then security, flexibility," explained Steve Conner, VP of Sales at Cloudistics,in this SYS-CON.tv interview at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
Your homes and cars can be automated and self-serviced. Why can't your storage? From simply asking questions to analyze and troubleshoot your infrastructure, to provisioning storage with snapshots, recovery and replication, your wildest sci-fi dream has come true. In his session at @DevOpsSummit at 20th Cloud Expo, Dan Florea, Director of Product Management at Tintri, provided a ChatOps demo where you can talk to your storage and manage it from anywhere, through Slack and similar services with...
The financial services market is one of the most data-driven industries in the world, yet it’s bogged down by legacy CPU technologies that simply can’t keep up with the task of querying and visualizing billions of records. In his session at 20th Cloud Expo, Karthik Lalithraj, a Principal Solutions Architect at Kinetica, discussed how the advent of advanced in-database analytics on the GPU makes it possible to run sophisticated data science workloads on the same database that is housing the rich...
"At the keynote this morning we spoke about the value proposition of Nutanix, of having a DevOps culture and a mindset, and the business outcomes of achieving agility and scale, which everybody here is trying to accomplish," noted Mark Lavi, DevOps Solution Architect at Nutanix, in this SYS-CON.tv interview at @DevOpsSummit at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
"We are an IT services solution provider and we sell software to support those solutions. Our focus and key areas are around security, enterprise monitoring, and continuous delivery optimization," noted John Balsavage, President of A&I Solutions, in this SYS-CON.tv interview at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.