Lexam Announces Positive Preliminary Economic Assessment Results for the Open Pit Projects in Timmins

Project Generates 32% IRR and C$33 Million NPV After-Tax; Cash Costs of US$865 per Ounce Gold

TORONTO, ONTARIO -- (Marketwired) -- 04/23/14 -- Lexam VG Gold Inc. (the "Company", "Lexam") (TSX:LEX)(FRANKFURT:VN3A)(OTCQX:LEXVF) announces the results of a Preliminary Economic Assessment ("PEA") on its open pit gold projects in Timmins, Ontario, Canada. The PEA was initiated to assess the potential of Lexam's gold projects, which include the Buffalo Ankerite, Davidson Tisdale, Fuller and Paymaster properties. The study was completed by RPA Inc. ("RPA") of Toronto, Canada, and is based on the Company's June 2013 mineral resource estimate.

The focus on the potential for open pit mining on the properties was driven by the near surface nature of the gold mineralization and previously released drill results indicating substantial widths of mineralization. In addition, there remains exploration potential to further expand the existing mineral resource at surface and to depth, in particular by expansion of the recently updated underground resource estimate of 650,600 ounces ("oz") gold ("Au") Measured and Indicated from 4.16 million tonnes grading 4.86 grams per tonne ("g/t") Au and 574,500 oz Au Inferred from 4.07 million tonnes grading 4.39 g/t Au. Further exploration by Lexam will focus on increasing the open pit and underground resources and adding new resource areas.

All dollar amounts in this press release are stated in C$ unless otherwise specified. PEA results are presented on a 100% ownership basis. The disclosure set forth below is derived from the PEA unless expressly noted.

Highlights of PEA Base Case, Scenario 1A (gold price US$1,300/oz, exchange rate C$:US$ 0.90):

--  After-tax Net Present Value ("NPV") of $33 million (at 7.5% discount
    rate), Internal Rate of Return ("IRR") of 32%, and 2.1 years payback. 
--  Average annual gold production of 45,000 oz Au over a life-of-mine
    ("LoM") of 6.5 years with a strip ratio of 9.6:1. 
--  Cash operating costs over LoM average US$865/oz Au. 
--  Initial capital cost to construct the mine is estimated at $58 million
    with potential to reduce initial costs through project optimization and
    more advanced studies. 
--  Base case assumes toll milling for all mineralization and contract
    mining for a portion of the waste stripping. 
--  Mining dilution of up to 27.5% is factored depending on the mineralized
    zone and thickness, along with mining extraction of 95%. 

The PEA is preliminary in nature and includes the use of inferred resources, which are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Thus, there is no certainty that the results of this PEA will be realized. Actual results may vary, perhaps materially.

Upon completion of the PEA, specific steps recommended by RPA include improving the definition of voids, which have been modeled conservatively by the recent resource estimate, and diamond drilling to upgrade the inferred resource to an indicated category. In management's view, the results of the PEA provide a strong incentive for continued exploration targeting resource expansion and classification upgrading, as well as geotechnical, metallurgical and engineering optimization studies.

Table 1 provides details of the base case PEA results along with a gold price and production rate sensitivity analysis.

Table 1  Details of the PEA and Sensitivities on a 100% Ownership Basis     
Description            Units       1A  Scenario 1B  Scenario 1C   Scenario 2
                                          Low Gold    High Gold   Production
                                 Base        Price        Price         Rate
                                 Case  Sensitivity  Sensitivity  Sensitivity
  Gold Price          US$/oz    1,300        1,250        1,400        1,400
  Exchange Rate       C$:US$     0.90         0.90         0.90         0.90
  LoM                  years      6.5          6.5          6.5          9.2
   Production     tonnes per                                                
   Rate          day ("tpd")    2,000        2,000        2,000        3,500
  LoM Annual                                                                
   Production             oz   45,000       45,000       45,000       62,000
  Strip Ratio      Waste:Ore      9.6          9.6          9.6          9.9
  Cash Operating                                                            
   Cost               US$/oz      865          860          875          944
  Grade               g/t Au     2.23         2.23         2.23         1.74
  Recovered Au         oz Au  293,000      293,000      293,000      571,000
Capital Costs:                                                              
  Initial Capital (millions)       58           58           58           95
Pre-Tax Operating                                                           
  Net Pre-Tax             C$                                                
   Cashflow       (millions)       73           58          103          174
  IRR                      %      36%          30%          49%          42%
  NPV at a                                                                  
   Discount Rate          C$                                                
   of 7.5%        (millions)       41           31           61           91
    Payback            years      1.9          2.1          1.5          2.0
    Construction       years      1.0          1.0          1.0          1.0
  Net After-Tax           C$                                                
   Cashflow       (millions)       61           50           84          137
  IRR                      %      32%          27%          41%          35%
  NPV at a                                                                  
   Discount Rate          C$                                                
   of 7.5%        (millions)       33           26           49           70
    Payback            years      2.1          2.3          1.8          2.4

Scenario 1A, the base case, and Scenarios 1B and 1C are based on gold price sensitivities, all using the same mine design basis and a 2,000 tpd production rate. Scenario 2, based on production rate sensitivity, employs a mine design basis at US$1,400/oz Au (resulting in an increased production profile) and 3,500 tpd production rate. All scenarios assume toll milling of mineralization at an existing facility in the local Timmins area. All cash operating costs consider for royalties.

The PEA contains a cash flow model based upon the geological and engineering work completed to date and technical and cost inputs developed by RPA. The Canadian National Instrument 43-101 ("NI 43-101") technical report summarizing the results of the updated PEA will be filed on SEDAR and made available on the Company's website within 45 days of this press release.

The PEA is based on a mineral resource estimate with an effective date of June 1, 2013, presented in the June 20, 2013 Technical Report titled "Technical Report and Updated Resource Estimate on the Buffalo Ankerite, Fuller, Paymaster, and Davidson Tisdale Gold Deposits" and authored by Dr. Wayne Ewert, P.Geo., Mr. Eugene Puritch, P.Eng., Ms. Tracy Armstrong, P.Geo., Mr. Yungang Wu, P.Geo., Mr. Antoine Yassa, P.Geo., Mr. Richard Routledge, P.Geo. of P&E Mining Consultants Inc. and by Ms. Katharine Masun, P.Geo., Mr.Tudorel Ciuculescu, P.Geo. of RPA Inc. Each of the foregoing is a Qualified Person and Independent of the Company in accordance with NI 43-101.

Qualified Person

The economic analysis contained in this news release is based upon information prepared by Mr. Glen Ehasoo, P.Eng., Senior Mining Engineer, RPA, Suite 388, 1130 West Pender Street, Vancouver, BC, Canada, who is a Qualified Person as defined by NI 43-101. Mr. Glen Ehasoo is independent of Lexam as defined by NI 43-101.

Kenneth W. Guy, P.Geo, a consultant to Lexam VG Gold, is the Qualified Person who supervised the preparation of the technical data in this news release.

About Lexam VG Gold

Lexam VG Gold explores for gold in the Timmins area of northern Ontario, Canada. The Company is carrying out ongoing exploration programs, designed to build the resource base and to test the growth potential and determine the economics on its four key property assets: Buffalo Ankerite and Fuller (100% interest), Davidson Tisdale (68.5% Lexam / 31.5% SGX Resources Inc.) and Paymaster (60% Lexam / 40% Goldcorp Canada Ltd.).

Together with the underground resource estimate presented at the beginning of this press release, an open pit resource of 761,400 oz Au Measured and Indicated from 12.41 million tonnes grading 1.91 g/t Au and 358,400 oz Au Inferred from 6.28 million tonnes grading 1.78 g/t Au, updates the Company's net resource estimate to a total of 1.412 million oz Au Measured and Indicated and 932.9 thousand oz Au Inferred - more details are presented further below in (4) of Technical Information. Lexam VG Gold had $3.5 million in cash on December 31, 2013, with no bank debt. The Company has 226,570,860 issued and outstanding shares, with 27% owned by Chairman Rob McEwen.

Technical Information

The technical information contained in this press release has been reviewed and approved by Kenneth W. Guy, P.Geo, a consultant to Lexam VG Gold and a Qualified Person within the meaning of the National Instrument 41-101 "Standards of Disclosure for Mineral Projects" ("NI 43-101").

(1) Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

(2) The quantity and grade of reported Inferred resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred resources as an Indicated or Measured mineral resource and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured mineral resource category.

(3) The mineral resources in this press release were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by CIM Council.

(4) The Measured and Indicated resources of the Company are distributed as follows:

Open Pit Measured and Indicated: 24,300 oz Au Measured from 0.31 million tonnes grading 2.44 g/t Au and 737,100 oz Au Indicated from 12.1 million tonnes grading 1.89 g/t Au;

Underground Measured and Indicated: 43,600 oz Au Measured from 0.24 million tonnes grading 5.55 g/t Au and 607,000 oz Au Indicated from 3.92 million tonnes grading 4.81 g/t Au.

(5) The resource estimates contained herein do not constitute a Feasibility or Pre-Feasibility study and contain no mineral reserves within the meaning of NI 43-101 or SEC Industry Guide 7. The mineral resource figures referred to in this press release are estimates and therefore insufficient to allow meaningful application of the technical and economic parameters to enable an evaluation of technical or economic viability and no assurances can be given that the indicated levels of gold content will be achieved. Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry practices. Estimates made at a given time may significantly change when new information becomes available. While the Company believes that the resource estimates included in this press release are well established, resource estimates are imprecise by their nature and depend, to a certain extent, upon statistical inferences which may ultimately prove unreliable. If such estimates are inaccurate or are reduced in the future, this could have a material adverse impact on the Company. In addition, this news release includes Inferred resources that are too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves.

Cautionary Note to U.S. Investors

All resource estimates reported by Lexam VG Gold are calculated in accordance with NI 43-101 and the Canadian Institute of Mining and Metallurgy Classification system. These standards are different from the standards generally permitted in reports filed with the SEC. Under NI 43-101, Lexam VG Gold reports indicated and inferred resources, measurements which are generally not permitted in filings made with the SEC. According to Canadian NI 43-101 criteria, the estimation of indicated resources involve greater uncertainty as to their economic feasibility than the estimation of proven and probable reserves. Under SEC Industry Guide 7 criteria, measured, indicated and inferred resources are considered Mineralized Material. The SEC considers that in addition to greater uncertainty as to the economic feasibility of Mineralized Material compared to Proven and Probable reserves, there is also greater uncertainty as to the existence of Mineralized Material. U.S. investors are cautioned not to assume that Measured or Indicated resources will be converted into economically mineable reserves. The estimation of Inferred resources involves far greater uncertainty as to their existence and economic viability than the estimation of other categories of resources.

Caution Concerning Forward-Looking Statements

This press release contains certain forward-looking statements and information. The forward-looking statements and information express, as at the date of this press release, Lexam VG Gold's plans, estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements involve a number of risks and uncertainties, and there can be no assurance that such statements will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements include, but are not limited to, factors associated with fluctuations in the market price of precious metals, mining industry risks, risks related to: litigation, property title, (including any agreements underlying the Company's properties), the state of the capital markets, whether shareholder and regulatory approvals for any proposed transaction are forthcoming, environmental risks and hazards, uncertainty as to calculation of mineral resources and reserves and other risks. Readers should not place undue reliance on forward-looking statements or information. Lexam VG Gold undertakes no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. See Lexam VG Gold's Annual Information Form for the period ended December 31, 2012 and available on SEDAR ( for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information. All forward-looking statements and information made in this news release are qualified by this cautionary statement.

To learn more about Lexam VG Gold (TSX:LEX)(FRANKFURT:VN3A)(OTCQX:LEXVF), visit our website:

The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Any Ops team trying to support a company in today’s cloud-connected world knows that a new way of thinking is required – one just as dramatic than the shift from Ops to DevOps. The diversity of modern operations requires teams to focus their impact on breadth vs. depth. In his session at DevOps Summit, Adam Serediuk, Director of Operations at xMatters, Inc., will discuss the strategic requirements of evolving from Ops to DevOps, and why modern Operations has begun leveraging the “NoOps” approa...
DevOps is here to stay because it works. Most businesses using this methodology are already realizing a wide range of real, measurable benefits as a result of implementing DevOps, including the breakdown of inter-departmental silos, faster delivery of new features and more stable operating environments. To take advantage of the cloud’s improved speed and flexibility, development and operations teams need to work together more closely and productively. In his session at DevOps Summit, Prashanth...
SYS-CON Events announced today that Sandy Carter, IBM General Manager Cloud Ecosystem and Developers, and a Social Business Evangelist, will keynote at the 17th International Cloud Expo®, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA.
SYS-CON Events announced today that Super Micro Computer, Inc., a global leader in high-performance, high-efficiency server, storage technology and green computing, will exhibit at the 17th International Cloud Expo®, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. Supermicro (NASDAQ: SMCI), the leading innovator in high-performance, high-efficiency server technology is a premier provider of advanced server Building Block Solutions® for Data ...
SYS-CON Events announced today that DataClear Inc. will exhibit at the 17th International Cloud Expo®, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. The DataClear ‘BlackBox’ is the only solution that moves your PC, browsing and data out of the United States and away from prying (and spying) eyes. Its solution automatically builds you a clean, on-demand, virus free, new virtual cloud based PC outside of the United States, and wipes it clean...
SYS-CON Events announced today that Machkey International Company will exhibit at the 17th International Cloud Expo®, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. Machkey provides advanced connectivity solutions for just about everyone. Businesses or individuals, Machkey is dedicated to provide high-quality and cost-effective products to meet all your needs.
The modern software development landscape consists of best practices and tools that allow teams to deliver software in a near-continuous manner. By adopting a culture of automation, measurement and sharing, the time to ship code has been greatly reduced, allowing for shorter release cycles and quicker feedback from customers and users. Still, with all of these tools and methods, how can teams stay on top of what is taking place across their infrastructure and codebase? Hopping between services a...
As the world moves towards more DevOps and microservices, application deployment to the cloud ought to become a lot simpler. The microservices architecture, which is the basis of many new age distributed systems such as OpenStack, NetFlix and so on, is at the heart of Cloud Foundry - a complete developer-oriented Platform as a Service (PaaS) that is IaaS agnostic and supports vCloud, OpenStack and AWS. In his session at 17th Cloud Expo, Raghavan "Rags" Srinivas, an Architect/Developer Evangeli...
As-a-service models offer huge opportunities, but also complicate security. It may seem that the easiest way to migrate to a new architectural model is to let others, experts in their field, do the work. This has given rise to many as-a-service models throughout the industry and across the entire technology stack, from software to infrastructure. While this has unlocked huge opportunities to accelerate the deployment of new capabilities or increase economic efficiencies within an organization, i...
As a CIO, are your direct reports IT managers or are they IT leaders? The hard truth is that many IT managers have risen through the ranks based on their technical skills, not their leadership ability. Many are unable to effectively engage and inspire, creating forward momentum in the direction of desired change. Renowned for its approach to leadership and emphasis on their people, organizations increasingly look to our military for insight into these challenges.
As operational failure becomes more acceptable to discuss within the software industry, the necessity for holding constructive, actionable postmortems increases. But most of what we know about postmortems from "pop culture" isn't actually relevant for the software systems we work on and within. In his session at DevOps Summit, J. Paul Reed will look at postmortem pitfalls, techniques, and tools you'll be able to take back to your own environment so they will be able to lay the foundations for h...
Containers are all the rage among developers and web companies, but they also represent two very substantial benefits to larger organizations. First, they have the potential to dramatically accelerate the application lifecycle from software builds and testing to deployment and upgrades. Second they represent the first truly hybrid-approach to consuming infrastructure, allowing organizations to run the same workloads on any cloud, virtual machine or physical server. Together, they represent a ver...
SYS-CON Events announced today the Containers & Microservices Bootcamp, being held November 3-4, 2015, in conjunction with 17th Cloud Expo, @ThingsExpo, and @DevOpsSummit at the Santa Clara Convention Center in Santa Clara, CA. This is your chance to get started with the latest technology in the industry. Combined with real-world scenarios and use cases, the Containers and Microservices Bootcamp, led by Janakiram MSV, a Microsoft Regional Director, will include presentations as well as hands-on...
As more intelligent IoT applications shift into gear, they’re merging into the ever-increasing traffic flow of the Internet. It won’t be long before we experience bottlenecks, as IoT traffic peaks during rush hours. Organizations that are unprepared will find themselves by the side of the road unable to cross back into the fast lane. As billions of new devices begin to communicate and exchange data – will your infrastructure be scalable enough to handle this new interconnected world?
"Matrix is an ambitious open standard and implementation that's set up to break down the fragmentation problems that exist in IP messaging and VoIP communication," explained John Woolf, Technical Evangelist at Matrix, in this interview at @ThingsExpo, held Nov 4–6, 2014, at the Santa Clara Convention Center in Santa Clara, CA.