Newcrest Mining Limited - Quarterly Report for the three months ending 31 March 2014

MELBOURNE, Australia, April 23, 2014 /CNW/ - Newcrest Mining Limited (ASX: NCM) - Quarterly Report for the three months ending 31 March 2014 (these figures are unaudited)

Key Points

  • Quarterly gold production of 551,590 ounces
  • Quarterly copper production of 21,012  tonnes
  • Average realised gold price for the quarter of A$1,450/oz
  • Group All-In Sustaining Cost(1) for the quarter of A$988/oz (US$886/oz)(2)
  • All-In Sustaining Cost(1) at each operation was below the average realised gold price for the quarter
  • Full year guidance maintained with gold production expected to be around the top of the guidance range (2.3Moz) and Group All-In Sustaining Costs expected to be at or below the lower end of the guidance range(3)
  • Cadia Valley production ahead of FY2014(4) guidance but FY2015(4) production is expected to be below 2014(4) with Ridgeway ore grades expected to be lower in 2015(3). Cadia East Panel Cave 2 west crusher commissioned ahead of schedule. Cadia Valley gold production expected to be around 700,000 ounces in FY2016 with a further increase in production expected in FY2017.(3),(4)
  • Lihir will continue to feed the process plant with predominantly stockpile material in FY2015(3),(4)
  • Newcrest's operational priority remains on maximising free cash flow, not maximising production ounces

Overview

Newcrest is on track to deliver full year gold production around the top end of the guidance range following production of 551,590 ounces of gold and 21,012 tonnes of copper for the March 2014 quarter with the All-In Sustaining Cost (AISC) of sales being A$988 per ounce (US$886 per ounce).

Gold production for the quarter was 11% lower than the previous quarter, primarily due to lower mill throughput associated with increased maintenance activity, which included a conveyor belt replacement at Ridgeway, a shutdown to complete the Cadia East west crusher tie-in and processing plant maintenance at Lihir. Lower production at Telfer, Ridgeway and Lihir for the quarter was partially offset by the production ramp-up at Cadia East.

Development of Cadia East Panel Cave 2 continued with the commissioning of the Panel Cave 2 west crusher and associated materials handling infrastructure completed ahead of schedule during the quarter. The additional crushing capacity will enable the production ramp-up at Cadia East to continue.

All-In Sustaining Cost of A$988 per ounce was 7% higher than the previous quarter primarily due to a 24% increase in sustaining capital expenditure per ounce and a 15% reduction in by-product credits per ounce compared to the previous quarter, partially offset by lower site operating costs. Each operation again had an All-In Sustaining Cost below the average realised gold price for the quarter of A$1,450 per ounce.

Newcrest Managing Director and Chief Executive Officer, Greg Robinson, said: "Newcrest continues to maintain a sharp focus on cost reduction initiatives across the entire business. Our year-to-date All-In Sustaining Cost of A$998 per ounce is A$285 per ounce lower than last financial year which has enabled us to expand our All-In Sustaining Cost operating margin to A$462 per ounce this quarter despite the lower gold price environment."

Exploration activities continued during the March 2014 quarter with positive drilling results at Wafi-Golpu and Gosowong.

During the quarter the Company announced that it had completed arrangements to extend the tenor of its existing bilateral bank loan facilities providing a smoother and longer average maturity profile with no material change to terms and conditions and no increase in interest cost.

(1)  All-In Sustaining Cost metrics as per World Gold Council Guidance Note on Non-GAAP Metrics, released 27 June 2013. Newcrest Group All-In Sustaining Cost will vary from quarter to quarter as a result of various factors including production performance, timing of sales, the level of sustaining capital and the relative contribution of each asset.
(2) March 2014 quarter All-In Sustaining Costs in USD terms are converted to USD at an average A$:US$ exchange rate for the quarter of $0.896.
(3) Subject to market and operating conditions - refer to Newcrest's Forward Looking Statements disclaimer on page 22.
(4) Refers to financial years ending 30 June.

Guidance(5)

Subject to market and operating conditions(5)

  • Full year production guidance is maintained for both gold and copper, with gold production expected to be around the top end of the guidance range (2.3 million ounces); and
  • Full Year Group All-In Sustaining Cost $M - including exploration, production stripping and sustaining capital expenditure - is expected to be at or below the lower end of the guidance range.

Guidance for the 2015 financial year will be provided in due course following completion of the budgeting process for 2015 which will be around the time of release of the June 2014 Quarterly results. At this stage, subject to completion of the budgeting process and market and operating conditions:

  • Cadia Valley production for the 2015 financial year is likely to be below that of the 2014 financial year principally due to lower gold and copper grades at Ridgeway, subject also to Cadia East Panel Cave 2 development rates. For the 2014 financial year, Cadia Valley is expected to produce above the guidance range(3) (480,000 to 530,000), principally due to unexpectedly higher grades at the Ridgeway operations, which are not expected to continue in the 2015 financial year. Overall, Cadia Valley gold production is expected to be around 700,000 ounces in the 2016 financial year with a further increase in production expected in the 2017 financial year(3); and
  • as part of its focus on cash maximisation, Lihir is likely to again have an elevated level of stockpile feed in the 2015 financial year such that production in the 2015 financial year is likely to be in the same range as for the 2014 financial year(3).

(5) Refer to Newcrest's Forward Looking Statements disclaimer on page 22 of the report

Forward Looking Statements

These materials include forward looking statements. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as "may", "will", "expect", "intend", "plan", "estimate", "anticipate", "continue", and "guidance", or other similar words and may include, without limitation, statements regarding plans, strategies and objectives of management, anticipated production or construction commencement dates and expected costs or production outputs.

Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the company's actual results, performance and achievements to differ materially from any future results, performance or achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the company operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues and litigation.

Forward looking statements are based on the company and its management's good faith assumptions relating to the financial, market, regulatory and other relevant environments that will exist and affect the company's business and operations in the future.  The company does not give any assurance that the assumptions on which forward looking statements are based will prove to be correct, or that the company's business or operations will not be affected in any material manner by these or other factors not foreseen or foreseeable by the company or management or beyond the company's control.

Although the company attempts and has attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in forward looking statements, there may be other factors that could cause actual results, performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the reasonable control of the company.  Accordingly, readers are cautioned not to place undue reliance on forward looking statements.  Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this information the company does not undertake any obligation to publicly update or revise any of the forward looking statements or to advise of any change in events, conditions or circumstances on which any such statement is based.

Ore Reserves and Mineral Resources Reporting Requirements

As an Australian company with securities listed on the Australian Securities Exchange ("ASX"), Newcrest is subject to Australian disclosure requirements and standards, including the requirements of the Corporations Act and the ASX. Investors should note that it is a requirement of the ASX listing rules that the reporting of ore reserves and mineral resources in Australia comply with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the "JORC Code") and that Newcrest's ore reserve and mineral resource estimates comply with the JORC Code. Newcrest ceased its listing on the Toronto Stock Exchange ("TSX") on 4 September 2013, but will remain subject to certain Canadian disclosure requirements and standards until it ceases to be an Ontario Securities Commission registrant. Prior to that, Newcrest will continue, in accordance with the requirements of National Instrument 43-101 - Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators, to report its ore reserves and mineral resources estimates in compliance with the JORC Code, along with a reconciliation to the material differences between the JORC Code and the applicable definitions adopted by the Canadian Institute of Mining, Metallurgy and Petroleum (CIM Definition Standards). In relation to the December 2013 Resources and Reserves Statement, released to the ASX on 14 February 2014, the reconciliation is set out in Newcrest's Canadian News Release dated 14 February 2014, and is available at www.sedar.com and at Newcrest's website www.newcrest.com.au.  Except as otherwise noted in that document, there are no material differences between the definitions of Measured, Indicated and Inferred Mineral Resources, and Proven and Probable Reserves, under the CIM Definition Standards and the equivalent or corresponding definitions in the JORC Code.

Competent Person's Statement

The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources and Ore Reserves and other scientific and technical information, is based on information compiled by Mr C. Moorhead. Mr Moorhead is the Executive General Manager Minerals and a full-time employee of Newcrest Mining Limited. He is a shareholder in Newcrest Mining Limited and is entitled to participate in Newcrest's executive equity long term incentive plan, details of which are included in Newcrest's 2013 Remuneration Report. Ore Reserves growth is one of the performance measures under that plan. He is a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Moorhead has sufficient experience which is relevant to the styles of mineralisation and types of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in The JORC Code 2012 and is a Qualified Person within the meaning of National Instrument 43-101 - Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators ("NI 43-101"). Mr Moorhead consents to the inclusion in this report of the matters based on his information in the form and context in which it appears including sampling, analytical and test data underlying the results.

A copy of the release be found on Newcrest's website: www.newcrest.com.au and on SEDAR: www.sedar.com.

SOURCE Newcrest Mining Limited

More Stories By PR Newswire

Copyright © 2007 PR Newswire. All rights reserved. Republication or redistribution of PRNewswire content is expressly prohibited without the prior written consent of PRNewswire. PRNewswire shall not be liable for any errors or delays in the content, or for any actions taken in reliance thereon.

Latest Stories
IT organizations are moving to the cloud in hopes to approve efficiency, increase agility and save money. Migrating workloads might seem like a simple task, but what many businesses don’t realize is that application migration criteria differs across organizations, making it difficult for architects to arrive at an accurate TCO number. In his session at 21st Cloud Expo, Joe Kinsella, CTO of CloudHealth Technologies, will offer a systematic approach to understanding the TCO of a cloud application...
SYS-CON Events announced today that CA Technologies has been named “Platinum Sponsor” of SYS-CON's 21st International Cloud Expo®, which will take place October 31-November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. CA Technologies helps customers succeed in a future where every business – from apparel to energy – is being rewritten by software. From planning to development to management to security, CA creates software that fuels transformation for companies in the applic...
Translating agile methodology into real-world best practices within the modern software factory has driven widespread DevOps adoption, yet much work remains to expand workflows and tooling across the enterprise. As models evolve from pockets of experimentation into wholescale organizational reinvention, practitioners find themselves challenged to incorporate the culture and architecture necessary to support DevOps at scale.
An increasing number of companies are creating products that combine data with analytical capabilities. Running interactive queries on Big Data requires complex architectures to store and query data effectively, typically involving data streams, an choosing efficient file format/database and multiple independent systems that are tied together through custom-engineered pipelines. In his session at @BigDataExpo at @ThingsExpo, Tomer Levi, a senior software engineer at Intel’s Advanced Analytics ...
"With Digital Experience Monitoring what used to be a simple visit to a web page has exploded into app on phones, data from social media feeds, competitive benchmarking - these are all components that are only available because of some type of digital asset," explained Leo Vasiliou, Director of Web Performance Engineering at Catchpoint Systems, in this SYS-CON.tv interview at DevOps Summit at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
SYS-CON Events announced today that Secure Channels, a cybersecurity firm, will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Secure Channels, Inc. offers several products and solutions to its many clients, helping them protect critical data from being compromised and access to computer networks from the unauthorized. The company develops comprehensive data encryption security strategie...
The goal of Continuous Testing is to shift testing left to find defects earlier and release software faster. This can be achieved by integrating a set of open source functional and performance testing tools in the early stages of your software delivery lifecycle. There is one process that binds all application delivery stages together into one well-orchestrated machine: Continuous Testing. Continuous Testing is the conveyer belt between the Software Factory and production stages. Artifacts are m...
Cloud resources, although available in abundance, are inherently volatile. For transactional computing, like ERP and most enterprise software, this is a challenge as transactional integrity and data fidelity is paramount – making it a challenge to create cloud native applications while relying on RDBMS. In his session at 21st Cloud Expo, Claus Jepsen, Chief Architect and Head of Innovation Labs at Unit4, will explore that in order to create distributed and scalable solutions ensuring high availa...
Cloud adoption is often driven by a desire to increase efficiency, boost agility and save money. All too often, however, the reality involves unpredictable cost spikes and lack of oversight due to resource limitations. In his session at 20th Cloud Expo, Joe Kinsella, CTO and Founder of CloudHealth Technologies, tackled the question: “How do you build a fully optimized cloud?” He will examine: Why TCO is critical to achieving cloud success – and why attendees should be thinking holistically abo...
Internet-of-Things discussions can end up either going down the consumer gadget rabbit hole or focused on the sort of data logging that industrial manufacturers have been doing forever. However, in fact, companies today are already using IoT data both to optimize their operational technology and to improve the experience of customer interactions in novel ways. In his session at @ThingsExpo, Gordon Haff, Red Hat Technology Evangelist, shared examples from a wide range of industries – including en...
In IT, we sometimes coin terms for things before we know exactly what they are and how they’ll be used. The resulting terms may capture a common set of aspirations and goals – as “cloud” did broadly for on-demand, self-service, and flexible computing. But such a term can also lump together diverse and even competing practices, technologies, and priorities to the point where important distinctions are glossed over and lost.
Detecting internal user threats in the Big Data eco-system is challenging and cumbersome. Many organizations monitor internal usage of the Big Data eco-system using a set of alerts. This is not a scalable process given the increase in the number of alerts with the accelerating growth in data volume and user base. Organizations are increasingly leveraging machine learning to monitor only those data elements that are sensitive and critical, autonomously establish monitoring policies, and to detect...
"We're a cybersecurity firm that specializes in engineering security solutions both at the software and hardware level. Security cannot be an after-the-fact afterthought, which is what it's become," stated Richard Blech, Chief Executive Officer at Secure Channels, in this SYS-CON.tv interview at @ThingsExpo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
Most companies are adopting or evaluating container technology - Docker in particular - to speed up application deployment, drive down cost, ease management and make application delivery more flexible overall. As with most new architectures, this dream takes a lot of work to become a reality. Even when you do get your application componentized enough and packaged properly, there are still challenges for DevOps teams to making the shift to continuous delivery and achieving that reduction in cost ...
Enterprise architects are increasingly adopting multi-cloud strategies as they seek to utilize existing data center assets, leverage the advantages of cloud computing and avoid cloud vendor lock-in. This requires a globally aware traffic management strategy that can monitor infrastructure health across data centers and end-user experience globally, while responding to control changes and system specification at the speed of today’s DevOps teams. In his session at 20th Cloud Expo, Josh Gray, Chie...