Welcome!

News Feed Item

Gold Standard Reports New Gold Assays from Previously Unassayed Historical Pinion Drill Core

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 05/15/14 -- Gold Standard Ventures Corp. (TSX VENTURE:GSV) (NYSE MKT:GSV) (NYSE Amex:GSV) ("Gold Standard" or the "Company") announced today that gold assays of historic Pinion drill holes not previously assayed for gold have yielded positive results including a new interval of 35.4 meters of 1.063 g Au/t (from 13.7 to 49.1 meters) in PN-07-02, and an 8.8 meter extension of an existing gold intercept to 54.3 meters of 0.686 g Au/t (from 43.3 to 97.6 meters) in SB-145. Gold Standard's 100%-owned Pinion Gold Project sits adjacent and immediately to the south of its Railroad Project in Nevada's Carlin Trend.

These shallow core holes were drilled by previous operators in 1996 and 2007 in a roughly north-south alignment for geotechnical and geologic purposes. During Gold Standard's re-logging and data review of the core from 12 core holes obtained in the Pinion acquisition, its geologists identified that 72% of the core had not been assayed for gold. The subsequent new assay data supports two important observations about the Pinion deposit:

--  These results continue to reinforce the significance of collapse breccia
    as a major gold host-a factor which was not apparently known to previous
    operators 
--  PN-07-02 bottomed in oxidized and silicified collapse breccia that
    assayed 1.425 g Au/t, indicating that previous drilling was too shallow
    to adequately test the potential of the lower breccia zone. Furthermore,
    three other holes were not drilled deep enough to intersect the lower
    breccia

All new assay results are summarized below:

----------------------------------------------------------------------------
                  Intervals                                                 
                        Not                                                 
             TD  Previously   Intercept   Thickness    Grade                
Drill Hole  (m) Assayed (m)         (m)         (m)  (g Au/t)       Comments
----------------------------------------------------------------------------
                                                                Geotechnical
                                                                hole drilled
                                                                south of the
               3.1 - 21.0 &                                        Main Zone
SB-140     54.6 32.6 - 54.6              barren               mineralization
----------------------------------------------------------------------------
                                                                Geotech hole
                                                                south of the
                                                                   Main Zone
SB-141     31.1 13.7 - 31.1              barren               mineralization
----------------------------------------------------------------------------
                                                                Geotech hole
                                                                south of the
                                                                   Main Zone
SB-142     26.8 14.9 - 26.8              barren               mineralization
----------------------------------------------------------------------------
                                                             Drilled between
                                                               the North and
SB-143     83.8    0 - 47.6              barren                   Main Zones
----------------------------------------------------------------------------
                                                             Drilled between
                                                               the North and
SB-144     74.7  2.7 - 37.5              barren                   Main Zones
----------------------------------------------------------------------------
                                                                 Extended an
                                                               existing gold
                                                               interval. The
                                                             entire interval
                                                                 is 54.3m of
                                                                0.686 g Au/t
                                                                from 43.3 to
SB-145     99.1  7.0 - 52.1 43.3 - 52.1         8.8     0.377         97.6m.
----------------------------------------------------------------------------
                                                                    Existing
                                                                  intercept:
                                                              40.5m of 2.126
                                                                 g Au/t from
SB-146     42.7        none           -           -         -      1.2-41.7m
----------------------------------------------------------------------------
                                                             Drilled between
                                                                the Main and
PN-07-01   94.7    0 - 94.7 19.8 - 21.3         1.5     0.239    North Zones
----------------------------------------------------------------------------
                                                              Drilled in the
                                                                 North Zone;
                                                               hole ended in
PN-07-02   49.1    0 - 49.1 13.7 - 49.1        35.4     1.063   1.425 g Au/t
----------------------------------------------------------------------------
                                                                    Not deep
                                                               enough, North
                                                             Zone target not
PN-07-03   82.7    0 - 82.7   3.0 - 4.5         1.5     0.302         tested
----------------------------------------------------------------------------
                                                               Lower breccia
                                                               not tested by
PN-07-04   91.8    0 - 91.8  9.1 - 13.7         4.6     0.381this drill hole
----------------------------------------------------------------------------
                                                              Drill hole not
                                                                deep enough,
                                                               Main Zone not
PN-07-05   91.8    0 - 91.8 35.0 - 38.1         3.1     1.303         tested
-------------------------------------------------------------               
                            44.2 - 45.7         1.5     0.351               
----------------------------------------------------------------------------

(i)Note: The gold intervals reported in the above table are based on a 0.200 g Au/t cutoff. Weighted averaging has been used to calculate all reported intervals. True widths are estimated at 85% of drilled thicknesses.

Gold Standard President and CEO Jonathan Awde noted that the new assays provide important confirmation of the upside potential of the Pinion deposit. "We are certainly pleased to see additional gold mineralization in these holes but we are even more excited to get further confirmation that the historical work apparently did not recognize the nature of the deposit and how it needed to be explored. Clearly, the breccia zone was not the focus of previous exploration efforts as we believe it should have been, and many of the holes were too shallow to intersect this target."

The initiation of re-logging, cross section work and geologic mapping at Pinion has identified a classic, Carlin Trend setting with gold hosted in an oxidized, flat to gently dipping, dissolution collapse breccia. The best existing drill intercepts (e.g., TCT-018: 24m of 4.30 g Au/t from 1.5 - 25.5m; and CPR-110: 67m of 1.06 g Au/t from 12 - 79m) are located in structural highs along west-northwest, north and northwest-striking fault zones. Previously unrecognized, intrusive rocks occur within the deposit and indicate the presence of important deep-seated, through-going conduits. Lateral extent and continuity of gold mineralization is excellent due to the channeling of the gold system within highly permeable collapse breccia sandwiched between relatively impermeable, silty micrite of the overlying Mississippian Tripon Pass Formation and thick bedded, calcarenite of the underlying Devonian Devil's Gate Formation. Geologic work, including cross sections constructed from the re-logging, has progressed through a third of the deposit area, and the model continues to support a very promising, classic Carlin-style picture for the Pinion deposit.

Sampling Methodology, Chain of Custody, Quality Control and Quality Assurance:

All core sampling was conducted under the supervision of the Company's project geologists and the chain of custody was continuously monitored to the sample preparation facility. Core from the SB-series holes was cut at the company's facility in Elko, NV and one half was sent to the lab for analysis and the other half retained in the original core box. A blank or certified reference material was inserted approximately every tenth sample. The core samples and pulp samples from the PN-07 series holes were delivered to ALS Minerals preparation facility in Elko, NV. The core samples were crushed and pulverized and all sample pulps were shipped to ALS Minerals certified laboratory in Vancouver. Pulps are digested and analyzed for gold using fire assay fusion and an atomic absorption spectroscopy (AAS) finish on a 30 gram split. Data verification of the analytical results includes a statistical analysis of the duplicates, standards and blanks that must pass certain parameters for acceptance to insure accurate and verifiable results.

The scientific and technical content and interpretations contained in this news release have been reviewed, verified and approved by Steven R. Koehler, Gold Standard's Manager of Projects, BSc. Geology and CPG-10216, a Qualified Person as defined by NI 43-101, Standards of Disclosure for Mineral Projects.

ABOUT GOLD STANDARD VENTURES - Gold Standard is an advanced stage gold exploration focused on district scale discoveries in Nevada. The Company's flagship project, the Railroad-Pinion Gold Project, is located within the prolific Carlin Trend. The recent Pinion gold deposit acquisition offers GSV a potential near-term development option and further consolidates the Company's premier land package in the Carlin Trend. Gold Standard is moving towards building NI 43-101 compliant gold resources at both the near surface, oxide-gold Pinion deposit and the classic Carlin style, North Bullion gold deposit in 2014.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor the NYSE MKT accepts responsibility for the adequacy or accuracy of this news release.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

This news release contains forward-looking statements, which relate to future events or future performance and reflect management's current expectations and assumptions. Such forward-looking statements reflect management's current beliefs and are based on assumptions made by and information currently available to the Company. All statements, other than statements of historical fact, included herein including, without limitation, statements about our proposed financing are forward looking statements. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Risk factors affecting the Company include, among others: the results from our exploration programs, global financial conditions and volatility of capital markets, uncertainty regarding the availability of additional capital, fluctuations in commodity prices; title matters; and the additional risks identified in our filings with Canadian securities regulators on SEDAR in Canada (available at www.sedar.com) and with the SEC on EDGAR (available at www.sec.gov/edgar.shtml). These forward-looking statements are made as of the date hereof and, except as required under applicable securities legislation, the Company does not assume any obligation to update or revise them to reflect new events or circumstances.

On behalf of the Board of Directors of Gold Standard,

Jonathan Awde, President and Director

Contacts:
Gold Standard Ventures Corp.
Jonathan Awde
President
604-669-5702
[email protected]
www.goldstandardv.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
DX World EXPO, LLC, a Lighthouse Point, Florida-based startup trade show producer and the creator of "DXWorldEXPO® - Digital Transformation Conference & Expo" has announced its executive management team. The team is headed by Levent Selamoglu, who has been named CEO. "Now is the time for a truly global DX event, to bring together the leading minds from the technology world in a conversation about Digital Transformation," he said in making the announcement.
"Space Monkey by Vivent Smart Home is a product that is a distributed cloud-based edge storage network. Vivent Smart Home, our parent company, is a smart home provider that places a lot of hard drives across homes in North America," explained JT Olds, Director of Engineering, and Brandon Crowfeather, Product Manager, at Vivint Smart Home, in this SYS-CON.tv interview at @ThingsExpo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
SYS-CON Events announced today that Conference Guru has been named “Media Sponsor” of the 22nd International Cloud Expo, which will take place on June 5-7, 2018, at the Javits Center in New York, NY. A valuable conference experience generates new contacts, sales leads, potential strategic partners and potential investors; helps gather competitive intelligence and even provides inspiration for new products and services. Conference Guru works with conference organizers to pass great deals to gre...
DevOps is under attack because developers don’t want to mess with infrastructure. They will happily own their code into production, but want to use platforms instead of raw automation. That’s changing the landscape that we understand as DevOps with both architecture concepts (CloudNative) and process redefinition (SRE). Rob Hirschfeld’s recent work in Kubernetes operations has led to the conclusion that containers and related platforms have changed the way we should be thinking about DevOps and...
The Internet of Things will challenge the status quo of how IT and development organizations operate. Or will it? Certainly the fog layer of IoT requires special insights about data ontology, security and transactional integrity. But the developmental challenges are the same: People, Process and Platform. In his session at @ThingsExpo, Craig Sproule, CEO of Metavine, demonstrated how to move beyond today's coding paradigm and shared the must-have mindsets for removing complexity from the develop...
In his Opening Keynote at 21st Cloud Expo, John Considine, General Manager of IBM Cloud Infrastructure, led attendees through the exciting evolution of the cloud. He looked at this major disruption from the perspective of technology, business models, and what this means for enterprises of all sizes. John Considine is General Manager of Cloud Infrastructure Services at IBM. In that role he is responsible for leading IBM’s public cloud infrastructure including strategy, development, and offering m...
The next XaaS is CICDaaS. Why? Because CICD saves developers a huge amount of time. CD is an especially great option for projects that require multiple and frequent contributions to be integrated. But… securing CICD best practices is an emerging, essential, yet little understood practice for DevOps teams and their Cloud Service Providers. The only way to get CICD to work in a highly secure environment takes collaboration, patience and persistence. Building CICD in the cloud requires rigorous ar...
Companies are harnessing data in ways we once associated with science fiction. Analysts have access to a plethora of visualization and reporting tools, but considering the vast amount of data businesses collect and limitations of CPUs, end users are forced to design their structures and systems with limitations. Until now. As the cloud toolkit to analyze data has evolved, GPUs have stepped in to massively parallel SQL, visualization and machine learning.
"Evatronix provides design services to companies that need to integrate the IoT technology in their products but they don't necessarily have the expertise, knowledge and design team to do so," explained Adam Morawiec, VP of Business Development at Evatronix, in this SYS-CON.tv interview at @ThingsExpo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
To get the most out of their data, successful companies are not focusing on queries and data lakes, they are actively integrating analytics into their operations with a data-first application development approach. Real-time adjustments to improve revenues, reduce costs, or mitigate risk rely on applications that minimize latency on a variety of data sources. In his session at @BigDataExpo, Jack Norris, Senior Vice President, Data and Applications at MapR Technologies, reviewed best practices to ...
Widespread fragmentation is stalling the growth of the IIoT and making it difficult for partners to work together. The number of software platforms, apps, hardware and connectivity standards is creating paralysis among businesses that are afraid of being locked into a solution. EdgeX Foundry is unifying the community around a common IoT edge framework and an ecosystem of interoperable components.
"ZeroStack is a startup in Silicon Valley. We're solving a very interesting problem around bringing public cloud convenience with private cloud control for enterprises and mid-size companies," explained Kamesh Pemmaraju, VP of Product Management at ZeroStack, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
Large industrial manufacturing organizations are adopting the agile principles of cloud software companies. The industrial manufacturing development process has not scaled over time. Now that design CAD teams are geographically distributed, centralizing their work is key. With large multi-gigabyte projects, outdated tools have stifled industrial team agility, time-to-market milestones, and impacted P&L stakeholders.
"Akvelon is a software development company and we also provide consultancy services to folks who are looking to scale or accelerate their engineering roadmaps," explained Jeremiah Mothersell, Marketing Manager at Akvelon, in this SYS-CON.tv interview at 21st Cloud Expo, held Oct 31 – Nov 2, 2017, at the Santa Clara Convention Center in Santa Clara, CA.
Enterprises are adopting Kubernetes to accelerate the development and the delivery of cloud-native applications. However, sharing a Kubernetes cluster between members of the same team can be challenging. And, sharing clusters across multiple teams is even harder. Kubernetes offers several constructs to help implement segmentation and isolation. However, these primitives can be complex to understand and apply. As a result, it’s becoming common for enterprises to end up with several clusters. Thi...