Click here to close now.

Welcome!

News Feed Item

West Kirkland Commences Exploration and Prefeasibility Study for Hasbrouck Project, Nevada

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 06/03/14 -- West Kirkland Mining Inc. (TSX VENTURE: WKM) ("West Kirkland, WKM" or the "Company") announces today that it has completed a thorough project plan on its recently acquired Hasbrouck and Three Hills properties (the "Hasbrouck Project") and will immediately start exploration and initiate a prefeasibility study (the "Prefeasibility Study").

West Kirkland recently raised $33.1 million in related financings and acquired a 75% interest in the Hasbrouck Project for a purchase price of US$20 million. Following the announcement of the Hasbrouck Project acquisition agreement in January, 2014, West Kirkland announced a mineral resource estimate increase of approximately 10%, which incorporated the results of subsequent drilling completed since the most recent mineral resource estimate disclosed in 2012 by the property vendor (see news release dated February 24, 2014) and the completion of a technical report dated February 21, 2014 titled "Technical Report for the Hasbrouck Project Esmeralda County, Nevada, USA, West Kirkland Mining Inc." (the "Technical Report") authored by Scott E. Wilson, C.P.G., which has been filed under the Company profile on SEDAR at www.sedar.com.

The Company has previously stated that in keeping with the recommendations of the Technical Report, it would complete a preliminary economic assessment of the Hasbrouck Project. However, the Company has recently completed a detailed review of the three dimensional deposit models, incorporating the recent mineral resource estimate increase referred to above, and conducted internal engineering, planning and interaction with the community and permit regulatory bodies, and now has sufficient confidence to proceed directly to the prefeasibility stage on the Three Hills and Hasbrouck surface oxide gold deposits.

The Hasbrouck Project includes two all-oxide deposits with at-surface and near-surface mineralization having minimal pre-strip and a low overall stripping ratio. Both deposits are well-drilled with over 600 bore holes. In addition, extensive metallurgical test work has been done indicating approximately 60% recovery at Hasbrouck and 80% recovery at Three Hills by heap leaching with moderate cyanide and lime consumption.

Both deposits have easy access from the state highway system and grid power is available nearby. The deposits are above the water table which simplifies operations, permitting and closure. The expected project approach to the Prefeasibility Study will be to look at two open pits with low-strip ratios and no pre-strips with heap leach extraction. The initial design concepts will focus on an initial operation at Three-Hills with a lower scale and environmental profile. The second phase of the design concept will then focus on Hasbrouck which has a longer potential permit time line. Initial feedback on this two-staged approach from local interests and state and federal regulators has been positive.

The new deposit model completed and announced by WKM has provided obvious exploration targets, including targets immediately adjacent to the Three Hills deposit and the Hasbrouck deposit. A 2,000 meter drilling program is expected to commence in July, 2014. The drilling program will involve resource infill, and step-outs, groundwater characterization, metallurgical samples, condemnation holes for infrastructure areas, water source and geotechnical studies.

Prefeasibility Study Detail

West Kirkland intends to complete the Prefeasibility Study by Q1 of 2015 using a team of leading, Nevada-based consultants, including:


--  Mine Development Associates - resources, mine design and report
    production
--  HC Osborne & Associates - metallurgy and process consultant
--  Kappes Cassiday & Associates - metallurgy and process design
--  NewFields - heap leach design and engineering
--  McClelland Labs - laboratory analyses and assays
--  N.A. Degerstrom - mine planning reviewer

Resource

The combined Hasbrouck and Three Hills deposits includes 1,279,900 gold equivalent (AuEq) ounces in the Measured and Indicated category (78.2 million tons at 0.012 opt Au and 0.232 opt Ag for 0.016 opt AuEq) and 761,000 ounces AuEq in the Inferred Category (69.9 million tons at 0.008 opt Au and 0.159 Ag for 0.011 opt AuEq) using a 0.005 opt AuEq cut-off. (See Technical Report filed on SEDAR. Gold equivalent ounces are calculated as follows: AuEq =Au+Ag/57.14).(i)

Exploration

Exploration drilling will be completed by reverse circulation methods and be focused primarily on areas immediately adjacent to the Three Hills and Hasbrouck deposits on specific mapped and modelled structures associated with the control of mineralization.

Permitting

Pre-application meetings with the Bureau of Land Management (BLM) and the Nevada Division of Environmental Protection (NDEP) have commenced the formal permitting process. Surveys required by the BLM include sensitive species and cultural resources and are currently being conducted. Rock characterization studies are required by NDEP for a Water Pollution Control Permit. Permitting work will initially focus on the Three Hills deposit which has a small footprint and short life of mine (approximately two years). These factors may result in a simpler and shorter permitting process.

Budget

The Prefeasibility Study, engineering drilling, permitting work and the immediate exploration program is budgeted to cost $5 million, in line with previous plans and milestones.

Qualified Persons

(i) Mr. Scott E. Wilson, AIPG Certified Professional Geologist, is WKM's Independent Qualified Person as defined under NI 43-101. Mr. Wilson has reviewed and verified the data disclosed in this news release to be in conformity with generally accepted CIM "Estimation of Mineral Resource and Mineral Reserves Best Practices" guidelines and in accordance with NI 43-101.

Sandy McVey, Chief Operating Officer for West Kirkland, and a non-independent Qualified Person as defined by NI 43-101, has reviewed the information contained in this news release and has verified the data.

About West Kirkland Mining Inc.

West Kirkland was formed in 2010 to focus on gold exploration along major geological trends in North America. The Company has consolidated significant mineral rights positions within the known gold trends of Nevada and Utah, including the recently acquired the Hasbrouck and Three Hills properties in southwestern Nevada. The founders and Board members of West Kirkland have successful experience in gold discovery, mine development and mine operations in Nevada and other gold producing jurisdictions in North America.

Disclaimer for Forward-Looking Information

This press release contains forward-looking information or forward-looking statements (collectively "forward-looking information") within the meaning of applicable securities laws. Forward-looking information is typically identified by words such as: "believe", "expect", "anticipate", "intend", "estimate", "postulate" and similar expressions, or are those, which, by their nature, refer to future events. Forward-looking information in this news release includes, without limitation, the completion of the Prefeasibility Study, the project approach of the Prefeasibility Study and exploration and all information under the heading "Prefeasibility Study Detail", including the Prefeasibility Study budget. Although West Kirkland believes that such timing and expenses as set out in this press release are reasonable, it can give no assurance that such expectations and estimates will prove to be correct. The Company cautions investors that any forward-looking information provided by the Company is not a guarantee of future results or performance, and that actual results may differ materially from those in forward-looking information as a result of various factors, including, but not limited to, the state of the financial markets for the Company's equity securities, the state of the market for gold or other minerals that may be produced generally, variations in the nature, quality and quantity of any mineral deposits that may be located, the Company's ability to obtain any necessary permits, consents or authorizations required for its activities, to raise the necessary capital or to be fully able to implement its business strategies and other risks associated with the exploration and development of mineral properties. The reader is referred to the Company's public filings for a more complete discussion of such risk factors and their potential effects which may be accessed through the Company's profile on SEDAR at www.sedar.com.

Cautionary Note to U.S. Investors Regarding the Use of Mining Terms

This press release has been prepared in accordance with the securities laws in effect in Canada, which differ from the requirements of U.S. securities laws. Unless otherwise indicated, all resource and reserve estimates included in this press release have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and the Canadian Institute of Mining, Metallurgy, and Petroleum Definition Standards on Mineral Resources and Mineral Reserves. NI 43-101 is a rule developed by the Canadian Securities Administrators which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Canadian standards, including NI 43-101, differ significantly from the requirements of the U.S. Securities and Exchange Commission (the "SEC"), and resource and reserve information contained therein may not be comparable to similar information disclosed by U.S. companies. In particular, and without limiting the generality of the foregoing, the term "resource" does not equate to the term "reserves". Under U.S. standards, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. The SEC's disclosure standards normally do not permit the inclusion of information concerning "measured mineral resources", "indicated mineral resources" or "inferred mineral resources" or other descriptions of the amount of mineralization in mineral deposits that do not constitute "reserves" by U.S. standards in documents filed with the SEC. U.S. investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into reserves.

U.S. investors should also understand that "inferred mineral resources" have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an "inferred mineral resource" will ever be upgraded to a higher category. Under Canadian rules, estimated "inferred mineral resources" may not form the basis of feasibility or pre-feasibility studies except in rare cases. Investors are cautioned not to assume that all or any part of an "inferred mineral resource" exists or is economically or legally mineable. Disclosure of "contained ounces" in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute "reserves" by SEC standards as in-place tonnage and grade without reference to unit measures. The requirements of NI 43-101 for identification of "reserves" are also not the same as those of the SEC, and reserves reported by the Company in compliance with NI 43-101 may not qualify as "reserves" under SEC standards. In addition, under SEC standards, a company may only be identified as "development" stage if it has established "reserves" by SEC standards and is engaged in the preparation of such reserves for extraction. Accordingly, information concerning mineral deposits set forth in this press release may not be comparable with information made public by companies that report in accordance with U.S. standards.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts:
West Kirkland Mining Inc.
R. Michael Jones
(604) 685-8311

West Kirkland Mining Inc.
Knox Henderson
(604) 685-8311
(604) 484-4710 (FAX)

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
The last decade was about virtual machines, but the next one is about containers. Containers enable a service to run on any host at any time. Traditional tools are starting to show cracks because they were not designed for this level of application portability. Now is the time to look at new ways to deploy and manage applications at scale. In his session at @DevOpsSummit, Brian “Redbeard” Harrington, a principal architect at CoreOS, will examine how CoreOS helps teams run in production. Attende...
The enterprise market will drive IoT device adoption over the next five years. In his session at @ThingsExpo, John Greenough, an analyst at BI Intelligence, division of Business Insider, analyzed how companies will adopt IoT products and the associated cost of adopting those products. John Greenough is the lead analyst covering the Internet of Things for BI Intelligence- Business Insider’s paid research service. Numerous IoT companies have cited his analysis of the IoT. Prior to joining BI In...
SYS-CON Events announced today that Intelligent Systems Services will exhibit at the 17th International Cloud Expo®, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. Established in 1994, Intelligent Systems Services Inc. is located near Washington, DC, with representatives and partners nationwide. ISS’s well-established track record is based on the continuous pursuit of excellence in designing, implementing and supporting nationwide clients’ ...
Containers are changing the security landscape for software development and deployment. As with any security solutions, security approaches that work for developers, operations personnel and security professionals is a requirement. In his session at DevOps Summit, Kevin Gilpin, CTO and Co-Founder of Conjur, will discuss various security considerations for container-based infrastructure and related DevOps workflows.
In his session at 16th Cloud Expo, Simone Brunozzi, VP and Chief Technologist of Cloud Services at VMware, reviewed the changes that the cloud computing industry has gone through over the last five years and shared insights into what the next five will bring. He also chronicled the challenges enterprise companies are facing as they move to the public cloud. He delved into the "Hybrid Cloud" space and explained why every CIO should consider ‘hybrid cloud' as part of their future strategy to achie...
With major technology companies and startups seriously embracing IoT strategies, now is the perfect time to attend @ThingsExpo in Silicon Valley. Learn what is going on, contribute to the discussions, and ensure that your enterprise is as "IoT-Ready" as it can be! Internet of @ThingsExpo, taking place Nov 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with 17th Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading in...
DevOps tends to focus on the relationship between Dev and Ops, putting an emphasis on the ops and application infrastructure. But that’s changing with microservices architectures. In her session at DevOps Summit, Lori MacVittie, Evangelist for F5 Networks, will focus on how microservices are changing the underlying architectures needed to scale, secure and deliver applications based on highly distributed (micro) services and why that means an expansion into “the network” for DevOps.
SYS-CON Events announced today that Secure Infrastructure & Services will exhibit at SYS-CON's 17th International Cloud Expo®, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. Secure Infrastructure & Services (SIAS) is a managed services provider of cloud computing solutions for the IBM Power Systems market. The company helps mid-market firms built on IBM hardware platforms to deploy new levels of reliable and cost-effective computing and hig...
SYS-CON Events announced today that JFrog, maker of Artifactory, the popular Binary Repository Manager, will exhibit at SYS-CON's @DevOpsSummit Silicon Valley, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. Based in California, Israel and France, founded by longtime field-experts, JFrog, creator of Artifactory and Bintray, has provided the market with the first Binary Repository solution and a software distribution social platform.
The basic integration architecture, as defined by ESBs, hasn’t changed for more than a decade. Most cloud integration providers still rely on an ESB architecture and their proprietary connectors. As a result, enterprise integration projects suffer from constraints of availability and reliability of these connectors that are not re-usable across other integration vendors. However, the rapid adoption of APIs and almost ubiquitous availability of APIs amongst most SaaS and Cloud applications are ra...
Today air travel is a minefield of delays, hassles and customer disappointment. Airlines struggle to revitalize the experience. GE and M2Mi will demonstrate practical examples of how IoT solutions are helping airlines bring back personalization, reduce trip time and improve reliability. In their session at @ThingsExpo, Shyam Varan Nath, Principal Architect with GE, and Dr. Sarah Cooper, M2Mi’s VP Business Development and Engineering, will explore the IoT cloud-based platform technologies drivi...
Agile, which started in the development organization, has gradually expanded into other areas downstream - namely IT and Operations. Teams – then teams of teams – have streamlined processes, improved feedback loops and driven a much faster pace into IT departments which have had profound effects on the entire organization. In his session at DevOps Summit, Anders Wallgren, Chief Technology Officer of Electric Cloud, will discuss how DevOps and Continuous Delivery have emerged to help connect dev...
SYS-CON Events announced today that Harbinger Systems will exhibit at SYS-CON's 17th International Cloud Expo®, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. Harbinger Systems is a global company providing software technology services. Since 1990, Harbinger has developed a strong customer base worldwide. Its customers include software product companies ranging from hi-tech start-ups in Silicon Valley to leading product companies in the US a...
SYS-CON Events announced today that Dyn, the worldwide leader in Internet Performance, will exhibit at SYS-CON's 17th International Cloud Expo®, which will take place on November 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. Dyn is a cloud-based Internet Performance company. Dyn helps companies monitor, control, and optimize online infrastructure for an exceptional end-user experience. Through a world-class network and unrivaled, objective intelligence into Internet condit...
Explosive growth in connected devices. Enormous amounts of data for collection and analysis. Critical use of data for split-second decision making and actionable information. All three are factors in making the Internet of Things a reality. Yet, any one factor would have an IT organization pondering its infrastructure strategy. How should your organization enhance its IT framework to enable an Internet of Things implementation? In his session at @ThingsExpo, James Kirkland, Red Hat's Chief Arch...