Maya Gold & Silver Announces First Mineral Reserves at Zgounder Silver Mine and Files a Pre-Feasibility Study (PFS)

BLAINVILLE, QUEBEC -- (Marketwired) -- 05/22/14 -- Maya Gold & Silver Inc. ("Maya" or the "Corporation") (TSX VENTURE: MYA) announces that it has filed on SEDAR today the Pre-Feasibility Study ("PFS") for its Zgounder Silver Mine in Morocco. The results from the PFS demonstrate the economic viability of the Zgounder Mine based on the mineral reserves derived from resources that were outlined by GoldMinds Geoservices Inc. The PFS highlighted that a significant amount of inferred resources are present which have the potential to be converted to reserves with additional drilling, and there remains an excellent exploration potential to further expand the size of the existing mineral inventory. The PFS also provided a more conservative estimate of profitability than the Preliminary Economic Assessment (PEA) due to the exclusion of the inferred resources; conversely, thereby the PFS provides estimates that have a lower geological risk, which is key element for financing purposes.

Highlights of the Zgounder Silver Mine PFS Study include:

--  An anticipated mine life of 6 years with the current reserves with
    Internal rate of return of 128 per cent;

--  First year silver production of 582,600 ounces, followed by two years at
    885,400 ounces, and the final three years at 914,000 ounces per year;

--  Mill feed grade estimated at 317 g/t Ag;

--  Total operating cost of USD109.50 per tonne (averaged over the expected
    mine's life);

--  Additional capex requirements total USD3.8 million, which include the
    proposed concentrator expansion;

--  Net present value of USD27.9 million (discounted at 6.5 per cent) at
    silver price of USD20.50 per ounce;

--  The Zgounder PFS was prepared as a strictly underground mine based
    solely on the measured and indicated mineral resources reported on
    February 19, 2014.


               Mineral Reserve Estimate as at March 21st, 2014
----------------------------------------------------------------------------
         Proven                 Probable              Proven + Probable
----------------------------------------------------------------------------
         Ag                       Ag                         Ag
 Tonnes  g/t   Ounces    Tonnes   g/t   Ounces     Tonnes   g/t     Ounces
----------------------------------------------------------------------------
152,000  281  1,371,000  421,000  330  4,474,000  573,000  317.3  5,845,000
----------------------------------------------------------------------------

Notes:

The reserves have been estimated in accordance with the definitions and guidelines adopted from the Canadian Institute of Mining, Metallurgy and Petroleum (CIM Standards on Mineral Resources and Reserves). The reserves are based entirely on measured and indicated resources and were converted as probable and proven respectively. Since the material is from underground mining operations, the cut-off grade includes the costs of production, processing and the general & administration (G&A).

Parameters of cut-off grade estimation (the exchange rate has been set at 7.63 MAD = $1.00, as of December 29, 2013.)

                     ----------------------------------
                     Parameters          Unit      Data
                     ----------------------------------
                     Mining             USD/t     32.79
                     Mining dilution        %     10.00
                     Development        USD/t     10.79
                     Processing         USD/t     45.89
                     G&A                USD/t      8.54
                     Metal price       USD/oz     20.50
                     Metal price          U/g      0.66
                     Process recovery       %      0.90
                     Cut-off grade        g/t       166
                     ----------------------------------

Details of the mineral resource estimate and the previously completed Preliminary Economic Assessment (PEA) can be found in the Company's new release dated March 5 th, 2014 which has been filed and is available for viewing and download on www.sedar.com or on Maya's website (http://mayagoldsilver.com/wp-content/uploads/2014/03/2014-19-03_MayaPEA_Final-Report.pdf). It is clear that the results of the PEA are significantly better than those presented herein due to the exclusion of the inferred resources. Maya anticipates that further drilling of the deposit could convert a significant portion of the inferred tonnage and potential structures into mineral resources of better categories and translate into additional years of production and revenue.

Additional to the mineral resource and reserves described herein and within previous press releases, a Mineral Potential between 1.5 to 2.0 million tonnes grading 300 to 400 g/t Ag has been estimated. The "Mineral Potential" is the tonnage which could be contained between elevations 1975 and 1750 (225m vertical panel) along the existing mine openings. This represents the historical amount processed by the previous operator plus the current NI 43-101 mineral resource disclosure between the surface and level 1925. It does not consider the eastern extension (276400E) where surface medieval workings extent for another 200 meters eastward with no drilling beneath. The potential quantity and grade reported as "Mineral Potential", is conceptual in nature, that there has been insufficient exploration to define a mineral resource and that it is uncertain if further exploration will result in the target being delineated as a mineral resource.

The report, titled "NI 43-101 Technical Report, Pre-Feasibility Study of the Zgounder Silver Deposit, Kingdom of Morocco" is dated May 16, 2014 with an effective date of March 21, 2014. It was prepared in conformity with NI 43-101 by Claude Duplessis, Eng. of Goldminds Geoservices Inc. and Gaston Gagnon, Eng. and Gilbert Rousseau, Eng. of SGS Canada Inc.; each is an "Independent Qualified Person" under NI 43-101.

Qualified Persons

The technical content of this news release has been reviewed by Gaston Gagnon, Eng. and Gilbert Rousseau, Eng. from SGS Canada Inc. and by Claude Duplessis Eng. Sr. Geological Engineer from GoldMinds Geoservices Inc.: all independent Qualified Persons under NI 43-101 standards.

ABOUT MAYA

Maya Gold & Silver Inc. is a Canadian listed mining focused on the exploration and development of gold and silver deposits in Morocco. Maya recently initiated mining at its Zgounder Mine. The Corporation's shares trade on the TSX Venture Exchange under the symbol "MYA".

For further information on Maya visit www.mayagoldsilver.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-looking statements

This release may contain forward-looking statements including management's assessments of future plans and operations, and expectations of future production. These statements are based on current expectations that involve a number of risks and uncertainties, which could cause actual results to differ materially from those anticipated. These risks include, but are not limited to, the risks associated with the mining and exploration industry (e.g. operational risks in development, exploration and production; delays or changes in plans with respect to exploration or development projects or capital expenditures; the uncertainty of reserve estimates; the uncertainty of estimates and projections relating to production and the uncertainty of the availability of capital). The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.

Contacts:
Maya Gold & Silver Inc.
Guy Goulet
Chief Executive Officer
450-435-0700 ext. 204

Nathalie Dion
Investor Relations
450-435-0700 ext. 202

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Cloud computing delivers on-demand resources that provide businesses with flexibility and cost-savings. The challenge in moving workloads to the cloud has been the cost and complexity of ensuring the initial and ongoing security and regulatory (PCI, HIPAA, FFIEC) compliance across private and public clouds. Manual security compliance is slow, prone to human error, and represents over 50% of the cost of managing cloud applications. Determining how to automate cloud security compliance is critical...
Enterprises have taken advantage of IoT to achieve important revenue and cost advantages. What is less apparent is how incumbent enterprises operating at scale have, following success with IoT, built analytic, operations management and software development capabilities - ranging from autonomous vehicles to manageable robotics installations. They have embraced these capabilities as if they were Silicon Valley startups.
The Internet of Things is clearly many things: data collection and analytics, wearables, Smart Grids and Smart Cities, the Industrial Internet, and more. Cool platforms like Arduino, Raspberry Pi, Intel's Galileo and Edison, and a diverse world of sensors are making the IoT a great toy box for developers in all these areas. In this Power Panel at @ThingsExpo, moderated by Conference Chair Roger Strukhoff, panelists discussed what things are the most important, which will have the most profound e...
"MobiDev is a Ukraine-based software development company. We do mobile development, and we're specialists in that. But we do full stack software development for entrepreneurs, for emerging companies, and for enterprise ventures," explained Alan Winters, U.S. Head of Business Development at MobiDev, in this SYS-CON.tv interview at 20th Cloud Expo, held June 6-8, 2017, at the Javits Center in New York City, NY.
With more than 30 Kubernetes solutions in the marketplace, it's tempting to think Kubernetes and the vendor ecosystem has solved the problem of operationalizing containers at scale or of automatically managing the elasticity of the underlying infrastructure that these solutions need to be truly scalable. Far from it. There are at least six major pain points that companies experience when they try to deploy and run Kubernetes in their complex environments. In this presentation, the speaker will d...
Dhiraj Sehgal works in Delphix's product and solution organization. His focus has been DevOps, DataOps, private cloud and datacenters customers, technologies and products. He has wealth of experience in cloud focused and virtualized technologies ranging from compute, networking to storage. He has spoken at Cloud Expo for last 3 years now in New York and Santa Clara.
Your job is mostly boring. Many of the IT operations tasks you perform on a day-to-day basis are repetitive and dull. Utilizing automation can improve your work life, automating away the drudgery and embracing the passion for technology that got you started in the first place. In this presentation, I'll talk about what automation is, and how to approach implementing it in the context of IT Operations. Ned will discuss keys to success in the long term and include practical real-world examples. Ge...
As IoT continues to increase momentum, so does the associated risk. Secure Device Lifecycle Management (DLM) is ranked as one of the most important technology areas of IoT. Driving this trend is the realization that secure support for IoT devices provides companies the ability to deliver high-quality, reliable, secure offerings faster, create new revenue streams, and reduce support costs, all while building a competitive advantage in their markets. In this session, we will use customer use cases...
Bill Schmarzo, author of "Big Data: Understanding How Data Powers Big Business" and "Big Data MBA: Driving Business Strategies with Data Science," is responsible for setting the strategy and defining the Big Data service offerings and capabilities for EMC Global Services Big Data Practice. As the CTO for the Big Data Practice, he is responsible for working with organizations to help them identify where and how to start their big data journeys. He's written several white papers, is an avid blogge...
When talking IoT we often focus on the devices, the sensors, the hardware itself. The new smart appliances, the new smart or self-driving cars (which are amalgamations of many ‘things'). When we are looking at the world of IoT, we should take a step back, look at the big picture. What value are these devices providing. IoT is not about the devices, its about the data consumed and generated. The devices are tools, mechanisms, conduits. This paper discusses the considerations when dealing with the...
Wooed by the promise of faster innovation, lower TCO, and greater agility, businesses of every shape and size have embraced the cloud at every layer of the IT stack – from apps to file sharing to infrastructure. The typical organization currently uses more than a dozen sanctioned cloud apps and will shift more than half of all workloads to the cloud by 2018. Such cloud investments have delivered measurable benefits. But they’ve also resulted in some unintended side-effects: complexity and risk. ...
Sanjeev Sharma Joins November 11-13, 2018 @DevOpsSummit at @CloudEXPO New York Faculty. Sanjeev Sharma is an internationally known DevOps and Cloud Transformation thought leader, technology executive, and author. Sanjeev's industry experience includes tenures as CTO, Technical Sales leader, and Cloud Architect leader. As an IBM Distinguished Engineer, Sanjeev is recognized at the highest levels of IBM's core of technical leaders.