Click here to close now.


News Feed Item

Lexam Files NI 43-101 Preliminary Economic Assessment Technical Report on Buffalo Ankerite, Fuller, Paymaster and Davidson Tisdale Properties

TORONTO, ONTARIO -- (Marketwired) -- 06/06/14 -- Lexam VG Gold Inc. ("Lexam", the "Company") (TSX:LEX)(FRANKFURT:VN3A)(OTCQX:LEXVF) announces that the technical report titled "Technical Report on the Preliminary Economic Assessment of the Buffalo Ankerite, Fuller, Paymaster and Davidson Tisdale Gold Deposits, Northeastern Ontario, Canada" (the "Technical Report") dated June 5, 2014 has been filed on SEDAR pursuant to the Canadian National Instrument 43-101 ("NI 43-101") requirements.

The Technical Report includes a preliminary economic assessment ("PEA") previously announced by the Company in a press release dated April 23, 2014. The Technical Report has been filed under Lexam's profile on SEDAR at and can also be viewed on the Company's website at

The Technical Report is authored by                                         
Roscoe Postle Associates Inc.: Glen Ehasoo, P.Eng., Katharine M. Masun,     
M.Sc., P.Geo., Tudorel Ciuculescu, M.Sc., P.Geo., Kathleen Ann Altman,      
Ph.D., P.E., Jeff Martin, P.Eng. and                                        
P&E Mining Consultants Inc.: by Wayne D. Ewert, Ph.D., P.Geo., Richard E.   
Routledge, M.Sc., P.Geo., Tracy J. Armstrong, P.Geo., Antoine R. Yassa,     
P.Geo., Yungang Wu, P.Geo., Eugene J. Puritch, P.Eng.,                      
(the "Authors"), each an Independent Qualified Person under the standards of
the NI 43-101, who have reviewed and approved the contents of this press    

Cautionary Note

The Technical Report is considered by the Authors to meet the requirements of a PEA as defined in NI 43-101 regulations. The economic analysis contained in the Technical Report is based, in part, on Inferred Resources, and is preliminary in nature. Inferred Resources are considered too geologically speculative to have mining and economic considerations applied to them and to be categorized as Mineral Reserves. There is no certainty that economic forecasts on which this PEA is based will be realized.

Cautionary Note to U.S. Investors

All resource estimates reported by Lexam are calculated in accordance with NI 43-101 and the Canadian Institute of Mining and Metallurgy Classification system. These standards are different from the standards generally permitted in reports filed with the SEC. Under NI 43-101, Lexam reports indicated and inferred resources, measurements which are generally not permitted in filings made with the SEC. According to Canadian NI 43-101 criteria, the estimation of indicated resources involve greater uncertainty as to their economic feasibility than the estimation of proven and probable reserves. Under SEC Industry Guide 7 criteria, measured, indicated and inferred resources are considered Mineralized Material. The SEC considers that in addition to greater uncertainty as to the economic feasibility of Mineralized Material compared to Proven and Probable reserves, there is also greater uncertainty as to the existence of Mineralized Material. U.S. investors are cautioned not to assume that Measured or Indicated resources will be converted into economically mineable reserves. The estimation of Inferred resources involves far greater uncertainty as to their existence and economic viability than the estimation of other categories of resources.

Caution Concerning Forward-Looking Statements

This press release contains certain forward-looking statements and information. The forward-looking statements and information express, as at the date of this press release, Lexam's plans, estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements involve a number of risks and uncertainties, and there can be no assurance that such statements will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements include, but are not limited to, factors associated with fluctuations in the market price of precious metals, mining industry risks, risks related to: litigation, property title, (including any agreements underlying the Company's properties), the state of the capital markets, whether shareholder and regulatory approvals for any proposed transaction are forthcoming, environmental risks and hazards, uncertainty as to calculation of mineral resources and reserves and other risks. Readers should not place undue reliance on forward-looking statements or information. Lexam undertakes no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. See Lexam's Annual Information Form for the period ended December 31, 2013 and available on SEDAR ( for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information. All forward-looking statements and information made in this news release are qualified by this cautionary statement.

To learn more about Lexam VG Gold (TSX:LEX), visit our website:

The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

Contact Us - at any time to subscribe or unsubscribe from Lexam's email distribution list.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Too often with compelling new technologies market participants become overly enamored with that attractiveness of the technology and neglect underlying business drivers. This tendency, what some call the “newest shiny object syndrome,” is understandable given that virtually all of us are heavily engaged in technology. But it is also mistaken. Without concrete business cases driving its deployment, IoT, like many other technologies before it, will fade into obscurity.
The IoT is upon us, but today’s databases, built on 30-year-old math, require multiple platforms to create a single solution. Data demands of the IoT require Big Data systems that can handle ingest, transactions and analytics concurrently adapting to varied situations as they occur, with speed at scale. In his session at @ThingsExpo, Chad Jones, chief strategy officer at Deep Information Sciences, will look differently at IoT data so enterprises can fully leverage their IoT potential. He’ll sha...
Today air travel is a minefield of delays, hassles and customer disappointment. Airlines struggle to revitalize the experience. GE and M2Mi will demonstrate practical examples of how IoT solutions are helping airlines bring back personalization, reduce trip time and improve reliability. In their session at @ThingsExpo, Shyam Varan Nath, Principal Architect with GE, and Dr. Sarah Cooper, M2Mi's VP Business Development and Engineering, will explore the IoT cloud-based platform technologies driv...
DevOps has often been described in terms of CAMS: Culture, Automation, Measuring, Sharing. While we’ve seen a lot of focus on the “A” and even on the “M”, there are very few examples of why the “C" is equally important in the DevOps equation. In her session at @DevOps Summit, Lori MacVittie, of F5 Networks, will explore HTTP/1 and HTTP/2 along with Microservices to illustrate why a collaborative culture between Dev, Ops, and the Network is critical to ensuring success.
There are many considerations when moving applications from on-premise to cloud. It is critical to understand the benefits and also challenges of this migration. A successful migration will result in lower Total Cost of Ownership, yet offer the same or higher level of robustness. Migration to cloud shifts computing resources from your data center, which can yield significant advantages provided that the cloud vendor an offer enterprise-grade quality for your application.
Overgrown applications have given way to modular applications, driven by the need to break larger problems into smaller problems. Similarly large monolithic development processes have been forced to be broken into smaller agile development cycles. Looking at trends in software development, microservices architectures meet the same demands. Additional benefits of microservices architectures are compartmentalization and a limited impact of service failure versus a complete software malfunction....
There will be 20 billion IoT devices connected to the Internet soon. What if we could control these devices with our voice, mind, or gestures? What if we could teach these devices how to talk to each other? What if these devices could learn how to interact with us (and each other) to make our lives better? What if Jarvis was real? How can I gain these super powers? In his session at 17th Cloud Expo, Chris Matthieu, co-founder and CTO of Octoblu, will show you!
As a CIO, are your direct reports IT managers or are they IT leaders? The hard truth is that many IT managers have risen through the ranks based on their technical skills, not their leadership ability. Many are unable to effectively engage and inspire, creating forward momentum in the direction of desired change. Renowned for its approach to leadership and emphasis on their people, organizations increasingly look to our military for insight into these challenges.
SYS-CON Events announced today that ProfitBricks, the provider of painless cloud infrastructure, will exhibit at SYS-CON's 17th International Cloud Expo®, which will take place on November 3–5, 2015, at the Santa Clara Convention Center in Santa Clara, CA. ProfitBricks is the IaaS provider that offers a painless cloud experience for all IT users, with no learning curve. ProfitBricks boasts flexible cloud servers and networking, an integrated Data Center Designer tool for visual control over the...
Recently announced Azure Data Lake addresses the big data 3V challenges; volume, velocity and variety. It is one more storage feature in addition to blobs and SQL Azure database. Azure Data Lake (should have been Azure Data Ocean IMHO) is really omnipotent. Just look at the key capabilities of Azure Data Lake:
The IoT market is on track to hit $7.1 trillion in 2020. The reality is that only a handful of companies are ready for this massive demand. There are a lot of barriers, paint points, traps, and hidden roadblocks. How can we deal with these issues and challenges? The paradigm has changed. Old-style ad-hoc trial-and-error ways will certainly lead you to the dead end. What is mandatory is an overarching and adaptive approach to effectively handle the rapid changes and exponential growth.
For almost two decades, businesses have discovered great opportunities to engage with customers and even expand revenue through digital systems, including web and mobile applications. Yet, even now, the conversation between the business and the technologists that deliver these systems is strained, in large part due to misaligned objectives. In his session at DevOps Summit, James Urquhart, Senior Vice President of Performance Analytics at SOASTA, Inc., will discuss how measuring user outcomes –...
As a company adopts a DevOps approach to software development, what are key things that both the Dev and Ops side of the business must keep in mind to ensure effective continuous delivery? In his session at DevOps Summit, Mark Hydar, Head of DevOps, Ericsson TV Platforms, will share best practices and provide helpful tips for Ops teams to adopt an open line of communication with the development side of the house to ensure success between the two sides.
DevOps is here to stay because it works. Most businesses using this methodology are already realizing a wide range of real, measurable benefits as a result of implementing DevOps, including the breakdown of inter-departmental silos, faster delivery of new features and more stable operating environments. To take advantage of the cloud’s improved speed and flexibility, development and operations teams need to work together more closely and productively. In his session at DevOps Summit, Prashanth...
Docker is hot. However, as Docker container use spreads into more mature production pipelines, there can be issues about control of Docker images to ensure they are production-ready. Is a promotion-based model appropriate to control and track the flow of Docker images from development to production? In his session at DevOps Summit, Fred Simon, Co-founder and Chief Architect of JFrog, will demonstrate how to implement a promotion model for Docker images using a binary repository, and then show h...