Click here to close now.


News Feed Item

Caza Oil & Gas Announces Excellent Result on Initial Test Well at Gramma Ridge and Provides Operational Update

HOUSTON, TEXAS -- (Marketwired) -- 05/29/14 -- Caza Oil & Gas, Inc. ("Caza" or the "Company") (TSX:CAZ) (AIM:CAZA) is pleased to announce another excellent result for the Company's Bone Spring program with the initial test well on its Gramma Ridge Property in Lea County, New Mexico, and to provide an update on drilling activity at its West Copperline, Forehand Ranch and Jazzmaster properties.

Gramma Ridge Property: The Gramma Ridge 27 State #1H horizontal Bone Spring test well (the "27-1H well") reached the intended total measured depth of approximately 15,496 feet in the 3rd Bone Spring Sand interval and was subsequently fracture stimulated beginning on May 13, 2014. Under controlled flowback the producing rates have steadily increased, and the well produced at a peak 24 hour gross rate of 830 barrels (bbls) of oil and 4.63 million cubic feet of natural gas, which equates to 1,602 bbls of oil equivalent, on May 27, 2014. The well was producing on a 24/64ths adjustable choke at 2,390 pounds per square inch flowing casing pressure. Oil is already being sold, and the Company expects to have natural gas flowing to sales in the near future.

In addition to production from the 3rd Bone Spring Sand interval, log data was obtained across the Brushy Canyon, Avalon and 1st and 2nd Bone Spring Sand intervals in the 27-1H well. The data indicates the presence of oil and natural gas across each of these intervals, which is favorable for future development on this 320 acre lease. Management believes the deeper Wolfcamp formation on the property is also prospective for oil and natural gas.

Caza currently has a 52.5% working interest (approximate 40.82% net revenue interest) in the Gramma Ridge 27-1H well and the property.

West Copperline Property: The Company is currently drilling ahead of schedule on the West Copperline 29 #4H horizontal Bone Spring well in Lea County, New Mexico, and should reach total measured depth within the 3rd Bone Spring Sand interval in approximately ten days. This well is a direct offset to the Company's producing West Copperline 29 #3H 3rd Bone Spring well and is anticipated to deliver similar results. The frac for this well is currently scheduled to begin on or around June 30, 2014. Once released, the Company plans to move the rig back to the Gramma Ridge property in order to commence drilling operations on the direct offset location to the 27-1H well.

Caza currently has a 62.5% working interest (approximate 47.25% net revenue interest) in the West Copperline 29 #4H well.

Forehand Ranch Property: The Company has begun a shallow pool Cherry Canyon development program at its Forehand Ranch property in Eddy County, New Mexico. The Cherry Canyon is a shallow oil interval in the Delaware Formation at approximately 4,000 feet vertical depth. The Company recently commenced drilling operations on the Forehand Ranch 22 State #1 vertical well and plans to initially drill three vertical wells in succession using the same rig.

Caza currently has a 63% working interest (approximate 47.25% net revenue interest) in the Forehand Ranch 22 State #1 well.

Jazzmaster Property: The non-operated Jazzmaster 17 State #3H horizontal Bone Spring well in Lea County New Mexico, has reached its intended total measured depth of 15,315 feet in the 2nd Bone Spring Sand interval and is scheduled to be fracture stimulated in the near future. This well is a direct offset to the Jazzmaster 17 State #4H well. The Company will update the market in due course once the frac is complete and the well is flowing to sales.

Log data was also obtained across the Brushy Canyon, Avalon and 1st and 3rd Bone Spring Sand intervals. The data indicates the presence of oil and natural gas across each of these intervals, which is favorable for the future development of the property.

Caza has a 25.0% working interest (approximately 19.94% net revenue interest) in the Jazzmaster 17 State #3H and #4H wells and the balance of the property, which is approximately 480 acres.

W. Michael Ford, Chief Executive Officer commented:

"We are extremely pleased with the Gramma Ridge result. Although the Gramma Ridge property is located in Lea County, New Mexico, this test well was a step out from our recent successes at the Marathon Road and West Copperline properties, which makes this result even more exciting and continues the Company's strong momentum in the Bone Spring play.

We have again been able to demonstrate the significant upside to be realized from stacked pay intervals in this play, as log and core data from the Gramma Ridge well suggest the 3rd Bone Spring Sand is only one of six potential pays present on this property for future development. We are very happy to continue the trend of creating significant shareholder value with this exceptional result.

We have a busy summer ahead and look forward to updating the market on our activity at West Copperline, Forehand Ranch and Jazzmaster properties once these wells are completed and brought online. The next scheduled Company operated well is the planned development well at Gramma Ridge, an offset to the very successful 27-1H well announced today."

About Caza

Caza is engaged in the acquisition, exploration, development and production of hydrocarbons in the following regions of the United States of America through its subsidiary, Caza Petroleum, Inc.: Permian Basin (West Texas and Southeast New Mexico) and Texas and Louisiana Gulf Coast (on-shore).

The Toronto Stock Exchange has neither approved nor disapproved the information contained herein.

In accordance with AIM Rules - Guidance Note for Mining, Oil and Gas Companies, the information contained in this announcement has been reviewed and approved by Anthony B. Sam, Vice President Operations of Caza who is a Petroleum Engineer and a member of The Society of Petroleum Engineers.


Information in this news release that is not current or historical factual information may constitute forward-looking information within the meaning of securities laws. Such information is often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "schedule", "continue", "estimate", "expect", "excellent", "may", "will", "hope", "project", "predict", "potential", "intend", "could", "might", "should", "believe", "develop", "test", "anticipation", "looks to be", "suggests" and similar expressions. In particular, information regarding the potential or future development of any property, the timing of future sales, or the timing, scope or success of, and information to be obtained from, drilling or completion operations and potential pay zones contained in this news release constitutes forward-looking information within the meaning of securities laws.

Implicit in this information, are assumptions regarding the success and timing of drilling operations, rig availability, projected production, projected revenue and expenses and well performance. These assumptions, although considered reasonable by the Company at the time of preparation, may prove to be incorrect. Readers are cautioned that actual future operations, operating results and economic performance of the Company are subject to a number of risks and uncertainties, including general economic, market and business conditions, well performance and operating risks and could differ materially from what is currently expected as set out above. The Gramma Ridge 27 State #1H horizontal Bone Spring well is in early stages of production. Future flow rates may vary, perhaps materially, and the tests disclosed herein are not necessarily indicative of long-term performance or of ultimate recovery.

For more exhaustive information on these risks and uncertainties you should refer to the Company's most recently filed annual information form which is available at and the Company's website at You should not place undue importance on forward-looking information and should not rely upon this information as of any other date. While we may elect to, we are under no obligation and do not undertake to update this information at any particular time except as may be required by securities laws.

Boe or barrel of oil equivalent may be misleading, particularly if used in isolation. A boe conversion of six thousand cubic feet: 1 barrel is based on an energy equivalency conversion method primarily applicable at the burner tip and does not represent a value equivalency at the well head. Given that the value ratio based on the current price of oil as compared to natural gas is significantly different from the energy equivalency of 6:1, utilizing a conversion on a 6:1 basis may be misleading as an indication of value.

Caza Oil & Gas, Inc.
Michael Ford, CEO +1 432 682 7424
John McGoldrick, Chairman +65 9731 7471 (Singapore)

Cenkos Securities plc
Beth McKiernan +44 131 220 9778 (Edinburgh)
Neil McDonald +44 131 220 6939 (Edinburgh)

VIGO Communications
Chris McMahon +44 20 7016 9570

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Saviynt Inc. has announced the availability of the next release of Saviynt for AWS. The comprehensive security and compliance solution provides a Command-and-Control center to gain visibility into risks in AWS, enforce real-time protection of critical workloads as well as data and automate access life-cycle governance. The solution enables AWS customers to meet their compliance mandates such as ITAR, SOX, PCI, etc. by including an extensive risk and controls library to detect known threats and b...
Chris Van Tuin, Chief Technologist for the Western US at Red Hat, has over 20 years of experience in IT and Software. Since joining Red Hat in 2005, he has been architecting solutions for strategic customers and partners with a focus on emerging technologies including IaaS, PaaS, and DevOps. He started his career at Intel in IT and Managed Hosting followed by leadership roles in services and sales engineering at Loudcloud and Linux startups.
Recently announced Azure Data Lake addresses the big data 3V challenges; volume, velocity and variety. It is one more storage feature in addition to blobs and SQL Azure database. Azure Data Lake (should have been Azure Data Ocean IMHO) is really omnipotent. Just look at the key capabilities of Azure Data Lake:
As-a-service models offer huge opportunities, but also complicate security. It may seem that the easiest way to migrate to a new architectural model is to let others, experts in their field, do the work. This has given rise to many as-a-service models throughout the industry and across the entire technology stack, from software to infrastructure. While this has unlocked huge opportunities to accelerate the deployment of new capabilities or increase economic efficiencies within an organization, i...
Electric power utilities face relentless pressure on their financial performance, and reducing distribution grid losses is one of the last untapped opportunities to meet their business goals. Combining IoT-enabled sensors and cloud-based data analytics, utilities now are able to find, quantify and reduce losses faster – and with a smaller IT footprint. Solutions exist using Internet-enabled sensors deployed temporarily at strategic locations within the distribution grid to measure actual line lo...
For almost two decades, businesses have discovered great opportunities to engage with customers and even expand revenue through digital systems, including web and mobile applications. Yet, even now, the conversation between the business and the technologists that deliver these systems is strained, in large part due to misaligned objectives. In his session at DevOps Summit, James Urquhart, Senior Vice President of Performance Analytics at SOASTA, Inc., will discuss how measuring user outcomes –...
The Internet of Everything is re-shaping technology trends–moving away from “request/response” architecture to an “always-on” Streaming Web where data is in constant motion and secure, reliable communication is an absolute necessity. As more and more THINGS go online, the challenges that developers will need to address will only increase exponentially. In his session at @ThingsExpo, Todd Greene, Founder & CEO of PubNub, will explore the current state of IoT connectivity and review key trends an...
Docker is hot. However, as Docker container use spreads into more mature production pipelines, there can be issues about control of Docker images to ensure they are production-ready. Is a promotion-based model appropriate to control and track the flow of Docker images from development to production? In his session at DevOps Summit, Fred Simon, Co-founder and Chief Architect of JFrog, will demonstrate how to implement a promotion model for Docker images using a binary repository, and then show h...
SYS-CON Events announced today that IBM Cloud Data Services has been named “Bronze Sponsor” of SYS-CON's 17th Cloud Expo, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. IBM Cloud Data Services offers a portfolio of integrated, best-of-breed cloud data services for developers focused on mobile computing and analytics use cases.
As the world moves towards more DevOps and microservices, application deployment to the cloud ought to become a lot simpler. The microservices architecture, which is the basis of many new age distributed systems such as OpenStack, NetFlix and so on, is at the heart of Cloud Foundry - a complete developer-oriented Platform as a Service (PaaS) that is IaaS agnostic and supports vCloud, OpenStack and AWS. In his session at 17th Cloud Expo, Raghavan "Rags" Srinivas, an Architect/Developer Evangeli...
The Internet of Things (IoT) is growing rapidly by extending current technologies, products and networks. By 2020, Cisco estimates there will be 50 billion connected devices. Gartner has forecast revenues of over $300 billion, just to IoT suppliers. Now is the time to figure out how you’ll make money – not just create innovative products. With hundreds of new products and companies jumping into the IoT fray every month, there’s no shortage of innovation. Despite this, McKinsey/VisionMobile data...
Today air travel is a minefield of delays, hassles and customer disappointment. Airlines struggle to revitalize the experience. GE and M2Mi will demonstrate practical examples of how IoT solutions are helping airlines bring back personalization, reduce trip time and improve reliability. In their session at @ThingsExpo, Shyam Varan Nath, Principal Architect with GE, and Dr. Sarah Cooper, M2Mi's VP Business Development and Engineering, will explore the IoT cloud-based platform technologies driv...
DevOps is here to stay because it works. Most businesses using this methodology are already realizing a wide range of real, measurable benefits as a result of implementing DevOps, including the breakdown of inter-departmental silos, faster delivery of new features and more stable operating environments. To take advantage of the cloud’s improved speed and flexibility, development and operations teams need to work together more closely and productively. In his session at DevOps Summit, Prashanth...
Containers have changed the mind of IT in DevOps. They enable developers to work with dev, test, stage and production environments identically. Containers provide the right abstraction for microservices and many cloud platforms have integrated them into deployment pipelines. DevOps and containers together help companies achieve their business goals faster and more effectively. In his session at DevOps Summit, Ruslan Synytsky, CEO and Co-founder of Jelastic, will review the current landscape of...
In their session at DevOps Summit, Asaf Yigal, co-founder and the VP of Product at, and Tomer Levy, co-founder and CEO of, will explore the entire process that they have undergone – through research, benchmarking, implementation, optimization, and customer success – in developing a processing engine that can handle petabytes of data. They will also discuss the requirements of such an engine in terms of scalability, resilience, security, and availability along with how the archi...