Caledonia Mining Corporation: Fourth Quarter and 2013 Results

TORONTO, ONTARIO -- (Marketwired) -- 03/31/14 -- Caledonia Mining Corporation (TSX: CAL)(OTCQX: CALVF)(AIM: CMCL) ("Caledonia" or the "Company") announces its operating and financial results for the fourth quarter of 2013 ("Q4" or the "Quarter") and the 12 months to December 31, 2013 (the "Year"). All results are reported in Canadian dollars unless otherwise indicated. Following the implementation of indigenisation in September 2012, Caledonia owns 49% of the Blanket Mine in Zimbabwe. Caledonia continues to consolidate Blanket and the operational and financial information set out below is on a 100% basis unless indicated otherwise.

Commenting on the results for 2013, Stefan Hayden, Caledonia's President and CEO said:

"2013 was a challenging year due to the lower gold price. Nevertheless, Caledonia has produced a creditable set of operating results for the year. Caledonia's financial results were adversely affected by the impairment of the Nama copper and cobalt exploration project in Zambia. After adjusting for this and other unusual items, Caledonia's financial performance was in-line with expectations.

"Notwithstanding the lower gold price, Blanket's cash flows remain strong and Blanket has continued to implement its investment strategy which I am confident will, as planned, result in further increases in production and underpin Blanket's position as one of Africa's lowest cost gold producers."

Operating and Financial Review

                         Q4     Q4    Year   Year  Comment
                        2012   2013   2012   2013
                                                   Gold production in Q4
                                                   2013 was adversely
                                                   affected by a 3-day
Gold produced (oz)     11,821 11,429 45,465 45,527 plant shut down for
                                                   essential maintenance
                                                   and a lower head grade
                                                   On-mine costs were
                                                   adversely affected by
On Mine cash cost       603    666    570    613   higher work-in-progress
 (US$/oz)(1)                                       at December 31, 2013 of
                                                   1,978 ounces.
                                                   All-in sustaining costs
                                                   were adversely affected
All-in sustaining cost                             in Q4 by higher
 (US$/oz)(1)            937   1,175   857    978   administrative expenses
                                                   and planned sustaining
                                                   capital investment
                                                   Lower sales in Q4 2013
                                                   is due to work in
Gold Sales (oz)        10,337 9,454  45,181 45,048 progress at December
                                                   31, 2013
                                                   Lower realised gold
Average realised gold                              prices in Q4 and Year
 price (US$/oz)(2)     1,703  1,277  1,666  1,402  2013 is due to the
                                                   lower gold price
                        9.7    4.5    40.9   29.9  Lower gross profit is
Gross profit ($'m)(3)                              due mainly to the lower
                                                   realised gold prices
                                                   Net loss in Q4 and the
                                                   Year is after an
Net (loss)/profit                                  impairment charge of
 attributable to        3.4   (14.3)  8.7   (3.0)  $14.2m mainly in
 shareholders ($'m)                                respect of the Nama
                                                   copper and cobalt
                                                   Adjusted basic earnings
                                                   per share excludes the
Adjusted basic                                     impairment charge,
 earnings per share(4)  6.3    0.2    49.9   28.3  foreign exchange
 (cents)                                           profits or losses,
                                                   indigenisation expenses
                                                   and deferred taxation.
                                                   Caledonia's cash is
Cash and cash                                      held in Canadian, UK
 equivalents ($'m)      27.9   25.2   27.9   25.2  and South African
                                                   Cash flow in Q4 was
                                                   adversely affected by
                                                   higher work-in progress
                                                   at December 31, 2013.
Cash from operating     8.0    2.8    29.7   14.6  Cash flow in the Year
 activities ($'m)                                  and the Quarter was
                                                   adversely affected by
                                                   the lower realised gold
                                                   Payments include direct
                                                   and indirect taxes,
                                                   royalties, licence fees
                                                   and levies. The total
                                                   of such payments in
Payments to the Gwanda                             2013 was lower
 Community and          5.9    3.6    24.0   19.5  primarily due to lower
 Zimbabwe Government                               income tax payable on
 ($'m)                                             the reduced profit and
                                                   reduced royalty
                                                   payments due to the
                                                   lower prevailing gold
(1) "On-mine cash costs" and "all-in sustaining cost" are non-IFRS measures.
Refer to Section 10 of the Management Discussion and Analysis ("MD&A") for a
discussion of non-IFRS measures.
(2) "Average realised gold price per ounce" is a non-IFRS measure. Refer to
Section 10 of the Management Discussion and Analysis ("MD&A") for a
discussion of non-IFRS measures.
(3) Gross Profit Gross profit is after deducting royalties, production costs
and depreciation but before administrative expenses
(4) "Adjusted earnings per share" ("EPS") is a non-IFRS measure which aims
to reflect Caledonia's ordinary trading performance. The adjusted EPS
calculation excludes any share based expense arising on the implementation
of indigenisation and the impairment and the foreign exchange profit, all of
which are included in the calculation of EPS under IFRS. Refer to Section 10
of the MD&A for a discussion of non-IFRS measures

Indigenisation and Growth at the Blanket mine

Blanket was the first substantial gold producer in Zimbabwe to comply with Zimbabwean indigenisation legislation following the completion of the various indigenisation transactions in September 2012. As an indigenised business, Blanket continues to implement its growth strategy which was announced in January 2013 and which will result in production increasing to approximately 52,000 ounces of gold per annum in 2015. Further increases in production are expected following the completion of the No. 6 Winze Project, which is intended to provide access to deeper resources below 750 meters.

Blanket: low-cost, highly cash generative

Blanket's results for the Quarter and the Year confirm its position as a low-cost producer, despite the adverse effects of higher work-in-progress at the end of 2013 and the planned increased capital investment. These investments to increase production at Blanket are expected to result in continued strong cash generation, notwithstanding any further decreases in the gold price, as Blanket's fixed cost base is spread across more production ounces.

Following the implementation of Indigenisation at Blanket, Caledonia receives 49% of Blanket's dividend distributions in addition to receiving the repayments of the facilitation loans of US$30 million.

Exploration at the Blanket Mine and at the Satellite Projects, Zimbabwe

Exploration continued at the Blanket Mine:

--  Five holes were drilled into the Eroica zone from the extended haulage
    on 22 Level, all of which identified mineralisation;
--  One hole was drilled from the 22 Level into the AR Main zone below 750
    meters which also intersected mineralisation as expected and the second
    hole has commenced;
--  Two holes were drilled into the Blanket zone below 750 meters in
    addition to the six holes which were drilled in the previous quarter. As
    expected, all eight holes that have been drilled into the Blanket zone
    below 750 meters have intersected mineralisation; and
--  Exploration has commenced on the Lima ore body above 14 Level with the
    objective of upgrading the existing indicated and inferred mineral

Exploration development and diamond drilling at the GG Project established the existence of multiple mineralized zones with potentially economic gold grades. The preliminary indications from metallurgical test work are that material from GG is not fully compatible with Blanket's metallurgical plant. Exploration at GG will continue with the objective of identifying the extent and characteristics of mineralisation so that an assessment can be made of the optimal processing methodology for material from GG.

At the Mascot Project development and exploration has continued during the Quarter on the 90 meter level (3 Level) and mineralisation has now been exposed covering a strike of 100 meters between 60 and 120 meter levels. A surface drilling programme was also initiated to test the main Mascot shear below the deepest workings. Two holes were drilled, both intersecting a mineralised zone approximately 60 meters below the known bottom of the old workings (approximately 350 meters below surface). Drilling will continue on a success-driven basis to test the lateral extent of the main Mascot shear.

Nama Cobalt and Copper Projects, Zambia

Metallurgical test work in 2009 indicated that only a small proportion of the cobalt-enriched material at Nama was amenable to hydro-metallurgical processing to produce cobalt hydroxide. Accordingly in quarter 4 of 2009 the carrying value of investment in D-type material at the Nama cobalt project was impaired. In 2012 Caledonia indicated that it was willing to commence cobalt mining activities on a smaller scale than had initially been envisaged so that the mining licences at Nama remained in good standing and Caledonia could continue to explore with the objective of identifying a significant deep-level copper resource. The 2013 copper exploration programme identified copper mineralisation which management believes is unlikely to show a sufficiently large return on the required investment. The results of the exploration programme also provide insufficient support for further deep-level copper exploration. Accordingly Caledonia has impaired all of the remaining capitalised investment at Nama.

Caledonia's Dividend Policy

On November 25, 2013 Caledonia announced a revised dividend policy in terms of which it intends to pay a dividend of 6 Canadian cents per share in 2014, split into 4 equal quarterly payments of 1.5 Canadian cents per share. The first quarterly dividend was paid on January 31, 2014; the next quarterly dividend is expected to be paid on April 30, 2014.

Notwithstanding the lower profits in the year, Caledonia's total 2014 dividend of 6 cents per share is almost eight times covered by Caledonia's cash resources at December 31, 2013 and over four times covered by net cash flow from operations in the year to December 31, 2013.

Caledonia will continue to maintain its strong financial position so that it can implement its stated growth strategy and retain the flexibility to take advantage of any opportunities that may arise without the need to raise third party finance.

Following the appointment of Computershare Investors Service Inc. as Caledonia's transfer agent and registrar in December 2013, Caledonia shareholders in the USA and UK now receive their dividends denominated in US dollars and Pounds sterling respectively; all other shareholders will continue to be paid in Canadian dollars. Computershare also offers Direct Registration System (DRS) services for Caledonia shareholders who do not wish to hold their shares in nominee accounts in the name of their financial adviser or stock-broker.

Caledonia's Strategy

Caledonia's primary strategy is to continue the existing investment programme at Blanket with the objective of increasing production. Caledonia believes the continuation of this strategy is in the best interests of shareholders because it is expected to increase cash flows and accelerate the repayment of the outstanding facilitation loans. Subject to an ongoing evaluation of the investment climate in Zimbabwe, Blanket and Caledonia will also consider additional acquisition opportunities in Zimbabwe on the basis of, inter alia, their fit with the existing operations and their capacity to enhance value for both Blanket's indigenous shareholders and Caledonia.

Caledonia will also use its financial and managerial resources which are outside Zimbabwe to consider any new opportunities in sub-Saharan Africa.


Despite the lower and volatile gold price from April 2013, development and exploration activity at Blanket has continued unabated. As previously advised, production is expected to increase to 48,000 ounces in 2014 and 52,000 ounces in 2015.

Exploration at Blanket below 750 meters continues and we are encouraged by the results evaluated so far. The down plunge extent of the Blanket 4 Ore body has now been intersected with 8 boreholes, all of which returned payable gold values. Work is in progress to add this resource body to the mine's mineral resource inventory.

Blanket has surplus metallurgical plant capacity and is sufficiently cash generative so that, if the investment climate is acceptable, it could invest in projects with a view to further increasing production, thereby helping to maintain downward pressure on the cost per ounce of gold produced.

Commenting on these results, Stefan Hayden, Caledonia's President and Chief Executive Officer said:

"Gold production in 2013 remained slightly ahead of 2012 and was also ahead of our guidance.

"Blanket's on-mine cash cost increased in Q4 compared to the previous quarter, however this was largely due to the higher work-in-progress at December 31, 2013. As a measure of Blanket's continued cost efficiency, the cost per tonne processed in 2013 fell from US$75.90 to US$70.40.

"In the early part of 2014, the achieved grade in certain production areas became uneconomic and production in those areas was terminated. Production in the first quarter of 2014 was also adversely affected by the unscheduled requirement to replace the winding ropes on the main production shaft. Both of these factors had an adverse effect on gold production in the first quarter of 2014. New production areas have and are being developed and I am confident that the 2014 production target of 48,000 ounces will be achieved, with 52,000 ounces expected in 2015.

"Development and exploration work at our satellite projects, GG and Mascot, has established the existence of multiple mineralized zones with potentially economic gold grades. Further work is being done to define the extent and viability of these mineralized zones.

"Under new Zimbabwean legislation, from the beginning of 2014 Blanket is required to sell its gold production to Fidelity Printers and Refiners. The new sales arrangements with Fidelity have reduced Blanket's working capital requirement due to the earlier payment terns. Blanket has received all payments due from Fidelity in-full and on-time.

"Zimbabwe offers some highly attractive investment opportunities, both at Blanket Mine (including the Satellite Projects) and elsewhere, which have the potential to generate substantial returns for all stakeholders. However, in light of the increased credit risk associated with the requirement to sell gold to Fidelity, Caledonia will actively consider other suitable investment opportunities with a view to using its resources outside Zimbabwe to optimise shareholder value."

The full Report & Accounts, including the Management Discussion and Analysis for the quarter and year ended December 31, 2013 are available from the Company's website www.caledoniamining.com and from SEDAR.

Consolidated Statement of Comprehensive Income
(in thousands of Canadian dollars except per share amounts)

                                  For the 3 months         For the 12 months
                                      ended Dec 31              ended Dec 31
                                     2013     2012     2013     2012    2011
Revenue                          12,114   17,612   65,113   75,221   55,705
Royalty                            (893)  (1,227)  (4,544)  (5,261)  (2,514)
Production costs                 (5,919)  (6,502) (27,412) (25,653) (21,093)
Depreciation                       (818)    (633)  (3,276)  (3,392)  (2,983)
Gross profit                      4,484    9,250   29,881   40,915   29,115
Administrative expenses          (2,067)  (1,108)  (7,772)  (4,055)  (3,351)
Share-based payment expense         (68)       -      (68) (14,569)  (1,101)
Indigenisation expenses(i)            -     (425)       -   (1,700)    (326)
Foreign exchange gain/(loss)      1,677      570    1,677       (4)     303
Impairment                      (14,203)    (330) (14,203)    (330)  (3,884)
Results from operating
 activities                     (10,177)   7,957    9,515   20,257   20,756
Net finance income/(cost)           102       25     (108)     (81)    (162)
Profit before tax               (10,075)   7,982    9,407   20,176   20,594
Tax expense                      (4,279)  (4,032)  (9,897) (12,818)  (8,464)
(Loss)/Profit for the period    (14,354)   3,950     (490)   7,358   12,130

Other comprehensive
Items that are or may be
 reclassified to profit or loss
Foreign currency translation
 differences of foreign
 operations                          38      370    2,254   (1,589)     265
Other comprehensive
 (loss)/income net of income tax     38      370    2,254   (1,589)     265
Total comprehensive income for
 the period                     (14,392)   4,320    1,764    5,769   12,395

(Loss)/profit attributable to:
Shareholders of the Company     (14,436)   3,353   (3,055)   8,720   12,130
Non-controlling interests            82      597    2,565   (1,362)       -
(Loss)/Profit for the period    (14,354)   3,950     (490)   7,358   12,130

Total comprehensive
 (loss)/income attributable to:
Shareholders of the Company     (14,363)   3,685     (726)   7,112   12,395
Non-controlling interests            29      635    2,490   (1,343)       -
Total comprehensive income for
 the period                     (14,392)   4,320    1,764    5,769   12,395

(Loss)/earnings per share
Basic                             (27.7)     6.4     (6.1)    17.2     24.2
Diluted                           (27.7)     6.4     (6.1)    17.2     23.8
Adjusted (loss)/earnings per
 share (cents)(ii) (iii)
Basic                               0.2      6.0     28.3     49.9     31.4
Diluted                             0.2      6.0     28.3     49.9     30.8
(i)    Expenses relating to the Zimbabwe indigenisation transaction were
       previously included in Administrative expenses.These expenses are now
       presented separately as they are relevant to the understanding of
       Caledonia's financial performance. The presentation of comparative
       figures has been aligned accordingly.
(ii)   Adjusted earnings per share ("EPS") is a non-IFRS measure which aims
       to reflect Caledonia's ordinary trading performance.The adjusted EPS
       calculation excludes any share based expense arising on the
       implementation of indigenisation and the impairment and the foreign
       exchange profit, all of which are included in the calculation of EPS
       under IFRS. Refer to Section 10 for a discussion of non-IFRS measures
(iii)  The EPS for 2012 and 2011 has been restated based on the 10: 1
       consolidation that took place in 2013.

Consolidated Statement of Cash Flows
(in thousands of Canadian dollars)
                                             For the 12 months ended Dec 31
                                                 2013       2012       2011
                                                    $          $          $
Cash flows from operating activities
Cash generated by operating activities         22,768     41,420     25,595
Net interest paid                                (108)       (81)      (162)
Tax paid                                       (7,974)   (11,618)    (8,005)
Net cash from operating activities             14,686     29,721     17,428

Cash flows from investing activities
Property, plant and equipment additions       (11,738)    (7,909)    (8,528)
Proceeds on sale of investment                      -         38          -
Net cash used in investing activities         (11,738)    (7,871)    (8,528)

Cash flows from financing activities
Advance dividends paid                         (1,987)    (3,739)         -
Dividends paid                                 (5,947)         -          -
Proceeds from the exercise of share options       470        974         38
Net cash from (used in) financing activities   (7,464)    (2,765)        38
Net increase/(decrease) in cash and cash
 equivalents                                   (4,516)    19,085      8,938
Cash and cash equivalents at beginning of
 the year                                      27,942      9,256        398
Effect of exchange rate fluctuations on cash
 held                                               -       (399)       (80)
Cash and cash equivalents at year end          23,426     27,942      9,256

Consolidated Statements of Financial Position
(in thousands of Canadian dollars)
                                              Dec 31      Dec 31      Dec 31
                                                2013        2012        2011
                                                   $           $           $
Total non-current assets                      33,448      36,533      34,248
Inventories                                    6,866       5,508       4,482
Prepayments                                      177         126         334
Trade and other receivables                    3,889       1,718       3,652
Cash and cash equivalents                     25,222      27,942       9,686
Total assets                                  69,602      71,827      52,402
Total non-current liabilities                 10,094       6,928       7,822
Trade and other payables                       4,600       5,775       3,841
Zimbabwe advance dividend accrual                  -       1,987           -
Income taxes payable                           1,138       1,518         295
Bank overdraft                                 1,796           -         430
Total liabilities                             17,628      16,208      12,388
Total equity                                  51,974      55,619      40,014
Total equity and liabilities                  69,602      71,827      52,402

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
In his general session at 18th Cloud Expo, Lee Atchison, Principal Cloud Architect and Advocate at New Relic, discussed cloud as a ‘better data center’ and how it adds new capacity (faster) and improves application availability (redundancy). The cloud is a ‘Dynamic Tool for Dynamic Apps’ and resource allocation is an integral part of your application architecture, so use only the resources you need and allocate /de-allocate resources on the fly.
SYS-CON Events announced today that Cloudbric, a leading website security provider, will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. Cloudbric is an elite full service website protection solution specifically designed for IT novices, entrepreneurs, and small and medium businesses. First launched in 2015, Cloudbric is based on the enterprise level Web Application Firewall by Penta Security Sys...
SYS-CON Events announced today that Impiger Technologies will exhibit in Booth #109 at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. Impiger Technologies is a world-class, enterprise software product engineering company specializing in Mobile Application Development, Cloud Applications, Microsoft Technology Solutions, Web Technology and Telecom Services. Impiger Technologies helps enterprises improve busi...
Virgil consists of an open-source encryption library, which implements Cryptographic Message Syntax (CMS) and Elliptic Curve Integrated Encryption Scheme (ECIES) (including RSA schema), a Key Management API, and a cloud-based Key Management Service (Virgil Keys). The Virgil Keys Service consists of a public key service and a private key escrow service. 

SYS-CON Events announced today that Cemware will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. Use MATLAB functions by just visiting website mathfreeon.com. MATLAB compatible, freely usable, online platform services. As of October 2016, 80,000 users from 180 countries are enjoying our platform service.
Data is the fuel that drives the machine learning algorithmic engines and ultimately provides the business value. In his session at Cloud Expo, Ed Featherston, a director and senior enterprise architect at Collaborative Consulting, will discuss the key considerations around quality, volume, timeliness, and pedigree that must be dealt with in order to properly fuel that engine.
Digitization is driving a fundamental change in society that is transforming the way businesses work with their customers, their supply chains and their people. Digital transformation leverages DevOps best practices, such as Agile Parallel Development, Continuous Delivery and Agile Operations to capitalize on opportunities and create competitive differentiation in the application economy. However, information security has been notably absent from the DevOps movement. Speed doesn’t have to negat...
SYS-CON Events announced today that eCube Systems, the leading provider of modern development tools and best practices for Continuous Integration on OpenVMS, will exhibit at SYS-CON's @DevOpsSummit at Cloud Expo New York, which will take place on June 7-9, 2016, at the Javits Center in New York City, NY. eCube Systems offers a family of middleware products and development tools that maximize return on technology investment by leveraging existing technical equity to meet evolving business needs. ...
SYS-CON Events announced today that MathFreeOn will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. MathFreeOn is Software as a Service (SaaS) used in Engineering and Math education. Write scripts and solve math problems online. MathFreeOn provides online courses for beginners or amateurs who have difficulties in writing scripts. In accordance with various mathematical topics, there are more tha...
In an era of historic innovation fueled by unprecedented access to data and technology, the low cost and risk of entering new markets has leveled the playing field for business. Today, any ambitious innovator can easily introduce a new application or product that can reinvent business models and transform the client experience. In their Day 2 Keynote at 19th Cloud Expo, Mercer Rowe, IBM Vice President of Strategic Alliances, and Raejeanne Skillern, Intel Vice President of Data Center Group and ...
The best way to leverage your Cloud Expo presence as a sponsor and exhibitor is to plan your news announcements around our events. The press covering Cloud Expo and @ThingsExpo will have access to these releases and will amplify your news announcements. More than two dozen Cloud companies either set deals at our shows or have announced their mergers and acquisitions at Cloud Expo. Product announcements during our show provide your company with the most reach through our targeted audiences.
In the 21st century, security on the Internet has become one of the most important issues. We hear more and more about cyber-attacks on the websites of large corporations, banks and even small businesses. When online we’re concerned not only for our own safety but also our privacy. We have to know that hackers usually start their preparation by investigating the private information of admins – the habits, interests, visited websites and so on. On the other hand, our own security is in danger bec...
@ThingsExpo has been named the Top 5 Most Influential Internet of Things Brand by Onalytica in the ‘The Internet of Things Landscape 2015: Top 100 Individuals and Brands.' Onalytica analyzed Twitter conversations around the #IoT debate to uncover the most influential brands and individuals driving the conversation. Onalytica captured data from 56,224 users. The PageRank based methodology they use to extract influencers on a particular topic (tweets mentioning #InternetofThings or #IoT in this ...
There is growing need for data-driven applications and the need for digital platforms to build these apps. In his session at 19th Cloud Expo, Muddu Sudhakar, VP and GM of Security & IoT at Splunk, will cover different PaaS solutions and Big Data platforms that are available to build applications. In addition, AI and machine learning are creating new requirements that developers need in the building of next-gen apps. The next-generation digital platforms have some of the past platform needs a...
Join Impiger for their featured webinar: ‘Cloud Computing: A Roadmap to Modern Software Delivery’ on November 10, 2016, at 12:00 pm CST. Very few companies have not experienced some impact to their IT delivery due to the evolution of cloud computing. This webinar is not about deciding whether you should entertain moving some or all of your IT to the cloud, but rather, a detailed look under the hood to help IT professionals understand how cloud adoption has evolved and what trends will impact th...