Newcrest Mining Limited - Quarterly Report for the three months ending 31 March 2014

MELBOURNE, Australia, April 23, 2014 /CNW/ - Newcrest Mining Limited (ASX: NCM) - Quarterly Report for the three months ending 31 March 2014 (these figures are unaudited)

Key Points

  • Quarterly gold production of 551,590 ounces
  • Quarterly copper production of 21,012  tonnes
  • Average realised gold price for the quarter of A$1,450/oz
  • Group All-In Sustaining Cost(1) for the quarter of A$988/oz (US$886/oz)(2)
  • All-In Sustaining Cost(1) at each operation was below the average realised gold price for the quarter
  • Full year guidance maintained with gold production expected to be around the top of the guidance range (2.3Moz) and Group All-In Sustaining Costs expected to be at or below the lower end of the guidance range(3)
  • Cadia Valley production ahead of FY2014(4) guidance but FY2015(4) production is expected to be below 2014(4) with Ridgeway ore grades expected to be lower in 2015(3). Cadia East Panel Cave 2 west crusher commissioned ahead of schedule. Cadia Valley gold production expected to be around 700,000 ounces in FY2016 with a further increase in production expected in FY2017.(3),(4)
  • Lihir will continue to feed the process plant with predominantly stockpile material in FY2015(3),(4)
  • Newcrest's operational priority remains on maximising free cash flow, not maximising production ounces


Newcrest is on track to deliver full year gold production around the top end of the guidance range following production of 551,590 ounces of gold and 21,012 tonnes of copper for the March 2014 quarter with the All-In Sustaining Cost (AISC) of sales being A$988 per ounce (US$886 per ounce).

Gold production for the quarter was 11% lower than the previous quarter, primarily due to lower mill throughput associated with increased maintenance activity, which included a conveyor belt replacement at Ridgeway, a shutdown to complete the Cadia East west crusher tie-in and processing plant maintenance at Lihir. Lower production at Telfer, Ridgeway and Lihir for the quarter was partially offset by the production ramp-up at Cadia East.

Development of Cadia East Panel Cave 2 continued with the commissioning of the Panel Cave 2 west crusher and associated materials handling infrastructure completed ahead of schedule during the quarter. The additional crushing capacity will enable the production ramp-up at Cadia East to continue.

All-In Sustaining Cost of A$988 per ounce was 7% higher than the previous quarter primarily due to a 24% increase in sustaining capital expenditure per ounce and a 15% reduction in by-product credits per ounce compared to the previous quarter, partially offset by lower site operating costs. Each operation again had an All-In Sustaining Cost below the average realised gold price for the quarter of A$1,450 per ounce.

Newcrest Managing Director and Chief Executive Officer, Greg Robinson, said: "Newcrest continues to maintain a sharp focus on cost reduction initiatives across the entire business. Our year-to-date All-In Sustaining Cost of A$998 per ounce is A$285 per ounce lower than last financial year which has enabled us to expand our All-In Sustaining Cost operating margin to A$462 per ounce this quarter despite the lower gold price environment."

Exploration activities continued during the March 2014 quarter with positive drilling results at Wafi-Golpu and Gosowong.

During the quarter the Company announced that it had completed arrangements to extend the tenor of its existing bilateral bank loan facilities providing a smoother and longer average maturity profile with no material change to terms and conditions and no increase in interest cost.

(1)  All-In Sustaining Cost metrics as per World Gold Council Guidance Note on Non-GAAP Metrics, released 27 June 2013. Newcrest Group All-In Sustaining Cost will vary from quarter to quarter as a result of various factors including production performance, timing of sales, the level of sustaining capital and the relative contribution of each asset.
(2) March 2014 quarter All-In Sustaining Costs in USD terms are converted to USD at an average A$:US$ exchange rate for the quarter of $0.896.
(3) Subject to market and operating conditions - refer to Newcrest's Forward Looking Statements disclaimer on page 22.
(4) Refers to financial years ending 30 June.


Subject to market and operating conditions(5)

  • Full year production guidance is maintained for both gold and copper, with gold production expected to be around the top end of the guidance range (2.3 million ounces); and
  • Full Year Group All-In Sustaining Cost $M - including exploration, production stripping and sustaining capital expenditure - is expected to be at or below the lower end of the guidance range.

Guidance for the 2015 financial year will be provided in due course following completion of the budgeting process for 2015 which will be around the time of release of the June 2014 Quarterly results. At this stage, subject to completion of the budgeting process and market and operating conditions:

  • Cadia Valley production for the 2015 financial year is likely to be below that of the 2014 financial year principally due to lower gold and copper grades at Ridgeway, subject also to Cadia East Panel Cave 2 development rates. For the 2014 financial year, Cadia Valley is expected to produce above the guidance range(3) (480,000 to 530,000), principally due to unexpectedly higher grades at the Ridgeway operations, which are not expected to continue in the 2015 financial year. Overall, Cadia Valley gold production is expected to be around 700,000 ounces in the 2016 financial year with a further increase in production expected in the 2017 financial year(3); and
  • as part of its focus on cash maximisation, Lihir is likely to again have an elevated level of stockpile feed in the 2015 financial year such that production in the 2015 financial year is likely to be in the same range as for the 2014 financial year(3).

(5) Refer to Newcrest's Forward Looking Statements disclaimer on page 22 of the report

Forward Looking Statements

These materials include forward looking statements. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as "may", "will", "expect", "intend", "plan", "estimate", "anticipate", "continue", and "guidance", or other similar words and may include, without limitation, statements regarding plans, strategies and objectives of management, anticipated production or construction commencement dates and expected costs or production outputs.

Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the company's actual results, performance and achievements to differ materially from any future results, performance or achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the company operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues and litigation.

Forward looking statements are based on the company and its management's good faith assumptions relating to the financial, market, regulatory and other relevant environments that will exist and affect the company's business and operations in the future.  The company does not give any assurance that the assumptions on which forward looking statements are based will prove to be correct, or that the company's business or operations will not be affected in any material manner by these or other factors not foreseen or foreseeable by the company or management or beyond the company's control.

Although the company attempts and has attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in forward looking statements, there may be other factors that could cause actual results, performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the reasonable control of the company.  Accordingly, readers are cautioned not to place undue reliance on forward looking statements.  Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this information the company does not undertake any obligation to publicly update or revise any of the forward looking statements or to advise of any change in events, conditions or circumstances on which any such statement is based.

Ore Reserves and Mineral Resources Reporting Requirements

As an Australian company with securities listed on the Australian Securities Exchange ("ASX"), Newcrest is subject to Australian disclosure requirements and standards, including the requirements of the Corporations Act and the ASX. Investors should note that it is a requirement of the ASX listing rules that the reporting of ore reserves and mineral resources in Australia comply with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the "JORC Code") and that Newcrest's ore reserve and mineral resource estimates comply with the JORC Code. Newcrest ceased its listing on the Toronto Stock Exchange ("TSX") on 4 September 2013, but will remain subject to certain Canadian disclosure requirements and standards until it ceases to be an Ontario Securities Commission registrant. Prior to that, Newcrest will continue, in accordance with the requirements of National Instrument 43-101 - Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators, to report its ore reserves and mineral resources estimates in compliance with the JORC Code, along with a reconciliation to the material differences between the JORC Code and the applicable definitions adopted by the Canadian Institute of Mining, Metallurgy and Petroleum (CIM Definition Standards). In relation to the December 2013 Resources and Reserves Statement, released to the ASX on 14 February 2014, the reconciliation is set out in Newcrest's Canadian News Release dated 14 February 2014, and is available at and at Newcrest's website  Except as otherwise noted in that document, there are no material differences between the definitions of Measured, Indicated and Inferred Mineral Resources, and Proven and Probable Reserves, under the CIM Definition Standards and the equivalent or corresponding definitions in the JORC Code.

Competent Person's Statement

The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources and Ore Reserves and other scientific and technical information, is based on information compiled by Mr C. Moorhead. Mr Moorhead is the Executive General Manager Minerals and a full-time employee of Newcrest Mining Limited. He is a shareholder in Newcrest Mining Limited and is entitled to participate in Newcrest's executive equity long term incentive plan, details of which are included in Newcrest's 2013 Remuneration Report. Ore Reserves growth is one of the performance measures under that plan. He is a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Moorhead has sufficient experience which is relevant to the styles of mineralisation and types of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in The JORC Code 2012 and is a Qualified Person within the meaning of National Instrument 43-101 - Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators ("NI 43-101"). Mr Moorhead consents to the inclusion in this report of the matters based on his information in the form and context in which it appears including sampling, analytical and test data underlying the results.

A copy of the release be found on Newcrest's website: and on SEDAR:

SOURCE Newcrest Mining Limited

More Stories By PR Newswire

Copyright © 2007 PR Newswire. All rights reserved. Republication or redistribution of PRNewswire content is expressly prohibited without the prior written consent of PRNewswire. PRNewswire shall not be liable for any errors or delays in the content, or for any actions taken in reliance thereon.

Latest Stories
Culture is the most important ingredient of DevOps. The challenge for most organizations is defining and communicating a vision of beneficial DevOps culture for their organizations, and then facilitating the changes needed to achieve that. Often this comes down to an ability to provide true leadership. As a CIO, are your direct reports IT managers or are they IT leaders? The hard truth is that many IT managers have risen through the ranks based on their technical skills, not their leadership ab...
The revocation of Safe Harbor has radically affected data sovereignty strategy in the cloud. In his session at 17th Cloud Expo, Jeff Miller, Product Management at Cavirin Systems, discussed how to assess these changes across your own cloud strategy, and how you can mitigate risks previously covered under the agreement.
In his General Session at DevOps Summit, Asaf Yigal, Co-Founder & VP of Product at, explored the value of Kibana 4 for log analysis and provided a hands-on tutorial on how to set up Kibana 4 and get the most out of Apache log files. He examined three use cases: IT operations, business intelligence, and security and compliance. Asaf Yigal is co-founder and VP of Product at log analytics software company In the past, he was co-founder of social-trading platform Currensee, which...
SYS-CON Events announced today that Catchpoint, a global leader in monitoring, and testing the performance of online applications, has been named "Silver Sponsor" of DevOps Summit New York, which will take place on June 7-9, 2016 at the Javits Center in New York City. Catchpoint radically transforms the way businesses manage, monitor, and test the performance of online applications. Truly understand and improve user experience with clear visibility into complex, distributed online systems.Founde...
Today air travel is a minefield of delays, hassles and customer disappointment. Airlines struggle to revitalize the experience. GE and M2Mi will demonstrate practical examples of how IoT solutions are helping airlines bring back personalization, reduce trip time and improve reliability. In their session at @ThingsExpo, Shyam Varan Nath, Principal Architect with GE, and Dr. Sarah Cooper, M2Mi’s VP Business Development and Engineering, explored the IoT cloud-based platform technologies driving t...
"eFolder does a lot of different things but we protect data and we are focused on protecting data no matter where it resides," explained Carlo Tapia, Product Marketing Manager at eFolder, in this interview at Cloud Expo, held November 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA.
The Internet of Things (IoT) is growing rapidly by extending current technologies, products and networks. By 2020, Cisco estimates there will be 50 billion connected devices. Gartner has forecast revenues of over $300 billion, just to IoT suppliers. Now is the time to figure out how you’ll make money – not just create innovative products. With hundreds of new products and companies jumping into the IoT fray every month, there’s no shortage of innovation. Despite this, McKinsey/VisionMobile data...
Cloud computing is unquestionably one of the driving forces of DevOps, as the automation of operations transforms enterprise software development. DevOps, however, is more than a technology trend, as it represents a move toward silo-busting, self-organizing horizontal teams that drive business velocity. At the same time, enterprise Digital Transformation represents an upheaval across the enterprise, as customer preferences and behavior drive enterprise technology decisions. This transformation ...
Most of the IoT Gateway scenarios involve collecting data from machines/processing and pushing data upstream to cloud for further analytics. The gateway hardware varies from Raspberry Pi to Industrial PCs. The document states the process of allowing deploying polyglot data pipelining software with the clear notion of supporting immutability. In his session at @ThingsExpo, Shashank Jain, a development architect for SAP Labs, discussed the objective, which is to automate the IoT deployment proces...
Just over a week ago I received a long and loud sustained applause for a presentation I delivered at this year’s Cloud Expo in Santa Clara. I was extremely pleased with the turnout and had some very good conversations with many of the attendees. Over the next few days I had many more meaningful conversations and was not only happy with the results but also learned a few new things. Here is everything I learned in those three days distilled into three short points.
In demand-intensive mobile and web applications, an emerging pattern is to host the Systems of Engagement in the cloud (for maximum responsiveness) but keep the Systems of Record with the other important business systems in the company datacenter, often on a tightly secured mainframe. But what about the space in between? In this IBM Redpaper publication, we show that the IBM Bluemix cloud platform offers technologies that make it easy for cloud-based SoEs to securely connect to on-premises IBM...
DevOps is about increasing efficiency, but nothing is more inefficient than building the same application twice. However, this is a routine occurrence with enterprise applications that need both a rich desktop web interface and strong mobile support. With recent technological advances from Isomorphic Software and others, rich desktop and tuned mobile experiences can now be created with a single codebase – without compromising functionality, performance or usability. In his session at DevOps Su...
As organizations realize the scope of the Internet of Things, gaining key insights from Big Data, through the use of advanced analytics, becomes crucial. However, IoT also creates the need for petabyte scale storage of data from millions of devices. A new type of Storage is required which seamlessly integrates robust data analytics with massive scale. These storage systems will act as “smart systems” provide in-place analytics that speed discovery and enable businesses to quickly derive meaningf...
In his keynote at @ThingsExpo, Chris Matthieu, Director of IoT Engineering at Citrix and co-founder and CTO of Octoblu, focused on building an IoT platform and company. He provided a behind-the-scenes look at Octoblu’s platform, business, and pivots along the way (including the Citrix acquisition of Octoblu).
In his General Session at 17th Cloud Expo, Bruce Swann, Senior Product Marketing Manager for Adobe Campaign, explored the key ingredients of cross-channel marketing in a digital world. Learn how the Adobe Marketing Cloud can help marketers embrace opportunities for personalized, relevant and real-time customer engagement across offline (direct mail, point of sale, call center) and digital (email, website, SMS, mobile apps, social networks, connected objects).