Welcome!

News Feed Item

Lake Shore Gold Identifies New, High-Grade Structures Near Current Mining at Bell Creek Labine Deposit

TORONTO, ONTARIO -- (Marketwired) -- 03/26/14 --

--  New, high-grade intersections reported in previously untested gap in
    Labine Deposit North A Zone and in two new hanging wall structures east
    of current mining (14.12 gram per tonne ("gpt") over 10.2 metres ("m"),
    8.41 gpt over 12.0 m and 7.01 gpt over 10.7 m)

--  Additional new high-grade structure, and intercepts in North A Zone,
    defined near active mining from drilling on 685 Level, intercepts
    include 11.42 gpt over 3.6 m, 8.47 gpt over 4.6 m, 7.76 gpt over 8.7 m,
    5.96 gpt over 6.5 m and 6.38 gpt over 6.0 m

--  Revised resource model for Labine Deposit suggests potential for
    significantly higher grades within slightly narrower structures below
    685 Level

--  Additional drilling to confirm and expand zones below 685 Level in
    progress

Lake Shore Gold Corp. (TSX: LSG)(NYSE MKT: LSG) ("Lake Shore Gold" or the "Company") today announced the results from 16 new holes (3,718 metres) from drilling at the Bell Creek Mine in the area now called the Labine Deposit, representing all of the mine's currently known zones. The new holes were drilled as part of a program designed to confirm and expand resources below the 685 Level. The program includes approximately 2,593 metres from the 2014 operating and capital budgets of 9,850 metres as well as 1,125 metres from a new 3,750 metre exploration budget announced in January 2014.

Key intersections being reported include 14.12 gpt over 10.2 m in BC610-865, 8.41 gpt over 12.0 m in BC610-911, 7.01 gpt over 10.7 m in BC610-863A and 6.02 gpt over 7.6 m in BC610-872. The drilling, completed from the 610 Level, was concentrated in an untested gap near the east limit of the current resource (Table 1 and Figures 1 and 2). The holes identify new high-grade intercepts within the North A Zone and also define two new hanging wall structures 100 metres to the east of current mining (HW6 and HW7). The new structures identified in the program appear to follow a similar southwest trend as other hanging wall structures being mined further to the west, but with thicker widths and better grades.

Additional results being announced include 11.42 gpt over 3.6 m in BC685-901, 8.47 gpt over 4.6 m in BC685-901, 7.76 gpt over 8.7 m in BC685-860A, 5.96 gpt over 6.5 m in BC685-861 and 6.38 gpt over 6.0 m in BC-685-902. These holes were drilled on the 685 Level in close proximity to active mining. The holes are considered important as they include new high-grade intercepts in the North A Zone and define a third new hanging wall structure from the current drilling that provides additional support for a revised deposit model the company is developing for the mine.

The revised deposit model is based on multiple southwest trending veins branching from the North A Zone rather than previous models which were based mainly on east-west trending zones. The revised model assumes somewhat narrower mining widths but with significantly higher grades for certain zones. By combining the results of previous drilling with the new holes being announced today, the Company has to date identified at least 7 new hanging wall structures, as well as several examples of intercepts from previously drilled holes crossing these new structures where widths could be reduced slightly to increase grades.

Tony Makuch, President and CEO of Lake Shore Gold, commented: "These early results from our 2014 drill program are very encouraging. They include high-grade intercepts in an untested gap in the Labine Deposit and have identified a number of new, high-grade structures near current mining. The results indicate that considerable potential exists to add ounces at Bell Creek, particularly on the hanging wall, as well as to significantly increase average grades in some areas at somewhat narrower widths. We have been very pleased with our operations at Bell Creek, where our average reserve grade was recently increased to 4.7 gpt and where production this year is on track to increase by more than 25%. We have one drill turning presently, which is continuing to test for new zones below the 685 Level, and are in the process of deploying a second drill for the same purpose."

Quality Control

The Qualified Person ("QP") for Lake Shore Gold's drill program at the Bell Creek Mine is Eric Kallio, P.Geo. who, as a QP, has prepared or supervised the preparation of the scientific or technical information for the property and verified the data disclosed in this press release. Mr. Kallio is an employee of Lake Shore Gold.

Lake Shore Gold has a quality control program to ensure best practices in the sampling and analysis of drill core. Normal practice for all programs has been to insert three Quality Control samples including one blank, one certified standard and one reject duplicate at a frequency of every forty drill core samples submitted. The blanks and the certified standards are checked to be within acceptable limits prior to being accepted into the GEMS SQL database. Routine assays have been completed using a standard fire assay with a 30-gram aliquot. For samples that return a value greater than ten grams per tonne gold, the remaining pulp is taken and fire assayed with a gravimetric finish.

Underground drilling at the Bell Creek Mine utilizes two different core sizes including; LTK-48 with a core diameter of 35.3mm (Bazooka drill) and BQ which has a core diameter of 36.4mm (electric drills). Sampling of drill core is conducted in intervals according to geological control (minimum 30cm, maximum 1.5m, averaging 1.0m) with all core being whole core sampled and pulps being stored in cold storage. For select drill holes, core is saw cut, the remaining half is stored in a secure location.

Gold analysis for underground drill core at Bell Creek has utilized three analytical laboratories. All underground drill core is analyzed at either ALS Canada Ltd. (2090 Riverside Drive, Timmins and 2103 Dollarton Hwy, North Vancouver), Activation Lab (1752 Riverside Drive, Timmins) or Lake Shore Gold Corp.'s Bell Creek Complex mill laboratory. ALS Canada Ltd. is ISO 9001:2008 and ISO 17025 certified. Activation Laboratories Ltd. in Timmins is ISO 9001 certified and follows their fully certified main Ancaster, Ontario lab analytical procedures (working towards ISO 17025 CANP4E in early 2014). Lake Shore Gold Corp's Bell Creek mill laboratory is not ISO certified.

About Lake Shore Gold

Lake Shore Gold is a gold mining company that is in production and is generating net free cash flow from its wholly owned operations in the Timmins Gold Camp. The Company is in production at both the Timmins West and Bell Creek mines, with material being delivered for processing to the Bell Creek Mill. In addition to current operations, the Company also has a number of highly prospective projects and exploration targets, all located in and around the Timmins Camp. The Company's common shares trade on the TSX and NYSE MKT under the symbol LSG.

FORWARD-LOOKING STATEMENTS

Certain statements in this press release relating to the Company's expected production levels, production growth, exploration activities, potential for increasing resources, project expenditures and business plans are "forward-looking statements" or "forward-looking information" within the meaning of certain securities laws, including under the provisions of Canadian provincial securities laws and under the United States Private Securities Litigation Reform Act of 1995 and are referred to herein as "forward-looking statements." The Company does not intend, and does not assume any obligation, to update these forward-looking statements. These forward-looking statements represent management's best judgment based on current facts and assumptions that management considers reasonable, including that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts, labour disturbances, interruption in transportation or utilities, or adverse weather conditions, that there are no material unanticipated variations in budgeted costs, that contractors will complete projects according to schedule, and that actual mineralization on properties will be consistent with models and will not be less than identified mineral reserves. The Company makes no representation that reasonable business people in possession of the same information would reach the same conclusions. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. In particular, delays in development or mining and fluctuations in the price of gold or in currency markets could prevent the Company from achieving its targets. Readers should not place undue reliance on forward-looking statements. More information about risks and uncertainties affecting the Company and its business is available in the Company's most recent Annual Information Form and other regulatory filings with the Canadian Securities Administrators, which are posted on sedar at www.sedar.com, or the Company's most recent Annual Report on Form 40-F and other regulatory filings with the Securities and Exchange Commission.

Table 1. New Drilling from 610 Level
----------------------------------------------------------------------------
                                                     Zone  Au Comp
HOLE-ID          Section     From (m)  To (m)   Width (m)    (gpt)      Zone
----------------------------------------------------------------------------
BC610-863A       5950           143.0   145.2         2.2     3.40       NA2
----------------------------------------------------------------------------
                                167.3   178.0        10.7     7.01       HW6
----------------------------------------------------------------------------
                 inc            167.3   174.0         6.7     9.10
----------------------------------------------------------------------------
                                201.0   203.2         2.2     3.65        NA
----------------------------------------------------------------------------
BC610-864        5950           154.4   160.0         5.6     4.64       NA2
----------------------------------------------------------------------------
                                180.1   182.7         2.6     2.65       HW6
----------------------------------------------------------------------------
                                213.8   216.0         2.2     5.05        NA
----------------------------------------------------------------------------
BC610-865        5950           174.7   177.0         2.3     4.28       NA2
----------------------------------------------------------------------------
                                190.7   200.9        10.2    14.12       HW6
----------------------------------------------------------------------------
                                230.6   238.9         8.3     5.29       HW8
----------------------------------------------------------------------------
                 inc            230.6   233.0         2.4    10.04
----------------------------------------------------------------------------
                 inc            236.0   238.9         2.9     4.55
----------------------------------------------------------------------------
                                257.6   259.6         2.0     2.94       NB2
----------------------------------------------------------------------------
BC610-866        5950           126.2   128.3         2.1     5.39    NA2 HW
----------------------------------------------------------------------------
                                139.2   141.9         2.7     8.00       NA2
----------------------------------------------------------------------------
                                170.5   173.0         2.5     5.08       HW6
----------------------------------------------------------------------------
                                193.7   196.0         2.3     4.07        NA
----------------------------------------------------------------------------
BC610-867        5950           130.0   134.7         4.7     2.47       NA2
----------------------------------------------------------------------------
                                166.1   168.3         2.2     0.36       HW6
----------------------------------------------------------------------------
                                197.1   199.3         2.2     1.15        NA
----------------------------------------------------------------------------
                                219.0   221.4         2.4     3.66       NB2
----------------------------------------------------------------------------
BC610-871        5950           200.0   203.4         3.4     4.95       NA2
----------------------------------------------------------------------------
                                277.3   279.3         2.0     3.26        NA
----------------------------------------------------------------------------
                                353.3   355.6         2.3     6.11        NB
----------------------------------------------------------------------------
BC610-872        5950           185.0   192.6         7.6     6.02       HW6
----------------------------------------------------------------------------
                 inc            185.0   187.9         2.9    10.95
----------------------------------------------------------------------------
                                255.8   258.9         3.1     3.39        NA
----------------------------------------------------------------------------
                                286.9   290.4         3.5     5.08       NB2
----------------------------------------------------------------------------
BC610-911        5950           210.3   212.3         2.0     1.91       NA2
----------------------------------------------------------------------------
                                243.6   255.6        12.0     8.41       HW7
----------------------------------------------------------------------------
                 inc            243.6   251.0         7.4     9.38
----------------------------------------------------------------------------
                 inc            253.6   255.6         2.0    13.02
----------------------------------------------------------------------------
                                286.0   288.0         2.0     1.07        NA
----------------------------------------------------------------------------

Table 2. New Drilling from 685 Level
----------------------------------------------------------------------------
                                                     Zone   Au Comp
HOLE-ID         Section     From (m)   To (m)   Width (m)     (gpt)     Zone
----------------------------------------------------------------------------
BC685-860A                      73.3     75.3         2.0      3.97      HW5
----------------------------------------------------------------------------
                                82.4     84.5         2.1      3.51      NW4
----------------------------------------------------------------------------
                               126.2    134.9         8.7      7.76       NA
----------------------------------------------------------------------------
BC685-861                       87.5     90.0         2.5      4.18      HW4
----------------------------------------------------------------------------
                               129.7    136.2         6.5      5.96       NA
----------------------------------------------------------------------------
                inc            132.8    136.2         3.4      8.93
----------------------------------------------------------------------------
                               155.4    160.7         5.3      2.75      NB2
----------------------------------------------------------------------------
                inc            155.4    157.6         2.2      3.63
----------------------------------------------------------------------------
BC685-901       5862             0.0      3.6         3.6     11.42       NA
----------------------------------------------------------------------------
                                 7.7     10.1         2.4     11.11      HW2
----------------------------------------------------------------------------
                                13.0     17.6         4.6      8.47      HW3
----------------------------------------------------------------------------

----------------------------------------------------------------------------
BC685-902       5850             0.0      6.0         6.0      6.38       NA
----------------------------------------------------------------------------
                                 7.7     10.2         2.5      0.36      HW2
----------------------------------------------------------------------------
                                23.4     25.6         2.2      5.07      HW3
----------------------------------------------------------------------------
                                34.8     38.0         3.2      3.05      HW4
----------------------------------------------------------------------------

----------------------------------------------------------------------------
BC685-903       5837            11.5     13.8         2.3      7.23      HW2
----------------------------------------------------------------------------
                                25.0     27.0         2.0      4.37      HW3
----------------------------------------------------------------------------
                                34.6     36.6         2.0      1.95      HW4
----------------------------------------------------------------------------
                                39.0     41.2         2.2      1.39      HW5
----------------------------------------------------------------------------

----------------------------------------------------------------------------
Notes:  1. Zones in BC685-904 and BC905 cut off by faulting and BC685-862
        only low grades.
        2. Assays are uncut and true widths are not reported.
        3. Intersections in BC685-901 and BC685-902 are partial intercepts
        (holes were drilled from new development in North A Zone).

To view 'Figure 1: Geology Map', please visit the following link: http://media3.marketwire.com/docs/lakefig10325.pdf

To view 'Figure 2: Cross Section (5950E)', please visit the following link: http://media3.marketwire.com/docs/lakefig20325.pdf

Contacts:
Lake Shore Gold Corp.
Tony Makuch
President & CEO
(416) 703-6298
[email protected]

Lake Shore Gold Corp.
Mark Utting
Vice-President, Investor Relations
(416) 703-6298
[email protected]
www.lsgold.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Charles Araujo is an industry analyst, internationally recognized authority on the Digital Enterprise and author of The Quantum Age of IT: Why Everything You Know About IT is About to Change. As Principal Analyst with Intellyx, he writes, speaks and advises organizations on how to navigate through this time of disruption. He is also the founder of The Institute for Digital Transformation and a sought after keynote speaker. He has been a regular contributor to both InformationWeek and CIO Insight...
For better or worse, DevOps has gone mainstream. All doubt was removed when IBM and HP threw up their respective DevOps microsites. Where are we on the hype cycle? It's hard to say for sure but there's a feeling we're heading for the "Peak of Inflated Expectations." What does this mean for the enterprise? Should they avoid DevOps? Definitely not. Should they be cautious though? Absolutely. The truth is that DevOps and the enterprise are at best strange bedfellows. The movement has its roots in t...
DXWorldEXPO LLC, the producer of the world's most influential technology conferences and trade shows has announced the 22nd International CloudEXPO | DXWorldEXPO "Early Bird Registration" is now open. Register for Full Conference "Gold Pass" ▸ Here (Expo Hall ▸ Here)
Join IBM November 1 at 21st Cloud Expo at the Santa Clara Convention Center in Santa Clara, CA, and learn how IBM Watson can bring cognitive services and AI to intelligent, unmanned systems. Cognitive analysis impacts today’s systems with unparalleled ability that were previously available only to manned, back-end operations. Thanks to cloud processing, IBM Watson can bring cognitive services and AI to intelligent, unmanned systems. Imagine a robot vacuum that becomes your personal assistant tha...
Your homes and cars can be automated and self-serviced. Why can't your storage? From simply asking questions to analyze and troubleshoot your infrastructure, to provisioning storage with snapshots, recovery and replication, your wildest sci-fi dream has come true. In his session at @DevOpsSummit at 20th Cloud Expo, Dan Florea, Director of Product Management at Tintri, provided a ChatOps demo where you can talk to your storage and manage it from anywhere, through Slack and similar services with...
Containers are rapidly finding their way into enterprise data centers, but change is difficult. How do enterprises transform their architecture with technologies like containers without losing the reliable components of their current solutions? In his session at @DevOpsSummit at 21st Cloud Expo, Tony Campbell, Director, Educational Services at CoreOS, will explore the challenges organizations are facing today as they move to containers and go over how Kubernetes applications can deploy with lega...
In their session at @DevOpsSummit at 21st Cloud Expo, Michael Berman, VP Engineering at TidalScale, and Ivo Jimenez, Engineer at TidalScale, will describe how automating tests in TidalScale is easy thanks to WaveRunner. They will show how they use WaveRunner, Jenkins, and Docker to have agile delivery of TidalScale. Michael Berman is VP Engineering at TidalScale. TidalScale is developing a scale up compute and resource architecture for customers to perform big data exploration and real time anal...
I think DevOps is now a rambunctious teenager - it's starting to get a mind of its own, wanting to get its own things but it still needs some adult supervision," explained Thomas Hooker, VP of marketing at CollabNet, in this SYS-CON.tv interview at DevOps Summit at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
"MobiDev is a software development company and we do complex, custom software development for everybody from entrepreneurs to large enterprises," explained Alan Winters, U.S. Head of Business Development at MobiDev, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
"With Digital Experience Monitoring what used to be a simple visit to a web page has exploded into app on phones, data from social media feeds, competitive benchmarking - these are all components that are only available because of some type of digital asset," explained Leo Vasiliou, Director of Web Performance Engineering at Catchpoint Systems, in this SYS-CON.tv interview at DevOps Summit at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
The “Digital Era” is forcing us to engage with new methods to build, operate and maintain applications. This transformation also implies an evolution to more and more intelligent applications to better engage with the customers, while creating significant market differentiators. In both cases, the cloud has become a key enabler to embrace this digital revolution. So, moving to the cloud is no longer the question; the new questions are HOW and WHEN. To make this equation even more complex, most ...
Recently, WebRTC has a lot of eyes from market. The use cases of WebRTC are expanding - video chat, online education, online health care etc. Not only for human-to-human communication, but also IoT use cases such as machine to human use cases can be seen recently. One of the typical use-case is remote camera monitoring. With WebRTC, people can have interoperability and flexibility for deploying monitoring service. However, the benefit of WebRTC for IoT is not only its convenience and interopera...
Learn how to solve the problem of keeping files in sync between multiple Docker containers. In his session at 16th Cloud Expo, Aaron Brongersma, Senior Infrastructure Engineer at Modulus, discussed using rsync, GlusterFS, EBS and Bit Torrent Sync. He broke down the tools that are needed to help create a seamless user experience. In the end, can we have an environment where we can easily move Docker containers, servers, and volumes without impacting our applications? He shared his results so yo...
Creating replica copies to tolerate a certain number of failures is easy, but very expensive at cloud-scale. Conventional RAID has lower overhead, but it is limited in the number of failures it can tolerate. And the management is like herding cats (overseeing capacity, rebuilds, migrations, and degraded performance). In his general session at 18th Cloud Expo, Scott Cleland, Senior Director of Product Marketing for the HGST Cloud Infrastructure Business Unit, discussed how a new approach is neces...
"This week we're really focusing on scalability, asset preservation and how do you back up to the cloud and in the cloud with object storage, which is really a new way of attacking dealing with your file, your blocked data, where you put it and how you access it," stated Jeff Greenwald, Senior Director of Market Development at HGST, in this SYS-CON.tv interview at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York City, NY.