Welcome!

News Feed Item

Riverside Resources and Partner Morro Bay Resources Drill 388.4 g/t Silver Over 22.7 Metres at the Penoles Gold-Silver Project in Durango, Mexico

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 06/09/14 -- Riverside Resources Inc. ("Riverside" or the "Company") (TSX VENTURE:RRI)(PINKSHEETS:RVSDF)(FRANKFURT:R99), is pleased to announce new drill results from the Jesus Maria Silver Mine area at the Penoles Project (the "Project") in Durango, Mexico, which is being funded by Morro Bay Resources. Twenty three (23) HQ sized core holes were drilled on the property, for a total of 2,143 metres during the most recent drill program with results still pending for 6 holes. The recent program discovered a new zone of mineralization and structural preparation (referred to as the "Jesus Maria South Zone") intersecting and trending southwest from the Jesus Maria Vein. The Jesus Maria South Zone had not been systematically tested and apparently never worked by previous mining. The first two drill holes that intersected the new zone, (JM DDH 14-10 and JM DDH 14-24) returned the best near surface intervals of silver mineralization intersected at the Penoles Property since Riverside acquired the property in 2007.

The first hole drilled (JM DDH 14-10) was a 30 metre step out, south from the final hole (JM DDH 13-9 "Hole 9") of the 2013 program (view www.rivres.com for maps and images). This drill hole, (JM DDH 14-10) intersected an approximately 41 metre wide near-surface mineralized interval averaging 123.9 g/t silver and more than 0.5 g/t gold, including a 4.25 metre interval that assayed 732.2 g/t silver and 1.20 g/t gold. The second hole, JM DDH 14-24, confirmed significant widths of mineralization, with 70.8 m interval averaging 147.8 g/t silver including a 22.7 m interval that returned 388.4 g/t silver.

Assay results for the drill holes received to date from the Jesus Maria South Zone, JM DDH 14-10 and JM DDH 14-24, are summarized below:


----------------------------------------------------------------------------
                                Interval                                    
Hole ID      From (m)   To (m)       (m) Au (ppm) Ag (ppm)   Pb (%)   Zn (%)
----------------------------------------------------------------------------
JM DDH 14-10     18.9     59.5     40.60    0.540    123.9     0.07     0.14
----------------------------------------------------------------------------
                 Including          4.25    1.201    732.2     0.13     0.35
----------------------------------------------------------------------------
                 Including          2.30    1.291    194.8     0.42     0.31
----------------------------------------------------------------------------
                 Including          6.70    1.082    122.9     0.05     0.12
----------------------------------------------------------------------------
JM DDH 14-24    52.65   123.45     70.80     0.37    147.8     0.03     0.08
----------------------------------------------------------------------------
                 Including         22.70    0.629    388.4     0.07     0.12
----------------------------------------------------------------------------
                 Including          5.45    1.474    144.2     0.11     0.06
----------------------------------------------------------------------------

(All reported intervals are core lengths, true widths have not yet been determined)

Six additional holes (JM DDH 14-25 through JM DDH 14-30) have been drilled to investigate the potential continuity of mineralization at Jesus Maria South Zone to the east of the JM DDH 14-24 location. Assay results for these six holes will be released as soon as they become available and have been interpreted.

Riverside's President and CEO, John-Mark Staude stated, "Riverside is pleased with the drilling and discovery of the Jesus Maria South Zone and looks forward to receiving further assays from the remaining six holes. Collectively this zone so far has a strike extent of drilling of over 250 meters. The expanded mineralization found at Jesus Maria combined with the Capitan Gold Zone, untested San Rafael Mine area and numerous other prospective targets provide plenty of upside as the Penoles Project continues to move forward."

Other assayed holes from the current campaign include drill holes JM DDH 14-11 through JM DDH 14-23, a series of vertical and inclined holes spaced at approximately 50 to 100 metre intervals along the Jesus Maria Vein which provide near surface extension to the shallow mined area. The Jesus Maria Vein holes (view www.rivres.com for maps) were designed to test for potential lateral extensions of the mineralized zone developed in the historical Jesus Maria mine region and to some extent began to extend the depth which remains wide open. The drilling successfully extended the confirmed strike length of the Jesus Maria Vein approximately 500 meters westwards, and intersected the vein at the expected depths, showing good continuity. The vein remains open at depth and along strike. The drill holes encountered encouraging mineralization zones as tabulated below. These results are currently being integrated into the Jesus Maria geological model, and will be commented on in more detail as the analysis is completed.


----------------------------------------------------------------------------
                                Interval                                    
Hole ID      From (m)   To (m)       (m) Au (ppm) Ag (ppm)   Pb (%)   Zn (%)
----------------------------------------------------------------------------
JM DDH 14-11    81.30    93.30     12.00    0.284     42.6     0.61     1.13
----------------------------------------------------------------------------
JM DDH 14-12         Hole was abandoned before reaching target depth        
----------------------------------------------------------------------------
JM DDH 14-13   100.90   113.30     12.40    0.226     55.9     0.04     0.11
----------------------------------------------------------------------------
and            146.30   157.80     11.50    0.280     36.7     0.16     0.34
----------------------------------------------------------------------------
JM DDH 14-14    41.00    58.65     17.65    0.122    123.3     0.94     0.78
----------------------------------------------------------------------------
JM DDH 14-15    29.00    36.05      7.05    0.233     34.7     0.53     0.57
----------------------------------------------------------------------------
JM DDH 14-16    36.05    38.40      2.35    0.187     53.9     1.16     1.02
----------------------------------------------------------------------------
JM DDH 14-17    74.50    76.80      2.30    0.149     56.6     2.22     1.76
----------------------------------------------------------------------------
JM DDH 14-18     56.3     60.8      4.50    0.064     50.9     0.78     0.72
----------------------------------------------------------------------------
JM DDH 14-19        Did not encounter any significant mineralization        
----------------------------------------------------------------------------
JM DDH 14-20        Did not encounter any significant mineralization        
----------------------------------------------------------------------------
JM DDH 14-21    37.95    39.85      1.90    0.254    251.4     0.01     0.02
----------------------------------------------------------------------------
and            113.20   129.35     16.15    0.100     39.4     0.25     0.38
----------------------------------------------------------------------------
JM DDH 14-22     28.9    59.55     30.65    0.178     41.4     0.03     0.11
----------------------------------------------------------------------------
                 Including          2.25    0.128    179.2     0.09     0.16
----------------------------------------------------------------------------
                 Including          2.95    0.938    138.4     0.14     0.29
----------------------------------------------------------------------------
And             70.45    93.05     22.60    0.346     26.4     0.40     0.61
----------------------------------------------------------------------------
JM DDH 14-23     25.3     56.5     31.20    0.112     55.7     0.17     0.33
----------------------------------------------------------------------------

(All reported intervals are core lengths, true widths have not yet been determined)

Two drill holes (CDDH-14-49 and CDDH-14-50) were designed to test the Capitan Hill Zone target but were terminated early without reaching target depth due to local ground conditions and were not submitted for assay.

Results of previous drill programs completed at the Penoles Project are summarized in a recent N.I. 43-101 completed by Morro Bay Resources filed on SEDAR (www.sedar.com).

About the Penoles Project:

The Penoles Project is located in the Durango silver-gold belt in north-central Mexico and is currently owned 100% by Riverside. The recently completed drill program was conducted pursuant to a commitment by Morro Bay Resources Ltd. ("Morro Bay") to perform $750,000 of exploration work on the property during the first part of 2014. Morro Bay can complete its option to earn an initial 51-per-cent interest in the property by paying USD$1.35-million in cash to Riverside and paying USD$1.5-million worth of Morro Bay shares by June 30, 2014. For more information see Riverside press release dated January 23, 2014.

There are approximately eleven targets on the Penoles Project, including the Capitan Gold Zone, the Pinchanzo Zone (see Riverside press release dated May 23, 2012), potential west extensions of El Capitan (referred to as the West Extension), a new target area located to the northwest of El Capitan (referred to as Santa Theresa) and the previously mined Jesus Maria and San Rafael Ag- Au-Pb-Zn mines. The district is highly prospective with active mining operations nearby and has proven to be a cost effective region where projects can be efficiently developed towards production.

The Capitan Gold Zone is an advanced epithermal prospect with 45 drill holes and 6,945 metres of total drilling so far, with geological work to-date indicating potential for a bulk tonnage gold style system at El Capitan, with the geologic interpretation indicating vectors for expansion with further drilling.

The 23 drill holes and 2,143 metres of recently completed drilling bring the aggregate drill figures to 31 drill holes over 3,000 metres at Jesus Maria. The 2013 drilling intercepted a semi-parallel sequence of upper silver-carbonate veining as well as the main quartz-rich Ag-Au-Pb-Zn Jesus Maria vein zone. Underground exploration and sampling of the old workings also found silver bearing carbonate veins, which prior to this recent work was not known and demonstrates larger potential for the Jesus Maria vein system than previously recognized. The 2014 drilling has encountered some of the widest and strongest silver mineralization to-date and builds on previous work with significant exploration upside still remaining at Jesus Maria and surrounding targets.

Qualified Person and QA/QC:

The scientific and technical data contained in this news release pertaining to the Penoles Project was reviewed by Howard Davies, MAIG - VP Exploration, a non-independent qualified person to Riverside Resources, who is responsible for ensuring that the geologic information provided in this news release is accurate and who acts as a "qualified person" under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

According to Morro Bay, all drill cores were placed in numbered boxes and transported to Morro Bay's secure core facilities by the drill contractor. Following detailed core logging all core was cut using a diamond bladed core saw under the direct supervision of Morro Bay's geologic staff with half of the core kept on site in the original core boxes. All drill samples were sealed in numbered plastic bags and transported to Inspectorate America Assay labs facility in Durango City for prep work and analyzed at their facilities in Reno, NV, USA. Inspectorate America is certified for the provision of assays and geochemical analysis (ISO:9001-2008). All samples were prepared using standard industry preparation methods followed by fire assay analysis and aqua regia digest for trace elements. All samples with greater than 10 g/t Au or 100 g/t silver were additionally tested by fire assay with a gravimetric finish. Morro Bay has included appropriate industry certified standards and blanks within the drill core sample stream in addition to the standards and duplicates included as part of the Inspectorate QA/QC program.

About Riverside Resources Inc.:

Riverside is a well-funded prospect generation team of focused, proactive precious and base metal discoverers with the breadth of knowledge to dig much deeper. The Company currently has more than $4,500,000 in the treasury and approximately 37,000,000 shares outstanding. The Company's model of growth through partnerships and exploration uses the prospect generation business approach to own resources, while partners share in de-risking projects en route to discovery. Riverside has additional properties available for option with more information available on the Company's website at www.rivres.com.

ON BEHALF OF RIVERSIDE RESOURCES INC.

Dr. John-Mark Staude, President & CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
SYS-CON Events announced today that Isomorphic Software will exhibit at DevOps Summit at 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. Isomorphic Software provides the SmartClient HTML5/AJAX platform, the most advanced technology for building rich, cutting-edge enterprise web applications for desktop and mobile. SmartClient combines the productivity and performance of traditional desktop software with the simp...
With so much going on in this space you could be forgiven for thinking you were always working with yesterday’s technologies. So much change, so quickly. What do you do if you have to build a solution from the ground up that is expected to live in the field for at least 5-10 years? This is the challenge we faced when we looked to refresh our existing 10-year-old custom hardware stack to measure the fullness of trash cans and compactors.
Extreme Computing is the ability to leverage highly performant infrastructure and software to accelerate Big Data, machine learning, HPC, and Enterprise applications. High IOPS Storage, low-latency networks, in-memory databases, GPUs and other parallel accelerators are being used to achieve faster results and help businesses make better decisions. In his session at 18th Cloud Expo, Michael O'Neill, Strategic Business Development at NVIDIA, focused on some of the unique ways extreme computing is...
The emerging Internet of Everything creates tremendous new opportunities for customer engagement and business model innovation. However, enterprises must overcome a number of critical challenges to bring these new solutions to market. In his session at @ThingsExpo, Michael Martin, CTO/CIO at nfrastructure, outlined these key challenges and recommended approaches for overcoming them to achieve speed and agility in the design, development and implementation of Internet of Everything solutions wi...
Cloud computing is being adopted in one form or another by 94% of enterprises today. Tens of billions of new devices are being connected to The Internet of Things. And Big Data is driving this bus. An exponential increase is expected in the amount of information being processed, managed, analyzed, and acted upon by enterprise IT. This amazing is not part of some distant future - it is happening today. One report shows a 650% increase in enterprise data by 2020. Other estimates are even higher....
Today we can collect lots and lots of performance data. We build beautiful dashboards and even have fancy query languages to access and transform the data. Still performance data is a secret language only a couple of people understand. The more business becomes digital the more stakeholders are interested in this data including how it relates to business. Some of these people have never used a monitoring tool before. They have a question on their mind like “How is my application doing” but no id...
The 19th International Cloud Expo has announced that its Call for Papers is open. Cloud Expo, to be held November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA, brings together Cloud Computing, Big Data, Internet of Things, DevOps, Digital Transformation, Microservices and WebRTC to one location. With cloud computing driving a higher percentage of enterprise IT budgets every year, it becomes increasingly important to plant your flag in this fast-expanding business opportuni...
Identity is in everything and customers are looking to their providers to ensure the security of their identities, transactions and data. With the increased reliance on cloud-based services, service providers must build security and trust into their offerings, adding value to customers and improving the user experience. Making identity, security and privacy easy for customers provides a unique advantage over the competition.
Qosmos has announced new milestones in the detection of encrypted traffic and in protocol signature coverage. Qosmos latest software can accurately classify traffic encrypted with SSL/TLS (e.g., Google, Facebook, WhatsApp), P2P traffic (e.g., BitTorrent, MuTorrent, Vuze), and Skype, while preserving the privacy of communication content. These new classification techniques mean that traffic optimization, policy enforcement, and user experience are largely unaffected by encryption. In respect wit...
Fact: storage performance problems have only gotten more complicated, as applications not only have become largely virtualized, but also have moved to cloud-based infrastructures. Storage performance in virtualized environments isn’t just about IOPS anymore. Instead, you need to guarantee performance for individual VMs, helping applications maintain performance as the number of VMs continues to go up in real time. In his session at Cloud Expo, Dhiraj Sehgal, Product and Marketing at Tintri, wil...
19th Cloud Expo, taking place November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA, will feature technical sessions from a rock star conference faculty and the leading industry players in the world. Cloud computing is now being embraced by a majority of enterprises of all sizes. Yesterday's debate about public vs. private has transformed into the reality of hybrid cloud: a recent survey shows that 74% of enterprises have a hybrid cloud strategy. Meanwhile, 94% of enterpri...
Enterprises have forever faced challenges surrounding the sharing of their intellectual property. Emerging cloud adoption has made it more compelling for enterprises to digitize their content, making them available over a wide variety of devices across the Internet. In his session at 19th Cloud Expo, Santosh Ahuja, Director of Architecture at Impiger Technologies, will introduce various mechanisms provided by cloud service providers today to manage and share digital content in a secure manner....
Smart Cities are here to stay, but for their promise to be delivered, the data they produce must not be put in new siloes. In his session at @ThingsExpo, Mathias Herberts, Co-founder and CTO of Cityzen Data, will deep dive into best practices that will ensure a successful smart city journey.
SYS-CON Events announced today that 910Telecom will exhibit at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. Housed in the classic Denver Gas & Electric Building, 910 15th St., 910Telecom is a carrier-neutral telecom hotel located in the heart of Denver. Adjacent to CenturyLink, AT&T, and Denver Main, 910Telecom offers connectivity to all major carriers, Internet service providers, Internet backbones and ...
To leverage Continuous Delivery, enterprises must consider impacts that span functional silos, as well as applications that touch older, slower moving components. Managing the many dependencies can cause slowdowns. See how to achieve continuous delivery in the enterprise.