Welcome!

News Feed Item

CORRECTION FROM SOURCE: Geovic Mining Corp. Announces Update on Chromite Project, New Caledonia Nautilus Mineral Sands Project

DENVER, COLORADO -- (Marketwired) -- 05/02/14 -- Geovic Mining Corp. ("Geovic" or "the Company") (TSX:GMC)(OTCBB:GVCM) is pleased to announce an update on its chromite mineral sands project in New Caledonia.

This replaces the press release originally issued on April 30th at 9:15 AM ET.

Please note the following Amendment to Table 1 - UNOCAL Historic Resources where the Total Indicated column under Chromium Oxide (%) should read 3.82 % and not 0.038203 %. Otherwise the contents of the News Release are accurate.


Table 1 - UNOCAL Historical Resources                                       
                                                          Chromium  Chromium
             Thickness      Area      Volume                 Oxide     Oxide
Deposit       (meters) (meters2)   (meters3)      Tonnes       (%)  (tonnes)
----------------------------------------------------------------------------
                                                                            
Indicated Resources                                                         
                                                                            
Pirogue           13.7 1,884,000  25,810,800  50,589,168      3.51 1,775,680
Ngo               10.5 1,249,000  13,114,500  25,704,420      3.23   830,253
Ouie              12.2 3,004,000  36,648,800  71,831,648      4.25 3,052,845
----------------------------------------------------------------------------
Total                                                                       
 Indicated        12.3 6,137,000  75,574,100 148,125,236      3.82 5,658,778
                                                                            
Inferred Resources                                                          
                                                                            
Mouea              8.2 2,940,000  24,108,000  47,251,680      3.23 1,526,229
----------------------------------------------------------------------------
Total                                                                       
 Inferred          8.2 2,940,000  24,108,000  47,251,680      3.23 1,526,229

The resources reported above are historical in nature and do not comply with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"). Geovic believes that the resource categories set out above are very similar to those currently set out in NI 43-101. In order to convert the historic resources to NI 43-101 compliant resources, additional geologic evaluation, including drilling and metallurgical testing, under the direction of a "qualified person" and reviewed by an independent "qualified person" will be necessary. No more recent evaluation of historic resources has been made to the best of Geovic's knowledge. While Geovic believes that the procedures used by UNOCAL have yielded unbiased estimates of in-situ tonnage and grades, no economic considerations have been applied to determine their appropriateness as resources under NI 43-101. A "qualified person" under NI 43-101 has not done sufficient work to classify the historical resource estimate. Geovic believes that the historic resource estimate is both relevant and reliable; however, it should not be relied upon and Geovic does not treat it as a current mineral resource.

Geovic Mining Background

Geovic is a U.S.-based corporation whose principal asset is 60.5% indirect ownership of a significant cobalt-nickel- manganese deposit in the Republic of Cameroon, Africa. Additional Company initiatives and project information may be found on the websites www.sedar.com, and www.sec.gov.

On behalf of the Board

Michael T. Mason, CEO

Cautionary Note Regarding Forward Looking Statements

Statements contained in this press release that are not historical facts are forward-looking statements (within the meaning of Canadian securities legislation) that involve risks and uncertainties. Forward-looking statements include, but are not limited to, statements with respect to the merits of the Company's mineral projects, the Company'sexploration plans, the preparation of a technical report, the grant of exploration license extensions and the Company's plan and expectations regarding its mineral projects. Incertain cases, forward-looking statements can be identified by the use of words such as "proposes", "expects", "is expected", "scheduled", "estimated", "intends", or variations of such words and phrases or statements that certain actions, events or results "will" occur. Forward-looking statements involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance, or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such risks and other factors include, among others, risks related to exploration activities and operations; actual results of current exploration activities; conclusions of economic evaluations; predicted capital costs, operating costs, the ability to obtain financing and to market the products, production rates; changes in project parameters as plans continue to be refined; future prices of metals; possible variations in ore resources, grades, or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labor disputes, other risks of the mining industry, delays in obtaining governmental approvals or financing or in the completion of development or construction activities and other factors as described in detail in the Company's Annual Report on Form 10-K, quarterly reports on Form 10-Q, and other filings with the U.S. Securities and Exchange Commission and Canadian securities regulatory authorities. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements in this press release speak only as of the date hereof. The Company does not undertake any obligation to release publicly any revisions to these forward-looking statements to reflect events or circumstances after the date hereof to reflect the occurrence of unanticipated events.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Ixia (Nasdaq: XXIA) has announced that NoviFlow Inc.has deployed IxNetwork® to validate the company’s designs and accelerate the delivery of its proven, reliable products. Based in Montréal, NoviFlow Inc. supports network carriers, hyperscale data center operators, and enterprises seeking greater network control and flexibility, network scalability, and the capacity to handle extremely large numbers of flows, while maintaining maximum network performance. To meet these requirements, NoviFlow in...
As companies gain momentum, the need to maintain high quality products can outstrip their development team’s bandwidth for QA. Building out a large QA team (whether in-house or outsourced) can slow down development and significantly increases costs. This eBook takes QA profiles from 5 companies who successfully scaled up production without building a large QA team and includes: What to consider when choosing CI/CD tools How culture and communication can make or break implementation
"There's a growing demand from users for things to be faster. When you think about all the transactions or interactions users will have with your product and everything that is between those transactions and interactions - what drives us at Catchpoint Systems is the idea to measure that and to analyze it," explained Leo Vasiliou, Director of Web Performance Engineering at Catchpoint Systems, in this SYS-CON.tv interview at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York Ci...
Redis is not only the fastest database, but it is the most popular among the new wave of databases running in containers. Redis speeds up just about every data interaction between your users or operational systems. In his session at 19th Cloud Expo, Dave Nielsen, Developer Advocate, Redis Labs, will share the functions and data structures used to solve everyday use cases that are driving Redis' popularity.
UpGuard has become a member of the Center for Internet Security (CIS), and will continue to help businesses expand visibility into their cyber risk by providing hardening benchmarks to all customers. By incorporating these benchmarks, UpGuard's CSTAR solution builds on its lead in providing the most complete assessment of both internal and external cyber risk. CIS benchmarks are a widely accepted set of hardening guidelines that have been publicly available for years. Numerous solutions exist t...
"We're bringing out a new application monitoring system to the DevOps space. It manages large enterprise applications that are distributed throughout a node in many enterprises and we manage them as one collective," explained Kevin Barnes, President of eCube Systems, in this SYS-CON.tv interview at DevOps at 18th Cloud Expo, held June 7-9, 2016, at the Javits Center in New York City, NY.
Choosing the right cloud for your workloads is a balancing act that can cost your organization time, money and aggravation - unless you get it right the first time. Economics, speed, performance, accessibility, administrative needs and security all play a vital role in dictating your approach to the cloud. Without knowing the right questions to ask, you could wind up paying for capacity you'll never need or underestimating the resources required to run your applications.
SYS-CON Events announced today that LeaseWeb USA, a cloud Infrastructure-as-a-Service (IaaS) provider, will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. LeaseWeb is one of the world's largest hosting brands. The company helps customers define, develop and deploy IT infrastructure tailored to their exact business needs, by combining various kinds cloud solutions.
Adding public cloud resources to an existing application can be a daunting process. The tools that you currently use to manage the software and hardware outside the cloud aren’t always the best tools to efficiently grow into the cloud. All of the major configuration management tools have cloud orchestration plugins that can be leveraged, but there are also cloud-native tools that can dramatically improve the efficiency of managing your application lifecycle. In his session at 18th Cloud Expo, ...
The competitive landscape of the global cloud computing market in the healthcare industry is crowded due to the presence of a large number of players. The large number of participants has led to the fragmented nature of the market. Some of the major players operating in the global cloud computing market in the healthcare industry are Cisco Systems Inc., Carestream Health Inc., Carecloud Corp., AGFA Healthcare, IBM Corp., Cleardata Networks, Merge Healthcare Inc., Microsoft Corp., Intel Corp., an...
SYS-CON Events announced today the Kubernetes and Google Container Engine Workshop, being held November 3, 2016, in conjunction with @DevOpsSummit at 19th Cloud Expo at the Santa Clara Convention Center in Santa Clara, CA. This workshop led by Sebastian Scheele introduces participants to Kubernetes and Google Container Engine (GKE). Through a combination of instructor-led presentations, demonstrations, and hands-on labs, students learn the key concepts and practices for deploying and maintainin...
StackIQ has announced the release of Stacki 3.2. Stacki is an easy-to-use Linux server provisioning tool. Stacki 3.2 delivers new capabilities that simplify the automation and integration of site-specific requirements. StackIQ is the commercial entity behind this open source bare metal provisioning tool. Since the release of Stacki in June of 2015, the Stacki core team has been focused on making the Community Edition meet the needs of members of the community, adding features and value, while ...
Using new techniques of information modeling, indexing, and processing, new cloud-based systems can support cloud-based workloads previously not possible for high-throughput insurance, banking, and case-based applications. In his session at 18th Cloud Expo, John Newton, CTO, Founder and Chairman of Alfresco, described how to scale cloud-based content management repositories to store, manage, and retrieve billions of documents and related information with fast and linear scalability. He addres...
Is your aging software platform suffering from technical debt while the market changes and demands new solutions at a faster clip? It’s a bold move, but you might consider walking away from your core platform and starting fresh. ReadyTalk did exactly that. In his General Session at 19th Cloud Expo, Michael Chambliss, Head of Engineering at ReadyTalk, will discuss why and how ReadyTalk diverted from healthy revenue and over a decade of audio conferencing product development to start an innovati...
Amazon has gradually rolled out parts of its IoT offerings in the last year, but these are just the tip of the iceberg. In addition to optimizing their back-end AWS offerings, Amazon is laying the ground work to be a major force in IoT – especially in the connected home and office. Amazon is extending its reach by building on its dominant Cloud IoT platform, its Dash Button strategy, recently announced Replenishment Services, the Echo/Alexa voice recognition control platform, the 6-7 strategic...