Welcome!

News Feed Item

TerraX Completes Drilling at Homer Lake and Moves Drill #1 to Barney Shear, Yellowknife City Gold Project; Drilling Continues With Drill #2 at Crestaurum Gold Deposit

YELLOWKNIFE, NORTHWEST TERRITORIES -- (Marketwired) -- 04/11/14 -- TerraX Minerals Inc. (TSX VENTURE: TXR)(FRANKFURT: TX0)(PINKSHEETS: TRXXF) has completed its planned four hole (1,000 m) drill program at the Homer Lake base metal/precious metal target and moved Drill #1 to the Barney Shear (28.32 m @ 2.97 g/t Au, inclusive of 4.00 m @ 12.59 g/t Au in news release August 14th, 2013) which is the extension of the Con Mine/Giant Mine shear system that has hosted more than 13 Moz of gold production from the two historic mines. The Barney Shear Zone is one of TerraX's primary gold targets on the Northbelt property of the Yellowknife City Gold Project ("YCGP") in the Northwest Territories. Drilling is still underway with a second drill at the nearby Crestaurum gold deposit, as announced on April 7, 2014.

The Barney Shear has been delineated over a strike length of 4.5 km by TerraX and previous workers and has only been drill tested by prior operators over a 600 m strike length. Surface mapping in June 2013 indicates that the Barney Shear Zone consists of multiple mineralized shears over a greater than 200 m width. The 2014 Barney Shear drilling will consist of up to 8 holes following the strike extension of the shear up to 300 m north of the mineralization defined in drilling carried out by Nebex Resources Ltd. in 1995 and 1996. In addition, TerraX will be re-entering the collars of 4 drill holes from the 1995-96 campaigns. These holes will be surveyed down hole to accurately determine the location of previously intersected zones of mineralization, and then multiple wedges will be turned off the original holes to generate additional mineralized intersections. This work is possible as the previous exploration drilling had left the original drill hole collars cased and capped to preserve them for future work on this important mineralized zone.

The first hole re-sampled by TerraX, NB95-16, was drilled on the Barney Shear by Nebex in 1995. TerraX's assay results include an interval of 20.86 m @ 3.79 g/t Au, inclusive of 4.00 m @ 12.59 g/t Au (news release of Aug 14, 2013). Holes NB-96-02 and NB96-04, drilled in 1996, were also re-logged and re-sampled by TerraX with assay results that included 8.16 m @ 5.06 g/t Au and 6.32 g/t Ag (NB96-02) and 27.00 m @ 1.9 g/t Au and 6.94 g/t Ag (NB96-04) (news release of Nov 14, 2014 ). The assay results from NB96-02 and NB96-04 are very encouraging as they confirm the strike continuation and substantial areal extent of the Barney Shear Zone. A map indicating the location of this prior drilling is available on our web site at www.terraxminerals.com.

Drilling at Homer Lake commenced on March 25, 2014 and targeted a buried conductor identified by airborne surveys conducted by TerraX in 2013 that had never been drill-tested This target area was within 500 m of a previously established ice road which made winter access easier and allowed this drill program to be completed quickly with less environmental impact than would have been the case with overland access in summer conditions. Logging and sampling of drill core from Homer Lake is currently underway with assay results pending.

Homer Lake is not a traditional gold target as would be expected in a major gold belt like the Yellowknife Gold Camp. It was originally discovered from surface prospecting in the 1930s and six mineralized structures were delineated during reconnaissance prospecting by TerraX in the Homer Lake area in 2013. One structure has been traced by TerraX for 1,200 m and has chip sample results of 7 m @ 0.50 g/t Au, 90.2 g/t Ag, 4.25% Pb and 0.89% Zn. A parallel structure sampled by TerraX graded 5 m @ 1.54 g/t Au, 95.5 g/t Ag, 3.13% Pb and 1.59% Zn. A grab sample by TerraX from a third structure graded 0.60 g/t Au, 529 g/t Ag, greater than 20% Pb, and 9.44% Zn.

The technical information contained in this news release has been approved by Joseph Campbell, the President of TerraX, who is a Qualified Person as defined in "National Instrument 43-101, Standards of Disclosure for Mineral Projects."

About the Yellowknife City Gold Project

The Yellowknife City Gold Project encompasses approximately 8,400 hectares of contiguous land immediately north of the City of Yellowknife in the Northwest Territories and includes TerraX's wholly-owned Northbelt property acquired in February 2013.

The Northbelt gold property encompasses 3,562 hectares on the prolific Yellowknife belt, all within 15 km of the city of Yellowknife, and covers 13 km of strike on the northern extension of the geology that contained the Giant (7.8 Moz) and Con (5.5 Moz) gold mines. The Northbelt property is host to multiple shears that are the recognized hosts for gold deposits in the Yellowknife camp and it contains innumerable gold showings and historic high grade drill results.

TerraX has carried out a strategy of acquiring prospective ground adjacent to Northbelt and in October 2013 entered into an option agreement whereby it can acquire a 100% interest in the Walsh Lake gold property, which is contiguous with and immediately east of Northbelt. The Walsh Lake property consists of seven leases and five claims totaling 6,659 acres (2,695 hectares). TerraX has also staked and acquired ground to the west of Northbelt to cover prospective geology that is on strike from Northbelt structures.

For more information on the Yellowknife City Gold Project, please visit our web site at www.terraxminerals.com.

On behalf of the Board of Directors

Joseph Campbell, President

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains forward-looking information, which involves known and unknown risks, uncertainties and other factors that may cause actual events to differ materially from current expectation. Important factors - including the availability of funds, the results of financing efforts, the completion of due diligence and the results of exploration activities - that could cause actual results to differ materially from the Company's expectations are disclosed in the Company's documents filed from time to time on SEDAR (see www.sedar.com). Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this press release. The company disclaims any intention or obligation, except to the extent required by law, to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise.

Contacts:
Paradox Public Relations
514-341-0408 or Toll Free: 1-866-460-0408
[email protected]

Vanguard Shareholder Solutions
604-608-0824 or Toll Free: 855-508-0824
[email protected]

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Business professionals no longer wonder if they'll migrate to the cloud; it's now a matter of when. The cloud environment has proved to be a major force in transitioning to an agile business model that enables quick decisions and fast implementation that solidify customer relationships. And when the cloud is combined with the power of cognitive computing, it drives innovation and transformation that achieves astounding competitive advantage.
Sanjeev Sharma Joins November 11-13, 2018 @DevOpsSummit at @CloudEXPO New York Faculty. Sanjeev Sharma is an internationally known DevOps and Cloud Transformation thought leader, technology executive, and author. Sanjeev's industry experience includes tenures as CTO, Technical Sales leader, and Cloud Architect leader. As an IBM Distinguished Engineer, Sanjeev is recognized at the highest levels of IBM's core of technical leaders.
When building large, cloud-based applications that operate at a high scale, it's important to maintain a high availability and resilience to failures. In order to do that, you must be tolerant of failures, even in light of failures in other areas of your application. "Fly two mistakes high" is an old adage in the radio control airplane hobby. It means, fly high enough so that if you make a mistake, you can continue flying with room to still make mistakes. In his session at 18th Cloud Expo, Le...
Machine learning has taken residence at our cities' cores and now we can finally have "smart cities." Cities are a collection of buildings made to provide the structure and safety necessary for people to function, create and survive. Buildings are a pool of ever-changing performance data from large automated systems such as heating and cooling to the people that live and work within them. Through machine learning, buildings can optimize performance, reduce costs, and improve occupant comfort by ...
René Bostic is the Technical VP of the IBM Cloud Unit in North America. Enjoying her career with IBM during the modern millennial technological era, she is an expert in cloud computing, DevOps and emerging cloud technologies such as Blockchain. Her strengths and core competencies include a proven record of accomplishments in consensus building at all levels to assess, plan, and implement enterprise and cloud computing solutions. René is a member of the Society of Women Engineers (SWE) and a m...
JETRO showcased Japan Digital Transformation Pavilion at SYS-CON's 21st International Cloud Expo® at the Santa Clara Convention Center in Santa Clara, CA. The Japan External Trade Organization (JETRO) is a non-profit organization that provides business support services to companies expanding to Japan. With the support of JETRO's dedicated staff, clients can incorporate their business; receive visa, immigration, and HR support; find dedicated office space; identify local government subsidies; get...
With 10 simultaneous tracks, keynotes, general sessions and targeted breakout classes, @CloudEXPO and DXWorldEXPO are two of the most important technology events of the year. Since its launch over eight years ago, @CloudEXPO and DXWorldEXPO have presented a rock star faculty as well as showcased hundreds of sponsors and exhibitors! In this blog post, we provide 7 tips on how, as part of our world-class faculty, you can deliver one of the most popular sessions at our events. But before reading...
Containers and Kubernetes allow for code portability across on-premise VMs, bare metal, or multiple cloud provider environments. Yet, despite this portability promise, developers may include configuration and application definitions that constrain or even eliminate application portability. In this session we'll describe best practices for "configuration as code" in a Kubernetes environment. We will demonstrate how a properly constructed containerized app can be deployed to both Amazon and Azure ...
This is going to be a live demo on a production ready CICD pipeline which automate the deployment of application onto AWS ECS and Fargate. The same pipeline will automate deployment into various environment such as Test, UAT, and Prod. The pipeline will go through various stages such as source, build, test, approval, UAT stage, Prod stage. The demo will utilize only AWS services including AWS CodeCommit, Codebuild, code pipeline, Elastic container service (ECS), ECR, and Fargate.
Digital Transformation: Preparing Cloud & IoT Security for the Age of Artificial Intelligence. As automation and artificial intelligence (AI) power solution development and delivery, many businesses need to build backend cloud capabilities. Well-poised organizations, marketing smart devices with AI and BlockChain capabilities prepare to refine compliance and regulatory capabilities in 2018. Volumes of health, financial, technical and privacy data, along with tightening compliance requirements by...
As Enterprise business moves from Monoliths to Microservices, adoption and successful implementations of Microservices become more evident. The goal of Microservices is to improve software delivery speed and increase system safety as scale increases. Documenting hurdles and problems for the use of Microservices will help consultants, architects and specialists to avoid repeating the same mistakes and learn how and when to use (or not use) Microservices at the enterprise level. The circumstance w...
"Avere Systems deals with data performance optimization in the cloud or on-premise. Even to this day many organizations struggle with what we call the problem of data gravity - 'Where should I put the data?' - because the data dictates ultimately where the jobs are going to run," explained Scott Jeschonek, Director Cloud Solutions at Avere Systems, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.