Maya Gold & Silver Announces First Mineral Reserves at Zgounder Silver Mine and Files a Pre-Feasibility Study (PFS)

BLAINVILLE, QUEBEC -- (Marketwired) -- 05/22/14 -- Maya Gold & Silver Inc. ("Maya" or the "Corporation") (TSX VENTURE: MYA) announces that it has filed on SEDAR today the Pre-Feasibility Study ("PFS") for its Zgounder Silver Mine in Morocco. The results from the PFS demonstrate the economic viability of the Zgounder Mine based on the mineral reserves derived from resources that were outlined by GoldMinds Geoservices Inc. The PFS highlighted that a significant amount of inferred resources are present which have the potential to be converted to reserves with additional drilling, and there remains an excellent exploration potential to further expand the size of the existing mineral inventory. The PFS also provided a more conservative estimate of profitability than the Preliminary Economic Assessment (PEA) due to the exclusion of the inferred resources; conversely, thereby the PFS provides estimates that have a lower geological risk, which is key element for financing purposes.

Highlights of the Zgounder Silver Mine PFS Study include:


--  An anticipated mine life of 6 years with the current reserves with
    Internal rate of return of 128 per cent;

--  First year silver production of 582,600 ounces, followed by two years at
    885,400 ounces, and the final three years at 914,000 ounces per year;

--  Mill feed grade estimated at 317 g/t Ag;

--  Total operating cost of USD109.50 per tonne (averaged over the expected
    mine's life);

--  Additional capex requirements total USD3.8 million, which include the
    proposed concentrator expansion;

--  Net present value of USD27.9 million (discounted at 6.5 per cent) at
    silver price of USD20.50 per ounce;

--  The Zgounder PFS was prepared as a strictly underground mine based
    solely on the measured and indicated mineral resources reported on
    February 19, 2014.


               Mineral Reserve Estimate as at March 21st, 2014
----------------------------------------------------------------------------
         Proven                 Probable              Proven + Probable
----------------------------------------------------------------------------
         Ag                       Ag                         Ag
 Tonnes  g/t   Ounces    Tonnes   g/t   Ounces     Tonnes   g/t     Ounces
----------------------------------------------------------------------------
152,000  281  1,371,000  421,000  330  4,474,000  573,000  317.3  5,845,000
----------------------------------------------------------------------------

Notes:

The reserves have been estimated in accordance with the definitions and guidelines adopted from the Canadian Institute of Mining, Metallurgy and Petroleum (CIM Standards on Mineral Resources and Reserves). The reserves are based entirely on measured and indicated resources and were converted as probable and proven respectively. Since the material is from underground mining operations, the cut-off grade includes the costs of production, processing and the general & administration (G&A).

Parameters of cut-off grade estimation (the exchange rate has been set at 7.63 MAD = $1.00, as of December 29, 2013.)


                     ----------------------------------
                     Parameters          Unit      Data
                     ----------------------------------
                     Mining             USD/t     32.79
                     Mining dilution        %     10.00
                     Development        USD/t     10.79
                     Processing         USD/t     45.89
                     G&A                USD/t      8.54
                     Metal price       USD/oz     20.50
                     Metal price          U/g      0.66
                     Process recovery       %      0.90
                     Cut-off grade        g/t       166
                     ----------------------------------

Details of the mineral resource estimate and the previously completed Preliminary Economic Assessment (PEA) can be found in the Company's new release dated March 5 th, 2014 which has been filed and is available for viewing and download on www.sedar.com or on Maya's website (http://mayagoldsilver.com/wp-content/uploads/2014/03/2014-19-03_MayaPEA_Final-Report.pdf). It is clear that the results of the PEA are significantly better than those presented herein due to the exclusion of the inferred resources. Maya anticipates that further drilling of the deposit could convert a significant portion of the inferred tonnage and potential structures into mineral resources of better categories and translate into additional years of production and revenue.

Additional to the mineral resource and reserves described herein and within previous press releases, a Mineral Potential between 1.5 to 2.0 million tonnes grading 300 to 400 g/t Ag has been estimated. The "Mineral Potential" is the tonnage which could be contained between elevations 1975 and 1750 (225m vertical panel) along the existing mine openings. This represents the historical amount processed by the previous operator plus the current NI 43-101 mineral resource disclosure between the surface and level 1925. It does not consider the eastern extension (276400E) where surface medieval workings extent for another 200 meters eastward with no drilling beneath. The potential quantity and grade reported as "Mineral Potential", is conceptual in nature, that there has been insufficient exploration to define a mineral resource and that it is uncertain if further exploration will result in the target being delineated as a mineral resource.

The report, titled "NI 43-101 Technical Report, Pre-Feasibility Study of the Zgounder Silver Deposit, Kingdom of Morocco" is dated May 16, 2014 with an effective date of March 21, 2014. It was prepared in conformity with NI 43-101 by Claude Duplessis, Eng. of Goldminds Geoservices Inc. and Gaston Gagnon, Eng. and Gilbert Rousseau, Eng. of SGS Canada Inc.; each is an "Independent Qualified Person" under NI 43-101.

Qualified Persons

The technical content of this news release has been reviewed by Gaston Gagnon, Eng. and Gilbert Rousseau, Eng. from SGS Canada Inc. and by Claude Duplessis Eng. Sr. Geological Engineer from GoldMinds Geoservices Inc.: all independent Qualified Persons under NI 43-101 standards.

ABOUT MAYA

Maya Gold & Silver Inc. is a Canadian listed mining focused on the exploration and development of gold and silver deposits in Morocco. Maya recently initiated mining at its Zgounder Mine. The Corporation's shares trade on the TSX Venture Exchange under the symbol "MYA".

For further information on Maya visit www.mayagoldsilver.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-looking statements

This release may contain forward-looking statements including management's assessments of future plans and operations, and expectations of future production. These statements are based on current expectations that involve a number of risks and uncertainties, which could cause actual results to differ materially from those anticipated. These risks include, but are not limited to, the risks associated with the mining and exploration industry (e.g. operational risks in development, exploration and production; delays or changes in plans with respect to exploration or development projects or capital expenditures; the uncertainty of reserve estimates; the uncertainty of estimates and projections relating to production and the uncertainty of the availability of capital). The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.

Contacts:
Maya Gold & Silver Inc.
Guy Goulet
Chief Executive Officer
450-435-0700 ext. 204

Nathalie Dion
Investor Relations
450-435-0700 ext. 202

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Eighty percent of a data scientist’s time is spent gathering and cleaning up data, and 80% of all data is unstructured and almost never analyzed. Cognitive computing, in combination with Big Data, is changing the equation by creating data reservoirs and using natural language processing to enable analysis of unstructured data sources. This is impacting every aspect of the analytics profession from how data is mined (and by whom) to how it is delivered. This is not some futuristic vision: it's ha...
Let’s face it, embracing new storage technologies, capabilities and upgrading to new hardware often adds complexity and increases costs. In his session at 18th Cloud Expo, Seth Oxenhorn, Vice President of Business Development & Alliances at FalconStor, will discuss how a truly heterogeneous software-defined storage approach can add value to legacy platforms and heterogeneous environments. The result reduces complexity, significantly lowers cost, and provides IT organizations with improved effi...
With the Apple Watch making its way onto wrists all over the world, it’s only a matter of time before it becomes a staple in the workplace. In fact, Forrester reported that 68 percent of technology and business decision-makers characterize wearables as a top priority for 2015. Recognizing their business value early on, FinancialForce.com was the first to bring ERP to wearables, helping streamline communication across front and back office functions. In his session at @ThingsExpo, Kevin Roberts...
Data-as-a-Service is the complete package for the transformation of raw data into meaningful data assets and the delivery of those data assets. In her session at 18th Cloud Expo, Lakshmi Randall, an industry expert, analyst and strategist, will address: What is DaaS (Data-as-a-Service)? Challenges addressed by DaaS Vendors that are enabling DaaS Architecture options for DaaS
One of the bewildering things about DevOps is integrating the massive toolchain including the dozens of new tools that seem to crop up every year. Part of DevOps is Continuous Delivery and having a complex toolchain can add additional integration and setup to your developer environment. In his session at @DevOpsSummit at 18th Cloud Expo, Miko Matsumura, Chief Marketing Officer of Gradle Inc., will discuss which tools to use in a developer stack, how to provision the toolchain to minimize onboa...
Cognitive Computing is becoming the foundation for a new generation of solutions that have the potential to transform business. Unlike traditional approaches to building solutions, a cognitive computing approach allows the data to help determine the way applications are designed. This contrasts with conventional software development that begins with defining logic based on the current way a business operates. In her session at 18th Cloud Expo, Judith S. Hurwitz, President and CEO of Hurwitz & ...
It's easy to assume that your app will run on a fast and reliable network. The reality for your app's users, though, is often a slow, unreliable network with spotty coverage. What happens when the network doesn't work, or when the device is in airplane mode? You get unhappy, frustrated users. An offline-first app is an app that works, without error, when there is no network connection.
The principles behind DevOps are not new - for decades people have been automating system administration and decreasing the time to deploy apps and perform other management tasks. However, only recently did we see the tools and the will necessary to share the benefits and power of automation with a wider circle of people. In his session at DevOps Summit, Bernard Sanders, Chief Technology Officer at CloudBolt Software, explored the latest tools including Puppet, Chef, Docker, and CMPs needed to...
The cloud promises new levels of agility and cost-savings for Big Data, data warehousing and analytics. But it’s challenging to understand all the options – from IaaS and PaaS to newer services like HaaS (Hadoop as a Service) and BDaaS (Big Data as a Service). In her session at @BigDataExpo at @ThingsExpo, Hannah Smalltree, a director at Cazena, will provide an educational overview of emerging “as-a-service” options for Big Data in the cloud. This is critical background for IT and data profes...
Father business cycles and digital consumers are forcing enterprises to respond faster to customer needs and competitive demands. Successful integration of DevOps and Agile development will be key for business success in today’s digital economy. In his session at DevOps Summit, Pradeep Prabhu, Co-Founder & CEO of Cloudmunch, covered the critical practices that enterprises should consider to seamlessly integrate Agile and DevOps processes, barriers to implementing this in the enterprise, and pr...
SYS-CON Events announced today that Men & Mice, the leading global provider of DNS, DHCP and IP address management overlay solutions, will exhibit at SYS-CON's 18th International Cloud Expo®, which will take place on June 7-9, 2016, at the Javits Center in New York City, NY. The Men & Mice Suite overlay solution is already known for its powerful application in heterogeneous operating environments, enabling enterprises to scale without fuss. Building on a solid range of diverse platform support,...
Advances in technology and ubiquitous connectivity have made the utilization of a dispersed workforce more common. Whether that remote team is located across the street or country, management styles/ approaches will have to be adjusted to accommodate this new dynamic. In his session at 17th Cloud Expo, Sagi Brody, Chief Technology Officer at Webair Internet Development Inc., focused on the challenges of managing remote teams, providing real-world examples that demonstrate what works and what do...
As enterprises work to take advantage of Big Data technologies, they frequently become distracted by product-level decisions. In most new Big Data builds this approach is completely counter-productive: it presupposes tools that may not be a fit for development teams, forces IT to take on the burden of evaluating and maintaining unfamiliar technology, and represents a major up-front expense. In his session at @BigDataExpo at @ThingsExpo, Andrew Warfield, CTO and Co-Founder of Coho Data, will dis...
With the proliferation of both SQL and NoSQL databases, organizations can now target specific fit-for-purpose database tools for their different application needs regarding scalability, ease of use, ACID support, etc. Platform as a Service offerings make this even easier now, enabling developers to roll out their own database infrastructure in minutes with minimal management overhead. However, this same amount of flexibility also comes with the challenges of picking the right tool, on the right ...
In most cases, it is convenient to have some human interaction with a web (micro-)service, no matter how small it is. A traditional approach would be to create an HTTP interface, where user requests will be dispatched and HTML/CSS pages must be served. This approach is indeed very traditional for a web site, but not really convenient for a web service, which is not intended to be good looking, 24x7 up and running and UX-optimized. Instead, talking to a web service in a chat-bot mode would be muc...