Welcome!

News Feed Item

Oracle Mining Files First Quarter Financial Results and Provides Finance and Strategy Update

Oracle Ridge Drill Results Include 23.5 Feet of 2.35% CuEQ and 5.5 Feet of 4.81% CuEQ

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 05/13/14 -- Oracle Mining Corp. ("Oracle Mining" or the "Corporation") (TSX: OMN)(FRANKFURT: OMC) announces its financial results for the period ended March 31, 2014. This news release should be read in conjunction with the unaudited condensed consolidated interim financial statements and notes thereto for the three months ended March 31, 2014 and 2013, and the related management's discussion & analysis ("MD&A"), both available on SEDAR at www.sedar.com.

First Quarter 2014 financial summary


--  Net loss for the quarter was $2.2 million compared to a net loss of $3.8
    million for the three months ended March 31, 2013, primarily due to a
    decrease of $1.4 million in exploration and evaluation expenditures, and
    a decrease of $0.6 million in general and administrative costs, offset
    by an increase of $0.5 million in interest expense;

--  Net working capital as at March 31, 2014 was a deficiency of $6.9
    million compared with a deficiency of $5.0 million on December 31, 2013;
    and

--  Cash and cash equivalents at March 31, 2014 totaled $0.3 million
    compared to $0.3 million on December 31, 2013.

During the quarter ended March 31, 2014, advances were made in three aspects of the Corporation's principal property, the Oracle Ridge copper project ("Oracle Ridge" or the "Project"), located northeast of Tucson, Arizona, U.S.A., including: (a) the announcement on February 26, 2014 of an updated Mineral Resource Estimate in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and filing on March 31, 2014 of a supporting NI 43-101 technical report under the Corporation's profile on SEDAR (www.sedar.com); (b) the continuation of geological, mining and engineering studies; and (c) permitting and regulatory programs. A discussion of the progress made on these activities is available in the MD&A.

All financial information for the quarter ended March 31, 2014 is prepared in accordance with International Financial Reporting Standards ("IFRS") and reported in United States dollars unless otherwise noted, including this news release. Please refer to Note 2 of the audited consolidated financial statements for the years ended December 31, 2013 and 2012 for more information.

Corporate strategy update

The Board of Directors of Oracle Mining and Management have reviewed the Corporation's spending priorities at the Oracle Ridge Project. During the past several years, Oracle Mining has focused primarily on project permitting, engineering studies in metallurgy and geotechnical engineering, drilling and resource modelling with the objective of completing a positive feasibility study in support of constructing a complete processing facility and tailings storage area. In the past few months, Oracle Mining has been conducting a review of various project alternatives. The Project is distinctively located in the sixth-largest copper producing region in the world and the proximity to producing copper mines could potentially provide synergistic opportunities to work with third-parties to utilize their existing infrastructure ("Third Party Options").

Accordingly, Oracle Mining has temporarily suspended the 2014 Drill Program and rationalized expenditures to manage remaining financial resources while evaluating Third Party Options and continuing to advance permitting. For additional clarity, evaluation of Third Party Options does not preclude Oracle Mining from pursuing the completion of a Feasibility Study. In conjunction with the change in strategy for the Corporation, Oracle Mining has amended its Loan Agreement with Rich Stone Mining Investment (Hong Kong) Limited ("Rich Stone") to provide additional funds to the Corporation in the short term (See "Rich Stone and Oracle Mining amend loan agreement" below).

There is no assurance that a Third Party Option will be pursued or, if pursued, be successful. To the extent possible, we intend to incorporate previously completed engineering studies in metallurgy and geotechnical engineering into a future Feasibility Study. There is no assurance that a Feasibility Study will be completed or, if completed, that the outcome will be positive. We have not made a production decision with respect to Oracle Ridge. A decision to proceed with production will be based upon the Corporation completing a future Feasibility Study demonstrating economic and technical viability.

Rich Stone and Oracle Mining amend loan agreement

In addition, Oracle Mining provides investors with an update regarding an amendment to its C$10 million secured convertible loan ("Loan Facility") with Rich Stone Mining Investment (Hong Kong) Limited ("Rich Stone"). Effective today, Rich Stone and the Corporation agreed to an amendment of the Loan Facility whereby the interest in aggregate amount of C$1,200,000 and the origination fee payable of C$600,000 (including origination fees paid to date by the Corporation to Rich Stone under the Loan Facility in the amount of C$390,000) are to be advanced to the Corporation as soon as practicable and repaid to Rich Stone on the maturity of the Loan Facility. As at May 13, 2014, the aggregate funds to be received from Rich Stone include C$1.19 million for the remaining second tranche of the Loan Facility and C$1.80 million for fees and interest to be repaid at the Loan Facility's maturity.

Oracle Ridge drill results

Oracle Mining is pleased to announce the initial assay results from its 2014 Drill Program at the Oracle Ridge Project. The four core holes reported in this news release were all drilled underground from Drill Station 3 with the purpose of extending high-grade copper mineralization beyond the drilling that defines our current Mineral Resource Estimate. Until further drilling is completed and a geologic model constructed, all intervals reported in this news release are apparent thicknesses. All units are imperial unless otherwise noted. Highlights include:


--  OUH-58 intersected two copper-bearing skarn beds of the Martin Formation
    in Zone 8, (B8 48 and B8 51) and copper-bearing endoskarn. OUH-58
    discovered B8 48 as a newly recognized copper-bearing skarn bed within
    the Martin Formation.
--  OUH-59 intersected an apparent thickness of 19.5 feet grading 2.17 %
    copper equivalent ("CuEQ") of Abrigo Formation (B8 51) 100 feet along
    strike north of the intersection in OUH-58. The hole also intersected
    lower-grade copper-bearing endoskarn north of the OUH-58 intersection.
--  OUH-60 was drilled to extend Zone 8 mineralization south of OUH-58. The
    hole intersected an apparent thickness of 23.5 feet of 2.35% CuEQ
    enhanced by notably higher silver content of 1.01 ounces silver per
    short ton. The hole also intersected an apparent thickness of 21.5 feet
    grading 1.13% CuEQ which may confirm the continuity of copper
    mineralization in new skarn bed B8 48.
--  OUH-61 was a vertical hole which successfully tested the trend of copper
    mineralized skarn below the drilling which defines the Mineral Resource
    Estimate. OUH-61 intersected two skarn beds in Zone 8 (B8 48 and B8 51)
    and another in Zone 12. Notable intersection of B8 51 was an apparent
    thickness of 19.4 feet of 2.03% CuEQ which contained and apparent
    thickness of 5.5 feet of 4.81% CuEQ. The potential for copper
    mineralization continues to the east of these intersections.

Each of these holes confirmed Oracle Mining's geologic interpretation and have extended copper-bearing skarn mineralization beyond the limit of current drilling and our current Mineral Resource Estimate. Intervals in the table below labelled "includes" are higher-grade portions of the previous listed interval. The following tabulates the assay results obtained from the underground drilling program to date:


----------------------------------------------------------------------------
                                      Au    Ag
Drill     From    To   Interval  Cu  (oz/  (oz/  CuEQ(i)
Hole     (feet) (feet)  (feet)  (%)  ton)  ton)    (%)     Zone  Azimuth Dip
----------------------------------------------------------------------------
OUH-58   139.5  150.0    10.5   1.00 0.003 0.26   1.13      B8     280   -68
----------------------------------------------------------------------------
OUH-58   184.0  217.5    33.5   1.28 0.003 0.23   1.41      B8     280   -68
----------------------------------------------------------------------------
OUH-58   223.0  235.2    12.2   0.51 0.002 0.19   1.07  Endoskarn  280   -68
----------------------------------------------------------------------------
OUH-59   220.0  239.5    19.5   2.07 0.003 0.20   2.17      B8     333   -62
----------------------------------------------------------------------------
OUH-59   249.50 258.50   9.00   0.67 0.002 0.34   0.80  Endoskarn  333   -62
----------------------------------------------------------------------------
OUH-60   144.5  166.0    21.5   0.97 0.005 0.27   1.13      B8     230   -63
----------------------------------------------------------------------------
includes 154.5  159.5    5.0    2.12 0.011 0.65   2.51
----------------------------------------------------------------------------
OUH-60   195.5  219.0    23.5   1.89 0.009 1.01   2.35      B8     230   -63
----------------------------------------------------------------------------
OUH-60   234.5  239.5    5.0    0.58 0.002 0.10   0.65  Endoskarn  230   -63
----------------------------------------------------------------------------
OUH-61   102.0  108.6    6.6    1.21 0.007 0.36   1.44     B12      0    -90
----------------------------------------------------------------------------
OUH-61   189.5  202.6    13.1   1.24 0.003 0.24   1.36      B8      0    -90
----------------------------------------------------------------------------
OUH-61   210.1  229.5    19.4   1.92 0.001 0.33   2.03      B8      0    -90
----------------------------------------------------------------------------
includes 224.0  229.5    5.5    4.55 0.001 0.84   4.81
----------------------------------------------------------------------------
(i)CuEQ - Copper equivalency has been estimated using metal pricing of $2.80
per pound of copper, $20 per ounce of silver and $1,300 per ounce of gold.
Metallurgical recovery were derived from preliminary lock cycle test results
and assumed to be 81% for gold and silver. The formula used is as follows:
CuEQ = Cu% + ((Ag oz/t x $20 x 0.81) + (Au oz/t x $1,300 x
0.81))/$2.80/2,000 x 100.

There are no known drilling, recovery or other factors that could materially affect the accuracy or reliability of the data. Oracle Mining has posted an updated diagram of all drill hole locations of these reported assay results at http://www.oracleminingcorp.com/_resources/images/2014_Zone_8_intersects.pdf.

Data Verification

The drill program and sampling protocol were managed by qualified persons employed by Oracle Mining. The Corporation maintains a rigorous QA/QC protocol on all aspects of sampling and analytical procedure. Drill core is checked, logged, marked for sampling and split in half. The sample length varies depending on the geology and the mineralization. In general, the samples are predominantly about 5 feet long. Drill core recovery was excellent and exceeded 90 per cent. One-half of each drill core is maintained for future reference and one-half of each drill core is sent for analysis. Half-core samples are shipped to Skyline Assayer and Laboratories ("Skyline"), in Tucson, Arizona, an ISO/IEC 17025 accredited laboratory. Skyline is contracted to complete all sample preparation and assaying and is independent of Oracle Mining. Samples are analyzed employing acid digestion and Atomic Absorption for analyses of copper, as well as fire assaying for silver and gold. For QA/QC purposes, Oracle Mining inserts standard reference materials and blank samples into each sample batch submitted for assay to monitor laboratory performance. The Corporation periodically submits the pulps of the samples assayed by its primary lab to ALS Chemex Labs Ltd. in Reno, Nevada for check analysis.

Kevin Francis RM SME, Vice President Technical Services of Oracle Mining, a non-independent "qualified person" within the meaning of NI 43-101, has reviewed and approved the scientific and technical information included in this news release.

About Oracle Mining Corp.

Oracle Mining Corp. (TSX: OMN)(FRANKFURT: OMC) is a Vancouver, Canada-based corporation that is the sole owner and operator of Oracle Ridge Mining, LLC and the Oracle Ridge copper project located 24 km northeast of Tucson, Arizona. Oracle Mining is managed by an experienced team of mining professionals with extensive operating and financial experience.

Cautionary Note Regarding Forward-Looking Information

Information and statements contained in this news release that are not historical facts are "forward-looking information" within the meaning of Canadian securities legislation that involves risks and uncertainties. Forward-looking information included herein is made as of the date of this news release and Oracle Mining does not intend, and does not assume any obligation, to update forward-looking information unless required by applicable securities laws. Forward-looking information relates to future events or future performance and reflects management of the Corporation's expectations or beliefs regarding future events. In certain cases, forward-looking information can be identified by the use of words such as "plans", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative of these terms or comparable terminology. Examples of forward-looking information in this news release include, but are not limited to, statements with respect to: our plans and expectations for the Oracle Ridge Project, including our ability to negotiate a favourable arrangement with any third-party for a Third-Party option to utilize their existing infrastructure and the timing or completion of any work on the Oracle Ridge Project. This forward-looking information is based, in part, on assumptions and factors that may change or prove to be incorrect, thus causing actual results, performance or achievements to be materially different from those expressed or implied by forward-looking information. Such factors and assumptions include, but are not limited to: our ability to successfully raise capital.

By its very nature, forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Corporation to be materially different from any future results, performance or achievements expressed or implied by forward-looking information. Such factors include, but are not limited to: risk that we are unable to enforce our legal rights under existing agreements, permits or licences or are subject to litigation or arbitration that has an adverse outcome, including results of operations, our mining and project development operations or our current or potential financing arrangements; risk that we are unable to obtaining financing or are substantially delayed in obtaining financing, as well as those factors discussed in the section entitled "Risks and Uncertainties" in the Managements' Discussion and Analysis for the year ended December 31, 2013 and discussed in the Corporation's annual information form dated March 31, 2014, for the year ended December 31, 2013, filed and available for review on SEDAR at www.sedar.com. Although the Corporation has attempted to identify important factors that could cause actual actions, events or results to differ materially from forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated by such forward-looking information. Accordingly, readers should not place undue reliance on forward-looking information.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Events announced today that Peak 10, Inc., a national IT infrastructure and cloud services provider, will exhibit at SYS-CON's 18th International Cloud Expo®, which will take place on June 7-9, 2016, at the Javits Center in New York City, NY. Peak 10 provides reliable, tailored data center and network services, cloud and managed services. Its solutions are designed to scale and adapt to customers’ changing business needs, enabling them to lower costs, improve performance and focus inter...
You think you know what’s in your data. But do you? Most organizations are now aware of the business intelligence represented by their data. Data science stands to take this to a level you never thought of – literally. The techniques of data science, when used with the capabilities of Big Data technologies, can make connections you had not yet imagined, helping you discover new insights and ask new questions of your data. In his session at @ThingsExpo, Sarbjit Sarkaria, data science team lead ...
So, you bought into the current machine learning craze and went on to collect millions/billions of records from this promising new data source. Now, what do you do with them? Too often, the abundance of data quickly turns into an abundance of problems. How do you extract that "magic essence" from your data without falling into the common pitfalls? In her session at @ThingsExpo, Natalia Ponomareva, Software Engineer at Google, will provide tips on how to be successful in large scale machine lear...
If there is anything we have learned by now, is that every business paves their own unique path for releasing software- every pipeline, implementation and practices are a bit different, and DevOps comes in all shapes and sizes. Software delivery practices are often comprised of set of several complementing (or even competing) methodologies – such as leveraging Agile, DevOps and even a mix of ITIL, to create the combination that’s most suitable for your organization and that maximize your busines...
Struggling to keep up with increasing application demand? Learn how Platform as a Service (PaaS) can streamline application development processes and make resource management easy.
In his session at @ThingsExpo, Chris Klein, CEO and Co-founder of Rachio, will discuss next generation communities that are using IoT to create more sustainable, intelligent communities. One example is Sterling Ranch, a 10,000 home development that – with the help of Siemens – will integrate IoT technology into the community to provide residents with energy and water savings as well as intelligent security. Everything from stop lights to sprinkler systems to building infrastructures will run ef...
Whether your IoT service is connecting cars, homes, appliances, wearable, cameras or other devices, one question hangs in the balance – how do you actually make money from this service? The ability to turn your IoT service into profit requires the ability to create a monetization strategy that is flexible, scalable and working for you in real-time. It must be a transparent, smoothly implemented strategy that all stakeholders – from customers to the board – will be able to understand and comprehe...
In the world of DevOps there are ‘known good practices’ – aka ‘patterns’ – and ‘known bad practices’ – aka ‘anti-patterns.' Many of these patterns and anti-patterns have been developed from real world experience, especially by the early adopters of DevOps theory; but many are more feasible in theory than in practice, especially for more recent entrants to the DevOps scene. In this power panel at @DevOpsSummit at 18th Cloud Expo, moderated by DevOps Conference Chair Andi Mann, panelists will dis...
See storage differently! Storage performance problems have only gotten worse and harder to solve as applications have become largely virtualized and moved to a cloud-based infrastructure. Storage performance in a virtualized environment is not just about IOPS, it is about how well that potential performance is guaranteed to individual VMs for these apps as the number of VMs keep going up real time. In his session at 18th Cloud Expo, Dhiraj Sehgal, in product and marketing at Tintri, will discu...
Machine Learning helps make complex systems more efficient. By applying advanced Machine Learning techniques such as Cognitive Fingerprinting, wind project operators can utilize these tools to learn from collected data, detect regular patterns, and optimize their own operations. In his session at 18th Cloud Expo, Stuart Gillen, Director of Business Development at SparkCognition, will discuss how research has demonstrated the value of Machine Learning in delivering next generation analytics to im...
Unless you don’t use the internet, don’t live in California, or haven’t been paying attention to the recent news… you should be aware that self-driving cars are on their way to becoming a reality. I have seen them – they are real. If you believe in the future reality of self-driving cars, then continue reading on. If you don’t believe in the future possibilities, then I am not sure what to do to convince you other than discuss the very real changes that will roll out with the consumer producti...
Up until last year, enterprises that were looking into cloud services usually undertook a long-term pilot with one of the large cloud providers, running test and dev workloads in the cloud. With cloud’s transition to mainstream adoption in 2015, and with enterprises migrating more and more workloads into the cloud and in between public and private environments, the single-provider approach must be revisited. In his session at 18th Cloud Expo, Yoav Mor, multi-cloud solution evangelist at Cloudy...
There is an ever-growing explosion of new devices that are connected to the Internet using “cloud” solutions. This rapid growth is creating a massive new demand for efficient access to data. And it’s not just about connecting to that data anymore. This new demand is bringing new issues and challenges and it is important for companies to scale for the coming growth. And with that scaling comes the need for greater security, gathering and data analysis, storage, connectivity and, of course, the...
This is not a small hotel event. It is also not a big vendor party where politicians and entertainers are more important than real content. This is Cloud Expo, the world's longest-running conference and exhibition focused on Cloud Computing and all that it entails. If you want serious presentations and valuable insight about Cloud Computing for three straight days, then register now for Cloud Expo.
IoT device adoption is growing at staggering rates, and with it comes opportunity for developers to meet consumer demand for an ever more connected world. Wireless communication is the key part of the encompassing components of any IoT device. Wireless connectivity enhances the device utility at the expense of ease of use and deployment challenges. Since connectivity is fundamental for IoT device development, engineers must understand how to overcome the hurdles inherent in incorporating multipl...