Welcome!

News Feed Item

Thundermin and Rambler Intersect High Grade Copper Mineralization at Little Deer

TORONTO, ONTARIO -- (Marketwired) -- 05/22/14 -- Thundermin Resources Inc. ("Thundermin") (TSX VENTURE:THR) and 50% joint venture partner Rambler Metals and Mining Canada Limited ("Rambler") (TSX VENTURE:RAB)(AIM:RMM) announce that they have intersected 2.9% Cu over 3.4 m and 3.8% Cu over 2.0 m, 2.1% Cu over 2.6 m, and 2.3 % Cu over 6.2 m in two separate drill holes on the Little Deer Copper Deposit ("Little Deer") (see Table 1 and Figure 1) located approximately 10 kilometres north of Springdale in north-central Newfoundland.


Table 1: Little Deer Drill Results (2014)                                   
-------------------------------------------------------------
Hole No.      NAD 83 UTM Zone 21             Dip           Az
           ------------------------                          
              East (m)    North (m)     (degrees)   (degrees)
-------------------------------------------------------------
LD-14-63       571,149    5,492,702        -58.2        327.5
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-63A      571,149    5,492,702        -58.2        327.5
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-64       571,149    5,492,702        -52.6        327.6
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-64A      571,149    5,492,702        -52.6        327.6
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-65       571,174    5,492,756        -51.2        329.3
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------
                                                             
-------------------------------------------------------------
LD-14-66       571,189    5,492,780        -57.7        327.9
-------------------------------------------------------------
and                                                          
-------------------------------------------------------------

-----------------------------------------------
Hole No.        From       To  Interval      Cu
                                               
                 (m)      (m)    (m)(i)     (%)
-----------------------------------------------
LD-14-63       800.5    803.9       3.4     2.9
-----------------------------------------------
and            819.0    819.7       0.7     1.9
-----------------------------------------------
and            886.6    887.2       0.6     1.9
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-63A      763.3    766.3       3.0     1.0
-----------------------------------------------
and            775.2    777.7       2.5     1.0
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-64       729.6    732.6       3.0     1.0
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-64A      723.3    724.3       1.0     0.9
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-65       206.5    208.5       2.0     3.8
-----------------------------------------------
and            414.8    417.4       2.6     2.1
-----------------------------------------------
and            629.6    630.0       0.4     8.0
-----------------------------------------------
and            635.3    641.5       6.2     2.3
-----------------------------------------------
                                               
-----------------------------------------------
LD-14-66       409.5    409.8       0.3     2.4
-----------------------------------------------
and            678.5    679.5       1.0     1.5
-----------------------------------------------
Notes:                                                                      
                                                                            
1) (i)The reported copper intersections are core lengths. The true          
thicknesses of the copper intersections are highly variable due to the      
nature of the mineralization.                                               
2) The "A" suffix in the drill hole number indicates a wedge hole.          

The recently completed 3,800 m drill program, which was designed to increase the mineral resources outlined to date and to further upgrade the Inferred Resources to the Indicated Resource category in the eastern portion of the deposit, consisted of four holes drilled from surface and two wedge holes. Holes LD-14-63, 63A and 65 all intersected the Little Deer Main Zone. Hole LD-14-65 also intersected two new copper zones higher in the hole grading 3.8% Cu over 2.0 m, from 206.5 to 208.5 m down the hole, and 2.1% Cu over 2.6 m, from 414.8 to 417.4 m down the hole. These two new copper zones were intersected within a previously unknown, large chlorite-sericite-silica-pyrite alteration zone and their lateral and depth extent is unknown at the present time. Hole LD-14-63 intersected two narrow copper zones, below the Little Deer Main Zone, which are possible extensions to two lenses of the Little Deer Footwall Zone Splay. Holes LD-14-64, 64A and 66 appear to have been "dyked out" as they all intersected thick sections of mafic dyke along with minor amounts of copper mineralization hosted by intensely chlorite altered basalt within the expected area of the Little Deer Main Zone.

John B. Heslop, President and Chief Executive Officer of Thundermin said "We are generally pleased with the results of the current drill program and continue to define continuity of the copper mineralization between wide-spaced, historical drill holes. Dykes which cut off the mineralization have also been intersected in previous drilling. We are currently compiling the recent drill information and planning additional holes to be drilled in order to improve the confidence level of the National Instrument 43-101 ("NI 43-101") compliant resources at Little Deer prior to undertaking a pre-feasibility study. In particular, we would like to confirm and expand the mineral resources in the Little Deer Footwall Zone Splay that is currently estimated to contain 797,000 tonnes ("t") grading 2.64% Cu (see news release dated June 22, 2011).

The Little Deer Copper Project hosts the Little Deer and Whalesback copper deposits. On June 22, 2011 and July 26, 2012, NI 43-101 compliant mineral resource estimates, which were undertaken by P&E Mining Consultants Inc. ("P&E") of Toronto, Ontario, were announced for Little Deer and Whalesback, respectively. P&E estimated that Little Deer contains Indicated Resources of 1,911,000 t at an average grade of 2.37% Cu (99.8 million lbs. Cu) and additional Inferred Resources of 3,748,000 t at an average grade of 2.13% Cu (176.0 million lbs. of Cu). P&E estimated that Whalesback contains Indicated Resources of 797,000 t grading 1.67% Cu (29.3 million lbs. Cu) and Inferred Resources of 443,000 t grading 1.57% Cu (15.3 million lbs. Cu). On a combined basis, Little Deer and Whalesback are estimated to contain Indicated Resources of 2,708,000 t grading 2.16% Cu (129.1 million lbs. Cu) and Inferred Resources of 4,191,000 t grading 2.07% Cu (191.3 million lbs. Cu). A complete summary of the mineral resources outlined to date on the Little Deer Copper Project can be found on Thundermin's website, in news releases and on SEDAR.

Little Deer Joint Venture

Under the terms of its joint venture agreement with Rambler, Thundermin has the right to increase its 50% interest in the Little Deer property to 65% by completing a feasibility study and to 75% by arranging 100% of the necessary bank financing required to place the property into commercial production. Details on Little Deer and Whalesback and the terms of the agreement with Rambler can be found in numerous Thundermin news releases and on Thundermin's website and on SEDAR.

Junior Exploration Assistance Program

Thundermin would like to acknowledge the financial support received from the Junior Exploration Assisstance Program ("JEA") of the Province of Newfoundland and Labrador in carrying out a portion of their work on Little Deer.

Qualified Persons

The NI 43-101 mineral resource estimate referred to above was prepared under the supervision of Mr. Eugene J. Puritch, P. Eng., President of P&E. Mr. Puritch is an independent Qualified Person ("Q.P.") in accordance with NI 43-101.

Mr. Andrew Hussey, P.Geo., Senior Project Geologist with Thundermin, is the Q.P. responsible for supervising all of the drilling programs at Little Deer for the purposes of NI 43-101. Mr. Hussey has also reviewed the contents of this new release for accuracy. All holes drilled by Thundermin and Rambler are NQ in size. Bulk density measurements, rock quality designations and photographic logging of significant mineralized intersections are performed systematically prior to assaying. The core is logged and the mineralized sections, where appropriate, are sawn in half at a core logging facility in Springdale. Half of the core is submitted for analyses to Eastern Analytical Limited, an independent and qualified assayer located in Springdale, Newfoundland and the remaining half of the core is kept for future reference. Blanks, duplicates and standards are routinely used as part of the assay procedures.

About Thundermin

Thundermin is a Canadian-based mineral exploration company focused on the exploration for and the discovery of economically viable base metal and gold deposits in Canada with its primary project being the Little Deer Copper Project as described above. Thundermin has an interest in, or the right to earn an interest in 12 base metal and gold properties in Canada. Thundermin owns a 100% interest in the Lebel Township gold property, which is located on the Kirkland Lake Main Break in the prolific Kirkland Lake gold camp. Thundermin has the right to earn a 100% interest in eight exploration licenses covering a large portion of the Stirling volcanogenic massive zinc-lead-copper-silver-gold sulphide belt located on Cape Breton Island, Nova Scotia. An initial diamond drill program undertaken on the property in 2012 was successful in intersecting copper mineralization in porphyritic volcanic rocks similar to those known to host massive sulphide deposits elsewhere. Thundermin has royalty interests in seven base metal and gold properties located in British Columbia and Quebec, the most significant being a 2.5% net smelter return royalty in the Pelletier Lake gold deposit which is under option to QMX Gold Corporation. Thundermin also has various shareholdings in twelve other junior resource companies exploring for base metal, gold, chrome, and diamond deposits in Canada.

Forward-Looking Statements

This news release may contain "Forward-Looking Statements" that involve risks and uncertainties, such as statements of Thundermin's plans, objectives, strategies, intentions and expectations. The words "potential," "anticipate," "forecast," "believe," "estimate," "expect," "may," "project," "plan," and similar expressions are intended to be among the statements that identify "Forward-Looking Statements". Although Thundermin believes that its expectations reflected in these "Forward-Looking Statements" are reasonable, such statements may involve unknown risks, uncertainties and other factors disclosed in our regulatory filings that can be viewed on the SEDAR website at www.sedar.com. For us, uncertainties arise from the behavior of financial and metals markets and from numerous other matters of national, regional, and global scale, including those of an environmental, climatic, natural, political, economic, business, competitive, or regulatory nature. These uncertainties may cause our actual future results to be materially different than those expressed in our "Forward-Looking Statements". Although Thundermin believes the facts and information contained in this news release to be as correct and current as possible, Thundermin does not warrant or make any representation as to the accuracy, validity or completeness of any facts or information contained herein and these statements should not be relied upon as representing its views subsequent to the date of this news release.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

For further information on Thundermin Resources Inc., visit Thundermin's website at www.thundermin.com or the SEDAR website at www.sedar.com.

To view the map associated with this press release, please visit the following link: http://media3.marketwire.com/docs/THRFigure-1.pdf.

Contacts:
Thundermin Resources Inc.
John B. Heslop
President & CEO
(647) 344-1167

Thundermin Resources Inc.
James W. Gill
Chairman
(416) 450-1851
www.thundermin.com

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Everywhere we turn in our industry we can find strong opinions about the direction, type and nature of cloud’s impact on computing and business. Another word that is used in every context in our industry is “hybrid.” In his session at 20th Cloud Expo, Alvaro Gonzalez, Director of Technical, Partner and Field Marketing at Peak 10, will use a combination of a few conceptual props and some research recently commissioned by Peak 10 to offer a real-world consideration of how the various categories of...
Five years ago development was seen as a dead-end career, now it’s anything but – with an explosion in mobile and IoT initiatives increasing the demand for skilled engineers. But apart from having a ready supply of great coders, what constitutes true ‘DevOps Royalty’? It’ll be the ability to craft resilient architectures, supportability, security everywhere across the software lifecycle. In his keynote at @DevOpsSummit at 20th Cloud Expo, Jeffrey Scheaffer, GM and SVP, Continuous Delivery Busine...
Most DevOps journeys involve several phases of maturity. Research shows that the inflection point where organizations begin to see maximum value is when they implement tight integration deploying their code to their infrastructure. Success at this level is the last barrier to at-will deployment. Storage, for instance, is more capable than where we read and write data. In his session at @DevOpsSummit at 20th Cloud Expo, Josh Atwell, a Developer Advocate for NetApp, will discuss the role and value...
SYS-CON Events announced today that Outscale, a global pure play Infrastructure as a Service provider and strategic partner of Dassault Systèmes, will exhibit at SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. Founded in 2010, Outscale simplifies infrastructure complexities and boosts the business agility of its customers. Outscale delivers a secure, reliable and industrial strength solution for its customers, which in...
SYS-CON Events announced today that Peak 10, Inc., a national IT infrastructure and cloud services provider, will exhibit at SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. Peak 10 provides reliable, tailored data center and network services, cloud and managed services. Its solutions are designed to scale and adapt to customers’ changing business needs, enabling them to lower costs, improve performance and focus intern...
SYS-CON Events announced today that CollabNet, a global leader in enterprise software development, release automation and DevOps solutions, will be a Bronze Sponsor of SYS-CON's 20th International Cloud Expo®, taking place from June 6-8, 2017, at the Javits Center in New York City, NY. CollabNet offers a broad range of solutions with the mission of helping modern organizations deliver quality software at speed. The company’s latest innovation, the DevOps Lifecycle Manager (DLM), supports Value S...
A strange thing is happening along the way to the Internet of Things, namely far too many devices to work with and manage. It has become clear that we'll need much higher efficiency user experiences that can allow us to more easily and scalably work with the thousands of devices that will soon be in each of our lives. Enter the conversational interface revolution, combining bots we can literally talk with, gesture to, and even direct with our thoughts, with embedded artificial intelligence, whic...
In order to meet the rapidly changing demands of today’s customers, companies are continually forced to redefine their business strategies in order to meet these needs, stay relevant and continue to see profitable growth. IoT deployment and development is integral in this transformation, and today businesses are increasingly seeing the value of investing their resources into IoT deployments. These technologies are able increase ROI through projects such as connecting supply chains or enabling sm...
Regardless of what business you’re in, it’s increasingly a software-driven business. Consumers’ rising expectations for connected digital and physical experiences are driving what some are calling the "Customer Experience Challenge.” In his session at @DevOpsSummit at 20th Cloud Expo, Marco Morales, Director of Global Solutions at CollabNet, will discuss how organizations are increasingly adopting a discipline of Value Stream Mapping to ensure that the software they are producing is poised to o...
This talk centers around how to automate best practices in a multi-/hybrid-cloud world based on our work with customers like GE, Discovery Communications and Fannie Mae. Today’s enterprises are reaping the benefits of cloud computing, but also discovering many risks and challenges. In the age of DevOps and the decentralization of IT, it’s easy to over-provision resources, forget that instances are running, or unintentionally expose vulnerabilities.
In his opening keynote at 20th Cloud Expo, Michael Maximilien, Research Scientist, Architect, and Engineer at IBM, will motivate why realizing the full potential of the cloud and social data requires artificial intelligence. By mixing Cloud Foundry and the rich set of Watson services, IBM's Bluemix is the best cloud operating system for enterprises today, providing rapid development and deployment of applications that can take advantage of the rich catalog of Watson services to help drive insigh...
SYS-CON Events announced today that SoftLayer, an IBM Company, has been named “Gold Sponsor” of SYS-CON's 18th Cloud Expo, which will take place on June 7-9, 2016, at the Javits Center in New York, New York. SoftLayer, an IBM Company, provides cloud infrastructure as a service from a growing number of data centers and network points of presence around the world. SoftLayer’s customers range from Web startups to global enterprises.
SYS-CON Events announced today that Super Micro Computer, Inc., a global leader in compute, storage and networking technologies, will exhibit at SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. Supermicro (NASDAQ: SMCI), the leading innovator in high-performance, high-efficiency server technology, is a premier provider of advanced server Building Block Solutions® for Data Center, Cloud Computing, Enterprise IT, Hadoop/...
With major technology companies and startups seriously embracing Cloud strategies, now is the perfect time to attend @CloudExpo | @ThingsExpo, June 6-8, 2017, at the Javits Center in New York City, NY and October 31 - November 2, 2017, Santa Clara Convention Center, CA. Learn what is going on, contribute to the discussions, and ensure that your enterprise is on the right path to Digital Transformation.
SYS-CON Events announced today that EARP Integration will exhibit at SYS-CON's 20th International Cloud Expo®, which will take place on June 6-8, 2017, at the Javits Center in New York City, NY. EARP Integration is a passionate software house. Since its inception in 2009 the company successfully delivers smart solutions for cities and factories that start their digital transformation. EARP provides bespoke solutions like, for example, advanced enterprise portals, business intelligence systems an...