Welcome!

News Feed Item

Pretium Resources Inc.: Brucejack Project Update

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 04/16/14 -- Pretium Resources Inc. (TSX:PVG)(NYSE:PVG) ("Pretivm") is pleased to announce the following update on its activities underway and planned for 2014 at its high-grade gold Brucejack Project.

Permitting

Pretivm expects to file its Environmental Assessment Certificate application ("EAC application") this quarter once it receives the final Application Information Requirements from the British Columbia Environmental Assessment Office ("BCEAO"), which is expected shortly. Once filed, the application will be evaluated for completeness over a 30-day period by BCEAO with the involvement of a working group including representatives of First Nations and local governments and other government agencies. Once the application has been accepted, the BCEAO has a maximum of 180 days to complete its review and prepare an assessment report for a decision by the Minister of Environment and the Minister of Energy and Mines.

In coordination with the provincial permitting process, the Canadian Environmental Assessment Agency will review the Environmental Impact Statement ("EIS") which Pretivm will submit concurrently with the provincial EAC application. Provincial and federal approval of the EAC application and EIS, respectively, allow for the issuance of the statutory permits and authorizations to begin construction of a mine at Brucejack.

Feasibility Study

Work to update the Brucejack Project feasibility study has been ongoing, with the mine plan and mining stopes now updated to incorporate the revised economic parameters of $1,100/oz gold, $17/oz silver and $0.92 CAD:US exchange rate. Based on this work, the production rate of 2,700 tonnes per day has been confirmed. Other updates include equipment and materials pricing to the second quarter, and the update of labour rates, schedule and productivity. The amended Brucejack Project feasibility study is on track for completion in June.

On completion of the amended feasibility study, basic engineering will commence in the third quarter, including the order of long-lead items to facilitate the start of construction once permits for the Project have been received.

Exploration

Subsequent to the bulk sample program, underground exploration in the Valley of the Kings was undertaken to assess the geological nature of the stockwork mineralization between the dominant east-west system and the north-south Cleopatra structure in the area of the 426615E cross-cut and 615 lateral. Non-selective material, which featured visible gold to varying degrees, was bagged from the blast rounds from benching (rounds of 3 meters by 2 meters and ranging in length from 10 to 15 meters), and from raising (rounds of 1.5 meters by 1 meter by 2 meters). The gold mineralization was hosted in variably-oriented parts of the system, and not limited to a single structural feature.

In February 2014, 1,000 tonnes of the bagged material from the 2013 Valley of the Kings exploration was processed at the Contact Mill in Montana. From the production of gravity and flotation concentrates we have recovered approximately 3,120 ounces of gold. The bulk of the assays have been received to date from Inspectorate America Corporation, and final gold production remains subject to remaining assays and final establishment of weights and assays and settlement.

The Valley of Kings hosts Measured and Indicated gold resources of 8.7 million ounces (15.3 million tonnes grading 17.6 grams per tonne gold).

A portion of the proceeds from this one-time production will be used to fund initiatives in northern British Columbia promoting community development. Under British Columbia's Mineral Tenure Act regulations, we are permitted to process up to 1,000 tonnes per year per claim unit. We will evaluate the potential for the production of 1,000 tonnes of selective high-grade material later in the year.

Crews are mobilizing to site to commence the 2014 exploration program at Brucejack which has been planned with a focus on continued resource definition in the Valley of the Kings, and which includes 15,000 meters of underground infill and step-out drilling to the east and west. The design of an access ramp from the 1345-meter level access ramp to the 1260-meter level is now being finalized.

Ian I Chang, M.A.Sc., P.Eng., Vice President, Project Development, Pretium Resources Inc. is the Qualified Person (QP) responsible for Brucejack Project development. Kenneth C. McNaughton, M.A.Sc., P.Eng., Chief Exploration Officer, Pretium Resources Inc. is the Qualified Person (QP) responsible for the Brucejack Project exploration program.

About Pretivm

Pretivm is creating value through gold at its high-grade gold Brucejack Project, located in northern British Columbia. Permitting of a high-grade underground gold mine at Brucejack is underway, with commercial production targeted to commence in 2016.

Forward-Looking Statements

This News Release contains "forward-looking information" and "forward-looking statements" within the meaning of applicable Canadian and United States securities legislation. Forward-looking information may include, but is not limited to, risks related to information with respect to our planned exploration and development activities, the adequacy of Pretivm's financial resources, the estimation of mineral reserves and resources including the 2013 Valley of the Kings Mineral Resource estimate, realization of mineral reserve and resource estimates and timing of development of Pretivm's Brucejack Project, costs and timing of future exploration, results of future exploration and drilling, production and processing estimates, capital and operating cost estimates, timelines and similar statements relating to the economic viability of the Brucejack Project, timing and receipt of approvals, consents and permits under applicable legislation, Pretivm's executive compensation approach and practice, and adequacy of financial resources. Wherever possible, words such as "plans", "expects", "projects", "assumes", "budget", "strategy", "scheduled", "estimates", "forecasts", "anticipates", "believes", "intends", "targets" and similar expressions or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative forms of any of these terms and similar expressions, have been used to identify forward-looking statements and information. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be forward-looking information.

Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking information, including, without limitation, those risks identified in Pretivm's Annual Information Form dated March 31, 2014 filed on SEDAR at www.sedar.com and in the United States on Form 40-F through EDGAR at the SEC's website at www.sec.gov. Forward-looking information is based on the expectations and opinions of Pretivm's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise. We do not assume any obligation to update forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place undue reliance on forward-looking information. Neither the TSX nor the NYSE has approved or disapproved of the information contained herein.

Contacts:
Pretium Resources Inc.
Robert Quartermain
President and Chief Executive Officer
(604) 558-1784

Pretium Resources Inc.
Michelle Romero
Vice President, Corporate Relations
(604) 558-1784
[email protected]
www.pretivm.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Events announced today that Avere Systems, a leading provider of hybrid cloud enablement solutions, will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Avere Systems was created by file systems experts determined to reinvent storage by changing the way enterprises thought about and bought storage resources. With decades of experience behind the company’s founders, Avere got its ...
Microsoft Azure Container Services can be used for container deployment in a variety of ways including support for Orchestrators like Kubernetes, Docker Swarm and Mesos. However, the abstraction for app development that support application self-healing, scaling and so on may not be at the right level. Helm and Draft makes this a lot easier. In this primarily demo-driven session at @DevOpsSummit at 21st Cloud Expo, Raghavan "Rags" Srinivas, a Cloud Solutions Architect/Evangelist at Microsoft, wi...
As you move to the cloud, your network should be efficient, secure, and easy to manage. An enterprise adopting a hybrid or public cloud needs systems and tools that provide: Agility: ability to deliver applications and services faster, even in complex hybrid environments Easier manageability: enable reliable connectivity with complete oversight as the data center network evolves Greater efficiency: eliminate wasted effort while reducing errors and optimize asset utilization Security: imple...
Containers are rapidly finding their way into enterprise data centers, but change is difficult. How do enterprises transform their architecture with technologies like containers without losing the reliable components of their current solutions? In his session at @DevOpsSummit at 21st Cloud Expo, Tony Campbell, Director, Educational Services at CoreOS, will explore the challenges organizations are facing today as they move to containers and go over how Kubernetes applications can deploy with lega...
High-velocity engineering teams are applying not only continuous delivery processes, but also lessons in experimentation from established leaders like Amazon, Netflix, and Facebook. These companies have made experimentation a foundation for their release processes, allowing them to try out major feature releases and redesigns within smaller groups before making them broadly available. In his session at 21st Cloud Expo, Brian Lucas, Senior Staff Engineer at Optimizely, will discuss how by using...
Today most companies are adopting or evaluating container technology - Docker in particular - to speed up application deployment, drive down cost, ease management and make application delivery more flexible overall. As with most new architectures, this dream takes significant work to become a reality. Even when you do get your application componentized enough and packaged properly, there are still challenges for DevOps teams to making the shift to continuous delivery and achieving that reducti...
In this strange new world where more and more power is drawn from business technology, companies are effectively straddling two paths on the road to innovation and transformation into digital enterprises. The first path is the heritage trail – with “legacy” technology forming the background. Here, extant technologies are transformed by core IT teams to provide more API-driven approaches. Legacy systems can restrict companies that are transitioning into digital enterprises. To truly become a lead...
Is advanced scheduling in Kubernetes achievable? Yes, however, how do you properly accommodate every real-life scenario that a Kubernetes user might encounter? How do you leverage advanced scheduling techniques to shape and describe each scenario in easy-to-use rules and configurations? In his session at @DevOpsSummit at 21st Cloud Expo, Oleg Chunikhin, CTO at Kublr, will answer these questions and demonstrate techniques for implementing advanced scheduling. For example, using spot instances ...
With major technology companies and startups seriously embracing Cloud strategies, now is the perfect time to attend 21st Cloud Expo October 31 - November 2, 2017, at the Santa Clara Convention Center, CA, and June 12-14, 2018, at the Javits Center in New York City, NY, and learn what is going on, contribute to the discussions, and ensure that your enterprise is on the right path to Digital Transformation.
SYS-CON Events announced today that Yuasa System will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Yuasa System is introducing a multi-purpose endurance testing system for flexible displays, OLED devices, flexible substrates, flat cables, and films in smartphones, wearables, automobiles, and healthcare.
SYS-CON Events announced today that CAST Software will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 - Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. CAST was founded more than 25 years ago to make the invisible visible. Built around the idea that even the best analytics on the market still leave blind spots for technical teams looking to deliver better software and prevent outages, CAST provides the software intelligence that matter ...
SYS-CON Events announced today that Daiya Industry will exhibit at the Japanese Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Ruby Development Inc. builds new services in short period of time and provides a continuous support of those services based on Ruby on Rails. For more information, please visit https://github.com/RubyDevInc.
When it comes to cloud computing, the ability to turn massive amounts of compute cores on and off on demand sounds attractive to IT staff, who need to manage peaks and valleys in user activity. With cloud bursting, the majority of the data can stay on premises while tapping into compute from public cloud providers, reducing risk and minimizing need to move large files. In his session at 18th Cloud Expo, Scott Jeschonek, Director of Product Management at Avere Systems, discussed the IT and busine...
SYS-CON Events announced today that Evatronix will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Evatronix SA offers comprehensive solutions in the design and implementation of electronic systems, in CAD / CAM deployment, and also is a designer and manufacturer of advanced 3D scanners for professional applications.
As businesses evolve, they need technology that is simple to help them succeed today and flexible enough to help them build for tomorrow. Chrome is fit for the workplace of the future — providing a secure, consistent user experience across a range of devices that can be used anywhere. In her session at 21st Cloud Expo, Vidya Nagarajan, a Senior Product Manager at Google, will take a look at various options as to how ChromeOS can be leveraged to interact with people on the devices, and formats th...