News Feed Item

Gold Standard Reports New Gold Assays from Previously Unassayed Historical Pinion Drill Core

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 05/15/14 -- Gold Standard Ventures Corp. (TSX VENTURE:GSV) (NYSE MKT:GSV) (NYSE Amex:GSV) ("Gold Standard" or the "Company") announced today that gold assays of historic Pinion drill holes not previously assayed for gold have yielded positive results including a new interval of 35.4 meters of 1.063 g Au/t (from 13.7 to 49.1 meters) in PN-07-02, and an 8.8 meter extension of an existing gold intercept to 54.3 meters of 0.686 g Au/t (from 43.3 to 97.6 meters) in SB-145. Gold Standard's 100%-owned Pinion Gold Project sits adjacent and immediately to the south of its Railroad Project in Nevada's Carlin Trend.

These shallow core holes were drilled by previous operators in 1996 and 2007 in a roughly north-south alignment for geotechnical and geologic purposes. During Gold Standard's re-logging and data review of the core from 12 core holes obtained in the Pinion acquisition, its geologists identified that 72% of the core had not been assayed for gold. The subsequent new assay data supports two important observations about the Pinion deposit:

--  These results continue to reinforce the significance of collapse breccia
    as a major gold host-a factor which was not apparently known to previous
--  PN-07-02 bottomed in oxidized and silicified collapse breccia that
    assayed 1.425 g Au/t, indicating that previous drilling was too shallow
    to adequately test the potential of the lower breccia zone. Furthermore,
    three other holes were not drilled deep enough to intersect the lower

All new assay results are summarized below:

             TD  Previously   Intercept   Thickness    Grade                
Drill Hole  (m) Assayed (m)         (m)         (m)  (g Au/t)       Comments
                                                                hole drilled
                                                                south of the
               3.1 - 21.0 &                                        Main Zone
SB-140     54.6 32.6 - 54.6              barren               mineralization
                                                                Geotech hole
                                                                south of the
                                                                   Main Zone
SB-141     31.1 13.7 - 31.1              barren               mineralization
                                                                Geotech hole
                                                                south of the
                                                                   Main Zone
SB-142     26.8 14.9 - 26.8              barren               mineralization
                                                             Drilled between
                                                               the North and
SB-143     83.8    0 - 47.6              barren                   Main Zones
                                                             Drilled between
                                                               the North and
SB-144     74.7  2.7 - 37.5              barren                   Main Zones
                                                                 Extended an
                                                               existing gold
                                                               interval. The
                                                             entire interval
                                                                 is 54.3m of
                                                                0.686 g Au/t
                                                                from 43.3 to
SB-145     99.1  7.0 - 52.1 43.3 - 52.1         8.8     0.377         97.6m.
                                                              40.5m of 2.126
                                                                 g Au/t from
SB-146     42.7        none           -           -         -      1.2-41.7m
                                                             Drilled between
                                                                the Main and
PN-07-01   94.7    0 - 94.7 19.8 - 21.3         1.5     0.239    North Zones
                                                              Drilled in the
                                                                 North Zone;
                                                               hole ended in
PN-07-02   49.1    0 - 49.1 13.7 - 49.1        35.4     1.063   1.425 g Au/t
                                                                    Not deep
                                                               enough, North
                                                             Zone target not
PN-07-03   82.7    0 - 82.7   3.0 - 4.5         1.5     0.302         tested
                                                               Lower breccia
                                                               not tested by
PN-07-04   91.8    0 - 91.8  9.1 - 13.7         4.6     0.381this drill hole
                                                              Drill hole not
                                                                deep enough,
                                                               Main Zone not
PN-07-05   91.8    0 - 91.8 35.0 - 38.1         3.1     1.303         tested
                            44.2 - 45.7         1.5     0.351               

(i)Note: The gold intervals reported in the above table are based on a 0.200 g Au/t cutoff. Weighted averaging has been used to calculate all reported intervals. True widths are estimated at 85% of drilled thicknesses.

Gold Standard President and CEO Jonathan Awde noted that the new assays provide important confirmation of the upside potential of the Pinion deposit. "We are certainly pleased to see additional gold mineralization in these holes but we are even more excited to get further confirmation that the historical work apparently did not recognize the nature of the deposit and how it needed to be explored. Clearly, the breccia zone was not the focus of previous exploration efforts as we believe it should have been, and many of the holes were too shallow to intersect this target."

The initiation of re-logging, cross section work and geologic mapping at Pinion has identified a classic, Carlin Trend setting with gold hosted in an oxidized, flat to gently dipping, dissolution collapse breccia. The best existing drill intercepts (e.g., TCT-018: 24m of 4.30 g Au/t from 1.5 - 25.5m; and CPR-110: 67m of 1.06 g Au/t from 12 - 79m) are located in structural highs along west-northwest, north and northwest-striking fault zones. Previously unrecognized, intrusive rocks occur within the deposit and indicate the presence of important deep-seated, through-going conduits. Lateral extent and continuity of gold mineralization is excellent due to the channeling of the gold system within highly permeable collapse breccia sandwiched between relatively impermeable, silty micrite of the overlying Mississippian Tripon Pass Formation and thick bedded, calcarenite of the underlying Devonian Devil's Gate Formation. Geologic work, including cross sections constructed from the re-logging, has progressed through a third of the deposit area, and the model continues to support a very promising, classic Carlin-style picture for the Pinion deposit.

Sampling Methodology, Chain of Custody, Quality Control and Quality Assurance:

All core sampling was conducted under the supervision of the Company's project geologists and the chain of custody was continuously monitored to the sample preparation facility. Core from the SB-series holes was cut at the company's facility in Elko, NV and one half was sent to the lab for analysis and the other half retained in the original core box. A blank or certified reference material was inserted approximately every tenth sample. The core samples and pulp samples from the PN-07 series holes were delivered to ALS Minerals preparation facility in Elko, NV. The core samples were crushed and pulverized and all sample pulps were shipped to ALS Minerals certified laboratory in Vancouver. Pulps are digested and analyzed for gold using fire assay fusion and an atomic absorption spectroscopy (AAS) finish on a 30 gram split. Data verification of the analytical results includes a statistical analysis of the duplicates, standards and blanks that must pass certain parameters for acceptance to insure accurate and verifiable results.

The scientific and technical content and interpretations contained in this news release have been reviewed, verified and approved by Steven R. Koehler, Gold Standard's Manager of Projects, BSc. Geology and CPG-10216, a Qualified Person as defined by NI 43-101, Standards of Disclosure for Mineral Projects.

ABOUT GOLD STANDARD VENTURES - Gold Standard is an advanced stage gold exploration focused on district scale discoveries in Nevada. The Company's flagship project, the Railroad-Pinion Gold Project, is located within the prolific Carlin Trend. The recent Pinion gold deposit acquisition offers GSV a potential near-term development option and further consolidates the Company's premier land package in the Carlin Trend. Gold Standard is moving towards building NI 43-101 compliant gold resources at both the near surface, oxide-gold Pinion deposit and the classic Carlin style, North Bullion gold deposit in 2014.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor the NYSE MKT accepts responsibility for the adequacy or accuracy of this news release.


This news release contains forward-looking statements, which relate to future events or future performance and reflect management's current expectations and assumptions. Such forward-looking statements reflect management's current beliefs and are based on assumptions made by and information currently available to the Company. All statements, other than statements of historical fact, included herein including, without limitation, statements about our proposed financing are forward looking statements. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Risk factors affecting the Company include, among others: the results from our exploration programs, global financial conditions and volatility of capital markets, uncertainty regarding the availability of additional capital, fluctuations in commodity prices; title matters; and the additional risks identified in our filings with Canadian securities regulators on SEDAR in Canada (available at www.sedar.com) and with the SEC on EDGAR (available at www.sec.gov/edgar.shtml). These forward-looking statements are made as of the date hereof and, except as required under applicable securities legislation, the Company does not assume any obligation to update or revise them to reflect new events or circumstances.

On behalf of the Board of Directors of Gold Standard,

Jonathan Awde, President and Director

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
For basic one-to-one voice or video calling solutions, WebRTC has proven to be a very powerful technology. Although WebRTC’s core functionality is to provide secure, real-time p2p media streaming, leveraging native platform features and server-side components brings up new communication capabilities for web and native mobile applications, allowing for advanced multi-user use cases such as video broadcasting, conferencing, and media recording.
Without lifecycle traceability and visibility across the tool chain, stakeholders from Planning-to-Ops have limited insight and answers to who, what, when, why and how across the DevOps lifecycle. This impacts the ability to deliver high quality software at the needed velocity to drive positive business outcomes. In his general session at @DevOpsSummit at 19th Cloud Expo, Eric Robertson, General Manager at CollabNet, will discuss how customers are able to achieve a level of transparency that e...
Fifty billion connected devices and still no winning protocols standards. HTTP, WebSockets, MQTT, and CoAP seem to be leading in the IoT protocol race at the moment but many more protocols are getting introduced on a regular basis. Each protocol has its pros and cons depending on the nature of the communications. Does there really need to be only one protocol to rule them all? Of course not. In his session at @ThingsExpo, Chris Matthieu, co-founder and CTO of Octoblu, walk you through how Oct...
DevOps is speeding towards the IT world like a freight train and the hype around it is deafening. There is no reason to be afraid of this change as it is the natural reaction to the agile movement that revolutionized development just a few years ago. By definition, DevOps is the natural alignment of IT performance to business profitability. The relevance of this has yet to be quantified but it has been suggested that the route to the CEO’s chair will come from the IT leaders that successfully ma...
Major trends and emerging technologies – from virtual reality and IoT, to Big Data and algorithms – are helping organizations innovate in the digital era. However, to create real business value, IT must think beyond the ‘what’ of digital transformation to the ‘how’ to harness emerging trends, innovation and disruption. Architecture is the key that underpins and ties all these efforts together. In the digital age, it’s important to invest in architecture, extend the enterprise footprint to the cl...
Almost everyone sees the potential of Internet of Things but how can businesses truly unlock that potential. The key will be in the ability to discover business insight in the midst of an ocean of Big Data generated from billions of embedded devices via Systems of Discover. Businesses will also need to ensure that they can sustain that insight by leveraging the cloud for global reach, scale and elasticity.
@DevOpsSummit has been named the ‘Top DevOps Influencer' by iTrend. iTrend processes millions of conversations, tweets, interactions, news articles, press releases, blog posts - and extract meaning form them and analyzes mobile and desktop software platforms used to communicate, various metadata (such as geo location), and automation tools. In overall placement, @DevOpsSummit ranked as the number one ‘DevOps Influencer' followed by @CloudExpo at third, and @MicroservicesE at 24th.
A critical component of any IoT project is what to do with all the data being generated. This data needs to be captured, processed, structured, and stored in a way to facilitate different kinds of queries. Traditional data warehouse and analytical systems are mature technologies that can be used to handle certain kinds of queries, but they are not always well suited to many problems, particularly when there is a need for real-time insights.
One of biggest questions about Big Data is “How do we harness all that information for business use quickly and effectively?” Geographic Information Systems (GIS) or spatial technology is about more than making maps, but adding critical context and meaning to data of all types, coming from all different channels – even sensors. In his session at @ThingsExpo, William (Bill) Meehan, director of utility solutions for Esri, will take a closer look at the current state of spatial technology and ar...
Without lifecycle traceability and visibility across the tool chain, stakeholders from Planning-to-Ops have limited insight and answers to who, what, when, why and how across the DevOps lifecycle. This impacts the ability to deliver high quality software at the needed velocity to drive positive business outcomes. In his session at @DevOpsSummit 19th Cloud Expo, Eric Robertson, General Manager at CollabNet, will show how customers are able to achieve a level of transparency that enables everyon...
Explosive growth in connected devices. Enormous amounts of data for collection and analysis. Critical use of data for split-second decision making and actionable information. All three are factors in making the Internet of Things a reality. Yet, any one factor would have an IT organization pondering its infrastructure strategy. How should your organization enhance its IT framework to enable an Internet of Things implementation? In his session at @ThingsExpo, James Kirkland, Red Hat's Chief Arch...
SYS-CON Events announced today that Interface Masters Technologies, a leader in Network Visibility and Uptime Solutions, will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. Interface Masters Technologies is a leading vendor in the network monitoring and high speed networking markets. Based in the heart of Silicon Valley, Interface Masters' expertise lies in Gigabit, 10 Gigabit and 40 Gigabit Eth...
The IoT industry is now at a crossroads, between the fast-paced innovation of technologies and the pending mass adoption by global enterprises. The complexity of combining rapidly evolving technologies and the need to establish practices for market acceleration pose a strong challenge to global enterprises as well as IoT vendors. In his session at @ThingsExpo, Clark Smith, senior product manager for Numerex, will discuss how Numerex, as an experienced, established IoT provider, has embraced a ...
As software becomes more and more complex, we, as software developers, have been splitting up our code into smaller and smaller components. This is also true for the environment in which we run our code: going from bare metal, to VMs to the modern-day Cloud Native world of containers, schedulers and microservices. While we have figured out how to run containerized applications in the cloud using schedulers, we've yet to come up with a good solution to bridge the gap between getting your conta...
Everyone knows that truly innovative companies learn as they go along, pushing boundaries in response to market changes and demands. What's more of a mystery is how to balance innovation on a fresh platform built from scratch with the legacy tech stack, product suite and customers that continue to serve as the business' foundation. In his General Session at 19th Cloud Expo, Michael Chambliss, Head of Engineering at ReadyTalk, will discuss why and how ReadyTalk diverted from healthy revenue an...