Welcome!

News Feed Item

Thundermin and Rambler Intersect High Grade Copper Mineralization at Little Deer

TORONTO, ONTARIO -- (Marketwired) -- 05/22/14 -- Thundermin Resources Inc. ("Thundermin") (TSX VENTURE:THR) and 50% joint venture partner Rambler Metals and Mining Canada Limited ("Rambler") (TSX VENTURE:RAB)(AIM:RMM) announce that they have intersected 2.9% Cu over 3.4 m and 3.8% Cu over 2.0 m, 2.1% Cu over 2.6 m, and 2.3 % Cu over 6.2 m in two separate drill holes on the Little Deer Copper Deposit ("Little Deer") (see Table 1 and Figure 1) located approximately 10 kilometres north of Springdale in north-central Newfoundland.


Table 1: Little Deer Drill Results (2014)                                   
-------------------------------------------------------------
Hole No.      NAD 83 UTM Zone 21             Dip           Az
           ------------------------                          
              East (m)    North (m)     (degrees)   (degrees)
-------------------------------------------------------------
LD-14-63       571,149    5,492,702        -58.2        327.5
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-63A      571,149    5,492,702        -58.2        327.5
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-64       571,149    5,492,702        -52.6        327.6
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-64A      571,149    5,492,702        -52.6        327.6
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-65       571,174    5,492,756        -51.2        329.3
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-66       571,189    5,492,780        -57.7        327.9
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------

-----------------------------------------------
Hole No.        From       To  Interval      Cu
                                               
                 (m)      (m)    (m)(i)     (%)
-----------------------------------------------
LD-14-63       800.5    803.9       3.4     2.9
-----------------------------------------------
and            819.0    819.7       0.7     1.9
-----------------------------------------------
and            886.6    887.2       0.6     1.9
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-63A      763.3    766.3       3.0     1.0
-----------------------------------------------
and            775.2    777.7       2.5     1.0
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-64       729.6    732.6       3.0     1.0
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-64A      723.3    724.3       1.0     0.9
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-65       206.5    208.5       2.0     3.8
-----------------------------------------------
and            414.8    417.4       2.6     2.1
-----------------------------------------------
and            629.6    630.0       0.4     8.0
-----------------------------------------------
and            635.3    641.5       6.2     2.3
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-66       409.5    409.8       0.3     2.4
-----------------------------------------------
and            678.5    679.5       1.0     1.5
-----------------------------------------------
Notes:                                                                      
                                                                            
1) (i)The reported copper intersections are core lengths. The true          
thicknesses of the copper intersections are highly variable due to the      
nature of the mineralization.                                               
2) The "A" suffix in the drill hole number indicates a wedge hole.          

The recently completed 3,800 m drill program, which was designed to increase the mineral resources outlined to date and to further upgrade the Inferred Resources to the Indicated Resource category in the eastern portion of the deposit, consisted of four holes drilled from surface and two wedge holes. Holes LD-14-63, 63A and 65 all intersected the Little Deer Main Zone. Hole LD-14-65 also intersected two new copper zones higher in the hole grading 3.8% Cu over 2.0 m, from 206.5 to 208.5 m down the hole, and 2.1% Cu over 2.6 m, from 414.8 to 417.4 m down the hole. These two new copper zones were intersected within a previously unknown, large chlorite-sericite-silica-pyrite alteration zone and their lateral and depth extent is unknown at the present time. Hole LD-14-63 intersected two narrow copper zones, below the Little Deer Main Zone, which are possible extensions to two lenses of the Little Deer Footwall Zone Splay. Holes LD-14-64, 64A and 66 appear to have been "dyked out" as they all intersected thick sections of mafic dyke along with minor amounts of copper mineralization hosted by intensely chlorite altered basalt within the expected area of the Little Deer Main Zone.

John B. Heslop, President and Chief Executive Officer of Thundermin said "We are generally pleased with the results of the current drill program and continue to define continuity of the copper mineralization between wide-spaced, historical drill holes. Dykes which cut off the mineralization have also been intersected in previous drilling. We are currently compiling the recent drill information and planning additional holes to be drilled in order to improve the confidence level of the National Instrument 43-101 ("NI 43-101") compliant resources at Little Deer prior to undertaking a pre-feasibility study. In particular, we would like to confirm and expand the mineral resources in the Little Deer Footwall Zone Splay that is currently estimated to contain 797,000 tonnes ("t") grading 2.64% Cu (see news release dated June 22, 2011).

The Little Deer Copper Project hosts the Little Deer and Whalesback copper deposits. On June 22, 2011 and July 26, 2012, NI 43-101 compliant mineral resource estimates, which were undertaken by P&E Mining Consultants Inc. ("P&E") of Toronto, Ontario, were announced for Little Deer and Whalesback, respectively. P&E estimated that Little Deer contains Indicated Resources of 1,911,000 t at an average grade of 2.37% Cu (99.8 million lbs. Cu) and additional Inferred Resources of 3,748,000 t at an average grade of 2.13% Cu (176.0 million lbs. of Cu). P&E estimated that Whalesback contains Indicated Resources of 797,000 t grading 1.67% Cu (29.3 million lbs. Cu) and Inferred Resources of 443,000 t grading 1.57% Cu (15.3 million lbs. Cu). On a combined basis, Little Deer and Whalesback are estimated to contain Indicated Resources of 2,708,000 t grading 2.16% Cu (129.1 million lbs. Cu) and Inferred Resources of 4,191,000 t grading 2.07% Cu (191.3 million lbs. Cu). A complete summary of the mineral resources outlined to date on the Little Deer Copper Project can be found on Thundermin's website, in news releases and on SEDAR.

Little Deer Joint Venture

Under the terms of its joint venture agreement with Rambler, Thundermin has the right to increase its 50% interest in the Little Deer property to 65% by completing a feasibility study and to 75% by arranging 100% of the necessary bank financing required to place the property into commercial production. Details on Little Deer and Whalesback and the terms of the agreement with Rambler can be found in numerous Thundermin news releases and on Thundermin's website and on SEDAR.

Junior Exploration Assistance Program

Thundermin would like to acknowledge the financial support received from the Junior Exploration Assisstance Program ("JEA") of the Province of Newfoundland and Labrador in carrying out a portion of their work on Little Deer.

Qualified Persons

The NI 43-101 mineral resource estimate referred to above was prepared under the supervision of Mr. Eugene J. Puritch, P. Eng., President of P&E. Mr. Puritch is an independent Qualified Person ("Q.P.") in accordance with NI 43-101.

Mr. Andrew Hussey, P.Geo., Senior Project Geologist with Thundermin, is the Q.P. responsible for supervising all of the drilling programs at Little Deer for the purposes of NI 43-101. Mr. Hussey has also reviewed the contents of this new release for accuracy. All holes drilled by Thundermin and Rambler are NQ in size. Bulk density measurements, rock quality designations and photographic logging of significant mineralized intersections are performed systematically prior to assaying. The core is logged and the mineralized sections, where appropriate, are sawn in half at a core logging facility in Springdale. Half of the core is submitted for analyses to Eastern Analytical Limited, an independent and qualified assayer located in Springdale, Newfoundland and the remaining half of the core is kept for future reference. Blanks, duplicates and standards are routinely used as part of the assay procedures.

About Thundermin

Thundermin is a Canadian-based mineral exploration company focused on the exploration for and the discovery of economically viable base metal and gold deposits in Canada with its primary project being the Little Deer Copper Project as described above. Thundermin has an interest in, or the right to earn an interest in 12 base metal and gold properties in Canada. Thundermin owns a 100% interest in the Lebel Township gold property, which is located on the Kirkland Lake Main Break in the prolific Kirkland Lake gold camp. Thundermin has the right to earn a 100% interest in eight exploration licenses covering a large portion of the Stirling volcanogenic massive zinc-lead-copper-silver-gold sulphide belt located on Cape Breton Island, Nova Scotia. An initial diamond drill program undertaken on the property in 2012 was successful in intersecting copper mineralization in porphyritic volcanic rocks similar to those known to host massive sulphide deposits elsewhere. Thundermin has royalty interests in seven base metal and gold properties located in British Columbia and Quebec, the most significant being a 2.5% net smelter return royalty in the Pelletier Lake gold deposit which is under option to QMX Gold Corporation. Thundermin also has various shareholdings in twelve other junior resource companies exploring for base metal, gold, chrome, and diamond deposits in Canada.

Forward-Looking Statements

This news release may contain "Forward-Looking Statements" that involve risks and uncertainties, such as statements of Thundermin's plans, objectives, strategies, intentions and expectations. The words "potential," "anticipate," "forecast," "believe," "estimate," "expect," "may," "project," "plan," and similar expressions are intended to be among the statements that identify "Forward-Looking Statements". Although Thundermin believes that its expectations reflected in these "Forward-Looking Statements" are reasonable, such statements may involve unknown risks, uncertainties and other factors disclosed in our regulatory filings that can be viewed on the SEDAR website at www.sedar.com. For us, uncertainties arise from the behavior of financial and metals markets and from numerous other matters of national, regional, and global scale, including those of an environmental, climatic, natural, political, economic, business, competitive, or regulatory nature. These uncertainties may cause our actual future results to be materially different than those expressed in our "Forward-Looking Statements". Although Thundermin believes the facts and information contained in this news release to be as correct and current as possible, Thundermin does not warrant or make any representation as to the accuracy, validity or completeness of any facts or information contained herein and these statements should not be relied upon as representing its views subsequent to the date of this news release.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

For further information on Thundermin Resources Inc., visit Thundermin's website at www.thundermin.com or the SEDAR website at www.sedar.com.

To view the map associated with this press release, please visit the following link: http://media3.marketwire.com/docs/THRFigure-1.pdf.

Contacts:
Thundermin Resources Inc.
John B. Heslop
President & CEO
(647) 344-1167

Thundermin Resources Inc.
James W. Gill
Chairman
(416) 450-1851
www.thundermin.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Imagine having the ability to leverage all of your current technology and to be able to compose it into one resource pool. Now imagine, as your business grows, not having to deploy a complete new appliance to scale your infrastructure. Also imagine a true multi-cloud capability that allows live migration without any modification between cloud environments regardless of whether that cloud is your private cloud or your public AWS, Azure or Google instance. Now think of a world that is not locked i...
In his session at Cloud Expo, Alan Winters, an entertainment executive/TV producer turned serial entrepreneur, will present a success story of an entrepreneur who has both suffered through and benefited from offshore development across multiple businesses: The smart choice, or how to select the right offshore development partner Warning signs, or how to minimize chances of making the wrong choice Collaboration, or how to establish the most effective work processes Budget control, or how to max...
SYS-CON Events announced today that Infranics will exhibit at SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. Since 2000, Infranics has developed SysMaster Suite, which is required for the stable and efficient management of ICT infrastructure. The ICT management solution developed and provided by Infranics continues to add intelligence to the ICT infrastructure through the IMC (Infra Management Cycle) based on mathemat...
Most companies are adopting or evaluating container technology - Docker in particular - to speed up application deployment, drive down cost, ease management and make application delivery more flexible overall. As with most new architectures, this dream takes a lot of work to become a reality. Even when you do get your application componentized enough and packaged properly, there are still challenges for DevOps teams to making the shift to continuous delivery and achieving that reduction in cost...
@DevOpsSummit has been named the ‘Top DevOps Influencer' by iTrend. iTrend processes millions of conversations, tweets, interactions, news articles, press releases, blog posts - and extract meaning form them and analyzes mobile and desktop software platforms used to communicate, various metadata (such as geo location), and automation tools. In overall placement, @DevOpsSummit ranked as the number one ‘DevOps Influencer' followed by @CloudExpo at third, and @MicroservicesE at 24th.
SYS-CON Events announced today that Auditwerx will exhibit at SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. Auditwerx specializes in SOC 1, SOC 2, and SOC 3 attestation services throughout the U.S. and Canada. As a division of Carr, Riggs & Ingram (CRI), one of the top 20 largest CPA firms nationally, you can expect the resources, skills, and experience of a much larger firm combined with the accessibility and attent...
SYS-CON Events announced today that Interoute, owner-operator of one of Europe's largest networks and a global cloud services platform, has been named “Bronze Sponsor” of SYS-CON's 20th Cloud Expo, which will take place on June 6-8, 2017 at the Javits Center in New York, New York. Interoute is the owner-operator of one of Europe's largest networks and a global cloud services platform which encompasses 12 data centers, 14 virtual data centers and 31 colocation centers, with connections to 195 add...
SYS-CON Events announced today that Cloudistics, an on-premises cloud computing company, has been named “Bronze Sponsor” of SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. Cloudistics delivers a complete public cloud experience with composable on-premises infrastructures to medium and large enterprises. Its software-defined technology natively converges network, storage, compute, virtualization, and management into a ...
MongoDB Atlas leverages VPC peering for AWS, a service that allows multiple VPC networks to interact. This includes VPCs that belong to other AWS account holders. By performing cross account VPC peering, users ensure networks that host and communicate their data are secure. In his session at 20th Cloud Expo, Jay Gordon, a Developer Advocate at MongoDB, will explain how to properly architect your VPC using existing AWS tools and then peer with your MongoDB Atlas cluster. He'll discuss the secur...
In his session at @ThingsExpo, Eric Lachapelle, CEO of the Professional Evaluation and Certification Board (PECB), will provide an overview of various initiatives to certifiy the security of connected devices and future trends in ensuring public trust of IoT. Eric Lachapelle is the Chief Executive Officer of the Professional Evaluation and Certification Board (PECB), an international certification body. His role is to help companies and individuals to achieve professional, accredited and worldw...
In his General Session at 16th Cloud Expo, David Shacochis, host of The Hybrid IT Files podcast and Vice President at CenturyLink, investigated three key trends of the “gigabit economy" though the story of a Fortune 500 communications company in transformation. Narrating how multi-modal hybrid IT, service automation, and agile delivery all intersect, he will cover the role of storytelling and empathy in achieving strategic alignment between the enterprise and its information technology.
While DevOps most critically and famously fosters collaboration, communication, and integration through cultural change, culture is more of an output than an input. In order to actively drive cultural evolution, organizations must make substantial organizational and process changes, and adopt new technologies, to encourage a DevOps culture. Moderated by Andi Mann, panelists discussed how to balance these three pillars of DevOps, where to focus attention (and resources), where organizations might...
Microservices are a very exciting architectural approach that many organizations are looking to as a way to accelerate innovation. Microservices promise to allow teams to move away from monolithic "ball of mud" systems, but the reality is that, in the vast majority of organizations, different projects and technologies will continue to be developed at different speeds. How to handle the dependencies between these disparate systems with different iteration cycles? Consider the "canoncial problem" ...
In his session at 20th Cloud Expo, Scott Davis, CTO of Embotics, will discuss how automation can provide the dynamic management required to cost-effectively deliver microservices and container solutions at scale. He will discuss how flexible automation is the key to effectively bridging and seamlessly coordinating both IT and developer needs for component orchestration across disparate clouds – an increasingly important requirement at today’s multi-cloud enterprise.
The essence of cloud computing is that all consumable IT resources are delivered as services. In his session at 15th Cloud Expo, Yung Chou, Technology Evangelist at Microsoft, demonstrated the concepts and implementations of two important cloud computing deliveries: Infrastructure as a Service (IaaS) and Platform as a Service (PaaS). He discussed from business and technical viewpoints what exactly they are, why we care, how they are different and in what ways, and the strategies for IT to transi...