Welcome!

News Feed Item

Lake Shore Gold Identifies New, High-Grade Structures Near Current Mining at Bell Creek Labine Deposit

TORONTO, ONTARIO -- (Marketwired) -- 03/26/14 --

--  New, high-grade intersections reported in previously untested gap in
    Labine Deposit North A Zone and in two new hanging wall structures east
    of current mining (14.12 gram per tonne ("gpt") over 10.2 metres ("m"),
    8.41 gpt over 12.0 m and 7.01 gpt over 10.7 m)

--  Additional new high-grade structure, and intercepts in North A Zone,
    defined near active mining from drilling on 685 Level, intercepts
    include 11.42 gpt over 3.6 m, 8.47 gpt over 4.6 m, 7.76 gpt over 8.7 m,
    5.96 gpt over 6.5 m and 6.38 gpt over 6.0 m

--  Revised resource model for Labine Deposit suggests potential for
    significantly higher grades within slightly narrower structures below
    685 Level

--  Additional drilling to confirm and expand zones below 685 Level in
    progress

Lake Shore Gold Corp. (TSX: LSG)(NYSE MKT: LSG) ("Lake Shore Gold" or the "Company") today announced the results from 16 new holes (3,718 metres) from drilling at the Bell Creek Mine in the area now called the Labine Deposit, representing all of the mine's currently known zones. The new holes were drilled as part of a program designed to confirm and expand resources below the 685 Level. The program includes approximately 2,593 metres from the 2014 operating and capital budgets of 9,850 metres as well as 1,125 metres from a new 3,750 metre exploration budget announced in January 2014.

Key intersections being reported include 14.12 gpt over 10.2 m in BC610-865, 8.41 gpt over 12.0 m in BC610-911, 7.01 gpt over 10.7 m in BC610-863A and 6.02 gpt over 7.6 m in BC610-872. The drilling, completed from the 610 Level, was concentrated in an untested gap near the east limit of the current resource (Table 1 and Figures 1 and 2). The holes identify new high-grade intercepts within the North A Zone and also define two new hanging wall structures 100 metres to the east of current mining (HW6 and HW7). The new structures identified in the program appear to follow a similar southwest trend as other hanging wall structures being mined further to the west, but with thicker widths and better grades.

Additional results being announced include 11.42 gpt over 3.6 m in BC685-901, 8.47 gpt over 4.6 m in BC685-901, 7.76 gpt over 8.7 m in BC685-860A, 5.96 gpt over 6.5 m in BC685-861 and 6.38 gpt over 6.0 m in BC-685-902. These holes were drilled on the 685 Level in close proximity to active mining. The holes are considered important as they include new high-grade intercepts in the North A Zone and define a third new hanging wall structure from the current drilling that provides additional support for a revised deposit model the company is developing for the mine.

The revised deposit model is based on multiple southwest trending veins branching from the North A Zone rather than previous models which were based mainly on east-west trending zones. The revised model assumes somewhat narrower mining widths but with significantly higher grades for certain zones. By combining the results of previous drilling with the new holes being announced today, the Company has to date identified at least 7 new hanging wall structures, as well as several examples of intercepts from previously drilled holes crossing these new structures where widths could be reduced slightly to increase grades.

Tony Makuch, President and CEO of Lake Shore Gold, commented: "These early results from our 2014 drill program are very encouraging. They include high-grade intercepts in an untested gap in the Labine Deposit and have identified a number of new, high-grade structures near current mining. The results indicate that considerable potential exists to add ounces at Bell Creek, particularly on the hanging wall, as well as to significantly increase average grades in some areas at somewhat narrower widths. We have been very pleased with our operations at Bell Creek, where our average reserve grade was recently increased to 4.7 gpt and where production this year is on track to increase by more than 25%. We have one drill turning presently, which is continuing to test for new zones below the 685 Level, and are in the process of deploying a second drill for the same purpose."

Quality Control

The Qualified Person ("QP") for Lake Shore Gold's drill program at the Bell Creek Mine is Eric Kallio, P.Geo. who, as a QP, has prepared or supervised the preparation of the scientific or technical information for the property and verified the data disclosed in this press release. Mr. Kallio is an employee of Lake Shore Gold.

Lake Shore Gold has a quality control program to ensure best practices in the sampling and analysis of drill core. Normal practice for all programs has been to insert three Quality Control samples including one blank, one certified standard and one reject duplicate at a frequency of every forty drill core samples submitted. The blanks and the certified standards are checked to be within acceptable limits prior to being accepted into the GEMS SQL database. Routine assays have been completed using a standard fire assay with a 30-gram aliquot. For samples that return a value greater than ten grams per tonne gold, the remaining pulp is taken and fire assayed with a gravimetric finish.

Underground drilling at the Bell Creek Mine utilizes two different core sizes including; LTK-48 with a core diameter of 35.3mm (Bazooka drill) and BQ which has a core diameter of 36.4mm (electric drills). Sampling of drill core is conducted in intervals according to geological control (minimum 30cm, maximum 1.5m, averaging 1.0m) with all core being whole core sampled and pulps being stored in cold storage. For select drill holes, core is saw cut, the remaining half is stored in a secure location.

Gold analysis for underground drill core at Bell Creek has utilized three analytical laboratories. All underground drill core is analyzed at either ALS Canada Ltd. (2090 Riverside Drive, Timmins and 2103 Dollarton Hwy, North Vancouver), Activation Lab (1752 Riverside Drive, Timmins) or Lake Shore Gold Corp.'s Bell Creek Complex mill laboratory. ALS Canada Ltd. is ISO 9001:2008 and ISO 17025 certified. Activation Laboratories Ltd. in Timmins is ISO 9001 certified and follows their fully certified main Ancaster, Ontario lab analytical procedures (working towards ISO 17025 CANP4E in early 2014). Lake Shore Gold Corp's Bell Creek mill laboratory is not ISO certified.

About Lake Shore Gold

Lake Shore Gold is a gold mining company that is in production and is generating net free cash flow from its wholly owned operations in the Timmins Gold Camp. The Company is in production at both the Timmins West and Bell Creek mines, with material being delivered for processing to the Bell Creek Mill. In addition to current operations, the Company also has a number of highly prospective projects and exploration targets, all located in and around the Timmins Camp. The Company's common shares trade on the TSX and NYSE MKT under the symbol LSG.

FORWARD-LOOKING STATEMENTS

Certain statements in this press release relating to the Company's expected production levels, production growth, exploration activities, potential for increasing resources, project expenditures and business plans are "forward-looking statements" or "forward-looking information" within the meaning of certain securities laws, including under the provisions of Canadian provincial securities laws and under the United States Private Securities Litigation Reform Act of 1995 and are referred to herein as "forward-looking statements." The Company does not intend, and does not assume any obligation, to update these forward-looking statements. These forward-looking statements represent management's best judgment based on current facts and assumptions that management considers reasonable, including that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts, labour disturbances, interruption in transportation or utilities, or adverse weather conditions, that there are no material unanticipated variations in budgeted costs, that contractors will complete projects according to schedule, and that actual mineralization on properties will be consistent with models and will not be less than identified mineral reserves. The Company makes no representation that reasonable business people in possession of the same information would reach the same conclusions. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. In particular, delays in development or mining and fluctuations in the price of gold or in currency markets could prevent the Company from achieving its targets. Readers should not place undue reliance on forward-looking statements. More information about risks and uncertainties affecting the Company and its business is available in the Company's most recent Annual Information Form and other regulatory filings with the Canadian Securities Administrators, which are posted on sedar at www.sedar.com, or the Company's most recent Annual Report on Form 40-F and other regulatory filings with the Securities and Exchange Commission.

Table 1. New Drilling from 610 Level
----------------------------------------------------------------------------
                                                     Zone  Au Comp
HOLE-ID          Section     From (m)  To (m)   Width (m)    (gpt)      Zone
----------------------------------------------------------------------------
BC610-863A       5950           143.0   145.2         2.2     3.40       NA2
----------------------------------------------------------------------------
                                167.3   178.0        10.7     7.01       HW6
----------------------------------------------------------------------------
                 inc            167.3   174.0         6.7     9.10
----------------------------------------------------------------------------
                                201.0   203.2         2.2     3.65        NA
----------------------------------------------------------------------------
BC610-864        5950           154.4   160.0         5.6     4.64       NA2
----------------------------------------------------------------------------
                                180.1   182.7         2.6     2.65       HW6
----------------------------------------------------------------------------
                                213.8   216.0         2.2     5.05        NA
----------------------------------------------------------------------------
BC610-865        5950           174.7   177.0         2.3     4.28       NA2
----------------------------------------------------------------------------
                                190.7   200.9        10.2    14.12       HW6
----------------------------------------------------------------------------
                                230.6   238.9         8.3     5.29       HW8
----------------------------------------------------------------------------
                 inc            230.6   233.0         2.4    10.04
----------------------------------------------------------------------------
                 inc            236.0   238.9         2.9     4.55
----------------------------------------------------------------------------
                                257.6   259.6         2.0     2.94       NB2
----------------------------------------------------------------------------
BC610-866        5950           126.2   128.3         2.1     5.39    NA2 HW
----------------------------------------------------------------------------
                                139.2   141.9         2.7     8.00       NA2
----------------------------------------------------------------------------
                                170.5   173.0         2.5     5.08       HW6
----------------------------------------------------------------------------
                                193.7   196.0         2.3     4.07        NA
----------------------------------------------------------------------------
BC610-867        5950           130.0   134.7         4.7     2.47       NA2
----------------------------------------------------------------------------
                                166.1   168.3         2.2     0.36       HW6
----------------------------------------------------------------------------
                                197.1   199.3         2.2     1.15        NA
----------------------------------------------------------------------------
                                219.0   221.4         2.4     3.66       NB2
----------------------------------------------------------------------------
BC610-871        5950           200.0   203.4         3.4     4.95       NA2
----------------------------------------------------------------------------
                                277.3   279.3         2.0     3.26        NA
----------------------------------------------------------------------------
                                353.3   355.6         2.3     6.11        NB
----------------------------------------------------------------------------
BC610-872        5950           185.0   192.6         7.6     6.02       HW6
----------------------------------------------------------------------------
                 inc            185.0   187.9         2.9    10.95
----------------------------------------------------------------------------
                                255.8   258.9         3.1     3.39        NA
----------------------------------------------------------------------------
                                286.9   290.4         3.5     5.08       NB2
----------------------------------------------------------------------------
BC610-911        5950           210.3   212.3         2.0     1.91       NA2
----------------------------------------------------------------------------
                                243.6   255.6        12.0     8.41       HW7
----------------------------------------------------------------------------
                 inc            243.6   251.0         7.4     9.38
----------------------------------------------------------------------------
                 inc            253.6   255.6         2.0    13.02
----------------------------------------------------------------------------
                                286.0   288.0         2.0     1.07        NA
----------------------------------------------------------------------------

Table 2. New Drilling from 685 Level
----------------------------------------------------------------------------
                                                     Zone   Au Comp
HOLE-ID         Section     From (m)   To (m)   Width (m)     (gpt)     Zone
----------------------------------------------------------------------------
BC685-860A                      73.3     75.3         2.0      3.97      HW5
----------------------------------------------------------------------------
                                82.4     84.5         2.1      3.51      NW4
----------------------------------------------------------------------------
                               126.2    134.9         8.7      7.76       NA
----------------------------------------------------------------------------
BC685-861                       87.5     90.0         2.5      4.18      HW4
----------------------------------------------------------------------------
                               129.7    136.2         6.5      5.96       NA
----------------------------------------------------------------------------
                inc            132.8    136.2         3.4      8.93
----------------------------------------------------------------------------
                               155.4    160.7         5.3      2.75      NB2
----------------------------------------------------------------------------
                inc            155.4    157.6         2.2      3.63
----------------------------------------------------------------------------
BC685-901       5862             0.0      3.6         3.6     11.42       NA
----------------------------------------------------------------------------
                                 7.7     10.1         2.4     11.11      HW2
----------------------------------------------------------------------------
                                13.0     17.6         4.6      8.47      HW3
----------------------------------------------------------------------------

----------------------------------------------------------------------------
BC685-902       5850             0.0      6.0         6.0      6.38       NA
----------------------------------------------------------------------------
                                 7.7     10.2         2.5      0.36      HW2
----------------------------------------------------------------------------
                                23.4     25.6         2.2      5.07      HW3
----------------------------------------------------------------------------
                                34.8     38.0         3.2      3.05      HW4
----------------------------------------------------------------------------

----------------------------------------------------------------------------
BC685-903       5837            11.5     13.8         2.3      7.23      HW2
----------------------------------------------------------------------------
                                25.0     27.0         2.0      4.37      HW3
----------------------------------------------------------------------------
                                34.6     36.6         2.0      1.95      HW4
----------------------------------------------------------------------------
                                39.0     41.2         2.2      1.39      HW5
----------------------------------------------------------------------------

----------------------------------------------------------------------------
Notes:  1. Zones in BC685-904 and BC905 cut off by faulting and BC685-862
        only low grades.
        2. Assays are uncut and true widths are not reported.
        3. Intersections in BC685-901 and BC685-902 are partial intercepts
        (holes were drilled from new development in North A Zone).

To view 'Figure 1: Geology Map', please visit the following link: http://media3.marketwire.com/docs/lakefig10325.pdf

To view 'Figure 2: Cross Section (5950E)', please visit the following link: http://media3.marketwire.com/docs/lakefig20325.pdf

Contacts:
Lake Shore Gold Corp.
Tony Makuch
President & CEO
(416) 703-6298
[email protected]

Lake Shore Gold Corp.
Mark Utting
Vice-President, Investor Relations
(416) 703-6298
[email protected]
www.lsgold.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
In his general session at 19th Cloud Expo, Manish Dixit, VP of Product and Engineering at Dice, discussed how Dice leverages data insights and tools to help both tech professionals and recruiters better understand how skills relate to each other and which skills are in high demand using interactive visualizations and salary indicator tools to maximize earning potential. Manish Dixit is VP of Product and Engineering at Dice. As the leader of the Product, Engineering and Data Sciences team at D...
In this presentation, you will learn first hand what works and what doesn't while architecting and deploying OpenStack. Some of the topics will include:- best practices for creating repeatable deployments of OpenStack- multi-site considerations- how to customize OpenStack to integrate with your existing systems and security best practices.
SYS-CON Events announced today that CrowdReviews.com has been named “Media Sponsor” of SYS-CON's 22nd International Cloud Expo, which will take place on June 5–7, 2018, at the Javits Center in New York City, NY. CrowdReviews.com is a transparent online platform for determining which products and services are the best based on the opinion of the crowd. The crowd consists of Internet users that have experienced products and services first-hand and have an interest in letting other potential buye...
Security, data privacy, reliability and regulatory compliance are critical factors when evaluating whether to move business applications from in-house client hosted environments to a cloud platform. In her session at 18th Cloud Expo, Vandana Viswanathan, Associate Director at Cognizant, In this session, will provide an orientation to the five stages required to implement a cloud hosted solution validation strategy.
In his session at 20th Cloud Expo, Scott Davis, CTO of Embotics, discussed how automation can provide the dynamic management required to cost-effectively deliver microservices and container solutions at scale. He also discussed how flexible automation is the key to effectively bridging and seamlessly coordinating both IT and developer needs for component orchestration across disparate clouds – an increasingly important requirement at today’s multi-cloud enterprise.
You want to start your DevOps journey but where do you begin? Do you say DevOps loudly 5 times while looking in the mirror and it suddenly appears? Do you hire someone? Do you upskill your existing team? Here are some tips to help support your DevOps transformation. Conor Delanbanque has been involved with building & scaling teams in the DevOps space globally. He is the Head of DevOps Practice at MThree Consulting, a global technology consultancy. Conor founded the Future of DevOps Thought Leade...
Jo Peterson is VP of Cloud Services for Clarify360, a boutique sourcing and benchmarking consultancy focused on transforming technology into business advantage. Clarify360 provides custom, end-to-end solutions from a portfolio of more than 170 suppliers globally. As an engineer, Jo sources net new technology footprints, and is an expert at optimizing and benchmarking existing environments focusing on Cloud Enablement and Optimization. She and her team work with clients on Cloud Discovery, Cloud ...
Founded in 2000, Chetu Inc. is a global provider of customized software development solutions and IT staff augmentation services for software technology providers. By providing clients with unparalleled niche technology expertise and industry experience, Chetu has become the premiere long-term, back-end software development partner for start-ups, SMBs, and Fortune 500 companies. Chetu is headquartered in Plantation, Florida, with thirteen offices throughout the U.S. and abroad.
Everyone wants the rainbow - reduced IT costs, scalability, continuity, flexibility, manageability, and innovation. But in order to get to that collaboration rainbow, you need the cloud! In this presentation, we'll cover three areas: First - the rainbow of benefits from cloud collaboration. There are many different reasons why more and more companies and institutions are moving to the cloud. Benefits include: cost savings (reducing on-prem infrastructure, reducing data center foot print, redu...
The technologies behind big data and cloud computing are converging quickly, offering businesses new capabilities for fast, easy, wide-ranging access to data. However, to capitalize on the cost-efficiencies and time-to-value opportunities of analytics in the cloud, big data and cloud technologies must be integrated and managed properly. Pythian's Director of Big Data and Data Science, Danil Zburivsky will explore: The main technology components and best practices being deployed to take advantage...
The standardization of container runtimes and images has sparked the creation of an almost overwhelming number of new open source projects that build on and otherwise work with these specifications. Of course, there's Kubernetes, which orchestrates and manages collections of containers. It was one of the first and best-known examples of projects that make containers truly useful for production use. However, more recently, the container ecosystem has truly exploded. A service mesh like Istio addr...
SYS-CON Events announced today that DatacenterDynamics has been named “Media Sponsor” of SYS-CON's 18th International Cloud Expo, which will take place on June 7–9, 2016, at the Javits Center in New York City, NY. DatacenterDynamics is a brand of DCD Group, a global B2B media and publishing company that develops products to help senior professionals in the world's most ICT dependent organizations make risk-based infrastructure and capacity decisions.
Most DevOps journeys involve several phases of maturity. Research shows that the inflection point where organizations begin to see maximum value is when they implement tight integration deploying their code to their infrastructure. Success at this level is the last barrier to at-will deployment. Storage, for instance, is more capable than where we read and write data. In his session at @DevOpsSummit at 20th Cloud Expo, Josh Atwell, a Developer Advocate for NetApp, will discuss the role and value...
Dynatrace is an application performance management software company with products for the information technology departments and digital business owners of medium and large businesses. Building the Future of Monitoring with Artificial Intelligence Today we can collect lots and lots of performance data. We build beautiful dashboards and even have fancy query languages to access and transform the data. Still performance data is a secret language only a couple of people understand. The more busi...
New competitors, disruptive technologies, and growing expectations are pushing every business to both adopt and deliver new digital services. This ‘Digital Transformation’ demands rapid delivery and continuous iteration of new competitive services via multiple channels, which in turn demands new service delivery techniques – including DevOps. In this power panel at @DevOpsSummit 20th Cloud Expo, moderated by DevOps Conference Co-Chair Andi Mann, panelists examined how DevOps helps to meet the de...