Welcome!

News Feed Item

Lake Shore Gold Identifies New, High-Grade Structures Near Current Mining at Bell Creek Labine Deposit

TORONTO, ONTARIO -- (Marketwired) -- 03/26/14 --


--  New, high-grade intersections reported in previously untested gap in
    Labine Deposit North A Zone and in two new hanging wall structures east
    of current mining (14.12 gram per tonne ("gpt") over 10.2 metres ("m"),
    8.41 gpt over 12.0 m and 7.01 gpt over 10.7 m) 
    
--  Additional new high-grade structure, and intercepts in North A Zone,
    defined near active mining from drilling on 685 Level, intercepts
    include 11.42 gpt over 3.6 m, 8.47 gpt over 4.6 m, 7.76 gpt over 8.7 m,
    5.96 gpt over 6.5 m and 6.38 gpt over 6.0 m 
    
--  Revised resource model for Labine Deposit suggests potential for
    significantly higher grades within slightly narrower structures below
    685 Level 
    
--  Additional drilling to confirm and expand zones below 685 Level in
    progress 

Lake Shore Gold Corp. (TSX:LSG)(NYSE MKT:LSG) ("Lake Shore Gold" or the "Company") today announced the results from 16 new holes (3,718 metres) from drilling at the Bell Creek Mine in the area now called the Labine Deposit, representing all of the mine's currently known zones. The new holes were drilled as part of a program designed to confirm and expand resources below the 685 Level. The program includes approximately 2,593 metres from the 2014 operating and capital budgets of 9,850 metres as well as 1,125 metres from a new 3,750 metre exploration budget announced in January 2014.

Key intersections being reported include 14.12 gpt over 10.2 m in BC610-865, 8.41 gpt over 12.0 m in BC610-911, 7.01 gpt over 10.7 m in BC610-863A and 6.02 gpt over 7.6 m in BC610-872. The drilling, completed from the 610 Level, was concentrated in an untested gap near the east limit of the current resource (Table 1 and Figures 1 and 2). The holes identify new high-grade intercepts within the North A Zone and also define two new hanging wall structures 100 metres to the east of current mining (HW6 and HW7). The new structures identified in the program appear to follow a similar southwest trend as other hanging wall structures being mined further to the west, but with thicker widths and better grades.

Additional results being announced include 11.42 gpt over 3.6 m in BC685-901, 8.47 gpt over 4.6 m in BC685-901, 7.76 gpt over 8.7 m in BC685-860A, 5.96 gpt over 6.5 m in BC685-861 and 6.38 gpt over 6.0 m in BC-685-902. These holes were drilled on the 685 Level in close proximity to active mining. The holes are considered important as they include new high-grade intercepts in the North A Zone and define a third new hanging wall structure from the current drilling that provides additional support for a revised deposit model the company is developing for the mine.

The revised deposit model is based on multiple southwest trending veins branching from the North A Zone rather than previous models which were based mainly on east-west trending zones. The revised model assumes somewhat narrower mining widths but with significantly higher grades for certain zones. By combining the results of previous drilling with the new holes being announced today, the Company has to date identified at least 7 new hanging wall structures, as well as several examples of intercepts from previously drilled holes crossing these new structures where widths could be reduced slightly to increase grades.

Tony Makuch, President and CEO of Lake Shore Gold, commented: "These early results from our 2014 drill program are very encouraging. They include high-grade intercepts in an untested gap in the Labine Deposit and have identified a number of new, high-grade structures near current mining. The results indicate that considerable potential exists to add ounces at Bell Creek, particularly on the hanging wall, as well as to significantly increase average grades in some areas at somewhat narrower widths. We have been very pleased with our operations at Bell Creek, where our average reserve grade was recently increased to 4.7 gpt and where production this year is on track to increase by more than 25%. We have one drill turning presently, which is continuing to test for new zones below the 685 Level, and are in the process of deploying a second drill for the same purpose."

Quality Control

The Qualified Person ("QP") for Lake Shore Gold's drill program at the Bell Creek Mine is Eric Kallio, P.Geo. who, as a QP, has prepared or supervised the preparation of the scientific or technical information for the property and verified the data disclosed in this press release. Mr. Kallio is an employee of Lake Shore Gold.

Lake Shore Gold has a quality control program to ensure best practices in the sampling and analysis of drill core. Normal practice for all programs has been to insert three Quality Control samples including one blank, one certified standard and one reject duplicate at a frequency of every forty drill core samples submitted. The blanks and the certified standards are checked to be within acceptable limits prior to being accepted into the GEMS SQL database. Routine assays have been completed using a standard fire assay with a 30-gram aliquot. For samples that return a value greater than ten grams per tonne gold, the remaining pulp is taken and fire assayed with a gravimetric finish.

Underground drilling at the Bell Creek Mine utilizes two different core sizes including; LTK-48 with a core diameter of 35.3mm (Bazooka drill) and BQ which has a core diameter of 36.4mm (electric drills). Sampling of drill core is conducted in intervals according to geological control (minimum 30cm, maximum 1.5m, averaging 1.0m) with all core being whole core sampled and pulps being stored in cold storage. For select drill holes, core is saw cut, the remaining half is stored in a secure location.

Gold analysis for underground drill core at Bell Creek has utilized three analytical laboratories. All underground drill core is analyzed at either ALS Canada Ltd. (2090 Riverside Drive, Timmins and 2103 Dollarton Hwy, North Vancouver), Activation Lab (1752 Riverside Drive, Timmins) or Lake Shore Gold Corp.'s Bell Creek Complex mill laboratory. ALS Canada Ltd. is ISO 9001:2008 and ISO 17025 certified. Activation Laboratories Ltd. in Timmins is ISO 9001 certified and follows their fully certified main Ancaster, Ontario lab analytical procedures (working towards ISO 17025 CANP4E in early 2014). Lake Shore Gold Corp's Bell Creek mill laboratory is not ISO certified.

About Lake Shore Gold

Lake Shore Gold is a gold mining company that is in production and is generating net free cash flow from its wholly owned operations in the Timmins Gold Camp. The Company is in production at both the Timmins West and Bell Creek mines, with material being delivered for processing to the Bell Creek Mill. In addition to current operations, the Company also has a number of highly prospective projects and exploration targets, all located in and around the Timmins Camp. The Company's common shares trade on the TSX and NYSE MKT under the symbol LSG.

FORWARD-LOOKING STATEMENTS

Certain statements in this press release relating to the Company's expected production levels, production growth, exploration activities, potential for increasing resources, project expenditures and business plans are "forward-looking statements" or "forward-looking information" within the meaning of certain securities laws, including under the provisions of Canadian provincial securities laws and under the United States Private Securities Litigation Reform Act of 1995 and are referred to herein as "forward-looking statements." The Company does not intend, and does not assume any obligation, to update these forward-looking statements. These forward-looking statements represent management's best judgment based on current facts and assumptions that management considers reasonable, including that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts, labour disturbances, interruption in transportation or utilities, or adverse weather conditions, that there are no material unanticipated variations in budgeted costs, that contractors will complete projects according to schedule, and that actual mineralization on properties will be consistent with models and will not be less than identified mineral reserves. The Company makes no representation that reasonable business people in possession of the same information would reach the same conclusions. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. In particular, delays in development or mining and fluctuations in the price of gold or in currency markets could prevent the Company from achieving its targets. Readers should not place undue reliance on forward-looking statements. More information about risks and uncertainties affecting the Company and its business is available in the Company's most recent Annual Information Form and other regulatory filings with the Canadian Securities Administrators, which are posted on sedar at www.sedar.com, or the Company's most recent Annual Report on Form 40-F and other regulatory filings with the Securities and Exchange Commission.


Table 1. New Drilling from 610 Level                                        
----------------------------------------------------------------------------
                                                     Zone  Au Comp          
HOLE-ID          Section     From (m)  To (m)   Width (m)    (gpt)      Zone
----------------------------------------------------------------------------
BC610-863A       5950           143.0   145.2         2.2     3.40       NA2
----------------------------------------------------------------------------
                                167.3   178.0        10.7     7.01       HW6
----------------------------------------------------------------------------
                 inc            167.3   174.0         6.7     9.10          
----------------------------------------------------------------------------
                                201.0   203.2         2.2     3.65        NA
----------------------------------------------------------------------------
BC610-864        5950           154.4   160.0         5.6     4.64       NA2
----------------------------------------------------------------------------
                                180.1   182.7         2.6     2.65       HW6
----------------------------------------------------------------------------
                                213.8   216.0         2.2     5.05        NA
----------------------------------------------------------------------------
BC610-865        5950           174.7   177.0         2.3     4.28       NA2
----------------------------------------------------------------------------
                                190.7   200.9        10.2    14.12       HW6
----------------------------------------------------------------------------
                                230.6   238.9         8.3     5.29       HW8
----------------------------------------------------------------------------
                 inc            230.6   233.0         2.4    10.04          
----------------------------------------------------------------------------
                 inc            236.0   238.9         2.9     4.55          
----------------------------------------------------------------------------
                                257.6   259.6         2.0     2.94       NB2
----------------------------------------------------------------------------
BC610-866        5950           126.2   128.3         2.1     5.39    NA2 HW
----------------------------------------------------------------------------
                                139.2   141.9         2.7     8.00       NA2
----------------------------------------------------------------------------
                                170.5   173.0         2.5     5.08       HW6
----------------------------------------------------------------------------
                                193.7   196.0         2.3     4.07        NA
----------------------------------------------------------------------------
BC610-867        5950           130.0   134.7         4.7     2.47       NA2
----------------------------------------------------------------------------
                                166.1   168.3         2.2     0.36       HW6
----------------------------------------------------------------------------
                                197.1   199.3         2.2     1.15        NA
----------------------------------------------------------------------------
                                219.0   221.4         2.4     3.66       NB2
----------------------------------------------------------------------------
BC610-871        5950           200.0   203.4         3.4     4.95       NA2
----------------------------------------------------------------------------
                                277.3   279.3         2.0     3.26        NA
----------------------------------------------------------------------------
                                353.3   355.6         2.3     6.11        NB
----------------------------------------------------------------------------
BC610-872        5950           185.0   192.6         7.6     6.02       HW6
----------------------------------------------------------------------------
                 inc            185.0   187.9         2.9    10.95          
----------------------------------------------------------------------------
                                255.8   258.9         3.1     3.39        NA
----------------------------------------------------------------------------
                                286.9   290.4         3.5     5.08       NB2
----------------------------------------------------------------------------
BC610-911        5950           210.3   212.3         2.0     1.91       NA2
----------------------------------------------------------------------------
                                243.6   255.6        12.0     8.41       HW7
----------------------------------------------------------------------------
                 inc            243.6   251.0         7.4     9.38          
----------------------------------------------------------------------------
                 inc            253.6   255.6         2.0    13.02          
----------------------------------------------------------------------------
                                286.0   288.0         2.0     1.07        NA
----------------------------------------------------------------------------
                                                                            
Table 2. New Drilling from 685 Level                                        
----------------------------------------------------------------------------
                                                     Zone   Au Comp         
HOLE-ID         Section     From (m)   To (m)   Width (m)     (gpt)     Zone
----------------------------------------------------------------------------
BC685-860A                      73.3     75.3         2.0      3.97      HW5
----------------------------------------------------------------------------
                                82.4     84.5         2.1      3.51      NW4
----------------------------------------------------------------------------
                               126.2    134.9         8.7      7.76       NA
----------------------------------------------------------------------------
BC685-861                       87.5     90.0         2.5      4.18      HW4
----------------------------------------------------------------------------
                               129.7    136.2         6.5      5.96       NA
----------------------------------------------------------------------------
                inc            132.8    136.2         3.4      8.93         
----------------------------------------------------------------------------
                               155.4    160.7         5.3      2.75      NB2
----------------------------------------------------------------------------
                inc            155.4    157.6         2.2      3.63         
----------------------------------------------------------------------------
BC685-901       5862             0.0      3.6         3.6     11.42       NA
----------------------------------------------------------------------------
                                 7.7     10.1         2.4     11.11      HW2
----------------------------------------------------------------------------
                                13.0     17.6         4.6      8.47      HW3
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
BC685-902       5850             0.0      6.0         6.0      6.38       NA
----------------------------------------------------------------------------
                                 7.7     10.2         2.5      0.36      HW2
----------------------------------------------------------------------------
                                23.4     25.6         2.2      5.07      HW3
----------------------------------------------------------------------------
                                34.8     38.0         3.2      3.05      HW4
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
BC685-903       5837            11.5     13.8         2.3      7.23      HW2
----------------------------------------------------------------------------
                                25.0     27.0         2.0      4.37      HW3
----------------------------------------------------------------------------
                                34.6     36.6         2.0      1.95      HW4
----------------------------------------------------------------------------
                                39.0     41.2         2.2      1.39      HW5
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Notes:  1. Zones in BC685-904 and BC905 cut off by faulting and BC685-862   
        only low grades.                                                    
        2. Assays are uncut and true widths are not reported.               
        3. Intersections in BC685-901 and BC685-902 are partial intercepts  
        (holes were drilled from new development in North A Zone).          

To view 'Figure 1: Geology Map', please visit the following link: http://media3.marketwire.com/docs/lakefig10325.pdf

To view 'Figure 2: Cross Section (5950E)', please visit the following link: http://media3.marketwire.com/docs/lakefig20325.pdf

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
The Internet giants are fully embracing AI. All the services they offer to their customers are aimed at drawing a map of the world with the data they get. The AIs from these companies are used to build disruptive approaches that cannot be used by established enterprises, which are threatened by these disruptions. However, most leaders underestimate the effect this will have on their businesses. In his session at 21st Cloud Expo, Rene Buest, Director Market Research & Technology Evangelism at Ara...
In his session at @ThingsExpo, Eric Lachapelle, CEO of the Professional Evaluation and Certification Board (PECB), provided an overview of various initiatives to certify the security of connected devices and future trends in ensuring public trust of IoT. Eric Lachapelle is the Chief Executive Officer of the Professional Evaluation and Certification Board (PECB), an international certification body. His role is to help companies and individuals to achieve professional, accredited and worldwide re...
It is ironic, but perhaps not unexpected, that many organizations who want the benefits of using an Agile approach to deliver software use a waterfall approach to adopting Agile practices: they form plans, they set milestones, and they measure progress by how many teams they have engaged. Old habits die hard, but like most waterfall software projects, most waterfall-style Agile adoption efforts fail to produce the results desired. The problem is that to get the results they want, they have to ch...
Cloud Expo, Inc. has announced today that Andi Mann and Aruna Ravichandran have been named Co-Chairs of @DevOpsSummit at Cloud Expo Silicon Valley which will take place Oct. 31-Nov. 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. "DevOps is at the intersection of technology and business-optimizing tools, organizations and processes to bring measurable improvements in productivity and profitability," said Aruna Ravichandran, vice president, DevOps product and solutions marketing...
"Loom is applying artificial intelligence and machine learning into the entire log analysis process, from start to finish and at the end you will get a human touch,” explained Sabo Taylor Diab, Vice President, Marketing at Loom Systems, in this SYS-CON.tv interview at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
Wooed by the promise of faster innovation, lower TCO, and greater agility, businesses of every shape and size have embraced the cloud at every layer of the IT stack – from apps to file sharing to infrastructure. The typical organization currently uses more than a dozen sanctioned cloud apps and will shift more than half of all workloads to the cloud by 2018. Such cloud investments have delivered measurable benefits. But they’ve also resulted in some unintended side-effects: complexity and risk. ...
"We are a monitoring company. We work with Salesforce, BBC, and quite a few other big logos. We basically provide monitoring for them, structure for their cloud services and we fit into the DevOps world" explained David Gildeh, Co-founder and CEO of Outlyer, in this SYS-CON.tv interview at DevOps Summit at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
21st International Cloud Expo, taking place October 31 - November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA, will feature technical sessions from a rock star conference faculty and the leading industry players in the world. Cloud computing is now being embraced by a majority of enterprises of all sizes. Yesterday's debate about public vs. private has transformed into the reality of hybrid cloud: a recent survey shows that 74% of enterprises have a hybrid cloud strategy. Me...
With major technology companies and startups seriously embracing Cloud strategies, now is the perfect time to attend 21st Cloud Expo October 31 - November 2, 2017, at the Santa Clara Convention Center, CA, and June 12-14, 2018, at the Javits Center in New York City, NY, and learn what is going on, contribute to the discussions, and ensure that your enterprise is on the right path to Digital Transformation.
SYS-CON Events announced today that Enzu will exhibit at SYS-CON's 21st Int\ernational Cloud Expo®, which will take place October 31-November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Enzu’s mission is to be the leading provider of enterprise cloud solutions worldwide. Enzu enables online businesses to use its IT infrastructure to their competitive advantage. By offering a suite of proven hosting and management services, Enzu wants companies to focus on the core of their ...
DevOps at Cloud Expo, taking place October 31 - November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with 21st Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to w...
In 2014, Amazon announced a new form of compute called Lambda. We didn't know it at the time, but this represented a fundamental shift in what we expect from cloud computing. Now, all of the major cloud computing vendors want to take part in this disruptive technology. In his session at 20th Cloud Expo, Doug Vanderweide, an instructor at Linux Academy, discussed why major players like AWS, Microsoft Azure, IBM Bluemix, and Google Cloud Platform are all trying to sidestep VMs and containers wit...
With major technology companies and startups seriously embracing Cloud strategies, now is the perfect time to attend 21st Cloud Expo October 31 - November 2, 2017, at the Santa Clara Convention Center, CA, and June 12-14, 2018, at the Javits Center in New York City, NY, and learn what is going on, contribute to the discussions, and ensure that your enterprise is on the right path to Digital Transformation.
Internet of @ThingsExpo, taking place October 31 - November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with 21st Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world. The Internet of Things (IoT) is the most profound change in personal and enterprise IT since the creation of the Worldwide Web more than 20 years ago. All major researchers estimate there will be tens of billions devic...
Amazon started as an online bookseller 20 years ago. Since then, it has evolved into a technology juggernaut that has disrupted multiple markets and industries and touches many aspects of our lives. It is a relentless technology and business model innovator driving disruption throughout numerous ecosystems. Amazon’s AWS revenues alone are approaching $16B a year making it one of the largest IT companies in the world. With dominant offerings in Cloud, IoT, eCommerce, Big Data, AI, Digital Assista...