IMX Resources Limited: Report for the Quarter Ended 31 March 2014

PERTH, AUSTRALIA -- (Marketwired) -- 04/30/14 -- IMX Resources Limited (ASX: IXR)(TSX: IXR)(TSX: IXR.WT) -


Cairn Hill Iron Ore Operations

--  Phase 2 extension of the Cairn Hill Mine, with operations continuing
    through to June 2015
--  Negative cash flow from operations of $1.4 million(1) due to receipt of
    provisional invoice for the final shipment for the Quarter on 4 April
    2014 (December Quarter: positive cash flow of $8.1 million)
--  Distributions to joint venture partners of $4.3 million, IMX's share
    $2.2 million (December Quarter $11.9 million, IMX's share $6.1 million)
--  Iron ore price protection delivers average realised iron price of A$142
    for the March Quarter exceeding the average 62% benchmark price of A$134
    for the Quarter

Ntaka Hill Nickel Sulphide Project

--  Tanzanian regulatory approval of joint venture agreement with MMG
    Exploration Holdings Limited ("MMG")
--  Assay results from final phase of December Quarter drilling identify new
    zone of nickel mineralisation, 'Ntaka Kati'
--  Aggressive exploration program, involving a total of 14,775m of diamond
    drilling and 8,700m of reverse circulation drilling expected to commence
    in May 2014 (4 drill rigs currently on site)

Mt Woods Exploration and Development

--  Pilot hematite drilling program and occurrence of coarse specular
    hematite at Fyans Prospect confirms hematite prospectivity of Mt Woods
--  Search continues for a development partner for the Mt Woods Magnetite
    Project with roadshows undertaken in China and the Middle East
--  Several parties actively engaged in process to secure a joint venture
    partner to explore for copper-gold on the Mt Woods tenements


--  Appointment of Gary Sutherland as Managing Director and Derek Fisher as
    Chairman, along with the relocation of the corporate office from Perth
    to Adelaide
--  IMX cash of $3.3 million, excluding cash invested in Cairn Hill joint

(1) All Dollars in this report are Australian Dollars unless otherwise stated.


Cairn Hill Joint Venture (IMX - 51%)

Summary information on production and shipments for the March Quarter are shown in Table 1 below (figures represent the full (100%) results of the Cairn Hill Joint Venture (the "Cairn Hill JV").

  Table 1. Cairn Hill JV: Production and shipment performance for the March
                                 Quarter 2014
                                 March        December     Comparison with
                          Quarter 2014    Quarter 2013    Previous Quarter
Waste removed (BCM)            587,022         454,681                29.1%
Waste and Ore (BCM)            689,482         554,770                24.3%
Ore Mined (tonnes)             440,578         430,383                 2.4%
Ore Crushed (tonnes)           421,955         403,942                 4.5%
Road Haulage (tonnes)          411,337         422,691                (2.7%)
Rail Haulage (tonnes)          431,592         418,871                 3.0%
Ore Shipped (tonnes)           450,344         381,735                18.0%


While the Total Recordable Injury Frequency Rate decreased to 13.49 (December Quarter: 19.1), one Recordable Injury occurred during the Quarter.

Mining continued in both Pit 1 and Pit 2 during the Quarter. Extra mining capacity was utilised to accelerate pre-stripping activities in Pit 2. This enabled ore to be accessed more quickly to partially compensate for the underperformance of the Pit 1 orebody at depth (ASX announcement 3 March 2014). Road and rail haulage volumes for the Quarter were adversely impacted by both reduced availability of ore for transport and heavy rainfalls which resulted in 61.5 hours of lost road access.

A total of 450,344 tonnes of ore were shipped in six shipments, which was in line with the Company's expectations. Six shipments are forecast for the June Quarter.

For the March Quarter, FOB costs averaged $84 per tonne shipped and $104 per tonne CIF (December Quarter: $94 and $111 respectively). The fall in costs per tonne was attributable to the six shipments in the March Quarter compared to five shipments for the December Quarter.

FOB costs per tonne shipped for the remainder of the 2014 financial year are forecast to average $84 per tonne shipped ($106 per tonne CIF). These costs are slightly higher than previously reported for the remainder of the 2014 financial year due to the June 2014 quarter expecting six shipments instead of the previously forecast seven shipments. The Company continues to operate with increased rail capacity in order to recover some of the capacity lost due to technical issues with locomotives and wet weather in 2013.

Operations Cash Flow

The Cairn Hill JV had negative cash flow from operations of $1.3 million (December Quarter: positive cash flow of $8.1 million). This is a timing issue only as the provisional invoice cash receipt of $8.6 million for the final shipment of the March Quarter which departed on 30 March 2014 was received on 3 April 2014. Had the cash for this shipment been received during the March Quarter, the cash flow would have been in line with the $6.8 million forecast in the December Quarter.

The iron ore price and AUD/USD exchange rate fell during the provisional pricing periods and the resulting provisional price received per tonne of magnetite-copper ore shipped during the March Quarter was $127 per tonne CIF (December Quarter $127 per tonne CIF). Hedges of the Platts 62% benchmark price resulted in a positive $0.9m impact on cash flow during the quarter.

During the March Quarter, the Cairn Hill JV made payments of $2.7 million for adjustments on final invoices, $1.2 million of which related to payments for shipments in the December Quarter. At spot prices and exchange rates on 31 March 2014, payments for adjustments on final invoices due for settlement in the June Quarter are estimated to be $7.3 million. This large settlement amount is due to a combination of falling iron prices and low copper grades of the final two shipments of the March quarter.


At the end of the March Quarter, the book value of ore stockpiles, being the cost to deliver the stockpiles to their present location, was $9.9 million (31 December 2013: $12.9 million). The decrease in the book value of ore stockpiles was due to lower tonnes mined, which resulted in a drawdown of stockpile levels in order to achieve six shipments for the Quarter. The breakdown by stockpile location is shown in Table 2 below.

                  Table 2. Ore stockpiles at 31 March 2014
                    Pre-Crusher   Post Crusher    Rankin Dam   Port Adelaide
 (tonnes)               110,659         67,878        38,668          44,860

Sales and Marketing

During the Quarter shipments were placed with existing, contracted customers.


1. Continuity of operations at Cairn Hill

Phase 2

During the Quarter, the Cairn Hill JV partners approved a Phase 2 extension of the Cairn Hill Mine that will see it continue operation through to mid-2015 (see ASX announcement 1 April 2014).

The Phase 2 extension will initially comprise the mining of two new open pits (Pits 3 and 4) located to the east of the current Pit 1, with production of over one million tonnes of product. There is potential to further extend the life of the Cairn Hill Mine with a cut-back to the existing Pit 2.

Based on Consensus Economics forecasts for the first half of 2015 of US$115.50 per tonne for the 62% Platts Iron Ore index and an AUD/USD exchange rate of 0.86, financial modelling indicates that together with Phase 1 operations, the Phase 2 extension is expected to generate post-tax, free cash flow of approximately $8.0 million for the Cairn Hill JV.

Owing to the especially coarse nature of Cairn Hill magnetite, existing customers have been able to produce very high-grade magnetite concentrates which are highly desirable as feed to the steel-making process. As a result, the intermediate product from Phase 2 is particularly attractive, with an existing customer having provided a letter of intent to purchase up to 100% of the Phase 2 product under an agreed pricing model based on the 62% Platts Iron Ore index.

Built on the current mining operation and infrastructure that is already in place, the Phase 2 extension is part of IMX's broader strategic vision to establish a minimum five year life at the Cairn Hill Mine.

Hematite exploration

Exploration for direct shipping ore ("DSO") hematite is an important element of the Company's efforts to maintain ongoing operations at Cairn Hill beyond 2015. Any discovery of economic DSO hematite at Mt Woods has the potential for near-term production utilising the road, rail and port infrastructure currently used by the Cairn Hill Mine.

Results of a pilot drilling program to test hematite at Mt Woods that was carried out in March 2014 returned wide intersections showing hematite derived from alteration of a magnetite iron formation (see ASX announcement 1 March 2014 and 21 March 2014). These results show that hematite-forming geological processes occur at Mt Woods and that the exploration methods applied in the pilot drilling program can detect it. Since announcing these exploration results on 1 March 2014 and 21 March 2014, IMX is not aware of any new information or data that materially affects the information included in that announcement.

Exploration for this style of hematite mineralisation was given added impetus by the identification of a significant occurrence of high-grade hematite from previous drilling at the Mt Woods Project. The intersection was identified in core drilled by former partner OZ Minerals Limited, who were exploring for copper (see ASX announcement 4 April 2014). Assaying of the hematite rich interval returned 8.4 metres @ 59.1% Fe from 406.7m (see Table 3).

    Table 3: Hematite Fe% intercepts in hole DD112FYA002 - Fyans Prospect
                                                                   Main iron
Hole          From      To   Width    Fe %    P %    S %  SiO2 %     mineral
DD12FYA002   384.0   389.3     5.3   49.80   0.03   0.02   20.75   Magnetite
DD12FYA002   406.5   414.9     8.4   59.10   0.04   0.10   11.70    Hematite
Includes     411.0   414.9     3.9   61.30   0.04   0.14    8.42    Hematite

Since announcing these exploration results on 4 April 2014, IMX is not aware of any new information or data that materially affects the information included in that announcement.

This intersection at Fyans is too deep and narrow to be of direct economic significance, but clearly demonstrates that the geochemical processes that created Arrium's hematite mineralisation at Peculiar Knob were also active on the Mt Woods tenements.

The Fyans Prospect is located approximately 11km south-west of Peculiar Knob.

2. Mt Woods Magnetite Project, South Australia (IMX 100%)

Investigation into optimised product handling solutions, particularly around the port were completed during the Quarter, with concept designs developed for changes to infrastructure.

The spring flora and fauna baseline survey for the Snaefell site was also finalised, with the field work having been completed during the December Quarter. This survey was undertaken to ensure that environmental baseline studies did not impact on the critical path for project permitting.

The process to secure a partner for the evaluation and development of the Mt Woods Magnetite Project continued during the Quarter. Azure Capital continues to advise on the process, with a number of potential partners currently engaged at various stages of review.


1. Nachingwea Property, Ntaka Hill (IMX 100%)

Joint venture with MMG

Having entered into a five year, US$60 million joint venture agreement with MMG in September 2013, MMG immediately commenced funding and directing exploration at the Nachingwea Project. MMG is targeting a resource in the order of 400,000 tonnes of contained nickel at greater than 1.5% nickel and has implemented a new exploration program, focussed on delineating high-grade, mafic intrusive style nickel mineralisation, which is considered to have the potential to increase the grade and size of the existing resource.

Stage One progressing well

The 'Stage One' work program defined by MMG and which commenced in September 2013, has a budget of US$10 million, with rapid evaluation of the potential for high-grade nickel discoveries and achievement of MMG's resource target, the primary objective.

In late 2013, MMG commenced a number of geophysical surveys to further highlight the potential within the Ntaka-Lionja corridor, including NSAMT (natural source audio magneto-tellurics), MLEM (moving loop electro-magnetic (EM)) and infill gravity surveys. Re-logging of oriented drill core and reassessment of down hole EM (DHEM) surveys have continued and along with the surface geophysical work, are providing a new understanding of the Ntaka intrusive.

Identification of drill targets is expected to be finalised in April, prior to the commencement of drilling in the June Quarter.

New zone of mineralisation identified at Ntaka Hill

Assay results received during the March Quarter confirmed a new zone of mineralisation, referred to as "Ntaka Kati", located 300m north of the current Sleeping Giant and Zeppelin resource (see ASX Announcement 24 February 2014). Two holes were drilled, each of which intersected mineralisation, with assay results including:

--  71.5m of nickel mineralisation, including 41m @ 0.40% Ni, 16m @ 0.5% Ni
    and 14.6m @ 0.7% Ni within 150m of the surface (NAD13-388); and
--  7.3m @ 1% Ni and 5.9m @ 0.6% Ni (NAD13-387).

Since announcing these exploration results on 24 February 2014, IMX is not aware of any new information or data that materially affects the information included in that announcement.

The discovery of Ntaka Kati continues to demonstrate the potential for the various zones of mineralisation at Ntaka Hill to form part of a much larger mineralised system up to 1.5km wide.

2. Nachingwea regional exploration

While primarily focused on the Ntaka Hill Nickel Sulphide Project to identify a resource in the order of 400,000 tonnes of contained nickel at greater than 1.5% nickel, MMG is also looking at the broader Nachingwea Project area which covers 6,800 km2 (tenements granted and under application).

Regional targeting for a virgin nickel sulphide discovery is based on an interpretation of a detailed aeromagnetic/radiometric survey flown in 2010, an extensive regional soil sampling program and a number of airborne EM (VTEM) surveys which cover approximately 60% of the Nachingwea Project area.

3. Mt Woods Copper-Gold Exploration, South Australia (IMX 100%)

OZ Minerals completed its withdrawal from the Mt Woods Exploration JV during the December Quarter, with all mineral rights over the Mt Woods tenements and interest in those tenements now 100% owned by IMX.

The prospectivity of the Mt Woods tenements, together with the availability of a significant exploration database established during previous exploration work, makes this an attractive opportunity for iron oxide copper gold discoveries in the world-class Gawler Craton mineral province.

A process to secure a joint venture partner for non-iron exploration on the Mt Woods tenements commenced during the December Quarter and is continuing. A number of parties have expressed an interest in non-iron exploration at Mt Woods and several Australian and international copper-gold explorers and producers are actively engaged in the process.


Cash position and distributions

As at 31 March 2014, the Group had cash at bank of $12.1 million, as detailed in Table 4 below:

                     Table 4. Consolidated Cash Position
                                                  31 Mar 2014    31 Dec 2013
                                                         ($m)           ($m)
IMX Resources Limited                                     3.3            3.1
Cairn Hill JV (51% IMX share is $4.5 million)             8.8           13.7
Consolidated Group                                       12.1           17.7

The Cairn Hill JV cash balance is the working capital required to fund the operation. Distributions to the JV partners are made so as to retain a cash balance of at least $3 million at all times.

As at 31 March 2014, IMX's Tanzanian subsidiary Ngwena Limited held $0.1 million of cash on behalf of MMG. This cash will contribute towards its expenditure on the Nachingwea JV.

Distributions to the Cairn Hill JV partners amounted to $4.3 million, of which IMX received $2.1 million (December quarter $11.9 million, IMX share $6.1 million).

In order to provide greater certainty in respect of cash flow from the Cairn Hill Mine, price protection was put in place for 90% of the Group's iron ore exposure from January to March 2014. The transactions entered provided a price for the 62% iron ore benchmark of AUD146.59 (January); AUD144.16 (February); and AUD136.52 (March) significantly above the spot prices that would have been achievable.

Appointment of Managing Director and Non-executive Director

During February, Dr Derek Fisher, a highly credentialed mining executive with over 40 years' experience in mining companies, spanning both corporate and operational roles, with a particular emphasis on iron ore and nickel projects, was appointed as a Non-executive Director. Subsequent to the end of the Quarter, Dr Fisher was appointed Chairman of the Company.

Immediately following the end of the March Quarter, Mr Gary Sutherland was appointed Managing Director. Mr Sutherland will drive IMX's iron ore growth strategy, based on its 51% owned Cairn Hill Mine and portfolio of development and exploration projects, including the 100% owned Mt Woods Magnetite Project.

In parallel with Mr Sutherland's appointment, IMX has decided to relocate its corporate head office from Perth to Adelaide, a move which is consistent with the Company's focus on its South Australian iron ore assets and will enable consolidation of its operational and corporate teams in one location. While this will result in some one off costs being incurred during the June and September Quarters, it is expected to deliver significant savings in recurring overhead costs.


Table 5. Tenements Held and Location
Tenement                        Ownership        Project            Location
ML6303 - Cairn Hill                  100%     Cairn Hill     South Australia
EL4649 - Kangaroo Dam                100%       Mt Woods     South Australia
EL4706 - Mt Woods                    100%       Mt Woods     South Australia
EL4963 - Warrina North               100%       Mt Woods     South Australia
EL4964 - Warrina South               100%       Mt Woods     South Australia
EL5048 - Mt Brady                    100%       Mt Woods     South Australia
EL4446 - Yarrabolina Hill            100%       Mt Woods     South Australia
EL4866 - Mt Paisley                  100%       Mt Woods     South Australia
EL4982 - Brumby Creek                100%       Mt Woods     South Australia
PL6489/2010 - Lubalisi               100%        Mibango            Tanzania
PL6895/2012 - Mioni                  100%        Mibango            Tanzania
PL7464/2011 - Luegele                100%        Mibango            Tanzania
PL8017/2012 - Molumbo Hill           100%        Mibango            Tanzania
PL8124/2012 - Milanga                100%        Mibango            Tanzania
PL8833/2013 - Kamafinga              100%        Mibango            Tanzania
PL8901/2013 - Sifumbi                100%        Mibango            Tanzania
PL8902/2013 - Mpondwe                100%        Mibango            Tanzania
PL9299/2013 - Lwega                  100%        Mibango            Tanzania
PL9394/2013 - Nkulya                 100%        Mibango            Tanzania
PL4422/2007 - Ntaka              100% (i)     Nachingwea            Tanzania
PL4917/2008 - Mbangala           100% (i)     Nachingwea            Tanzania
PL4918/2008 - Lukumbi            100% (i)     Nachingwea            Tanzania
PL5447/2008 - Noli SE            100% (i)     Nachingwea            Tanzania
PL5971/2009 - Matambare          100% (i)     Nachingwea            Tanzania
PL5977/2009 - Naujombo           100% (i)     Nachingwea            Tanzania
PL5978/2009 - Kihangara North    100% (i)     Nachingwea            Tanzania
PL6073/2009 - Chilalo            100% (i)     Nachingwea            Tanzania
PL6148/2009 - Mbwemburu North    100% (i)     Nachingwea            Tanzania
PL6149/2009 - Chilalo West       100% (i)     Nachingwea            Tanzania
PL6153/2009 - Mbwemburu          100% (i)     Nachingwea            Tanzania
PL6154/2009 - Nachingwea SW      100% (i)     Nachingwea            Tanzania
PL6156/2009 - Noli SW            100% (i)     Nachingwea            Tanzania
PL6158/2009 - Kiperere East      100% (i)     Nachingwea            Tanzania
PL6161/2009 - Mtimbo             100% (i)     Nachingwea            Tanzania
PL6397/2010 - Kiperere West      100% (i)     Nachingwea            Tanzania
PL6409/2010 - Rappa              100% (i)     Nachingwea            Tanzania
PL6412/2010 - Mujira             100% (i)     Nachingwea            Tanzania
PL6414/2010 - Kihangara          100% (i)     Nachingwea            Tanzania
PL6467/2010 - Nepanga            100% (i)     Nachingwea            Tanzania
PL6634/2010 - Mihumo             100% (i)     Nachingwea            Tanzania
PL6635/2010 - Nachingwea NW      100% (i)     Nachingwea            Tanzania
PL7095/2011 - Nditi              100% (i)     Nachingwea            Tanzania
PL7226/2011 - Ntaka South        100% (i)     Nachingwea            Tanzania
PL8625/2012 - Nambu West         100% (i)     Nachingwea            Tanzania
PL8626/2012 - Nambugu East       100% (i)     Nachingwea            Tanzania
PL8627/2012 - Lumpumbulu         100% (i)     Nachingwea            Tanzania
PL8628/2012 - Kipendengwa        100% (i)     Nachingwea            Tanzania
PL8748/2012 - Kihue              100% (i)     Nachingwea            Tanzania
PL8754/2012 - Chikoweti          100% (i)     Nachingwea            Tanzania
PL8811/2013 - Chimbo             100% (i)     Nachingwea            Tanzania
PL8812/2013 - Mbemba             100% (i)     Nachingwea            Tanzania
PL9397/2013 - Mtimbo South       100% (i)     Nachingwea            Tanzania
PL9442/2013 - Nachi West         100% (i)     Nachingwea            Tanzania
PL9557/2014 - Nachunguru         100% (i)     Nachingwea            Tanzania
                                                              New Brunswick,
Claim Block 4242                 50% (ii)     St Stephen              Canada
                                                              New Brunswick,
Claim Block 5787                 50% (ii)     St Stephen              Canada

(i) Subject to farm-in joint venture with MMG
(ii) Subject to 50/50 joint venture with ABE Resources

Table 6. Tenements Acquired During the Quarter
Tenement             Ownership              Project                 Location
PL9557/2014               100%           Nachingwea                 Tanzania
EL4982                    100%             Mt Woods          South Australia

Tenements Disposed During the Quarter

No tenements were disposed of during the March Quarter.

Farm-in Agreements

As at 31 March 2014, IMX held a 100% interest in the Nachingwea Project which is the subject of a farm-in agreement with MMG.

Gary Sutherland, Managing Director

About IMX

IMX Resources Limited is an Australian-based mining and exploration company, listed on the Australian Securities Exchange and Toronto Stock Exchange, with projects located in Australia and East Africa.

In Australia, IMX operates and owns 51% of the Cairn Hill Mine, located 55km south-east of Coober Pedy in South Australia, where it produces a premium coarse-grained magnetite-copper-gold DSO product at a rate of 1.8Mtpa. This operation generates cash flow which underpins the IMX investment proposition.

IMX is also actively exploring for direct shipping hematite at its Mt Woods tenements, located near the Cairn Hill Mine, and progressing development options for its Mt Woods Magnetite Project. Studies indicate that a smaller scale, lower cost project may be developed utilising existing infrastructure already in use at the Cairn Hill Mine. Efforts to secure a partner to support development of the Mt Woods Magnetite Project are continuing.

In Africa, IMX owns the highly prospective Ntaka Hill Nickel Sulphide Project, located within the broader 6,800km2 Nachingwea Exploration Project in south-eastern Tanzania which is prospective for nickel and copper sulphide, gold and graphite mineralization. Ntaka Hill is a potentially world-class nickel sulphide project which is being explored under a US$60 million exploration joint venture with MMG Exploration Holdings Limited.

Visit: www.imxresources.com.au

Cautionary statement: The TSX does not accept responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

Forward-looking statements: This news release includes certain "forward-looking statements". Forward-looking statements and forward-looking information are frequently characterised by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may", "will" or "could" occur. All statements other than statements of historical fact included in this release are forward-looking statements or constitute forward-looking information. There can be no assurance that such information or statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such information. Important factors could cause actual results to differ materially from IMX's expectations.

These forward-looking statements are based on certain assumptions, the opinions and estimates of management and qualified persons at the date the statements are made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements or information. These factors include the inherent risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drilling results and other geological data, fluctuating metal prices, the possibility of project cost overruns or unanticipated costs and expenses, the ability of contracted parties (including laboratories and drill companies to provide services as contracted), uncertainties relating to required approvals, issues associated with the availability and costs of financing needed in the future and other factors. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Exploration target tonnage quantity and grade estimates are conceptual in nature only. These figures are not resource estimates as defined by the 2004 JORC Code or NI 43-101, as insufficient exploration has been conducted to define a Mineral Resource and it is uncertain if further exploration will result in the target being delineated as a Mineral Resource.

IMX undertakes no obligation to update forward-looking statements or information if circumstances should change. The reader is cautioned not to place undue reliance on forward-looking statements or information. Readers are also cautioned to review the risk factors identified by IMX in its regulatory filings made from time to time with the ASX, TSX and applicable Canadian securities regulators.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
WebRTC defines no default signaling protocol, causing fragmentation between WebRTC silos. SIP and XMPP provide possibilities, but come with considerable complexity and are not designed for use in a web environment. In his session at @ThingsExpo, Matthew Hodgson, technical co-founder of the Matrix.org, discussed how Matrix is a new non-profit Open Source Project that defines both a new HTTP-based standard for VoIP & IM signaling and provides reference implementations.
The Internet of Things (IoT), in all its myriad manifestations, has great potential. Much of that potential comes from the evolving data management and analytic (DMA) technologies and processes that allow us to gain insight from all of the IoT data that can be generated and gathered. This potential may never be met as those data sets are tied to specific industry verticals and single markets, with no clear way to use IoT data and sensor analytics to fulfill the hype being given the IoT today.
In his general session at 18th Cloud Expo, Lee Atchison, Principal Cloud Architect and Advocate at New Relic, discussed cloud as a ‘better data center’ and how it adds new capacity (faster) and improves application availability (redundancy). The cloud is a ‘Dynamic Tool for Dynamic Apps’ and resource allocation is an integral part of your application architecture, so use only the resources you need and allocate /de-allocate resources on the fly.
As data explodes in quantity, importance and from new sources, the need for managing and protecting data residing across physical, virtual, and cloud environments grow with it. Managing data includes protecting it, indexing and classifying it for true, long-term management, compliance and E-Discovery. Commvault can ensure this with a single pane of glass solution – whether in a private cloud, a Service Provider delivered public cloud or a hybrid cloud environment – across the heterogeneous enter...
Traditional on-premises data centers have long been the domain of modern data platforms like Apache Hadoop, meaning companies who build their business on public cloud were challenged to run Big Data processing and analytics at scale. But recent advancements in Hadoop performance, security, and most importantly cloud-native integrations, are giving organizations the ability to truly gain value from all their data. In his session at 19th Cloud Expo, David Tishgart, Director of Product Marketing ...
We're entering the post-smartphone era, where wearable gadgets from watches and fitness bands to glasses and health aids will power the next technological revolution. With mass adoption of wearable devices comes a new data ecosystem that must be protected. Wearables open new pathways that facilitate the tracking, sharing and storing of consumers’ personal health, location and daily activity data. Consumers have some idea of the data these devices capture, but most don’t realize how revealing and...
So you think you are a DevOps warrior, huh? Put your money (not really, it’s free) where your metrics are and prove it by taking The Ultimate DevOps Geek Quiz Challenge, sponsored by DevOps Summit. Battle through the set of tough questions created by industry thought leaders to earn your bragging rights and win some cool prizes.
A completely new computing platform is on the horizon. They’re called Microservers by some, ARM Servers by others, and sometimes even ARM-based Servers. No matter what you call them, Microservers will have a huge impact on the data center and on server computing in general. Although few people are familiar with Microservers today, their impact will be felt very soon. This is a new category of computing platform that is available today and is predicted to have triple-digit growth rates for some ...
Governments around the world are adopting Safe Harbor privacy provisions to protect customer data from leaving sovereign territories. Increasingly, global companies are required to create new instances of their server clusters in multiple countries to keep abreast of these new Safe Harbor laws. Is it worth it? In his session at 19th Cloud Expo, Adam Rogers, Managing Director of Anexia, Inc., will discuss how to keep your data legal and still stay in business.
In past @ThingsExpo presentations, Joseph di Paolantonio has explored how various Internet of Things (IoT) and data management and analytics (DMA) solution spaces will come together as sensor analytics ecosystems. This year, in his session at @ThingsExpo, Joseph di Paolantonio from DataArchon, will be adding the numerous Transportation areas, from autonomous vehicles to “Uber for containers.” While IoT data in any one area of Transportation will have a huge impact in that area, combining sensor...
SYS-CON Events announced today that SoftNet Solutions will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. SoftNet Solutions specializes in Enterprise Solutions for Hadoop and Big Data. It offers customers the most open, robust, and value-conscious portfolio of solutions, services, and tools for the shortest route to success with Big Data. The unique differentiator is the ability to architect and ...
SYS-CON Events announced today that MathFreeOn will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. MathFreeOn is Software as a Service (SaaS) used in Engineering and Math education. Write scripts and solve math problems online. MathFreeOn provides online courses for beginners or amateurs who have difficulties in writing scripts. In accordance with various mathematical topics, there are more tha...
The best way to leverage your Cloud Expo presence as a sponsor and exhibitor is to plan your news announcements around our events. The press covering Cloud Expo and @ThingsExpo will have access to these releases and will amplify your news announcements. More than two dozen Cloud companies either set deals at our shows or have announced their mergers and acquisitions at Cloud Expo. Product announcements during our show provide your company with the most reach through our targeted audiences.
Successful transition from traditional IT to cloud computing requires three key ingredients: an IT architecture that allows companies to extend their internal best practices to the cloud, a cost point that allows economies of scale, and automated processes that manage risk exposure and maintain regulatory compliance with industry regulations (FFIEC, PCI-DSS, HIPAA, FISMA). The unique combination of VMware, the IBM Cloud, and Cloud Raxak, a 2016 Gartner Cool Vendor in IT Automation, provides a co...
More and more brands have jumped on the IoT bandwagon. We have an excess of wearables – activity trackers, smartwatches, smart glasses and sneakers, and more that track seemingly endless datapoints. However, most consumers have no idea what “IoT” means. Creating more wearables that track data shouldn't be the aim of brands; delivering meaningful, tangible relevance to their users should be. We're in a period in which the IoT pendulum is still swinging. Initially, it swung toward "smart for smar...