Click here to close now.




















Welcome!

News Feed Item

Thundermin and Rambler Intersect High Grade Copper Mineralization at Little Deer

TORONTO, ONTARIO -- (Marketwired) -- 05/22/14 -- Thundermin Resources Inc. ("Thundermin") (TSX VENTURE:THR) and 50% joint venture partner Rambler Metals and Mining Canada Limited ("Rambler") (TSX VENTURE:RAB)(AIM:RMM) announce that they have intersected 2.9% Cu over 3.4 m and 3.8% Cu over 2.0 m, 2.1% Cu over 2.6 m, and 2.3 % Cu over 6.2 m in two separate drill holes on the Little Deer Copper Deposit ("Little Deer") (see Table 1 and Figure 1) located approximately 10 kilometres north of Springdale in north-central Newfoundland.


Table 1: Little Deer Drill Results (2014)                                   
-------------------------------------------------------------
Hole No.      NAD 83 UTM Zone 21             Dip           Az
           ------------------------                          
              East (m)    North (m)     (degrees)   (degrees)
-------------------------------------------------------------
LD-14-63       571,149    5,492,702        -58.2        327.5
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-63A      571,149    5,492,702        -58.2        327.5
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-64       571,149    5,492,702        -52.6        327.6
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-64A      571,149    5,492,702        -52.6        327.6
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-65       571,174    5,492,756        -51.2        329.3
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-66       571,189    5,492,780        -57.7        327.9
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------

-----------------------------------------------
Hole No.        From       To  Interval      Cu
                                               
                 (m)      (m)    (m)(i)     (%)
-----------------------------------------------
LD-14-63       800.5    803.9       3.4     2.9
-----------------------------------------------
and            819.0    819.7       0.7     1.9
-----------------------------------------------
and            886.6    887.2       0.6     1.9
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-63A      763.3    766.3       3.0     1.0
-----------------------------------------------
and            775.2    777.7       2.5     1.0
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-64       729.6    732.6       3.0     1.0
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-64A      723.3    724.3       1.0     0.9
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-65       206.5    208.5       2.0     3.8
-----------------------------------------------
and            414.8    417.4       2.6     2.1
-----------------------------------------------
and            629.6    630.0       0.4     8.0
-----------------------------------------------
and            635.3    641.5       6.2     2.3
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-66       409.5    409.8       0.3     2.4
-----------------------------------------------
and            678.5    679.5       1.0     1.5
-----------------------------------------------
Notes:                                                                      
                                                                            
1) (i)The reported copper intersections are core lengths. The true          
thicknesses of the copper intersections are highly variable due to the      
nature of the mineralization.                                               
2) The "A" suffix in the drill hole number indicates a wedge hole.          

The recently completed 3,800 m drill program, which was designed to increase the mineral resources outlined to date and to further upgrade the Inferred Resources to the Indicated Resource category in the eastern portion of the deposit, consisted of four holes drilled from surface and two wedge holes. Holes LD-14-63, 63A and 65 all intersected the Little Deer Main Zone. Hole LD-14-65 also intersected two new copper zones higher in the hole grading 3.8% Cu over 2.0 m, from 206.5 to 208.5 m down the hole, and 2.1% Cu over 2.6 m, from 414.8 to 417.4 m down the hole. These two new copper zones were intersected within a previously unknown, large chlorite-sericite-silica-pyrite alteration zone and their lateral and depth extent is unknown at the present time. Hole LD-14-63 intersected two narrow copper zones, below the Little Deer Main Zone, which are possible extensions to two lenses of the Little Deer Footwall Zone Splay. Holes LD-14-64, 64A and 66 appear to have been "dyked out" as they all intersected thick sections of mafic dyke along with minor amounts of copper mineralization hosted by intensely chlorite altered basalt within the expected area of the Little Deer Main Zone.

John B. Heslop, President and Chief Executive Officer of Thundermin said "We are generally pleased with the results of the current drill program and continue to define continuity of the copper mineralization between wide-spaced, historical drill holes. Dykes which cut off the mineralization have also been intersected in previous drilling. We are currently compiling the recent drill information and planning additional holes to be drilled in order to improve the confidence level of the National Instrument 43-101 ("NI 43-101") compliant resources at Little Deer prior to undertaking a pre-feasibility study. In particular, we would like to confirm and expand the mineral resources in the Little Deer Footwall Zone Splay that is currently estimated to contain 797,000 tonnes ("t") grading 2.64% Cu (see news release dated June 22, 2011).

The Little Deer Copper Project hosts the Little Deer and Whalesback copper deposits. On June 22, 2011 and July 26, 2012, NI 43-101 compliant mineral resource estimates, which were undertaken by P&E Mining Consultants Inc. ("P&E") of Toronto, Ontario, were announced for Little Deer and Whalesback, respectively. P&E estimated that Little Deer contains Indicated Resources of 1,911,000 t at an average grade of 2.37% Cu (99.8 million lbs. Cu) and additional Inferred Resources of 3,748,000 t at an average grade of 2.13% Cu (176.0 million lbs. of Cu). P&E estimated that Whalesback contains Indicated Resources of 797,000 t grading 1.67% Cu (29.3 million lbs. Cu) and Inferred Resources of 443,000 t grading 1.57% Cu (15.3 million lbs. Cu). On a combined basis, Little Deer and Whalesback are estimated to contain Indicated Resources of 2,708,000 t grading 2.16% Cu (129.1 million lbs. Cu) and Inferred Resources of 4,191,000 t grading 2.07% Cu (191.3 million lbs. Cu). A complete summary of the mineral resources outlined to date on the Little Deer Copper Project can be found on Thundermin's website, in news releases and on SEDAR.

Little Deer Joint Venture

Under the terms of its joint venture agreement with Rambler, Thundermin has the right to increase its 50% interest in the Little Deer property to 65% by completing a feasibility study and to 75% by arranging 100% of the necessary bank financing required to place the property into commercial production. Details on Little Deer and Whalesback and the terms of the agreement with Rambler can be found in numerous Thundermin news releases and on Thundermin's website and on SEDAR.

Junior Exploration Assistance Program

Thundermin would like to acknowledge the financial support received from the Junior Exploration Assisstance Program ("JEA") of the Province of Newfoundland and Labrador in carrying out a portion of their work on Little Deer.

Qualified Persons

The NI 43-101 mineral resource estimate referred to above was prepared under the supervision of Mr. Eugene J. Puritch, P. Eng., President of P&E. Mr. Puritch is an independent Qualified Person ("Q.P.") in accordance with NI 43-101.

Mr. Andrew Hussey, P.Geo., Senior Project Geologist with Thundermin, is the Q.P. responsible for supervising all of the drilling programs at Little Deer for the purposes of NI 43-101. Mr. Hussey has also reviewed the contents of this new release for accuracy. All holes drilled by Thundermin and Rambler are NQ in size. Bulk density measurements, rock quality designations and photographic logging of significant mineralized intersections are performed systematically prior to assaying. The core is logged and the mineralized sections, where appropriate, are sawn in half at a core logging facility in Springdale. Half of the core is submitted for analyses to Eastern Analytical Limited, an independent and qualified assayer located in Springdale, Newfoundland and the remaining half of the core is kept for future reference. Blanks, duplicates and standards are routinely used as part of the assay procedures.

About Thundermin

Thundermin is a Canadian-based mineral exploration company focused on the exploration for and the discovery of economically viable base metal and gold deposits in Canada with its primary project being the Little Deer Copper Project as described above. Thundermin has an interest in, or the right to earn an interest in 12 base metal and gold properties in Canada. Thundermin owns a 100% interest in the Lebel Township gold property, which is located on the Kirkland Lake Main Break in the prolific Kirkland Lake gold camp. Thundermin has the right to earn a 100% interest in eight exploration licenses covering a large portion of the Stirling volcanogenic massive zinc-lead-copper-silver-gold sulphide belt located on Cape Breton Island, Nova Scotia. An initial diamond drill program undertaken on the property in 2012 was successful in intersecting copper mineralization in porphyritic volcanic rocks similar to those known to host massive sulphide deposits elsewhere. Thundermin has royalty interests in seven base metal and gold properties located in British Columbia and Quebec, the most significant being a 2.5% net smelter return royalty in the Pelletier Lake gold deposit which is under option to QMX Gold Corporation. Thundermin also has various shareholdings in twelve other junior resource companies exploring for base metal, gold, chrome, and diamond deposits in Canada.

Forward-Looking Statements

This news release may contain "Forward-Looking Statements" that involve risks and uncertainties, such as statements of Thundermin's plans, objectives, strategies, intentions and expectations. The words "potential," "anticipate," "forecast," "believe," "estimate," "expect," "may," "project," "plan," and similar expressions are intended to be among the statements that identify "Forward-Looking Statements". Although Thundermin believes that its expectations reflected in these "Forward-Looking Statements" are reasonable, such statements may involve unknown risks, uncertainties and other factors disclosed in our regulatory filings that can be viewed on the SEDAR website at www.sedar.com. For us, uncertainties arise from the behavior of financial and metals markets and from numerous other matters of national, regional, and global scale, including those of an environmental, climatic, natural, political, economic, business, competitive, or regulatory nature. These uncertainties may cause our actual future results to be materially different than those expressed in our "Forward-Looking Statements". Although Thundermin believes the facts and information contained in this news release to be as correct and current as possible, Thundermin does not warrant or make any representation as to the accuracy, validity or completeness of any facts or information contained herein and these statements should not be relied upon as representing its views subsequent to the date of this news release.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

For further information on Thundermin Resources Inc., visit Thundermin's website at www.thundermin.com or the SEDAR website at www.sedar.com.

To view the map associated with this press release, please visit the following link: http://media3.marketwire.com/docs/THRFigure-1.pdf.

Contacts:
Thundermin Resources Inc.
John B. Heslop
President & CEO
(647) 344-1167

Thundermin Resources Inc.
James W. Gill
Chairman
(416) 450-1851
www.thundermin.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
"Alert Logic is a managed security service provider that basically deploys technologies, but we support those technologies with the people and process behind it," stated Stephen Coty, Chief Security Evangelist at Alert Logic, in this SYS-CON.tv interview at 16th Cloud Expo, held June 9-11, 2015, at the Javits Center in New York City.
"We specialize in testing. DevOps is all about continuous delivery and accelerating the delivery pipeline and there is no continuous delivery without testing," noted Marc Hornbeek, Sr. Solutions Architect at Spirent Communications, in this SYS-CON.tv interview at @DevOpsSummit, held June 9-11, 2015, at the Javits Center in New York City.
"ProfitBricks was founded in 2010 and we are the painless cloud - and we are also the Infrastructure as a Service 2.0 company," noted Achim Weiss, Chief Executive Officer and Co-Founder of ProfitBricks, in this SYS-CON.tv interview at 16th Cloud Expo, held June 9-11, 2015, at the Javits Center in New York City.
With SaaS use rampant across organizations, how can IT departments track company data and maintain security? More and more departments are commissioning their own solutions and bypassing IT. A cloud environment is amorphous and powerful, allowing you to set up solutions for all of your user needs: document sharing and collaboration, mobile access, e-mail, even industry-specific applications. In his session at 16th Cloud Expo, Shawn Mills, President and a founder of Green House Data, discussed h...
"We do data integration for B2B also application to application, and we do data management and enable Big Data," explained Pat Adamiak, Vice President, Product Marketing at Liaison Technologies, in this SYS-CON.tv interview at 16th Cloud Expo, held June 9-11, 2015, at the Javits Center in New York City.
The Cloud industry has moved from being more than just being able to provide infrastructure and management services on the Cloud. Enter a new era of Cloud computing where monetization’s services through the Cloud are an essential piece of strategy to feed your organizations bottom-line, your revenue and Profitability. In their session at 16th Cloud Expo, Ermanno Bonifazi, CEO & Founder of Solgenia, and Ian Khan, Global Strategic Positioning & Brand Manager at Solgenia, discussed how to easily o...
One of the hottest areas in cloud right now is DRaaS and related offerings. In his session at 16th Cloud Expo, Dale Levesque, Disaster Recovery Product Manager with Windstream's Cloud and Data Center Marketing team, will discuss the benefits of the cloud model, which far outweigh the traditional approach, and how enterprises need to ensure that their needs are properly being met.
Palerra, the cloud security automation company, announced enhanced support for Amazon AWS, allowing IT security and DevOps teams to automate activity and configuration monitoring, anomaly detection, and orchestrated remediation, thereby meeting compliance mandates within complex infrastructure deployments. "Monitoring and threat detection for AWS is a non-trivial task. While Amazon's flexible environment facilitates successful DevOps implementations, it adds another layer, which can become a ...
The speed of software changes in growing and large scale rapid-paced DevOps environments presents a challenge for continuous testing. Many organizations struggle to get this right. Practices that work for small scale continuous testing may not be sufficient as the requirements grow. In his session at DevOps Summit, Marc Hornbeek, Sr. Solutions Architect of DevOps continuous test solutions at Spirent Communications, explained the best practices of continuous testing at high scale, which is rele...
"We got started as search consultants. On the services side of the business we have help organizations save time and save money when they hit issues that everyone more or less hits when their data grows," noted Otis Gospodnetić, Founder of Sematext, in this SYS-CON.tv interview at @DevOpsSummit, held June 9-11, 2015, at the Javits Center in New York City.
Growth hacking is common for startups to make unheard-of progress in building their business. Career Hacks can help Geek Girls and those who support them (yes, that's you too, Dad!) to excel in this typically male-dominated world. Get ready to learn the facts: Is there a bias against women in the tech / developer communities? Why are women 50% of the workforce, but hold only 24% of the STEM or IT positions? Some beginnings of what to do about it! In her Opening Keynote at 16th Cloud Expo, S...
Delphix, the market leader in Data as a Service (DaaS), has been announced winner of the DevOps Solution Award at the prestigious Computing Vendor Excellence Awards in London. The awards celebrate the achievements of the technology vendors and service providers that are leading the field of enterprise IT. Delphix was recognised as the vendor demonstrating the most effective support of DevOps culture for its ability to improve time to market and collaboration between teams.
"Our biggest growth area has been the security services, the managed services - the things that differentiate us in the market that there is no client that's too small and there's no client that's too big," explained Paul Mazzucco, Chief Security Officer at TierPoint, in this SYS-CON.tv interview at 16th Cloud Expo, held June 9-11, 2015, at the Javits Center in New York City.
"We've just seen a huge influx of new partners coming into our ecosystem, and partners building unique offerings on top of our API set," explained Seth Bostock, Chief Executive Officer at IndependenceIT, in this SYS-CON.tv interview at 16th Cloud Expo, held June 9-11, 2015, at the Javits Center in New York City.
Explosive growth in connected devices. Enormous amounts of data for collection and analysis. Critical use of data for split-second decision making and actionable information. All three are factors in making the Internet of Things a reality. Yet, any one factor would have an IT organization pondering its infrastructure strategy. How should your organization enhance its IT framework to enable an Internet of Things implementation? In his session at @ThingsExpo, James Kirkland, Red Hat's Chief Arch...