Lexam Announces Positive Preliminary Economic Assessment Results for the Open Pit Projects in Timmins

Project Generates 32% IRR and C$33 Million NPV After-Tax; Cash Costs of US$865 per Ounce Gold

TORONTO, ONTARIO -- (Marketwired) -- 04/23/14 -- Lexam VG Gold Inc. (the "Company", "Lexam") (TSX:LEX)(FRANKFURT:VN3A)(OTCQX:LEXVF) announces the results of a Preliminary Economic Assessment ("PEA") on its open pit gold projects in Timmins, Ontario, Canada. The PEA was initiated to assess the potential of Lexam's gold projects, which include the Buffalo Ankerite, Davidson Tisdale, Fuller and Paymaster properties. The study was completed by RPA Inc. ("RPA") of Toronto, Canada, and is based on the Company's June 2013 mineral resource estimate.

The focus on the potential for open pit mining on the properties was driven by the near surface nature of the gold mineralization and previously released drill results indicating substantial widths of mineralization. In addition, there remains exploration potential to further expand the existing mineral resource at surface and to depth, in particular by expansion of the recently updated underground resource estimate of 650,600 ounces ("oz") gold ("Au") Measured and Indicated from 4.16 million tonnes grading 4.86 grams per tonne ("g/t") Au and 574,500 oz Au Inferred from 4.07 million tonnes grading 4.39 g/t Au. Further exploration by Lexam will focus on increasing the open pit and underground resources and adding new resource areas.

All dollar amounts in this press release are stated in C$ unless otherwise specified. PEA results are presented on a 100% ownership basis. The disclosure set forth below is derived from the PEA unless expressly noted.

Highlights of PEA Base Case, Scenario 1A (gold price US$1,300/oz, exchange rate C$:US$ 0.90):


--  After-tax Net Present Value ("NPV") of $33 million (at 7.5% discount
    rate), Internal Rate of Return ("IRR") of 32%, and 2.1 years payback. 
--  Average annual gold production of 45,000 oz Au over a life-of-mine
    ("LoM") of 6.5 years with a strip ratio of 9.6:1. 
--  Cash operating costs over LoM average US$865/oz Au. 
--  Initial capital cost to construct the mine is estimated at $58 million
    with potential to reduce initial costs through project optimization and
    more advanced studies. 
--  Base case assumes toll milling for all mineralization and contract
    mining for a portion of the waste stripping. 
--  Mining dilution of up to 27.5% is factored depending on the mineralized
    zone and thickness, along with mining extraction of 95%. 

The PEA is preliminary in nature and includes the use of inferred resources, which are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Thus, there is no certainty that the results of this PEA will be realized. Actual results may vary, perhaps materially.

Upon completion of the PEA, specific steps recommended by RPA include improving the definition of voids, which have been modeled conservatively by the recent resource estimate, and diamond drilling to upgrade the inferred resource to an indicated category. In management's view, the results of the PEA provide a strong incentive for continued exploration targeting resource expansion and classification upgrading, as well as geotechnical, metallurgical and engineering optimization studies.

Table 1 provides details of the base case PEA results along with a gold price and production rate sensitivity analysis.


Table 1  Details of the PEA and Sensitivities on a 100% Ownership Basis     
----------------------------------------------------------------------------
                             Scenario                                       
Description            Units       1A  Scenario 1B  Scenario 1C   Scenario 2
                            ------------------------------------------------
                                          Low Gold    High Gold   Production
                                 Base        Price        Price         Rate
                                 Case  Sensitivity  Sensitivity  Sensitivity
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
  Gold Price          US$/oz    1,300        1,250        1,400        1,400
----------------------------------------------------------------------------
  Exchange Rate       C$:US$     0.90         0.90         0.90         0.90
----------------------------------------------------------------------------
Production                                                                  
 Profile:                                                                   
----------------------------------------------------------------------------
  LoM                  years      6.5          6.5          6.5          9.2
----------------------------------------------------------------------------
  Mineralized                                                               
   Production     tonnes per                                                
   Rate          day ("tpd")    2,000        2,000        2,000        3,500
----------------------------------------------------------------------------
  LoM Annual                                                                
   Production             oz   45,000       45,000       45,000       62,000
----------------------------------------------------------------------------
  Strip Ratio      Waste:Ore      9.6          9.6          9.6          9.9
----------------------------------------------------------------------------
  Cash Operating                                                            
   Cost               US$/oz      865          860          875          944
----------------------------------------------------------------------------
Processing:                                                                 
----------------------------------------------------------------------------
  Grade               g/t Au     2.23         2.23         2.23         1.74
----------------------------------------------------------------------------
  Recovered Au         oz Au  293,000      293,000      293,000      571,000
----------------------------------------------------------------------------
Capital Costs:                                                              
----------------------------------------------------------------------------
                          C$                                                
  Initial Capital (millions)       58           58           58           95
----------------------------------------------------------------------------
Pre-Tax Operating                                                           
 Performance:                                                               
----------------------------------------------------------------------------
  Net Pre-Tax             C$                                                
   Cashflow       (millions)       73           58          103          174
----------------------------------------------------------------------------
  IRR                      %      36%          30%          49%          42%
----------------------------------------------------------------------------
  NPV at a                                                                  
   Discount Rate          C$                                                
   of 7.5%        (millions)       41           31           61           91
----------------------------------------------------------------------------
    Payback            years      1.9          2.1          1.5          2.0
----------------------------------------------------------------------------
    Construction       years      1.0          1.0          1.0          1.0
----------------------------------------------------------------------------
After-Tax                                                                   
 Economic                                                                   
 Performance:                                                               
----------------------------------------------------------------------------
  Net After-Tax           C$                                                
   Cashflow       (millions)       61           50           84          137
----------------------------------------------------------------------------
  IRR                      %      32%          27%          41%          35%
----------------------------------------------------------------------------
  NPV at a                                                                  
   Discount Rate          C$                                                
   of 7.5%        (millions)       33           26           49           70
----------------------------------------------------------------------------
    Payback            years      2.1          2.3          1.8          2.4
----------------------------------------------------------------------------

Scenario 1A, the base case, and Scenarios 1B and 1C are based on gold price sensitivities, all using the same mine design basis and a 2,000 tpd production rate. Scenario 2, based on production rate sensitivity, employs a mine design basis at US$1,400/oz Au (resulting in an increased production profile) and 3,500 tpd production rate. All scenarios assume toll milling of mineralization at an existing facility in the local Timmins area. All cash operating costs consider for royalties.

The PEA contains a cash flow model based upon the geological and engineering work completed to date and technical and cost inputs developed by RPA. The Canadian National Instrument 43-101 ("NI 43-101") technical report summarizing the results of the updated PEA will be filed on SEDAR and made available on the Company's website within 45 days of this press release.

The PEA is based on a mineral resource estimate with an effective date of June 1, 2013, presented in the June 20, 2013 Technical Report titled "Technical Report and Updated Resource Estimate on the Buffalo Ankerite, Fuller, Paymaster, and Davidson Tisdale Gold Deposits" and authored by Dr. Wayne Ewert, P.Geo., Mr. Eugene Puritch, P.Eng., Ms. Tracy Armstrong, P.Geo., Mr. Yungang Wu, P.Geo., Mr. Antoine Yassa, P.Geo., Mr. Richard Routledge, P.Geo. of P&E Mining Consultants Inc. and by Ms. Katharine Masun, P.Geo., Mr.Tudorel Ciuculescu, P.Geo. of RPA Inc. Each of the foregoing is a Qualified Person and Independent of the Company in accordance with NI 43-101.

Qualified Person

The economic analysis contained in this news release is based upon information prepared by Mr. Glen Ehasoo, P.Eng., Senior Mining Engineer, RPA, Suite 388, 1130 West Pender Street, Vancouver, BC, Canada, who is a Qualified Person as defined by NI 43-101. Mr. Glen Ehasoo is independent of Lexam as defined by NI 43-101.

Kenneth W. Guy, P.Geo, a consultant to Lexam VG Gold, is the Qualified Person who supervised the preparation of the technical data in this news release.

About Lexam VG Gold

Lexam VG Gold explores for gold in the Timmins area of northern Ontario, Canada. The Company is carrying out ongoing exploration programs, designed to build the resource base and to test the growth potential and determine the economics on its four key property assets: Buffalo Ankerite and Fuller (100% interest), Davidson Tisdale (68.5% Lexam / 31.5% SGX Resources Inc.) and Paymaster (60% Lexam / 40% Goldcorp Canada Ltd.).

Together with the underground resource estimate presented at the beginning of this press release, an open pit resource of 761,400 oz Au Measured and Indicated from 12.41 million tonnes grading 1.91 g/t Au and 358,400 oz Au Inferred from 6.28 million tonnes grading 1.78 g/t Au, updates the Company's net resource estimate to a total of 1.412 million oz Au Measured and Indicated and 932.9 thousand oz Au Inferred - more details are presented further below in (4) of Technical Information. Lexam VG Gold had $3.5 million in cash on December 31, 2013, with no bank debt. The Company has 226,570,860 issued and outstanding shares, with 27% owned by Chairman Rob McEwen.

Technical Information

The technical information contained in this press release has been reviewed and approved by Kenneth W. Guy, P.Geo, a consultant to Lexam VG Gold and a Qualified Person within the meaning of the National Instrument 41-101 "Standards of Disclosure for Mineral Projects" ("NI 43-101").

(1) Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

(2) The quantity and grade of reported Inferred resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred resources as an Indicated or Measured mineral resource and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured mineral resource category.

(3) The mineral resources in this press release were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by CIM Council.

(4) The Measured and Indicated resources of the Company are distributed as follows:

Open Pit Measured and Indicated: 24,300 oz Au Measured from 0.31 million tonnes grading 2.44 g/t Au and 737,100 oz Au Indicated from 12.1 million tonnes grading 1.89 g/t Au;

Underground Measured and Indicated: 43,600 oz Au Measured from 0.24 million tonnes grading 5.55 g/t Au and 607,000 oz Au Indicated from 3.92 million tonnes grading 4.81 g/t Au.

(5) The resource estimates contained herein do not constitute a Feasibility or Pre-Feasibility study and contain no mineral reserves within the meaning of NI 43-101 or SEC Industry Guide 7. The mineral resource figures referred to in this press release are estimates and therefore insufficient to allow meaningful application of the technical and economic parameters to enable an evaluation of technical or economic viability and no assurances can be given that the indicated levels of gold content will be achieved. Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry practices. Estimates made at a given time may significantly change when new information becomes available. While the Company believes that the resource estimates included in this press release are well established, resource estimates are imprecise by their nature and depend, to a certain extent, upon statistical inferences which may ultimately prove unreliable. If such estimates are inaccurate or are reduced in the future, this could have a material adverse impact on the Company. In addition, this news release includes Inferred resources that are too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves.

Cautionary Note to U.S. Investors

All resource estimates reported by Lexam VG Gold are calculated in accordance with NI 43-101 and the Canadian Institute of Mining and Metallurgy Classification system. These standards are different from the standards generally permitted in reports filed with the SEC. Under NI 43-101, Lexam VG Gold reports indicated and inferred resources, measurements which are generally not permitted in filings made with the SEC. According to Canadian NI 43-101 criteria, the estimation of indicated resources involve greater uncertainty as to their economic feasibility than the estimation of proven and probable reserves. Under SEC Industry Guide 7 criteria, measured, indicated and inferred resources are considered Mineralized Material. The SEC considers that in addition to greater uncertainty as to the economic feasibility of Mineralized Material compared to Proven and Probable reserves, there is also greater uncertainty as to the existence of Mineralized Material. U.S. investors are cautioned not to assume that Measured or Indicated resources will be converted into economically mineable reserves. The estimation of Inferred resources involves far greater uncertainty as to their existence and economic viability than the estimation of other categories of resources.

Caution Concerning Forward-Looking Statements

This press release contains certain forward-looking statements and information. The forward-looking statements and information express, as at the date of this press release, Lexam VG Gold's plans, estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements involve a number of risks and uncertainties, and there can be no assurance that such statements will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements include, but are not limited to, factors associated with fluctuations in the market price of precious metals, mining industry risks, risks related to: litigation, property title, (including any agreements underlying the Company's properties), the state of the capital markets, whether shareholder and regulatory approvals for any proposed transaction are forthcoming, environmental risks and hazards, uncertainty as to calculation of mineral resources and reserves and other risks. Readers should not place undue reliance on forward-looking statements or information. Lexam VG Gold undertakes no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. See Lexam VG Gold's Annual Information Form for the period ended December 31, 2012 and available on SEDAR (www.sedar.com) for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information. All forward-looking statements and information made in this news release are qualified by this cautionary statement.

To learn more about Lexam VG Gold (TSX:LEX)(FRANKFURT:VN3A)(OTCQX:LEXVF), visit our website: www.lexamvggold.com.

The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Intelligent Automation is now one of the key business imperatives for CIOs and CISOs impacting all areas of business today. In his session at 21st Cloud Expo, Brian Boeggeman, VP Alliances & Partnerships at Ayehu, will talk about how business value is created and delivered through intelligent automation to today’s enterprises. The open ecosystem platform approach toward Intelligent Automation that Ayehu delivers to the market is core to enabling the creation of the self-driving enterprise.
"At the keynote this morning we spoke about the value proposition of Nutanix, of having a DevOps culture and a mindset, and the business outcomes of achieving agility and scale, which everybody here is trying to accomplish," noted Mark Lavi, DevOps Solution Architect at Nutanix, in this SYS-CON.tv interview at @DevOpsSummit at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
"We're here to tell the world about our cloud-scale infrastructure that we have at Juniper combined with the world-class security that we put into the cloud," explained Lisa Guess, VP of Systems Engineering at Juniper Networks, in this SYS-CON.tv interview at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
SYS-CON Events announced today that Grape Up will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct. 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Grape Up is a software company specializing in cloud native application development and professional services related to Cloud Foundry PaaS. With five expert teams that operate in various sectors of the market across the U.S. and Europe, Grape Up works with a variety of customers from emergi...
Detecting internal user threats in the Big Data eco-system is challenging and cumbersome. Many organizations monitor internal usage of the Big Data eco-system using a set of alerts. This is not a scalable process given the increase in the number of alerts with the accelerating growth in data volume and user base. Organizations are increasingly leveraging machine learning to monitor only those data elements that are sensitive and critical, autonomously establish monitoring policies, and to detect...
"We're a cybersecurity firm that specializes in engineering security solutions both at the software and hardware level. Security cannot be an after-the-fact afterthought, which is what it's become," stated Richard Blech, Chief Executive Officer at Secure Channels, in this SYS-CON.tv interview at @ThingsExpo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
In his session at 20th Cloud Expo, Mike Johnston, an infrastructure engineer at Supergiant.io, discussed how to use Kubernetes to set up a SaaS infrastructure for your business. Mike Johnston is an infrastructure engineer at Supergiant.io with over 12 years of experience designing, deploying, and maintaining server and workstation infrastructure at all scales. He has experience with brick and mortar data centers as well as cloud providers like Digital Ocean, Amazon Web Services, and Rackspace. H...
You know you need the cloud, but you’re hesitant to simply dump everything at Amazon since you know that not all workloads are suitable for cloud. You know that you want the kind of ease of use and scalability that you get with public cloud, but your applications are architected in a way that makes the public cloud a non-starter. You’re looking at private cloud solutions based on hyperconverged infrastructure, but you’re concerned with the limits inherent in those technologies.
Consumers increasingly expect their electronic "things" to be connected to smart phones, tablets and the Internet. When that thing happens to be a medical device, the risks and benefits of connectivity must be carefully weighed. Once the decision is made that connecting the device is beneficial, medical device manufacturers must design their products to maintain patient safety and prevent compromised personal health information in the face of cybersecurity threats. In his session at @ThingsExpo...
SYS-CON Events announced today that Massive Networks will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Massive Networks mission is simple. To help your business operate seamlessly with fast, reliable, and secure internet and network solutions. Improve your customer's experience with outstanding connections to your cloud.
DevOps is under attack because developers don’t want to mess with infrastructure. They will happily own their code into production, but want to use platforms instead of raw automation. That’s changing the landscape that we understand as DevOps with both architecture concepts (CloudNative) and process redefinition (SRE). Rob Hirschfeld’s recent work in Kubernetes operations has led to the conclusion that containers and related platforms have changed the way we should be thinking about DevOps and...
Everything run by electricity will eventually be connected to the Internet. Get ahead of the Internet of Things revolution and join Akvelon expert and IoT industry leader, Sergey Grebnov, in his session at @ThingsExpo, for an educational dive into the world of managing your home, workplace and all the devices they contain with the power of machine-based AI and intelligent Bot services for a completely streamlined experience.
Because IoT devices are deployed in mission-critical environments more than ever before, it’s increasingly imperative they be truly smart. IoT sensors simply stockpiling data isn’t useful. IoT must be artificially and naturally intelligent in order to provide more value In his session at @ThingsExpo, John Crupi, Vice President and Engineering System Architect at Greenwave Systems, will discuss how IoT artificial intelligence (AI) can be carried out via edge analytics and machine learning techn...
FinTechs use the cloud to operate at the speed and scale of digital financial activity, but are often hindered by the complexity of managing security and compliance in the cloud. In his session at 20th Cloud Expo, Sesh Murthy, co-founder and CTO of Cloud Raxak, showed how proactive and automated cloud security enables FinTechs to leverage the cloud to achieve their business goals. Through business-driven cloud security, FinTechs can speed time-to-market, diminish risk and costs, maintain continu...
When shopping for a new data processing platform for IoT solutions, many development teams want to be able to test-drive options before making a choice. Yet when evaluating an IoT solution, it’s simply not feasible to do so at scale with physical devices. Building a sensor simulator is the next best choice; however, generating a realistic simulation at very high TPS with ease of configurability is a formidable challenge. When dealing with multiple application or transport protocols, you would be...