Welcome!

News Feed Item

Thundermin and Rambler Intersect High Grade Copper Mineralization at Little Deer

TORONTO, ONTARIO -- (Marketwired) -- 05/22/14 -- Thundermin Resources Inc. ("Thundermin") (TSX VENTURE:THR) and 50% joint venture partner Rambler Metals and Mining Canada Limited ("Rambler") (TSX VENTURE:RAB)(AIM:RMM) announce that they have intersected 2.9% Cu over 3.4 m and 3.8% Cu over 2.0 m, 2.1% Cu over 2.6 m, and 2.3 % Cu over 6.2 m in two separate drill holes on the Little Deer Copper Deposit ("Little Deer") (see Table 1 and Figure 1) located approximately 10 kilometres north of Springdale in north-central Newfoundland.


Table 1: Little Deer Drill Results (2014)                                   
-------------------------------------------------------------
Hole No.      NAD 83 UTM Zone 21             Dip           Az
           ------------------------                          
              East (m)    North (m)     (degrees)   (degrees)
-------------------------------------------------------------
LD-14-63       571,149    5,492,702        -58.2        327.5
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-63A      571,149    5,492,702        -58.2        327.5
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-64       571,149    5,492,702        -52.6        327.6
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-64A      571,149    5,492,702        -52.6        327.6
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-65       571,174    5,492,756        -51.2        329.3
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-66       571,189    5,492,780        -57.7        327.9
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------

-----------------------------------------------
Hole No.        From       To  Interval      Cu
                                               
                 (m)      (m)    (m)(i)     (%)
-----------------------------------------------
LD-14-63       800.5    803.9       3.4     2.9
-----------------------------------------------
and            819.0    819.7       0.7     1.9
-----------------------------------------------
and            886.6    887.2       0.6     1.9
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-63A      763.3    766.3       3.0     1.0
-----------------------------------------------
and            775.2    777.7       2.5     1.0
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-64       729.6    732.6       3.0     1.0
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-64A      723.3    724.3       1.0     0.9
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-65       206.5    208.5       2.0     3.8
-----------------------------------------------
and            414.8    417.4       2.6     2.1
-----------------------------------------------
and            629.6    630.0       0.4     8.0
-----------------------------------------------
and            635.3    641.5       6.2     2.3
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-66       409.5    409.8       0.3     2.4
-----------------------------------------------
and            678.5    679.5       1.0     1.5
-----------------------------------------------
Notes:                                                                      
                                                                            
1) (i)The reported copper intersections are core lengths. The true          
thicknesses of the copper intersections are highly variable due to the      
nature of the mineralization.                                               
2) The "A" suffix in the drill hole number indicates a wedge hole.          

The recently completed 3,800 m drill program, which was designed to increase the mineral resources outlined to date and to further upgrade the Inferred Resources to the Indicated Resource category in the eastern portion of the deposit, consisted of four holes drilled from surface and two wedge holes. Holes LD-14-63, 63A and 65 all intersected the Little Deer Main Zone. Hole LD-14-65 also intersected two new copper zones higher in the hole grading 3.8% Cu over 2.0 m, from 206.5 to 208.5 m down the hole, and 2.1% Cu over 2.6 m, from 414.8 to 417.4 m down the hole. These two new copper zones were intersected within a previously unknown, large chlorite-sericite-silica-pyrite alteration zone and their lateral and depth extent is unknown at the present time. Hole LD-14-63 intersected two narrow copper zones, below the Little Deer Main Zone, which are possible extensions to two lenses of the Little Deer Footwall Zone Splay. Holes LD-14-64, 64A and 66 appear to have been "dyked out" as they all intersected thick sections of mafic dyke along with minor amounts of copper mineralization hosted by intensely chlorite altered basalt within the expected area of the Little Deer Main Zone.

John B. Heslop, President and Chief Executive Officer of Thundermin said "We are generally pleased with the results of the current drill program and continue to define continuity of the copper mineralization between wide-spaced, historical drill holes. Dykes which cut off the mineralization have also been intersected in previous drilling. We are currently compiling the recent drill information and planning additional holes to be drilled in order to improve the confidence level of the National Instrument 43-101 ("NI 43-101") compliant resources at Little Deer prior to undertaking a pre-feasibility study. In particular, we would like to confirm and expand the mineral resources in the Little Deer Footwall Zone Splay that is currently estimated to contain 797,000 tonnes ("t") grading 2.64% Cu (see news release dated June 22, 2011).

The Little Deer Copper Project hosts the Little Deer and Whalesback copper deposits. On June 22, 2011 and July 26, 2012, NI 43-101 compliant mineral resource estimates, which were undertaken by P&E Mining Consultants Inc. ("P&E") of Toronto, Ontario, were announced for Little Deer and Whalesback, respectively. P&E estimated that Little Deer contains Indicated Resources of 1,911,000 t at an average grade of 2.37% Cu (99.8 million lbs. Cu) and additional Inferred Resources of 3,748,000 t at an average grade of 2.13% Cu (176.0 million lbs. of Cu). P&E estimated that Whalesback contains Indicated Resources of 797,000 t grading 1.67% Cu (29.3 million lbs. Cu) and Inferred Resources of 443,000 t grading 1.57% Cu (15.3 million lbs. Cu). On a combined basis, Little Deer and Whalesback are estimated to contain Indicated Resources of 2,708,000 t grading 2.16% Cu (129.1 million lbs. Cu) and Inferred Resources of 4,191,000 t grading 2.07% Cu (191.3 million lbs. Cu). A complete summary of the mineral resources outlined to date on the Little Deer Copper Project can be found on Thundermin's website, in news releases and on SEDAR.

Little Deer Joint Venture

Under the terms of its joint venture agreement with Rambler, Thundermin has the right to increase its 50% interest in the Little Deer property to 65% by completing a feasibility study and to 75% by arranging 100% of the necessary bank financing required to place the property into commercial production. Details on Little Deer and Whalesback and the terms of the agreement with Rambler can be found in numerous Thundermin news releases and on Thundermin's website and on SEDAR.

Junior Exploration Assistance Program

Thundermin would like to acknowledge the financial support received from the Junior Exploration Assisstance Program ("JEA") of the Province of Newfoundland and Labrador in carrying out a portion of their work on Little Deer.

Qualified Persons

The NI 43-101 mineral resource estimate referred to above was prepared under the supervision of Mr. Eugene J. Puritch, P. Eng., President of P&E. Mr. Puritch is an independent Qualified Person ("Q.P.") in accordance with NI 43-101.

Mr. Andrew Hussey, P.Geo., Senior Project Geologist with Thundermin, is the Q.P. responsible for supervising all of the drilling programs at Little Deer for the purposes of NI 43-101. Mr. Hussey has also reviewed the contents of this new release for accuracy. All holes drilled by Thundermin and Rambler are NQ in size. Bulk density measurements, rock quality designations and photographic logging of significant mineralized intersections are performed systematically prior to assaying. The core is logged and the mineralized sections, where appropriate, are sawn in half at a core logging facility in Springdale. Half of the core is submitted for analyses to Eastern Analytical Limited, an independent and qualified assayer located in Springdale, Newfoundland and the remaining half of the core is kept for future reference. Blanks, duplicates and standards are routinely used as part of the assay procedures.

About Thundermin

Thundermin is a Canadian-based mineral exploration company focused on the exploration for and the discovery of economically viable base metal and gold deposits in Canada with its primary project being the Little Deer Copper Project as described above. Thundermin has an interest in, or the right to earn an interest in 12 base metal and gold properties in Canada. Thundermin owns a 100% interest in the Lebel Township gold property, which is located on the Kirkland Lake Main Break in the prolific Kirkland Lake gold camp. Thundermin has the right to earn a 100% interest in eight exploration licenses covering a large portion of the Stirling volcanogenic massive zinc-lead-copper-silver-gold sulphide belt located on Cape Breton Island, Nova Scotia. An initial diamond drill program undertaken on the property in 2012 was successful in intersecting copper mineralization in porphyritic volcanic rocks similar to those known to host massive sulphide deposits elsewhere. Thundermin has royalty interests in seven base metal and gold properties located in British Columbia and Quebec, the most significant being a 2.5% net smelter return royalty in the Pelletier Lake gold deposit which is under option to QMX Gold Corporation. Thundermin also has various shareholdings in twelve other junior resource companies exploring for base metal, gold, chrome, and diamond deposits in Canada.

Forward-Looking Statements

This news release may contain "Forward-Looking Statements" that involve risks and uncertainties, such as statements of Thundermin's plans, objectives, strategies, intentions and expectations. The words "potential," "anticipate," "forecast," "believe," "estimate," "expect," "may," "project," "plan," and similar expressions are intended to be among the statements that identify "Forward-Looking Statements". Although Thundermin believes that its expectations reflected in these "Forward-Looking Statements" are reasonable, such statements may involve unknown risks, uncertainties and other factors disclosed in our regulatory filings that can be viewed on the SEDAR website at www.sedar.com. For us, uncertainties arise from the behavior of financial and metals markets and from numerous other matters of national, regional, and global scale, including those of an environmental, climatic, natural, political, economic, business, competitive, or regulatory nature. These uncertainties may cause our actual future results to be materially different than those expressed in our "Forward-Looking Statements". Although Thundermin believes the facts and information contained in this news release to be as correct and current as possible, Thundermin does not warrant or make any representation as to the accuracy, validity or completeness of any facts or information contained herein and these statements should not be relied upon as representing its views subsequent to the date of this news release.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

For further information on Thundermin Resources Inc., visit Thundermin's website at www.thundermin.com or the SEDAR website at www.sedar.com.

To view the map associated with this press release, please visit the following link: http://media3.marketwire.com/docs/THRFigure-1.pdf.

Contacts:
Thundermin Resources Inc.
John B. Heslop
President & CEO
(647) 344-1167

Thundermin Resources Inc.
James W. Gill
Chairman
(416) 450-1851
www.thundermin.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Internet of @ThingsExpo, taking place June 6-8, 2017 at the Javits Center in New York City, New York, is co-located with the 20th International Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world. @ThingsExpo New York Call for Papers is now open.
"ReadyTalk is an audio and web video conferencing provider. We've really come to embrace WebRTC as the platform for our future of technology," explained Dan Cunningham, CTO of ReadyTalk, in this SYS-CON.tv interview at WebRTC Summit at 19th Cloud Expo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
When it comes to cloud computing, the ability to turn massive amounts of compute cores on and off on demand sounds attractive to IT staff, who need to manage peaks and valleys in user activity. With cloud bursting, the majority of the data can stay on premises while tapping into compute from public cloud providers, reducing risk and minimizing need to move large files. In his session at 18th Cloud Expo, Scott Jeschonek, Director of Product Management at Avere Systems, discussed the IT and busin...
Data is the fuel that drives the machine learning algorithmic engines and ultimately provides the business value. In his session at Cloud Expo, Ed Featherston, a director and senior enterprise architect at Collaborative Consulting, discussed the key considerations around quality, volume, timeliness, and pedigree that must be dealt with in order to properly fuel that engine.
Successful digital transformation requires new organizational competencies and capabilities. Research tells us that the biggest impediment to successful transformation is human; consequently, the biggest enabler is a properly skilled and empowered workforce. In the digital age, new individual and collective competencies are required. In his session at 19th Cloud Expo, Bob Newhouse, CEO and founder of Agilitiv, drew together recent research and lessons learned from emerging and established compa...
Everyone knows that truly innovative companies learn as they go along, pushing boundaries in response to market changes and demands. What's more of a mystery is how to balance innovation on a fresh platform built from scratch with the legacy tech stack, product suite and customers that continue to serve as the business' foundation. In his General Session at 19th Cloud Expo, Michael Chambliss, Head of Engineering at ReadyTalk, discussed why and how ReadyTalk diverted from healthy revenue and mor...
Effectively SMBs and government programs must address compounded regulatory compliance requirements. The most recent are Controlled Unclassified Information and the EU's GDPR have Board Level implications. Managing sensitive data protection will likely result in acquisition criteria, demonstration requests and new requirements. Developers, as part of the pre-planning process and the associated supply chain, could benefit from updating their code libraries and design by incorporating changes. In...
"Coalfire is a cyber-risk, security and compliance assessment and advisory services firm. We do a lot of work with the cloud service provider community," explained Ryan McGowan, Vice President, Sales (West) at Coalfire Systems, Inc., in this SYS-CON.tv interview at 19th Cloud Expo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
CloudJumper, a Workspace as a Service (WaaS) platform innovator for agile business IT, has been recognized with the Customer Value Leadership Award for its nWorkSpace platform by Frost & Sullivan. The company was also featured in a new report(1) by the industry research firm titled, “Desktop-as-a-Service Buyer’s Guide, 2016,” which provides a comprehensive comparison of DaaS providers, including CloudJumper, Amazon, VMware, and Microsoft.
"We are an all-flash array storage provider but our focus has been on VM-aware storage specifically for virtualized applications," stated Dhiraj Sehgal of Tintri in this SYS-CON.tv interview at 19th Cloud Expo, held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA.
The 20th International Cloud Expo has announced that its Call for Papers is open. Cloud Expo, to be held June 6-8, 2017, at the Javits Center in New York City, brings together Cloud Computing, Big Data, Internet of Things, DevOps, Containers, Microservices and WebRTC to one location. With cloud computing driving a higher percentage of enterprise IT budgets every year, it becomes increasingly important to plant your flag in this fast-expanding business opportunity. Submit your speaking proposal ...
We are always online. We access our data, our finances, work, and various services on the Internet. But we live in a congested world of information in which the roads were built two decades ago. The quest for better, faster Internet routing has been around for a decade, but nobody solved this problem. We’ve seen band-aid approaches like CDNs that attack a niche's slice of static content part of the Internet, but that’s it. It does not address the dynamic services-based Internet of today. It does...
You have great SaaS business app ideas. You want to turn your idea quickly into a functional and engaging proof of concept. You need to be able to modify it to meet customers' needs, and you need to deliver a complete and secure SaaS application. How could you achieve all the above and yet avoid unforeseen IT requirements that add unnecessary cost and complexity? You also want your app to be responsive in any device at any time. In his session at 19th Cloud Expo, Mark Allen, General Manager of...
Bert Loomis was a visionary. This general session will highlight how Bert Loomis and people like him inspire us to build great things with small inventions. In their general session at 19th Cloud Expo, Harold Hannon, Architect at IBM Bluemix, and Michael O'Neill, Strategic Business Development at Nvidia, discussed the accelerating pace of AI development and how IBM Cloud and NVIDIA are partnering to bring AI capabilities to "every day," on-demand. They also reviewed two "free infrastructure" pr...
Major trends and emerging technologies – from virtual reality and IoT, to Big Data and algorithms – are helping organizations innovate in the digital era. However, to create real business value, IT must think beyond the ‘what’ of digital transformation to the ‘how’ to harness emerging trends, innovation and disruption. Architecture is the key that underpins and ties all these efforts together. In the digital age, it’s important to invest in architecture, extend the enterprise footprint to the cl...