First Nickel Reports Financial and Operating Results for the Three Months Ended March 31, 2014

TORONTO, ONTARIO -- (Marketwired) -- 05/12/14 -- First Nickel Inc. ("FNI" or the "Company") (TSX: FNI) announces its results for the three months ended March 31, 2014. The Company's unaudited condensed interim financial statements and management's discussion and analysis for the period have been filed on SEDAR and will be available at www.sedar.com and on the Company's website at www.fnimining.com. This news release should be read in conjunction with the Company's unaudited condensed interim financial statements and management's discussion and analysis for the period ended March 31, 2014. This news release contains forward-looking information that is subject to the risks and assumptions set out in our cautionary statement on forward-looking information, which is located at the end of this news release. (All dollar amounts herein are in Canadian funds unless otherwise indicated.)

HIGHLIGHTS FOR FIRST QUARTER 2014


--  Production: The Lockerby Mine produced 2.7 million pounds of contained
    nickel and 1.7 million pounds of contained copper during the three
    months ended March 31, 2014.
--  Revenue: Revenue for the three months ended March 31, 2014 was $16.8
    million.
--  Total cash production costs(1): Total cash production costs were $12.8
    million for the three months ended March 31,2014, or $8.22 per GMV(2)-
    net pound of nickel produced.
--  Development: Ramp development to the 68 Level was completed early in
    January and lateral development totaled 532 metres for the three months
    ended March 31, 2014.
--  Net loss: The Company had a net loss of $9.3 million for the three
    months ended March 31, 2014.
--  Liquidity: The Company's unrestricted cash balance at March 31, 2014 was
    $1.9 million, and it had US$2.0 million available to draw under the BNS
    credit facility as at March 31, 2014.
--  Debt facilities: The Company's debt facilities will mature in March
    2015, creating a current-account deficit on the balance sheet at March
    31, 2014. The Company is in discussion with its principal shareholders
    regarding the possible refinancing or extension of the debt before its
    maturity.

On May 6, 2014, an accident occurred at the Lockerby Mine involving a fall of material and the deaths of two contract production drillers. The Company responded to the accident by following established protocols and emphasizing transparent communication within the bounds of those protocols, as well as counselling and supporting the families of the deceased, employees and the local community.

Summary of Financial and Operating Results

The Company reported revenue of $16.8 million, total cash production costs of $12.8 million and a net loss of $9.3 million for the three months ended March 31, 2014.

Under the Company's gross-metal-value ("GMV") ore-processing agreement with Glencore Canada Corporation (the "GMV Agreement"), the Company is paid for accountable gross metal value, which is based on the contained metal, multiplied by a specified percentage that is determined based on the average nickel grade of the ore delivered. There are no specifically-identified processing costs under the GMV Agreement given that the specified GMV percentage results in revenues that are paid and recorded net of processing costs. The GMV Agreement was adopted effective July 1, 2013, and the predecessor agreement (the "Original Agreement") required different accounting for revenues and cost of sales, which affects the comparability of certain financial statement elements between the current period and the first quarter of 2013.

(1) For additional information, see Non-IFRS Financial Measures section.

(2) Metric adapted for the gross-metal-value ("GMV") offtake agreement, see Total cash production costs section.

Under the GMV Agreement, ore-treatment costs are not included in the cost of goods sold, but are netted against nickel and by-product revenues. All things being equal, the accounting in the current period under the GMV Agreement would result in lower revenue, lower cost of goods sold and lower by-product revenue than prior-period accounting under the Original Agreement.

The following table presents the unaudited statements of comprehensive loss for the three months ended March 31, 2014:


----------------------------------------------------------------------------
                                                For the three months ended
                                                    March 31,      March 31,
Canadian $, except for share and per-share
 amounts,                                                2014           2013
----------------------------------------------------------------------------
Revenue
  Revenue                                        $ 16,787,275   $ 26,772,605
Cost of sales
  Cost of sales                                    16,865,993     21,553,541
  Depreciation                                      4,229,681      3,642,486
----------------------------------------------------------------------------
Total cost of sales                                21,095,674     25,196,027
----------------------------------------------------------------------------
Gross (loss) / income                             (4,308,399)      1,576,578
----------------------------------------------------------------------------
  General and administrative                        1,112,923      1,275,574
  Exploration and evaluation                          138,955        136,311
  Other income                                      (566,739)              -
----------------------------------------------------------------------------
Operating (loss) / income                         (4,993,538)        164,693
----------------------------------------------------------------------------
  Financing expense                                 4,260,465      1,060,108
----------------------------------------------------------------------------
Net finance expense                                 4,260,465      1,060,108
----------------------------------------------------------------------------
Loss before taxes                                 (9,254,003)      (895,415)
Income & mining taxes                                       -              -
----------------------------------------------------------------------------
Net loss and comprehensive loss                 $ (9,254,003)    $ (895,415)
----------------------------------------------------------------------------
Loss per share - basic and diluted                   $ (0.01)            $ -
----------------------------------------------------------------------------
Weighted average number of common shares
 outstanding - basic                              644,152,033    530,839,250
----------------------------------------------------------------------------

Lockerby Mine Operating Results

Safety, Health & Environment

The Company's directors, management, employees and contractors continue to place the highest priority on safety, health and the environment. During the three months ended March 31, 2014, there were no lost time injuries or reportable environmental incidents, and four medical-aid incidents.

On May 6, 2014, an accident occurred at the Lockerby Mine involving a fall of material and the deaths of two contract production drillers. The Company responded to the accident by following established protocols and emphasizing transparent communication within the bounds of those protocols, as well as counselling and supporting the families of the deceased, employees and the local community.

Production

In the three months ended March 31, 2014, the Lockerby Mine produced 2.7 million pounds of contained nickel and 1.7 million pounds of contained copper. Contained-nickel production in the first quarter of 2014 is below the first quarter of 2013 by 26% mainly reflecting a 21% reduction in average nickel head grades mined during the respective periods, combined with a 6% drop in ore tonnes produced. The variations in tonnes and grade mainly reflect grade variations for stopes within the Depth Zone and lower scheduled ore tonnage from one year to the next; however, tonnes mined during the first quarter of 2014 were affected by poor in-stope ground conditions that affected blast-hole drilling. Average nickel grade in the first quarter of 2014 was affected by final results from definition drilling, which resulted in additional tonnes from a primary stope but a corresponding reduction in the associated ore grade. The first and second quarters of 2014 are expected to have lower production than the second half of the year, based on the planned sequencing of stopes for later in 2014. Production of nickel and copper is expected to be in the lower ends of the respective ranges based on the Company's 2014 guidance (see "Outlook for 2014" section).

In the three months ended March 31, 2014, 55,939 tonnes of ore were mined at Lockerby, producing approximately 1.6 million pounds of GMV-net payable nickel, at an average head grade of 2.21%, and approximately 0.9 million pounds of GMV-net payable copper at an average head grade of 1.35%.


----------------------------------------------------------------------------
For the three months ended March 31,                     2014           2013
----------------------------------------------------------------------------
Tonnes of ore produced                                 55,939         59,877
Production
  Contained nickel (pounds)                         2,727,907      3,682,968
  Payable nickel (pounds) - Original Agreement
   (Q1 2013)                                                -      2,698,719
  Net payable nickel (pounds) - GMV agreement
   (Q1 2014)                                        1,561,427              -
  Nickel head grade                                     2.21%          2.79%
  Contained copper (pounds)                         1,670,598      2,125,297
  Payable copper (pounds) - Original Agreement
   (Q1 2013)                                                -      1,832,162
  Net payable copper (pounds) - GMV agreement
   (Q1 2014)                                          856,498              -
  Copper head grade                                     1.35%          1.61%

Tonnes of ore shipped                                  51,045         61,062
----------------------------------------------------------------------------

Revenue

The Company recorded total revenue of $16.8 million in the three months ended March 31, 2014, compared with total revenue of $26.8 million in the three months ended March 31, 2013. Revenues in the first quarter of 2014 show a significant decrease over the prior-year period partly reflecting lower nickel production, with contained nickel pounds produced approximately 26% below the prior-year period, combined with lower average realized nickel prices in the first quarter of 2014 (by approximately 15%). The impact of lower realized nickel prices was partially offset by foreign -currency translation gains related to weaker average Canadian-US dollar exchange rates, which lead to higher values for revenues presented in Canadian dollars. The decrease in first-quarter revenues compared to the prior year also includes the impact of accounting changes under the GMV Agreement, which affect the comparability to prior-period revenues and result in lower current-year values for revenue recorded under the GMV Agreement compared to higher gross revenues recorded under the Original Agreement in the first quarter of 2013.

The amendment to the Glencore ore-processing agreement and adoption of a GMV Agreement in the second half of 2013 resulted in revenues that were recorded net of the deduction of processing costs and other GMV deductions (as disclosed in the Company's MD&A for the year ended Dec 31, 2013). Revenues under the Original Agreement in the first quarter of 2013 were recorded gross of processing costs. Revenues recorded under the Original Agreement during the first half of 2013 were also affected by volume adjustments, following milling by Glencore. Estimated grade was determined by the Lockerby geology department and, in the event that the Glencore milling results returned a different grade than the Company's' estimated grade, a quantity adjustment was made to revenue in the statement of comprehensive loss in the period in which the new information became available.


----------------------------------------------------------------------------
                                                   For the three months
                                                    March 31,      March 31,
Canadian $,                                              2014           2013
----------------------------------------------------------------------------
Provisional nickel revenue - Original
 Agreement (prior-year Q1)                                $ -   $ 20,190,061
Provisional net nickel revenue - GMV agreement
 (Q1 2014)                                         11,614,207              -
Nickel quantity adjustment                                  -        667,157
Nickel price adjustment                             1,145,037      (504,447)
Provisional by-product revenue - Original
 Agreement (prior-year Q1)                                  -      7,074,899
Provisional net by-product revenue - GMV
 agreement (Q1 2014)                                4,130,180              -
By-product price and quantity adjustment -
 current period                                     (102,149)      (149,765)
Forward-sales-agreement losses                              -      (151,402)
----------------------------------------------------------------------------
Total revenue                                    $ 16,787,275   $ 27,126,503
----------------------------------------------------------------------------
(1) For the purposes of this press release, year-to-date revenue includes
 pre-production capitalized revenue.

Total cash production costs(3)

Cash production costs are a non-IFRS measure that is based on the cost of goods sold, less by-product revenues. Costs of goods sold of $16.9 million in the first quarter of 2014 were $4.7 million below the comparable prior-year period mainly due to the exclusion of treatment costs, following the mid-2013 adoption of the GMV Agreement, partly offset by higher mine operating costs in 2014. Cost of sales for the first quarter of 2013 included $8.9 million in treatment costs which are not incurred under the GMV Agreement in the current period. On a comparative basis, excluding the $8.9 million in treatment costs from the prior-year period would result in costs of goods sold for the first quarter of 2014 that are above the prior-year period by $4.2 million or 33%, mainly reflecting higher mine operating costs (by $4.4 million) and labour (by $0.2 million), partially offset by lower development costs than the first quarter of 2013 (by $0.4 million).

(3) For additional information, see Non-IFRS Financial Measures section.

Mine operating costs in the first three months of 2014 were above the first quarter of 2013 due to several factors, including higher energy costs driven by very cold winter temperatures (impact of $1.4 million including natural gas and electricity), on-site crushing costs ($0.4 million), which started in mid-2013 with the adoption of the GMV Agreement, higher backfill costs arising from significantly increased backfill activity in 2014, compounded by the cold weather and the freezing of aggregate material used to backfill stopes, higher equipment maintenance costs, diesel and other costs that are driven by higher activity as well as deeper mining compared to the prior-year period.

Cash production costs in the three months ended March 31, 2014 were $12.8 million, which is below the prior -year amount by $2.1 million or 14%, mainly reflecting the variance in cost of sales described above, partially offset by the $2.9 million impact of lower by-product revenue. The economic impact of by-product credits in the first quarter of 2014 is based chiefly on the production of 1.7 million contained copper pounds, which is 21% lower than the 2.1 million contained copper pounds produced during the first quarter of 2013. The reduction in copper by-product production is magnified by the 9% drop in realized copper prices from the first quarter of 2013 (average realized price of $3.48 per pound) to the first quarter of 2014 (average of $3.17 per pound realized). While the volume and pricing of copper by-product both show reductions from the prior-year period, by 21% and 9% respectively, by-product revenues recorded in the first quarter of 2014 are below the prior-year period by 42%, which demonstrates the revenue impact of accounting changes related to the GMV Agreement, whereby the reporting of by-product revenues is net of GMV deductions (as described in the "Revenue" heading above).

On a unit basis, cash production costs per GMV-net pound were $8.22 in the first quarter of 2014, which is significantly above the Company's full-year guidance range of $5.22 to $5.74 per pound, partly reflecting the volume impact of lower GMV-net nickel production in the quarter, which results in a lower denominator in the calculation of per-pound costs, together with the impact of higher cash production costs during the first quarter as discussed above. Cash production costs are not expected to remain at high levels in subsequent quarters of 2014, and higher expected production levels for the remaining quarters of 2014 are expected to result in lower per-unit costs. The Company expects cash production costs per GMV-net pound to be at the upper end of the range for 2014 (see "Outlook for 2014" section).


----------------------------------------------------------------------------
Canadian $, except production amounts for the
 three months ended March 31,                            2014           2013
----------------------------------------------------------------------------
Cost of goods sold(1)                            $ 16,865,993   $ 21,553,541
Provisional by-product revenue(2)                 (4,130,180)    (7,074,899)
By-product revenue - mark-to-market and final
 settlement adjustments                               102,149        149,765
By-product revenue - quantity adjustments -
 original agreement                                         -        353,898
Forward sales agreements related to by-
 products                                                   -       (25,742)
----------------------------------------------------------------------------
Total cash production costs(3) (net of by-
 product credits)                                $ 12,837,962   $ 14,956,563
----------------------------------------------------------------------------
Payable nickel production (pounds) - Original
 Agreement (prior-year Q1)                                  -      2,698,719
Cash production cost per pound of nickel(3,4)
 produced - original agreement (prior-year Q1)            $ -         $ 5.54
Net payable nickel production (pounds) - GMV
 agreement (Q1 2014)                                1,561,427              -
Cash production cost per pound of nickel(3,4)
 produced - GMV agreement (Q1 2014)                    $ 8.22            $ -
----------------------------------------------------------------------------
(1) Cost of goods sold does not include depreciation.
(2) Revenue presented for the three months ended March 31, 2014 is based on
 the GMV Agreement and revenue presented for the three months ended March
 31, 2013 is based on the Original Agreement.
(3) For additional information, see Non-IFRS Financial Measures section.
(4) Cash production cost per pound based on cash production cost for the
 commercial production period divided by associated net payable nickel
 production for the same period.

As disclosed in the Company's MD&A for the year ended December 31, 2013, the change in accounting treatment generated by the GMV Agreement also resulted in a change to the Company's performance metrics, in order to ensure that the Company's performance is comparable to prior periods. Prior to the third quarter of 2013, the Company's performance metrics included payable nickel and copper, total cash production costs and cash production costs per pound of payable nickel produced. Under the GMV Agreement, the Company's performance metrics will include contained nickel and copper, net-GMV nickel and copper payable pounds, total cash production costs and cash production costs per net-GMV pound of nickel produced. See the "Outlook for 2014" section for details about operational metrics, and the manner in which the economic performance of the Lockerby Mine under the GMV Agreement may be compared to prior periods.

Capital

The Company made capital expenditures of $3.0 million in the three months ended March 31, 2014, mostly representing underground development costs at the Lockerby Mine.

The development rate for the three months ended March 31, 2014 averaged 6.0 metres per day.

Exploration

The Company's exploration strategy is focused on base metals and guided by the objectives of increasing resources and reserves in conjunction with the development and/or acquisition of quality projects, resulting in multiple mining operations. Due to the downturn in nickel prices seen through 2013 and ongoing efforts to bolster the Company's liquidity, FNI has not incurred any significant exploration expenditures on its exploration properties since December 31, 2012.

OUTLOOK FOR 2014

The Company's outlook for 2014 is detailed in the table below. As discussed in the " Lockerby Mine Operating Results" section, the Company expects production of nickel and copper to be in the lower ends of the respective ranges for 2014, and mine site operating costs and cash production costs per GMV -net pound of nickel produced are expected to be at the upper ends of the respective ranges for 2014.


----------------------------------------------------------------------------
Canadian $, except metal pounds                                         2014
----------------------------------------------------------------------------
Contained nickel lbs (millions)                                  13.5 - 15.1
Contained copper lbs (millions)                                    7.2 - 8.0
GMV net payable nickel lbs (millions)                              6.8 - 7.6
GMV net payable copper lbs (millions)                              3.6 - 4.0
Mine site operating costs (millions)                           $58.1 - $61.0
Cash production cost per GMV-net pound of nickel produced(1)   $5.22 - $5.74
----------------------------------------------------------------------------
(1) For additional information, see Non-IFRS Financial Measures section
Assumptions: Cu per lb US$3.25, CAD/USD 1:1

Capital expenditures

Capital expenditures for 2014 are projected to be approximately $7.2 million, including approximately $3.5 million related to underground development.

General and administrative expenses

General and administrative expenses for 2014 are projected to be approximately $4.4 million, not including share -based compensation. Financing costs and exploration expenditures are projected to be approximately $1.8 million and $0.4 million, respectively, in 2014.

Qualified Person

The foregoing scientific and technical information has been prepared or reviewed by Paul C. Davis, P.Geo., Vice-President Exploration of the Company. Mr. Davis is a "qualified person" within the meaning of National Instrument 43-101.

The Company follows rigorous quality control practices and procedures in full compliance with National Instrument 43-101, and these are described on the Company's website and in all technical news releases.

About FNI

FNI is a Canadian mining and exploration Company. The Company's mission is to be the most dynamic North American emerging base metal mining Company in which to work and invest and to be respected in the communities in which it operates. FNI owns and operates the Lockerby Mine in the Sudbury Basin in northern Ontario, which reached full production during 2013 and is expected to produce approximately 14 million pounds of contained nickel and approximately 7 million pounds of contained copper in 2014, providing a foundation from which to grow the Company. More than half of FNI's common shares are held by institutional investors. FNI's shares are traded on the TSX under the symbol FNI.

To learn more about the Company please visit www.fnimining.com and follow us on LinkedIn and Twitter @FNI_Mining.

Cautionary Statement Regarding Forward-Looking Information

Certain statements contained in this news release may contain forward-looking information about FNI. Forward-looking information can often be identified by the use of forward-looking terminology such as "anticipate", "believe", "continue", "budget", "forecast", "estimate", "schedule", "expect", "goal", "intend", "target", "potential", "objective", "may", "plan" or "will" or the negative thereof or variations thereon or similar terminology. Forward-looking information may include, but is not limited to: the continued operation of the Lockerby Mine; expectations of obtaining financing in the near term; future financial or operating performance of the Company and its projects; the future price of metals; the long term supply and demand for nickel; continuation of exploration activities; mineral reserve and mineral resource estimates; the realization of mineral resource estimates; costs of production and key supplies; capital, operating and exploration expenditures; forecasts of sales and production; costs and timing of the development of new and existing deposits; costs and timing of future exploration; the requirements for additional capital; government regulation of mining operations; environmental risks, reclamation expenses and/or title disputes or claims.

By its nature, forward-looking information is based on certain factors and assumptions which involve known and unknown risks, uncertainties and other factors which may cause the actual results, realization of mineral resources, performance or achievements of the Company, financial position or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information. Accordingly, actual events may differ materially from those implied by any forward-looking information. Readers are cautioned not to place undue reliance on forward-looking information, which speak only as of the date the statements were made and readers are also advised to consider such forward-looking information while considering the risk factors set forth in the management's discussion and analysis for the year ended December 31, 2012 under the heading "Risks and Uncertainties" and under the heading "Risk Factors" in the Company's Annual Information Form for the year ended December 31, 2012. The Company disclaims any intention or obligation to publicly update or otherwise revise any forward-looking information whether as a result of new information, future events or other such factors which affect this information or to explain any material difference between subsequent actual events and such forward-looking information, except as required by applicable law.

Non-IFRS Financial Measures: The cash cost per pound of nickel produced, cash cost per net-GMV pound of nickel produced and total production costs are non-IFRS financial measures that do not have a standardized meaning under International Financial Reporting Standards ("IFRS") and, as a result, may not be comparable to similar measures presented by other companies. Management uses these statistics to monitor operating costs and profitability, and believes that certain investors use this information to evaluate the Company's performance and ability to generate cash flow in addition to conventional IFRS measures. Accordingly, it is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. On a GMV basis, total cash production costs include mining costs, surface ore-handling and trucking costs, equipment operating lease costs, mine site general and administration costs, environmental costs and Vale royalties, less net-GMV by-product revenue, including forward sales gains and losses, and price adjustments from sales of copper, cobalt and PGE's.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
More and more brands have jumped on the IoT bandwagon. We have an excess of wearables – activity trackers, smartwatches, smart glasses and sneakers, and more that track seemingly endless datapoints. However, most consumers have no idea what “IoT” means. Creating more wearables that track data shouldn't be the aim of brands; delivering meaningful, tangible relevance to their users should be. We're in a period in which the IoT pendulum is still swinging. Initially, it swung toward "smart for smart...
Complete Internet of Things (IoT) embedded device security is not just about the device but involves the entire product’s identity, data and control integrity, and services traversing the cloud. A device can no longer be looked at as an island; it is a part of a system. In fact, given the cross-domain interactions enabled by IoT it could be a part of many systems. Also, depending on where the device is deployed, for example, in the office building versus a factory floor or oil field, security ha...
In IT, we sometimes coin terms for things before we know exactly what they are and how they’ll be used. The resulting terms may capture a common set of aspirations and goals – as “cloud” did broadly for on-demand, self-service, and flexible computing. But such a term can also lump together diverse and even competing practices, technologies, and priorities to the point where important distinctions are glossed over and lost.
An IoT product’s log files speak volumes about what’s happening with your products in the field, pinpointing current and potential issues, and enabling you to predict failures and save millions of dollars in inventory. But until recently, no one knew how to listen. In his session at @ThingsExpo, Dan Gettens, Chief Research Officer at OnProcess, discussed recent research by Massachusetts Institute of Technology and OnProcess Technology, where MIT created a new, breakthrough analytics model for s...
"We are the public cloud providers. We are currently providing 50% of the resources they need for doing e-commerce business in China and we are hosting about 60% of mobile gaming in China," explained Yi Zheng, CPO and VP of Engineering at CDS Global Cloud, in this SYS-CON.tv interview at 19th Cloud Expo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
SYS-CON Events has announced today that Roger Strukhoff has been named conference chair of Cloud Expo and @ThingsExpo 2017 New York. The 20th Cloud Expo and 7th @ThingsExpo will take place on June 6-8, 2017, at the Javits Center in New York City, NY. "The Internet of Things brings trillions of dollars of opportunity to developers and enterprise IT, no matter how you measure it," stated Roger Strukhoff. "More importantly, it leverages the power of devices and the Internet to enable us all to im...
"We are a custom software development, engineering firm. We specialize in cloud applications from helping customers that have on-premise applications migrating to the cloud, to helping customers design brand new apps in the cloud. And we specialize in mobile apps," explained Peter Di Stefano, Vice President of Marketing at Impiger Technologies, in this SYS-CON.tv interview at 19th Cloud Expo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
When it comes to cloud computing, the ability to turn massive amounts of compute cores on and off on demand sounds attractive to IT staff, who need to manage peaks and valleys in user activity. With cloud bursting, the majority of the data can stay on premises while tapping into compute from public cloud providers, reducing risk and minimizing need to move large files. In his session at 18th Cloud Expo, Scott Jeschonek, Director of Product Management at Avere Systems, discussed the IT and busin...
Data is the fuel that drives the machine learning algorithmic engines and ultimately provides the business value. In his session at 20th Cloud Expo, Ed Featherston, director/senior enterprise architect at Collaborative Consulting, will discuss the key considerations around quality, volume, timeliness, and pedigree that must be dealt with in order to properly fuel that engine.
In his general session at 19th Cloud Expo, Manish Dixit, VP of Product and Engineering at Dice, discussed how Dice leverages data insights and tools to help both tech professionals and recruiters better understand how skills relate to each other and which skills are in high demand using interactive visualizations and salary indicator tools to maximize earning potential. Manish Dixit is VP of Product and Engineering at Dice. As the leader of the Product, Engineering and Data Sciences team at D...
What happens when the different parts of a vehicle become smarter than the vehicle itself? As we move toward the era of smart everything, hundreds of entities in a vehicle that communicate with each other, the vehicle and external systems create a need for identity orchestration so that all entities work as a conglomerate. Much like an orchestra without a conductor, without the ability to secure, control, and connect the link between a vehicle’s head unit, devices, and systems and to manage the ...
Financial Technology has become a topic of intense interest throughout the cloud developer and enterprise IT communities. Accordingly, attendees at the upcoming 20th Cloud Expo at the Javits Center in New York, June 6-8, 2017, will find fresh new content in a new track called FinTech.
The Internet of Things will challenge the status quo of how IT and development organizations operate. Or will it? Certainly the fog layer of IoT requires special insights about data ontology, security and transactional integrity. But the developmental challenges are the same: People, Process and Platform and how we integrate our thinking to solve complicated problems. In his session at 19th Cloud Expo, Craig Sproule, CEO of Metavine, demonstrated how to move beyond today's coding paradigm and sh...
"We're a cybersecurity firm that specializes in engineering security solutions both at the software and hardware level. Security cannot be an after-the-fact afterthought, which is what it's become," stated Richard Blech, Chief Executive Officer at Secure Channels, in this SYS-CON.tv interview at @ThingsExpo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
All clouds are not equal. To succeed in a DevOps context, organizations should plan to develop/deploy apps across a choice of on-premise and public clouds simultaneously depending on the business needs. This is where the concept of the Lean Cloud comes in - resting on the idea that you often need to relocate your app modules over their life cycles for both innovation and operational efficiency in the cloud. In his session at @DevOpsSummit at19th Cloud Expo, Valentin (Val) Bercovici, CTO of Soli...