Welcome!

News Feed Item

Levon Corrects Silver Equivalent Calculations in February 26, 2014 Press Release

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 04/28/14 -- Levon Resources Ltd. ("Levon" or "the Company") (TSX: LVN) (PINKSHEETS: LVNVF) (BERLIN: LO9) (FRANKFURT: LO9) has identified calculation errors in the silver equivalent (Ag Eq) values for the composited drill hole intersections reported in its press release of February 26, 2014 (the "Press Release"). The silver equivalent calculations contained in the Press Release understated the actual calculated silver equivalent for the reported drill hole composites by approximately 5.4% due to an error in the metal prices used in the calculation.

The Ag Eq values in the Press Release were presented in a series of five tables, and certain of these values were mentioned in the accompanying text in the Press Release. The correct values appear in the tables below and will be posted for all the holes on the Levon website (www.levon.com). The corrected composite widths are unchanged and are reported in metres (m) and feet (ft), and calculated Ag Eq in grams per ton (g/t) Ag Eq, and ounces per ton (oz/t) Ag Eq.

To view Tables 1 - 5 that are associated with this release, please visit the following link: http://media3.marketwire.com/docs/941878-t1-5.pdf

Assay Reporting

--  The final lab assays for Ag, Au, Zn, and Pb from the 2 m sawed and
    continuously sampled core intercepts are summarized in this press
    release.
--  Assays and calculated silver equivalent grams per metric tonne (g/t Ag
    Eq) are reported for the composited drill intersections in metres (m)
    and also in feet (ft), and troy ounces per metric tonne (oz/t Ag Eq).
--  Drill hole assay composites were calculated using the metal prices and
    cut offs that Independent Mining Consultants (IMC) and M3 Engineering
    and Technology (M3) used in their calculation of the Cordero resource,
    (see July 31, 2012 technical report, as amended and restated May 10,
    2013) and modeling in the Preliminary Economic Analysis (PEA) (see March
    12, 2012 PEA, as amended and restated May 8, 2013). The PEA provides the
    details of the NSR/t cutoff grade modeling. Management believes the
    metal prices used in the PEA continue to be realistic long term
    estimates, and the prices used are: USD$25/oz Ag, $1,000/oz Au, $1.00/
    Pb Zn and Pb.
--  Composite intervals were selected using a USD $6 NSR/t cutoff, which
    equates to about 10 g/t Ag Eq. Minimum down hole grade continuity is 10
    m in any of the composites.
--  The composites were calculated directly from the assays and represent
    in-situ Ag Eqs.

Qualified Person

Vic Chevillon, AIPG QPG # 11054, the Company's VP, Exploration and a qualified person as such term is defined in NI 43-101 of the Canadian Securities Administrators has reviewed and approved this news release.

About Levon Resources

Levon is a well-funded gold and precious metals exploration Company, exploring the company's 100% owned flagship Cordero bulk tonnage silver, gold, zinc, and lead project near Hidalgo Del Parral, Chihuahua, Mexico.

Levon's most recent mineral resource estimate is contained in a technical report prepared by IMC titled "Cordero Project June 2012 Mineral Resource Update, Chihuahua, Mexico" dated July 31, 2012, as amended and restated May 10, 2013, which is filed under the Company's profile at www.sedar.com.

ON BEHALF OF THE BOARD

Ron Tremblay, President and Chief Executive Officer

Safe Harbour Statement - This news release contains "forward-looking information" and "forward-looking statements" (together, the "forward looking statements") within the meaning of applicable securities laws and the United States Private Securities Litigation Reform Act of 1995, including our belief as to the extent and timing of various studies including the PEA, and exploration results, the potential tonnage, grades and content of deposits, timing and establishment and extent of resources estimates. These forward-looking statements are made as of the date of this news release and the dates of technical reports, as applicable. Readers are cautioned not to place undue reliance on forward-looking statements, as there can be no assurance that the future circumstances, outcomes or results anticipated in or implied by such forward-looking statements will occur or that plans, intentions or expectations upon which the forward-looking statements are based will occur. While we have based these forward-looking statements on our expectations about future events as at the date that such statements were prepared, the statements are not a guarantee that such future events will occur and are subject to risks, uncertainties, assumptions and other factors which could cause events or outcomes to differ materially from those expressed or implied by such forward-looking statements.

Such factors and assumptions include, among others, the effects of general economic conditions, the price of gold and silver, changing foreign exchange rates and actions by government authorities, uncertainties associated with legal proceedings and negotiations and misjudgments in the course of preparing forward-looking information. In addition, there are known and unknown risk factors which could cause our actual results, performance or achievements to differ materially from any future results, performance or achievements expressed or implied by the forward-looking statements. Known risk factors include risks associated with project development; the need for additional financing; operational risks associated with mining and mineral processing; fluctuations in metal prices; title matters; uncertainties and risks related to carrying on business in foreign countries; environmental liability claims and insurance; reliance on key personnel; the potential for conflicts of interest among certain of our officers, directors or promoters of with certain other projects; the absence of dividends; currency fluctuations; competition; dilution; the volatility of the our common share price and volume; tax consequences to U.S. investors; and other risks and uncertainties. Although we have attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. We are under no obligation to update or alter any forward-looking statements except as required under applicable securities laws.

Cautionary Note to United States Investors - The information contained herein and incorporated by reference herein has been prepared in accordance with the requirements of Canadian securities laws, which differ from the requirements of United States securities laws. In particular, the term "resource" does not equate to the term "reserve". The Securities Exchange Commission's (the "SEC") disclosure standards normally do not permit the inclusion of information concerning "measured mineral resources", "indicated mineral resources" or "inferred mineral resources" or other descriptions of the amount of mineralization in mineral deposits that do not constitute "reserves" by SEC standards, unless such information is required to be disclosed by the law of the Company's jurisdiction of incorporation or of a jurisdiction in which its securities are traded. U.S. investors should also understand that "inferred mineral resources" have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. Disclosure of "contained ounces" is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute "reserves" by SEC standards as in place tonnage and grade without reference to unit measures.

Neither the Toronto Stock Exchange ("TSX") nor its Regulation Services Provider (as that term is defined in the policies of the TSX) accepts responsibility for the adequacy or accuracy of this release.

Contacts:
Levon Resources Ltd.
IR Direct
604-682-2991

Levon Resources Ltd.
Main Office
604-682-3701
www.levon.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
When it comes to cloud computing, the ability to turn massive amounts of compute cores on and off on demand sounds attractive to IT staff, who need to manage peaks and valleys in user activity. With cloud bursting, the majority of the data can stay on premises while tapping into compute from public cloud providers, reducing risk and minimizing need to move large files. In his session at 18th Cloud Expo, Scott Jeschonek, Director of Product Management at Avere Systems, discussed the IT and busine...
Enterprises have taken advantage of IoT to achieve important revenue and cost advantages. What is less apparent is how incumbent enterprises operating at scale have, following success with IoT, built analytic, operations management and software development capabilities – ranging from autonomous vehicles to manageable robotics installations. They have embraced these capabilities as if they were Silicon Valley startups. As a result, many firms employ new business models that place enormous impor...
SYS-CON Events announced today that TidalScale, a leading provider of systems and services, will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 - Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. TidalScale has been involved in shaping the computing landscape. They've designed, developed and deployed some of the most important and successful systems and services in the history of the computing industry - internet, Ethernet, operating s...
Coca-Cola’s Google powered digital signage system lays the groundwork for a more valuable connection between Coke and its customers. Digital signs pair software with high-resolution displays so that a message can be changed instantly based on what the operator wants to communicate or sell. In their Day 3 Keynote at 21st Cloud Expo, Greg Chambers, Global Group Director, Digital Innovation, Coca-Cola, and Vidya Nagarajan, a Senior Product Manager at Google, will discuss how from store operations...
We all know that end users experience the Internet primarily with mobile devices. From an app development perspective, we know that successfully responding to the needs of mobile customers depends on rapid DevOps – failing fast, in short, until the right solution evolves in your customers' relationship to your business. Whether you’re decomposing an SOA monolith, or developing a new application cloud natively, it’s not a question of using microservices – not doing so will be a path to eventual b...
In his session at 21st Cloud Expo, James Henry, Co-CEO/CTO of Calgary Scientific Inc., will introduce you to the challenges, solutions and benefits of training AI systems to solve visual problems with an emphasis on improving AIs with continuous training in the field. He will explore applications in several industries and discuss technologies that allow the deployment of advanced visualization solutions to the cloud.
Nordstrom is transforming the way that they do business and the cloud is the key to enabling speed and hyper personalized customer experiences. In his session at 21st Cloud Expo, Ken Schow, VP of Engineering at Nordstrom, will discuss some of the key learnings and common pitfalls of large enterprises moving to the cloud. This includes strategies around choosing a cloud provider(s), architecture, and lessons learned. In addition, he’ll go over some of the best practices for structured team migrat...
As people view cloud as a preferred option to build IT systems, the size of the cloud-based system is getting bigger and more complex. As the system gets bigger, more people need to collaborate from design to management. As more people collaborate to create a bigger system, the need for a systematic approach to automate the process is required. Just as in software, cloud now needs DevOps. In this session, the audience can see how people can solve this issue with a visual model. Visual models ha...
SYS-CON Events announced today that Taica will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Taica manufacturers Alpha-GEL brand silicone components and materials, which maintain outstanding performance over a wide temperature range -40C to +200C. For more information, visit http://www.taica.co.jp/english/.
SYS-CON Events announced today that MIRAI Inc. will exhibit at the Japan External Trade Organization (JETRO) Pavilion at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. MIRAI Inc. are IT consultants from the public sector whose mission is to solve social issues by technology and innovation and to create a meaningful future for people.
Recently, REAN Cloud built a digital concierge for a North Carolina hospital that had observed that most patient call button questions were repetitive. In addition, the paper-based process used to measure patient health metrics was laborious, not in real-time and sometimes error-prone. In their session at 21st Cloud Expo, Sean Finnerty, Executive Director, Practice Lead, Health Care & Life Science at REAN Cloud, and Dr. S.P.T. Krishnan, Principal Architect at REAN Cloud, will discuss how they bu...
As hybrid cloud becomes the de-facto standard mode of operation for most enterprises, new challenges arise on how to efficiently and economically share data across environments. In his session at 21st Cloud Expo, Dr. Allon Cohen, VP of Product at Elastifile, will explore new techniques and best practices that help enterprise IT benefit from the advantages of hybrid cloud environments by enabling data availability for both legacy enterprise and cloud-native mission critical applications. By rev...
Join IBM November 1 at 21st Cloud Expo at the Santa Clara Convention Center in Santa Clara, CA, and learn how IBM Watson can bring cognitive services and AI to intelligent, unmanned systems. Cognitive analysis impacts today’s systems with unparalleled ability that were previously available only to manned, back-end operations. Thanks to cloud processing, IBM Watson can bring cognitive services and AI to intelligent, unmanned systems. Imagine a robot vacuum that becomes your personal assistant tha...
The next XaaS is CICDaaS. Why? Because CICD saves developers a huge amount of time. CD is an especially great option for projects that require multiple and frequent contributions to be integrated. But… securing CICD best practices is an emerging, essential, yet little understood practice for DevOps teams and their Cloud Service Providers. The only way to get CICD to work in a highly secure environment takes collaboration, patience and persistence. Building CICD in the cloud requires rigorous ar...
SYS-CON Events announced today that Datera will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Datera offers a radically new approach to data management, where innovative software makes data infrastructure invisible, elastic and able to perform at the highest level. It eliminates hardware lock-in and gives IT organizations the choice to source x86 server nodes, with business model option...