Allied Nevada Announces Hycroft Mill Expansion Prefeasibility Study Results With 26.5% IRR(1) and $1.7 Billion NPV(1)

On-Site Oxidation and Staged Construction Schedule Reduce Construction and Operating Risks

RENO, NEVADA -- (Marketwired) -- 04/22/14 -- Allied Nevada Gold Corp. ("Allied Nevada", "we', "us", "our" or the "Company") (TSX: ANV)(NYSE MKT: ANV) is pleased to provide a summary of the prefeasibility study results for the Hycroft mill expansion, completed by M3 Engineering and Technology ("M3") in association with the Company. M3 developed the process flow sheet, capital cost estimate, operating cost estimate and financial model, while Allied Nevada developed the mineral reserves and mine plan. The prefeasibility study assumes a two-phase construction plan for the mill expansion. With the successful completion and positive results of the Ambient Alkaline Oxidation ("AAO") pilot plant, we have incorporated the onsite oxidation of the sulfide concentrate into the prefeasibility study, which should allow us to produce dore on-site for sale (as compared with the previous plan of selling concentrate).

Key Highlights of the Prefeasibility Study

Results of the prefeasibility study, based on a $1,300 per ounce of gold price and a $21.67 per ounce of silver price, include the following:


--  Average annual production for the first five years of full production
    (2018-2022) of approximately 450,000 ounces of gold and 21.0 million
    ounces of silver (approximately 800,000 ounces gold equivalent(2))

--  Average adjusted cash costs per ounce(3) for the first five years of
    full production of $478 annually (with silver as a byproduct credit)

--  Mining and processing life of 20 years

--  Two phase construction schedule reduces construction risk and moderates
    capital spending program; 60,000 tons of ore per day ("tpd") capacity in
    Phase 1 and increasing to 120,000 tpd in Phase 2

--  Addition of on-site AAO circuit to oxidize and process sulfide
    concentrate to produce dore on-site

--  Phase 1 capital of $900 million(1) to deliver annual production of
    550,000 ounces gold equivalent in 2017

--  Phase 2 capital of $422 million to increase average annual production to
    approximately 800,000 ounces gold equivalent beginning in 2018

--  Life-of-mine ("LOM") after tax internal rate of return ("IRR")(1) of
    26.5%

--  LOM net present value ("NPV")(1) of $1.7 billion (at a 5% discount)

"I have stated repeatedly since joining Allied Nevada that I believe that the Hycroft mill expansion is a project that needs to be built," commented Randy Buffington, President and CEO. "There aren't many large projects today located in politically stable jurisdictions with complimentary infrastructure like this one. The ability to produce dore on-site using the AAO process is a significant step toward derisking the project. I believe this prefeasibility study addresses many of the risks associated with the previous plans, while maintaining robust financial returns."

The following summarizes LOM assumptions for the mill expansion project:


----------------------------------------------------------------------------
                                                                         LOM
                                                                 (2014-2033)
----------------------------------------------------------------------------
Total tons of ore processed (000s)                                   934,020
----------------------------------------------------------------------------
Grade - Au (ounces per ton)                                            0.011
----------------------------------------------------------------------------
Grade - Ag (ounces per ton)                                             0.50
----------------------------------------------------------------------------
Total gold ounces sold (000s)                                          7,366
----------------------------------------------------------------------------
Total silver ounces sold (000s)                                      328,606
----------------------------------------------------------------------------
Total gold equivalent ounces sold (000s)                              12,843
----------------------------------------------------------------------------
Total revenue at $1,300/oz Au and $21.67/oz Ag (millions)            $16,696
----------------------------------------------------------------------------
Revenue per ton processed                                             $17.88
----------------------------------------------------------------------------
Mining cost per ton mined                                              $1.40
----------------------------------------------------------------------------
Milling cost per ton of ore milled (includes all treatment
 costs)                                                                $8.83
----------------------------------------------------------------------------
Heap leach cost per ton of ore heap leached (includes
 crushing)                                                             $2.53
----------------------------------------------------------------------------
G&A cost per ton of ore processed                                      $0.35
----------------------------------------------------------------------------
Nevada Net Proceeds Tax and refining cost per ton of ore
 processed                                                             $0.45
----------------------------------------------------------------------------

Construction path

Based upon the prefeasibility study, construction of the full plant is designed and scheduled to be completed in two phases. Phase 1 of the mill construction is expected to include: one grinding line, comprised of one semi-autogenous ("SAG") mill and two ball mills and a regrind mill, capable of processing up to 60,000 tpd; sulfide flotation cells; tails leach tanks; oxidation tanks; an oxygen plant; starter tails capacity; and the associated infrastructure for these facilities. In Phase 1, the rail spur and power requirements are expected to be constructed. Current estimates assume that the oxygen plant will be constructed by a third party vendor, which is accounted for in operating costs. The flow sheet will be designed with three streams to process; (1) whole ore; (2) sulfide with the AAO plant; or (3) transitional material with the AAO circuit and a tails leach plant. Our projections are based on construction of Phase 1 commencing in the last quarter of 2014, which is dependent on our ability to secure the necessary financing. Phase 1 is scheduled to be completed within 24 months, which would result in commissioning in the last quarter of 2016.

Upon successful commissioning of Phase 1 of the mill expansion, we intend to begin construction of Phase 2. Phase 2 is designed to increase the mill capacity to 120,000 tpd by adding a second grinding line, comprised of an additional SAG mill and two additional ball mills, additional flotation cells and additional tanks for the AAO circuit commensurate with the increased capacity of the grinding circuit. Under the prefeasibility study, construction of Phase 2 is currently projected to begin commissioning in the last quarter of 2017.



                      ------------------------------------------------------
                                  PHASE 1                    PHASE 2
----------------------------------------------------------------------------
Expansion includes:    - Mill infrastructure      - 1 x SAG mill
                       - 1 x SAG mill             - 2 x Ball mills
                       - 2 x Ball mills           - Increased flotation
                                                    capacity
                       - Partial flotation        - Additional tanks for AAO
                         circuit                    and tails leach circuits
                       - Partial AAO circuit
                       - Oxygen plant (over the
                         fence)
                       - Tails leach plant
                       - Rail spur and trona
                         handling
                       - Power line
                       - Tails impoundment
----------------------------------------------------------------------------

Flow Sheet Description and Significant Changes

Mining initially will be conducted using the existing fleet of mining equipment at Hycroft. Between 2017 and 2025 we expect to add two additional wire rope shovels and 19 haul trucks. The current crushing circuit will act as the primary crusher for the mill, with the secondary and tertiary crushers being used for pre-crushing and pebble crushing, respectively.

The major components of the milling facility are crushing (existing), grinding, flotation, oxidation, tails leach and Merrill-Crowe (existing). Significant changes to the flow sheet include the elimination of cleaner flotation and the autoclave facility and the addition of a fourth ball mill, AAO circuit, oxygen plant and tails leach plant. We anticipate adding a high-grade filter press and additional refinery capacity to the existing Merrill-Crowe plant to process the increase in production from the sulfide mill.

The current mill design is expected to have three stream capabilities, including:


1.  Mill Stream 1 (Whole ore leach) - highly oxidized transitional ore is
    ground and leached in the tails leach plant.

2.  Mill Stream 2 (Sulfide processing) - sulfidic ore is ground and floated
    to create a concentrate. The concentrate is oxidized through the AAO
    plant and leached to extract the gold and silver.

3.  Mill Stream 3 (Partially oxidized transition processing) - transition
    material that is partially oxidized is ground and floated to create a
    concentrate. The concentrate is oxidized and leached, while the
    remaining material that does not float (the flotation tails) is leached
    directly.

Average recovery rates vary depending on the process stream. LOM average recoveries are projected to be as follows:


           ----------------------------------------------------------------
                         GOLD                           SILVER
           ----------------------------------------------------------------
             Contained  Recovered Recovery   Contained   Recovered Recovery
                Ounces     Ounces      (%)      Ounces      Ounces      (%)
---------------------------------------------------------------------------
Heap Leach:
---------------------------------------------------------------------------
- Run-of-
 mine        1,695,600    929,373     54.8  61,559,646   8,681,552     14.1
---------------------------------------------------------------------------
- Crushed      334,456    238,776     71.4  13,612,611   3,004,196     22.1
---------------------------------------------------------------------------
Mill stream
 1             836,646    556,804     66.6  35,563,100  26,969,509     75.8
---------------------------------------------------------------------------
Mill stream
 2           6,552,751  4,678,108     71.4 259,717,083 208,878,702     80.4
---------------------------------------------------------------------------
Mill stream
 3           1,009,395    741,827     73.5  93,343,558  83,948,674     89.9
-----------================================================================
TOTAL       10,428,847  7,144,887     68.5 463,795,999 331,482,633     71.5
-----------================================================================

Economic Analysis

As noted above, the results of the revised prefeasibility study indicate an IRR projected to be 26.5% and a NPV projected to be $1.7 billion at a discount rate of 5%, assuming gold and silver prices of $1,300 per ounce and $21.67 per ounce, respectively and based on additional assumptions set forth in the table titled "Assumptions used in the prefeasibility study estimate" at the end of this press release. The initial capital to construct the mill and associated infrastructure is on a go-forward basis and does not include capital spent to date on the mill expansion such as mills and motors, crushing and excavation. The cash flow model considers the current heap leach revenue and costs as part of the project. The capital estimate to construct the mill in two phases is presented in the following table.



                                            --------------------------------
                                               PHASE 1    PHASE 2      Total
                                              millions   millions   millions
----------------------------------------------------------------------------
Direct costs                                    $525.4     $276.2     $801.6
----------------------------------------------------------------------------
Indirect costs (includes contingency)           $262.9     $138.3     $401.1
----------------------------------------------------------------------------
Owners cost                                     $111.8       $7.4     $119.2
----------------------------------------------------------------------------
Total capital                                   $900.1     $421.9   $1,322.0
----------------------------------------------------------------------------

The Hycroft mill expansion is projected to generate a significant amount of gold and silver at relatively low adjusted cash costs per ounce(3). The project, however, is extremely sensitive to metal prices. The following table illustrates the sensitivity to changes to the calculated IRR and NPV(1) at 0% and 5% discount rates at various gold and silver prices and based on a constant ratio of the silver price to the gold price of 60:1. Additional sensitivity would result from changes to this ratio.



----------------------------------------------------------------------------
                          After tax NPV     After tax NPV
      Metal Prices             (0%)              (5%)         After tax IRR
----------------------------------------------------------------------------
     Au          Ag          Billions          Billions             %
----------------------------------------------------------------------------
   $1,200      $20.00          $2.3              $1.1             17.5
----------------------------------------------------------------------------
   $1,300      $21.67          $3.2              $1.7             26.5
----------------------------------------------------------------------------
   $1,400      $23.33          $4.0              $2.2             36.8
----------------------------------------------------------------------------

Next Steps

The Board of Directors has reviewed the results of the prefeasibility study and approved moving forward with completing the feasibility study. M3 is expected to complete the feasibility study by the end of the third quarter.

Financing

We have retained Credit Suisse Securities (USA) LLC and expect to retain Scotia Capital Inc. to advise us and execute on financing and/or investment options for the mill expansion capital requirements.

Mineral Reserve and Resource Update

The revised prefeasibility study was based on the Proven and Probable Mineral Reserves estimated at December 31, 2013, as updated to reflect the new mine plan and for the economics of the study, of 10.6 million ounces of gold and 467.1 million ounces of silver. Proven and Probable Mineral Reserves were calculated using a $1,200 per ounce gold price and a $20 per ounce silver price.

Conference Call Information

We will host a conference call and webcast on April 23, 2014, at 8:00 am PT, to discuss the revised prefeasibility study. The listen-only webcast can be accessed from the home page of our website at www.alliednevada.com. To dial-in to the conference call and participate in the questions and answer session, please dial:

North America toll-free - 1-866-782-8903

Outside of North America - 1-647-426-1845

An audio recording of the call will be archived on our website at www.alliednevada.com.

Assumptions used in the prefeasibility study estimate:


----------------------------------------------------------------------------
Parameter             Assumption            Description
----------------------------------------------------------------------------
Mining years          17 years              150 million tons per year
                                            ("mtpy") by 2017, 200 mtpy by
                                            2025
----------------------------------------------------------------------------
Processing years      20 years              Last 3 years are from stockiles
----------------------------------------------------------------------------
Inflation             None - real basis     All projected revenue and costs
                                            were assumed to be in January 1,
                                            2014 real terms, with no
                                            inflation applied.
----------------------------------------------------------------------------
Starting basis        January 1, 2014 go-   All economic analyses were done
                      forward               on a January 1, 2014, "go-
                                            forward" basis.
----------------------------------------------------------------------------
Capital structure     Unlevered             No debt financing or interest
                                            payments were assumed.
----------------------------------------------------------------------------
Discount rate         5% real               All the NPVs shown in this
                                            report were calculated using a
                                            discount rate of 5%. Sensitivity
                                            analysis has been completed for
                                            0% and 10% discount rates.
----------------------------------------------------------------------------
Metal prices (base    $1,300/oz Au,         Commodity prices were assumed to
 case)                $21.67/oz Ag (60:1)   be constant over the DCF
                                            timeframe.
----------------------------------------------------------------------------
Refining charge       $ 0.75 per Au and Ag  Applied a refining charge of
                      oz                    $ 0.50/oz and a deleterious
                                            elements charge of $0.25/oz.
----------------------------------------------------------------------------
Melt loss             -0.5% Au and Ag       Applied to account for melt
                                            losses during the refining
                                            process.
----------------------------------------------------------------------------
Payable metal         99.9% Au and 99.0% Ag Assumptions to arrive at payable
                                            metal are based on the current
                                            contract with Johnson Matthey.
----------------------------------------------------------------------------

Summary of updated mine plan and assumed economics:


                                --------------------------------------------
                                  First 5 Years  Life of Project
                                        Average          Average  LOM Totals
                                    (2018-2022)      (2018-2029) (2014-2033)
----------------------------------------------------------------------------
Production
 Information:
Total tons of ore
 processed - heap
 leach                  (000's)          11,070            8,342     225,934
Tons of ore processed
 - mill                 (000's)          43,680           43,750     708,085
Tons of waste mined     (000's)          88,938           98,100   1,454,192
----------------------------------------------------------------------------
Total tons              (000's)         143,688          150,192   2,388,212
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Contained gold                          615,094          610,151  10,428,847
----------------------------------------------------------------------------
Contained silver                     27,620,521       27,144,492 463,795,999
----------------------------------------------------------------------------
Ounces sold - gold                      449,413          438,040   7,366,306
Ounces sold - silver                 21,022,341       21,247,041 328,605,552
----------------------------------------------------------------------------
Ounces sold - gold
 equivalent                             799,786          792,157  12,843,065
----------------------------------------------------------------------------

Cash Flow Information:
Cash inflows:
----------------------------------------------------------------------------
Revenue from metal
 sales                 ($ 000's)      1,039,722        1,029,805  16,695,985
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Cash outflows:
----------------------------------------------------------------------------
 Operating costs       ($ 000's)        670,241          637,105  11,173,832
----------------------------------------------------------------------------
 Income taxes          ($ 000's)         16,685           37,764     497,408
 Inventory adjustments ($ 000's)          2,792           21,742   (263,593)
 Reclamation spending
  & salvage            ($ 000's)              -                -      77,413
 Capital spending      ($ 000's)         45,965           37,841   2,029,305
----------------------------------------------------------------------------
Total Cash Outflows    ($ 000's)        735,683          734,451  13,514,364
----------------------------------------------------------------------------
----------------------------------------------------------------------------
 Net Cash Flow         ($ 000's)        304,038          295,353   3,181,620
----------------------------------------------------------------------------
----------------------------------------------------------------------------
After-tax NPV @ 5%     ($ 000's)                                   1,681,985
After-tax NPV @ 10%    ($ 000's)                                     887,850
After-tax Internal
 Rate of Return            %                                            26.5
Adjusted cash costs(3)
 per gold ounce sold:
 With silver as
  byproduct credit      ($ / Oz)            478              404         550
 Gold equivalent        ($ / Oz)            838              804         870
----------------------------------------------------------------------------
----------------------------------------------------------------------------
From a silver
 production and sales
 point of view:
 Silver equivalent
  production (ounces
  Ag)                                47,987,121       47,529,441  40,774,889
 Adjusted cash costs
  per ounce with gold
  as a byproduct
  credit ($/silver
  ounce sold)                                $2               $1          $3
----------------------------------------------------------------------------

Metal selling prices used in determining the economics for the project were $1,300 per ounce of gold and $21.67 per ounce of silver. Gold equivalent is calculated using a 60:1 silver to gold ounce ratio.

No assurance or guarantee is provided that the calculated IRR or NPV values will be achieved. Actual results may differ materially.

Allied Nevada will file an NI 43-101 compliant Technical Report within the regulatory timeframe. Once filed the report will be available at www.alliednevada.com or under the Company's profile at www.sedar.com.



----------------------------------------------------------------------------
           Proven & Probable Mineral Reserves - December 31, 2013
----------------------------------------------------------------------------
                           Tons          Grades      Contained Ounces (000s)
----------------------------------------------------------------------------
                            (000s)    Au    Ag  AuEq      Au      Ag    AuEq
----------------------------------------------------------------------------
Proven Heap Leach          163,479 0.009  0.14 0.011   1,440  22,446   1,814
Probable Heap Leach         45,561 0.008  0.72 0.020     342  32,924     891
----------------------------------------------------------------------------
Total Proven & Probable
 Heap Leach                209,041 0.009  0.26 0.013   1,782  55,370   2,705
----------------------------------------------------------------------------

----------------------------------------------------------------------------
Proven Mill                593,559 0.012  0.57 0.022   7,144 340,823  12,825
Probable Mill              148,402 0.011  0.48 0.019   1,630  70,953   2,812
----------------------------------------------------------------------------
Total Proven & Probable
 Mill                      741,960 0.012  0.55 0.021   8,774 411,776  15,980
----------------------------------------------------------------------------

----------------------------------------------------------------------------
TOTAL PROVEN & PROBABLE
 MINERAL RESERVES          951,001 0.011  0.49 0.019  10,556 467,146  18,342
----------------------------------------------------------------------------
Waste                    1,444,275
----------------------------------
Total Tons               2,395,276
----------------------------------
Strip Ratio                   1.52
----------------------------------

For additional information on key assumptions, parameters and methods used to estimate the mineral reserves, including quality assurance measures and other technical information in respect of the Hycroft Mine, please refer to our technical report entitled "Technical Report - Allied Nevada Gold Corp. - Hycroft Mine, Winnemucca, Nevada, USA" and dated March 6, 2013. Allied Nevada expects to file an updated Technical Report within the regulatory timeframe required by National Instrument 43-101 requirements.

Cautionary Statement Regarding Forward Looking Information

This press release contains forward-looking statements within the meaning of Section 27A of the U.S. Securities Act of 1933, as amended (the "Securities Act"), Section 21E of the U.S. Securities Exchange Act of 1934, as amended (the "Exchange Act") (and the equivalent under Canadian securities laws) and the Private Securities Litigation Reform Act (the "PSLRA") or in releases made by the U.S. Securities and Exchange Commission (the "SEC"), all as may be amended from time to time. This cautionary statement is being made pursuant to the Securities Act, the Exchange Act and the PSLRA with the intention of obtaining the benefit of the "safe harbor" provisions of such laws. All statements, other than statements of historical fact, included herein or incorporated by reference, that address activities, events or developments that we expect or anticipate will or may occur in the future, are forward-looking statements. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "estimate", "plan", "anticipate", "expect", "intend", "believe", "project", "target", "budget", "may", "can", "will", "would", "could", "should", "seeks", or "scheduled to", or other similar words, or negatives of these terms or other variations of these terms or comparable language or any discussion of strategy or intentions. Such forward-looking statements include, without limitation, statements regarding our future business strategy, plans and goals; future gold and silver prices; the timing of or expected results of the completed feasibility study; delays in processing gold and silver; the potential for confirming, upgrading and expanding gold and silver mineralized material at Hycroft; reserve and resource estimates and the timing of the release of updated estimates; estimates of gold and silver grades; future prices for gold and silver; recovery rates for gold and silver; anticipated operating, capital and construction costs, anticipated sales, project economics, net present values and expected rates of return; the realization of expansion and construction activities and the costs and timing thereof; availability and cost of financing; production estimates and other statements that are not historical facts. Forward-looking statements address activities, events or developments that Allied Nevada expects or anticipates will or may occur in the future, and are based on current expectations and assumptions.

These statements involve known and unknown risks, uncertainties, assumptions and other factors which may cause our actual results, performance or achievements to be materially different from any results, performance or achievements expressed or implied by such forward-looking statements. Important factors that could cause actual results, performance or achievements to differ materially from those in the forward-looking statements include, among others, risks that Allied Nevada's exploration and property advancement efforts will not be successful; risks relating to fluctuations in the price of gold and silver; an increase in the cost or timing of new projects; the inherently hazardous nature of mining-related activities; uncertainties concerning reserve, resource and grade estimates; uncertainties relating to obtaining approvals and permits from governmental regulatory authorities; and availability and timing of capital for financing the Company's exploration, development and expansion activities, including the uncertainty of being able to raise capital on favorable terms or at all; as well as those factors discussed in Allied Nevada's filings with the SEC including Allied Nevada's latest Annual Report on Form 10-K and its other SEC filings (and Canadian filings) including, without limitation, its latest Quarterly Report on Form 10-Q (which may be secured from us, either directly or from our website at www.alliednevada.com or at the SEC website www.sec.gov).

Although Allied Nevada has attempted to identify important factors that could cause actual results, performance or achievements to differ materially from those described in forward-looking statements, there may be other factors that cause results, performance or achievements not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results, performance and achievements and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company does not intend to publicly update any forward-looking statements, whether as a result of new information, future events, or otherwise, except as may be required under applicable securities laws. The technical contents of this news release have been prepared under the supervision of Daniel Roth, Project Manager at M3 Engineering and Technology, and Tony Peterson, Corporate Mine Engineer at Allied Nevada Gold Corp., a Registered Professional Engineer in the State of Colorado #43867 who are Qualified Persons as defined by National Instrument 43-101. For further information regarding the quality assurance program and the quality control measures applied, as well as other relevant technical information, please see the Hycroft Technical Report which will be filed within the regulatory timeframe on www.sedar.com.

Cautionary Note to U.S. Investors - The United States Securities and Exchange Commission permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We use certain terms on this website (or press release), such as "measured," "indicated," and "inferred" "resources," which the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC. U.S. Investors are urged to consider closely the disclosure in our Form 10-K which may be secured from our website or the SEC website at http://www.sec.gov/edgar.shtml.

Non-GAAP Measures - Adjusted cash costs per ounce is a non-GAAP financial measure, calculated on a per ounce of gold sold basis, and includes all direct and indirect operating cash costs related to the physical activities of producing gold, including mining, processing, cash portions of production costs written-down, third party refining expenses, on-site administrative and support costs, royalties, and mining production taxes, net of revenue earned from silver sales. Because we are a primary gold producer and our operations focus on maximizing profits and cash flows from the extraction and sale of gold, we believe that silver revenue is peripheral and not material to our key performance measures or our Hycroft Mine operating segment and, as such, adjusted cash costs per ounce is reduced by the benefit received from silver sales.

Adjusted cash costs per ounce provides management and investors with a further measure, in addition to conventional measures prepared in accordance with GAAP, to assess the performance of our mining operations and ability to generate cash flows over multiple periods from the sale of gold. Non-GAAP financial measures do not have any standardized meaning prescribed by GAAP and, therefore, may not be comparable to similar measures presented by other mining companies. Accordingly, the above measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP.



(1)  All costs are on a go-forward basis and consider capital spent to date
     as sunk costs.  Net Present Value ("NPV") and Internal Rate of Return
     ("IRR") are calculated using $1,300 per gold ounce and $21.67 per
     silver ounce and additional assumptions set forth in the table titled
     "Assumptions used in the prefeasibility study estimate" at the end of
     this press release. No assurance or guarantee is provided that the
     calculated IRR or NPV values will be achieved.  Actual results may
     differ materially.

(2)  Gold equivalent values are calculated using a 60:1 silver to gold
     ratio.

(3)  The term "adjusted cash costs per ounce" is a non-GAAP financial
     measure. Non-GAAP financial measures do not have any standardized
     meaning prescribed by GAAP and, therefore, should not be considered in
     isolation or as a substitute for measures of performance prepared in
     accordance with GAAP. See the section at the end of this press release
     and in the most recently filed Annual Report on Form 10-K titled "Non-
     GAAP Financial Measures" for further information on adjusted cash costs
     per ounce.

Contacts:
Allied Nevada Gold Corp.
Randy Buffington
President & CEO
(775) 358-4455

Allied Nevada Gold Corp.
Tracey Thom
Vice President, Investor Relations
(775) 789-0119
www.alliednevada.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
MongoDB Atlas leverages VPC peering for AWS, a service that allows multiple VPC networks to interact. This includes VPCs that belong to other AWS account holders. By performing cross account VPC peering, users ensure networks that host and communicate their data are secure. In his session at 20th Cloud Expo, Jay Gordon, a Developer Advocate at MongoDB, will explain how to properly architect your VPC using existing AWS tools and then peer with your MongoDB Atlas cluster. He'll discuss the secur...
Things are changing so quickly in IoT that it would take a wizard to predict which ecosystem will gain the most traction. In order for IoT to reach its potential, smart devices must be able to work together. Today, there are a slew of interoperability standards being promoted by big names to make this happen: HomeKit, Brillo and Alljoyn. In his session at @ThingsExpo, Adam Justice, vice president and general manager of Grid Connect, will review what happens when smart devices don’t work togethe...
Building a cross-cloud operational model can be a daunting task. Per-cloud silos are not the answer, but neither is a fully generic abstraction plane that strips out capabilities unique to a particular provider. In his session at 20th Cloud Expo, Chris Wolf, VP & Chief Technology Officer, Global Field & Industry at VMware, will discuss how successful organizations approach cloud operations and management, with insights into where operations should be centralized and when it’s best to decentraliz...
SYS-CON Events announced today that Juniper Networks (NYSE: JNPR), an industry leader in automated, scalable and secure networks, will exhibit at SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. Juniper Networks challenges the status quo with products, solutions and services that transform the economics of networking. The company co-innovates with customers and partners to deliver automated, scalable and secure network...
Deep learning has been very successful in social sciences and specially areas where there is a lot of data. Trading is another field that can be viewed as social science with a lot of data. With the advent of Deep Learning and Big Data technologies for efficient computation, we are finally able to use the same methods in investment management as we would in face recognition or in making chat-bots. In his session at 20th Cloud Expo, Gaurav Chakravorty, co-founder and Head of Strategy Development ...
DevOps is often described as a combination of technology and culture. Without both, DevOps isn't complete. However, applying the culture to outdated technology is a recipe for disaster; as response times grow and connections between teams are delayed by technology, the culture will die. A Nutanix Enterprise Cloud has many benefits that provide the needed base for a true DevOps paradigm. In his Day 3 Keynote at 20th Cloud Expo, Chris Brown, a Solutions Marketing Manager at Nutanix, will explore t...
Most companies are adopting or evaluating container technology - Docker in particular - to speed up application deployment, drive down cost, ease management and make application delivery more flexible overall. As with most new architectures, this dream takes a lot of work to become a reality. Even when you do get your application componentized enough and packaged properly, there are still challenges for DevOps teams to making the shift to continuous delivery and achieving that reduction in cost...
SYS-CON Events announced today that SoftLayer, an IBM Company, has been named “Gold Sponsor” of SYS-CON's 18th Cloud Expo, which will take place on June 7-9, 2016, at the Javits Center in New York, New York. SoftLayer, an IBM Company, provides cloud infrastructure as a service from a growing number of data centers and network points of presence around the world. SoftLayer’s customers range from Web startups to global enterprises.
Imagine having the ability to leverage all of your current technology and to be able to compose it into one resource pool. Now imagine, as your business grows, not having to deploy a complete new appliance to scale your infrastructure. Also imagine a true multi-cloud capability that allows live migration without any modification between cloud environments regardless of whether that cloud is your private cloud or your public AWS, Azure or Google instance. Now think of a world that is not locked i...
Technology innovation is the driving force behind modern business and enterprises must respond by increasing the speed and efficiency of software delivery. The challenge is that existing enterprise applications are expensive to develop and difficult to modernize. This often results in what Gartner calls "Bimodal IT," where business struggle to apply modern tools and practices to traditional monolithic applications. But these existing assets can be modernized and made more efficient without havin...
SYS-CON Events announced today that CA Technologies has been named “Platinum Sponsor” of SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY, and the 21st International Cloud Expo®, which will take place October 31-November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. CA Technologies helps customers succeed in a future where every business – from apparel to energy – is being rewritten by software. From ...
SYS-CON Events announced today that Auditwerx will exhibit at SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. Auditwerx specializes in SOC 1, SOC 2, and SOC 3 attestation services throughout the U.S. and Canada. As a division of Carr, Riggs & Ingram (CRI), one of the top 20 largest CPA firms nationally, you can expect the resources, skills, and experience of a much larger firm combined with the accessibility and attent...
SYS-CON Events announced today that Technologic Systems Inc., an embedded systems solutions company, will exhibit at SYS-CON's @ThingsExpo, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. Technologic Systems is an embedded systems company with headquarters in Fountain Hills, Arizona. They have been in business for 32 years, helping more than 8,000 OEM customers and building over a hundred COTS products that have never been discontinued. Technologic Systems’ pr...
SYS-CON Events announced today that HTBase will exhibit at SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. HTBase (Gartner 2016 Cool Vendor) delivers a Composable IT infrastructure solution architected for agility and increased efficiency. It turns compute, storage, and fabric into fluid pools of resources that are easily composed and re-composed to meet each application’s needs. With HTBase, companies can quickly prov...
SYS-CON Events announced today that Loom Systems will exhibit at SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. Founded in 2015, Loom Systems delivers an advanced AI solution to predict and prevent problems in the digital business. Loom stands alone in the industry as an AI analysis platform requiring no prior math knowledge from operators, leveraging the existing staff to succeed in the digital era. With offices in S...