Integra Gold SEDAR Files Technical Report for Initial Preliminary Economic Assessment for the Lamaque Gold Project

VANCOUVER, BC--(Marketwired - April 29, 2014) - Integra Gold Corp. (TSX VENTURE: ICG) ("Integra" or the "Company") is pleased to announce that it has filed on SEDAR today the NI 43-101 technical report for the Preliminary Economic Assessment ("PEA"), disclosed in the Company's news release dated March 11, 2014, for its Lamaque Gold Project ("Lamaque") located in Val-d'Or, Québec. The PEA, prepared by InnovExplo Inc. ("InnovExplo") with technical contributions from AMEC, Golder Associates, Geologica Groupe-Conseil Inc., Geopointcom Inc. and WSP Engineering, demonstrates the strong economic potential of the Lamaque Project.

The report will be available under the Company's profile on SEDAR and on the Company's website via the following link: http://www.integragold.com/i/pdf/reports/43-101_PEA_Lamaque_2014.pdf.

PEA Highlights:

  • Base Case Pre-tax IRR of 51% and NPV (5% discount rate) of CAD$146.0 M
  • Average annual production of 112,400 gold ("Au") ounces per year with peak annual production at 143,300 Au ounces per year and total production of 505,600 Au ounces
  • Life of Mine ("LOM") cash cost of CAD$665 per Au ounce and cash costs plus sustaining costs of CAD$805 per Au ounce
  • In excess of 56,600 meters ("m") in 157 drill holes has now been completed subsequent to the database cut-off date of April 24, 2013 for the resource estimates used in the PEA which highlights the strong potential for resource growth
  • Proposed underground operation with a vertical depth of 620 m and material processed at nearby mills via toll, or custom, milling
  • The plan as outlined in the PEA will have minimal impact on the community as there are no homes, businesses, or other infrastructure where the proposed mining will take place
  • Potential to significantly reduce capital expenditures by delaying development of second ramp until cash flow from the first ramp has been achieved

"We were impressed with the results of the first PEA and look forward to seeing the impact an updated resource will have on what are already very promising numbers," noted President and CEO Stephen de Jong. "With this additional 57,000 meters of drilling we are confident we will continue to see the Lamaque resource and projected mine life grow increasing the overall viability and appeal of the project."

PEA Base Case Assumptions and Summary

============================================================================
Gold Price (USD$)                                                   $1,275  
----------------------------------------------------------------------------
Exchange Rate (CAD$ to USD$)                                        1.05    
----------------------------------------------------------------------------
Gold Price (CAD$)                                                   $1,339  
----------------------------------------------------------------------------
Average Annual Gold Production (ounces)                             112,400 
----------------------------------------------------------------------------
Peak Annual Gold Production (ounces)                                143,300 
----------------------------------------------------------------------------
Pre-Production Capital Costs (CAD$)                                 $69.2 M 
----------------------------------------------------------------------------
LOM Sustaining Capital (CAD$)                                       $66.8 M 
----------------------------------------------------------------------------
Pre-Production Period (years)                                       2       
----------------------------------------------------------------------------
Mine Life (years)                                                   4.25    
----------------------------------------------------------------------------
Cash Cost per Au Ounce (CAD$)                                       $665    
----------------------------------------------------------------------------
Cash Costs and Sustaining Cost per Au Ounce (CAD$)                  $805    
============================================================================
                                                                            
============================================================================
PRE-TAX                                                                     
----------------------------------------------------------------------------
Life of Mine NPV at 5% Discount Rate (CAD$)                         $146.0 M
----------------------------------------------------------------------------
Internal Rate of Return                                             51%     
----------------------------------------------------------------------------
Payback Period (years)                                              1.5     
============================================================================
                                                                            
============================================================================
AFTER-TAX                                                                   
----------------------------------------------------------------------------
Life of Mine NPV at 5% Discount Rate (CAD$)                         $88.5 M 
----------------------------------------------------------------------------
Internal Rate of Return                                             38%     
----------------------------------------------------------------------------
Payback Period (years)                                              1.8     
============================================================================

PEA Production Profile (Diluted Head Grade after Mining)

============================================================================
                                            Grade            Au Ounces      
         Year              Tonnes         (g/t Au)           Recovered      
============================================================================
    Pre-production            -               -                  -          
----------------------------------------------------------------------------
    Pre-production         124,500          7.46              28,000        
----------------------------------------------------------------------------
           1               398,500          7.97              95,500        
----------------------------------------------------------------------------
           2               512,400          9.35              143,300       
----------------------------------------------------------------------------
           3               463,700          9.25              127,000       
----------------------------------------------------------------------------
           4               501,500          6.76              98,700        
----------------------------------------------------------------------------
           5               80,800           5.88              13,100        
============================================================================
         TOTAL            2,081,400         8.19              505,600       
============================================================================

2014 Lamaque Drill Program

Planned drilling for 2014 at the Lamaque project has been increased to a minimum of 45,000 m. This includes the recently completed 24,000 m definition program at the Triangle Zone, definition drilling at the Fortune Zone (8,000 m), exploration drilling at Plug No. 5 (5,000 m) and Mine No. 3 targets (6,000 m), and geotechnical drilling at Parallel, Triangle, and Fortune zones (2,000 m). The Plug No. 5 and Mine No. 3 targets are not currently included in the Lamaque Project's total resource and following the proposed drill programs the Company will conduct resource estimation on these targets in the latter part of 2014.

The PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA will be realized.

Project and Company Profile

Integra's Lamaque gold project is located in the heart of the Val-d'Or gold camp in the Province of Québec, Canada, approximately 550 km northwest of Montréal. Québec is rated one of the best mining jurisdictions in the world. Infrastructure, human resources and mining expertise are readily available.

The Company's primary objective is to continue to prove up additional resources while advancing the existing resource towards production. The project is divided into three main clusters of mineralization, the North, South and West Cluster. The North Cluster consists of the Parallel, Fortune, No. 5 Plug, and No. 3 Mine zones and is located approximately 1 km northwest from the South Cluster, which includes the No. 4 Plug, Triangle and Triangle South zones. The Sixteen Zone and No. 6 Vein form the West Cluster. The zones from the West Cluster, as well as the Mine No. 3 and Plug No. 5 zones from the North Cluster are not included in the PEA.

Qualified Person

The Lamaque Project is under the direct supervision of Hervé Thiboutot, Eng. Senior Vice-President of the Company, and Francois Chabot, Eng. and Operations and Engineering Manager of the Company. Both Mr. Thiboutot and Mr. Chabot are Qualified Persons ("QP") as defined by National Instrument 43-101.

In addition, each of the individuals listed below are independent QP for the purposes of NI 43-101. All scientific and technical information in this press release in respect of the Lamaque Project or the PEA is based upon information prepared by or under the supervision of those individuals.

For InnovExplo Inc., Sylvie Poirier, Eng. (Mining) and Laurent Roy, Eng. (Mining); for Geologica, Alain-Jean Beauregard, Geol. (Geology) and Daniel Gaudreault, Eng. (Geology); for GeoPointcom, Christian D'Amours, Geol. (Resources); for Amec, Stephan Bergeron, Eng. (Environment); for Golder Associates, James Tod, Eng. (Geo-Mechanics); and for WSP Engineering, Michel Garon, Eng. (Metallurgy).

The Company's QPs have reviewed the technical content of this press release.

ON BEHALF OF THE BOARD OF DIRECTORS

Stephen de Jong
CEO & President

Follow Integra Gold On:

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward Looking Statements: Certain disclosures in this release constitute forward-looking statements. In making the forward-looking statements in this release, the Company has applied certain factors and assumptions that are based on the Company's current beliefs as well as assumptions made by and information currently available to the Company, including that the Company is able to obtain any government or other regulatory approvals required to complete the private placement and Company's planned exploration activities, that the Company is able to complete the private placement, that the Company is able to procure personnel, equipment and supplies required for its exploration activities in sufficient quantities and on a timely basis and that actual results of exploration activities are consistent with management's expectations. Although the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect, and the forward-looking statements in this release are subject to numerous risks, uncertainties and other factors that may cause future results to differ materially from those expressed or implied in such forward-looking statements. Such risk factors include, among others, that the private placement will not be completed, that actual results of the Company's exploration activities will be different than those expected by management and that the Company will be unable to obtain or will experience delays in obtaining any required government approvals or be unable to procure required equipment and supplies in sufficient quantities and on a timely basis. Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Join us at Cloud Expo June 6-8 to find out how to securely connect your cloud app to any cloud or on-premises data source – without complex firewall changes. More users are demanding access to on-premises data from their cloud applications. It’s no longer a “nice-to-have” but an important differentiator that drives competitive advantages. It’s the new “must have” in the hybrid era. Users want capabilities that give them a unified view of the data to get closer to customers and grow business. The...
Internet of @ThingsExpo, taking place October 31 - November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with 21st Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world. The Internet of Things (IoT) is the most profound change in personal and enterprise IT since the creation of the Worldwide Web more than 20 years ago. All major researchers estimate there will be tens of billions devic...
SYS-CON Events announced today that MobiDev, a client-oriented software development company, will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place October 31-November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. MobiDev is a software company that develops and delivers turn-key mobile apps, websites, web services, and complex software systems for startups and enterprises. Since 2009 it has grown from a small group of passionate engineers and business...
SYS-CON Events announced today that GrapeUp, the leading provider of rapid product development at the speed of business, will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place October 31-November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. Grape Up is a software company, specialized in cloud native application development and professional services related to Cloud Foundry PaaS. With five expert teams that operate in various sectors of the market acr...
What's the role of an IT self-service portal when you get to continuous delivery and Infrastructure as Code? This general session showed how to create the continuous delivery culture and eight accelerators for leading the change. Don Demcsak is a DevOps and Cloud Native Modernization Principal for Dell EMC based out of New Jersey. He is a former, long time, Microsoft Most Valuable Professional, specializing in building and architecting Application Delivery Pipelines for hybrid legacy, and cloud ...
SYS-CON Events announced today that Ayehu will exhibit at SYS-CON's 21st International Cloud Expo®, which will take place on October 31 - November 2, 2017 at the Santa Clara Convention Center in Santa Clara California. Ayehu provides IT Process Automation & Orchestration solutions for IT and Security professionals to identify and resolve critical incidents and enable rapid containment, eradication, and recovery from cyber security breaches. Ayehu provides customers greater control over IT infras...
With major technology companies and startups seriously embracing Cloud strategies, now is the perfect time to attend 21st Cloud Expo October 31 - November 2, 2017, at the Santa Clara Convention Center, CA, and June 12-14, 2018, at the Javits Center in New York City, NY, and learn what is going on, contribute to the discussions, and ensure that your enterprise is on the right path to Digital Transformation.
Automation is enabling enterprises to design, deploy, and manage more complex, hybrid cloud environments. Yet the people who manage these environments must be trained in and understanding these environments better than ever before. A new era of analytics and cognitive computing is adding intelligence, but also more complexity, to these cloud environments. How smart is your cloud? How smart should it be? In this power panel at 20th Cloud Expo, moderated by Conference Chair Roger Strukhoff, pane...
21st International Cloud Expo, taking place October 31 - November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA, will feature technical sessions from a rock star conference faculty and the leading industry players in the world. Cloud computing is now being embraced by a majority of enterprises of all sizes. Yesterday's debate about public vs. private has transformed into the reality of hybrid cloud: a recent survey shows that 74% of enterprises have a hybrid cloud strategy. Me...
DevOps at Cloud Expo, taking place October 31 - November 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with 21st Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world. The widespread success of cloud computing is driving the DevOps revolution in enterprise IT. Now as never before, development teams must communicate and collaborate in a dynamic, 24/7/365 environment. There is no time to w...
The current age of digital transformation means that IT organizations must adapt their toolset to cover all digital experiences, beyond just the end users’. Today’s businesses can no longer focus solely on the digital interactions they manage with employees or customers; they must now contend with non-traditional factors. Whether it's the power of brand to make or break a company, the need to monitor across all locations 24/7, or the ability to proactively resolve issues, companies must adapt to...
In this presentation, Striim CTO and founder Steve Wilkes will discuss practical strategies for counteracting fraud and cyberattacks by leveraging real-time streaming analytics. In his session at @ThingsExpo, Steve Wilkes, Founder and Chief Technology Officer at Striim, will provide a detailed look into leveraging streaming data management to correlate events in real time, and identify potential breaches across IoT and non-IoT systems throughout the enterprise. Strategies for processing massive ...
SYS-CON Events announced today that Cloud Academy named "Bronze Sponsor" of 21st International Cloud Expo which will take place October 31 - November 2, 2017 at the Santa Clara Convention Center in Santa Clara, CA. Cloud Academy is the industry’s most innovative, vendor-neutral cloud technology training platform. Cloud Academy provides continuous learning solutions for individuals and enterprise teams for Amazon Web Services, Microsoft Azure, Google Cloud Platform, and the most popular cloud com...
Cloud Expo, Inc. has announced today that Andi Mann and Aruna Ravichandran have been named Co-Chairs of @DevOpsSummit at Cloud Expo Silicon Valley which will take place Oct. 31-Nov. 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA. "DevOps is at the intersection of technology and business-optimizing tools, organizations and processes to bring measurable improvements in productivity and profitability," said Aruna Ravichandran, vice president, DevOps product and solutions marketing...
In his session at Cloud Expo, Alan Winters, an entertainment executive/TV producer turned serial entrepreneur, presented a success story of an entrepreneur who has both suffered through and benefited from offshore development across multiple businesses: The smart choice, or how to select the right offshore development partner Warning signs, or how to minimize chances of making the wrong choice Collaboration, or how to establish the most effective work processes Budget control, or how to ma...