KIRKLAND LAKE, ONTARIO -- (Marketwired) -- 06/24/14 -- Kirkland Lake Gold Inc. (the "Company") (TSX: KGI) (AIM: KGI), an operating and exploration gold mining company, is pleased to announce an update on operations and production activities for the beginning of its fiscal year 2015 (began May 1, 2014) and a summary of its three-year mine production plan. The mine plan is based on a CAD$1,350 gold price. All figures in the release are stated in Canadian dollars.


--  Year to date production (May 1 - June 20, or 51 days) totalled 52,987
    tons at a head grade of 0.42 ounces per ton ("opt"), or 14.4 grams per
    tonne ("gpt") to produce 21,426 ounces.

--  Robust gold pour on June 19, 2014 of 4,862 fine ounces based on one
    week's production.

--  A new mining horizon is being developed on the 5,400 foot level of the
    South Mine Complex ("SMC") that saw the first stope, 5417, come online
    in mid-May. This now gives the Company three mining horizons in the SMC.
    Proven and probable reserve blocks from this level up to the 5,300 foot
    level include 481,000 tons at 0.57 opt (19.5 gpt) containing 274,000
    ounces; while proven and probable reserves from this level down to 5,600
    foot level include 299,000 tons at 0.70 (24.0 gpt) opt containing
    209,000 ounces. The Company is planning to mine 5 stopes from the 5,400
    foot level in fiscal 2015.

--  The Company is also developing the main SMC decline ramp as part of its
    sustaining capital budget in fiscal year 2015 in order to mine on the
    5,600 foot level and below where reserve grades are even higher and will
    be incorporated into the Company's fiscal 2016 mine plan. Please refer
    to the summary of reserves and resources table later in the press

--  On May 12 following a 7 day shutdown the Company commissioned the new
    ball mill with ore, running the mill on a new 5 and 2 day schedule with
    a daily throughput averaging 1700 tons per day ("tpd") run of mine ore
    at better than 96% recovery. At its peak, the mill ran at 2,000 tpd.

--  The mine is currently producing at a rate of 1,050 tpd of ore. The
    Company will take delivery of two new one boom, T1 D, electric hydraulic
    jumbos in the second half of the calendar year. Productivity
    improvements realized with this new equipment are expected to increase
    average daily ore tonnage to 1,150 - 1,250 tpd.

--  The Company remains on track to achieve its fiscal 2015 guidance of
    140,000 to 155,000 ounces of gold produced.

--  The Company currently has 5,400 tons of ore stockpiled in front of the


--  Kirkland Lake Gold's reserve and resource base is as follows:

    --  Proven and probable reserves: 2,784,000 tons at an average grade of
        0.50 opt (17.1 gpt) for 1,385,000 ounces
    --  Measured and indicated resources: 4,152,000 tons at an average grade
        of 0.49 opt (16.8 gpt) for 2,055,000 ounces
    --  Inferred resources of 2,092,000 tons at an average grade of 0.54 opt
        (18.5 gpt) for 1,133,000 ounces
--  Total mine life of 14 years.

--  Average gold production for the next three year totalling:

    --  FY 2015: 140,000 - 155,000 ounces per year at an average grade of
        0.37 opt (12.7 gpt)
    --  FY 2016: 150,000 - 170,000 ounces per year at an average grade of
        0.39 opt (13.4 gpt)
    --  FY 2017: 160,000 - 180,000 ounces per year at an average grade of
        0.41 opt (14.0 gpt)
--  Fiscal 2015 operating cost guidance of CAD$800 - $850 per ounce.

--  Fiscal 2015 AISC of CAD$1,250 - $1,350 per ounce.

--  Fiscal 2015 total sustaining, property, plant, and equipment
    expenditures of $58,000,000

--  Fiscal 2015 revenue of approximately CAD$200,000,000; Cash flow from
    operations of between CAD$ 50,000,000 - $60,000,000

--  Fiscal 2015 free cash flow generation of between CAD$15,000,000 -

--  The current three-year mine plan calls for daily ore tonnages to remain
    steady at 1,150 - 1,250 tons per day. Ounces will increase due to higher
    grades coming from the SMC as the 5400, 5600 and 5900 levels are opened
    up and mined over the ensuing years. Therefore, operating costs per
    ounce are expected to continue to decrease in fiscal years 2016 and 2017
    with operating costs per ton remaining relatively flat. The resultant
    outcome will be to increase profitability and maximize free cash flow.
    Over the next three-years, Management's target is to lower AISC to
    CAD$1,190 - $1,250 per ounce.

Summary of SMC Reserves and Resources by Level

                 Proven + Probable     Proven + Probable   Proven + Probable
LEVEL                       (TONS)               (GRADE)            (OUNCES)
5025                        89,000   0.44 opt (15.1 gpt)              39,000
5300                       620,000   0.47 opt (16.1 gpt)             290,000
5400                       481,000   0.57 opt (19.5 gpt)             274,000
5600                                           0.70 opt
                           299,000            (24.0 gpt)             209,000
5700 - 6600

              Measured + Indicated Measured + Indicated Measured + Indicated
LEVEL                       (TONS)              (GRADE)             (OUNCES)
5025                        57,000  0.39 opt (13.3 gpt)               22,000
5300                       220,000  0.39 opt (13.3 gpt)               86,000
5400                       179,000  0.41 opt (14.0 gpt)               71,000
5600                       222,000  0.55 opt (18.8 gpt)              122,000
5700 - 6600                768,000  0.91 opt (31.1 gpt)              703,000

Mr. George Ogilvie, President and CEO commented, "The current fiscal year is off to a strong start with operations thriving under the new strategy of focusing on quality tons to significantly improve head grades. The year-to-date head grade is 0.42 opt (14.4 gpt) which represents a 30% increase over and above the 0.32 opt (10.9 gpt) achieved in fiscal 2013. This approach will continue over the next three years, where the plan calls for keeping daily ore tons constant in order to keep labour and other mining costs stagnant, with an increase in produced ounces coming from higher grades. Grades in the SMC get significantly richer at depth, where development of additional high-grade areas (incorporated in the fiscal years 2015, 2016 and 2017 mine plans) is underway. It's pleasing to see we are now mining on a third mining horizon, 5400L, in the SMC where reserve grades in the block up to the 5,300L are above 0.55 opt (18.8 gpt). Costs are trending down due by previously announced cost-saving measures while others recently implemented (e.g. change in mill schedule) will start to be realized from June. In addition we should see further productivity improvements in the second half of the calendar year with the arrival of two new one boom, T1 D, electric hydraulic jumbos."

"The Company expects to be free cash flow positive at current gold prices in the next 2 - 3 months. The ounces forecast in fiscal years 2016 and 2017 do not take into account any mining from the near surface mineralization. Our recent flow through financing will allow us to accelerate the exploration drilling of the near surface mineralization; which includes a resource expansion and in-fill drilling to define a reserve. In house a preliminary economic assessment is being undertaken to help define the robustness of the near surface mineralization economics. The study is expected to be complete by the end of the calendar year," concluded Mr. Ogilvie.

About the Company

Kirkland Lake Gold's corporate goal is to create a self-sustaining and long-lived intermediate gold mining company based in the historic Kirkland Lake Gold Camp. The Company plans to do this by mining to the reserve grade, generating profits and free cash flow for the shareholders. The Company will also look to take advantage of its increased infrastructure capacity in the appropriate gold price environment. At the same time, the Company is committed to maintaining a significant exploration program aimed at developing and maintaining a property wide reserve and resource base sufficient to sustain a mine life of more than ten years. Over the last several years the Company has invested significant capital to improve the infrastructure of the business including upgrading the production hoist, skips, mill, underground mobile equipment and capital development. From initial discovery to present day there have been over 24 million ounces of gold mined from the Kirkland Lake camp while the current reserve and resource provides for more than 10 years of mining with significant exploration upside.

The reserve estimates and technical disclosure have been reviewed, verified (including sampling, analytical and test data) and compiled by the Company's geological staff (which includes a 'qualified person', Stewart Carmichael P.Geo., the Company's Chief Exploration Geologist, for the purpose of National Instrument 43-101, Standards of Disclosure for Mineral Projects, of the Canadian Securities Administrators). Mr. Carmichael also supervised the preparation of the information that forms the basis of the technical disclosure in this release.

Neither the Toronto Stock Exchange nor the AIM Market of the London Stock Exchange has reviewed and neither accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward Looking Statements

This Press Release contains statements which constitute "forward-looking statements", including statements regarding the plans, intentions, beliefs and current expectations of the Company with respect to the future business activities and operating performance of the Company. The words "may", "would", "could", "should", "will", "intend", "plan", "anticipate", "believe", "estimate", "expect" and similar expressions, as they relate to the Company, are intended to identify such forward-looking statements. Forward-looking statements used in this Press Release include, but may not be limited to, statements regarding the Company's production capacity and its exploration program. Investors are cautioned that forward-looking statements are based on the opinions, assumptions and estimates of management considered reasonable at the date the statements are made such as, without limitation, opinion, assumptions and estimates of management regarding the Company's business, its ability to increase its production capacity and decrease its production cost. Such opinions, assumptions and estimates, are inherently subject to a variety of risks and uncertainties and other known and unknown factors that could cause actual events or results to differ materially from those projected in the forward-looking statements.

These factors include the Company's expectations in connection with the projects and exploration programs being met, the impact of general business and economic conditions, global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future conditions, fluctuating gold prices, currency exchange rates (such as the Canadian dollar versus the United States Dollar), possible variations in ore grade or recovery rates, changes in accounting policies, changes in the Company's corporate mineral resources, changes in project parameters as plans continue to be refined, changes in project development, construction, production and commissioning time frames, risks related to joint venture operations, the possibility of project cost overruns or unanticipated costs and expenses, higher prices for fuel, power, labour and other consumables contributing to higher costs and general risks of the mining industry, failure of plant, equipment or processes to operate as anticipated, unexpected changes in mine life, seasonality and unanticipated weather changes, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, and limitations on insurance, as well as those risk factors discussed or referred to in the Company's annual Management's Discussion and Analysis and Annual Information Form for the year ended April 30, 2013 and the Company's Management's Discussion and Analysis for the interim period ended January 31, 2014 filed with the securities regulatory authorities in certain provinces of Canada and available at www.sedar.com. Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking statements prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, believed, estimated or expected. Although the Company has attempted to identify important risks, uncertainties and factors which could cause actual results to differ materially, there may be others that cause results not to be as anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update these forward-looking statements except as otherwise required by applicable law.

Glossary of Terms

National Instrument 43-101 Definitions of Resources and Reserves

The Reserve and Resource estimation classifications as prescribed in National Instrument 43-101 are given here for clarity.

Mineral Resource

Mineral Resources are sub-divided into 3 categories depending on the geological confidence. The highest level with the most confidence is the `Measured' category. The next level of confidence is the `Indicated' category and the lowest level, or the resource with the least confidence, is the `Inferred' category.

Inferred Mineral Resource

An `Inferred Mineral Resource' is that part of a Mineral Resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling, gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes.

Indicated Mineral Resource

An `Indicated Mineral Resource' is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics, can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed.

Measured Mineral Resource

A `Measured Mineral Resource' is that part of a Mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity.

Mineral Reserve

Mineral Reserves are sub-divided into 2 categories. The highest level of Reserves or the level with the most confidence is the `Proven' category and the lower level of confidence of the Reserves is the `Probable' category. Reserves are distinguished from resources as all of the technical and economic parameters have been applied and the estimated grade and tonnage of the resources should closely approximate the actual results of mining. The guidelines state "Minerals Reserves are inclusive of the diluting material that will be mined in conjunction with the Mineral Reserve and delivered to the treatment plant or equivalent facility." The guidelines also state that, "The term `Mineral Reserve' need not necessarily signify that extraction facilities are in place or operative or that all government approvals have been received. It does signify that there are reasonable expectations of such approvals."

Probable Mineral Reserve

A `Probable Mineral Reserve' is the economically mineable part of an Indicated and in some circumstances a Measured Mineral Resource demonstrated by a least a Preliminary Feasibility Study. This study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified.

Proven Mineral Reserve

A `Proven Mineral Reserve' is the economically mineable part of a Measured Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction is justified.

A more detailed list of technical terms can be found at http://klgold.com/cmsAssets/docs/pdfs/2013/2013%20Annual%20Information%20Form.pdf

Kirkland Lake Gold Inc.
George Ogilvie, P.Eng
+1 709 532 5716
+1 705 568 6444 (FAX)
[email protected]

Kirkland Lake Gold Inc.
Lindsay Dunlop
Director of Investor Relations
+1 416-840-7884
+1 705 568 6444 (FAX)
[email protected]

NOMAD: Panmure Gordon (UK) Limited
Callum Stewart / Adam James
+44 (0) 20 7886 2500

Tim Blythe/Halimah Hussain/Camilla Horsfall
+44 (0) 20 7138 3204

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

Latest Stories
Enterprises have taken advantage of IoT to achieve important revenue and cost advantages. What is less apparent is how incumbent enterprises operating at scale have, following success with IoT, built analytic, operations management and software development capabilities - ranging from autonomous vehicles to manageable robotics installations. They have embraced these capabilities as if they were Silicon Valley startups.
DXWorldEXPO LLC announced today that Kevin Jackson joined the faculty of CloudEXPO's "10-Year Anniversary Event" which will take place on November 11-13, 2018 in New York City. Kevin L. Jackson is a globally recognized cloud computing expert and Founder/Author of the award winning "Cloud Musings" blog. Mr. Jackson has also been recognized as a "Top 100 Cybersecurity Influencer and Brand" by Onalytica (2015), a Huffington Post "Top 100 Cloud Computing Experts on Twitter" (2013) and a "Top 50 C...
Digital transformation is about embracing digital technologies into a company's culture to better connect with its customers, automate processes, create better tools, enter new markets, etc. Such a transformation requires continuous orchestration across teams and an environment based on open collaboration and daily experiments. In his session at 21st Cloud Expo, Alex Casalboni, Technical (Cloud) Evangelist at Cloud Academy, explored and discussed the most urgent unsolved challenges to achieve fu...
The standardization of container runtimes and images has sparked the creation of an almost overwhelming number of new open source projects that build on and otherwise work with these specifications. Of course, there's Kubernetes, which orchestrates and manages collections of containers. It was one of the first and best-known examples of projects that make containers truly useful for production use. However, more recently, the container ecosystem has truly exploded. A service mesh like Istio addr...
As DevOps methodologies expand their reach across the enterprise, organizations face the daunting challenge of adapting related cloud strategies to ensure optimal alignment, from managing complexity to ensuring proper governance. How can culture, automation, legacy apps and even budget be reexamined to enable this ongoing shift within the modern software factory? In her Day 2 Keynote at @DevOpsSummit at 21st Cloud Expo, Aruna Ravichandran, VP, DevOps Solutions Marketing, CA Technologies, was jo...
Predicting the future has never been more challenging - not because of the lack of data but because of the flood of ungoverned and risk laden information. Microsoft states that 2.5 exabytes of data are created every day. Expectations and reliance on data are being pushed to the limits, as demands around hybrid options continue to grow.
Poor data quality and analytics drive down business value. In fact, Gartner estimated that the average financial impact of poor data quality on organizations is $9.7 million per year. But bad data is much more than a cost center. By eroding trust in information, analytics and the business decisions based on these, it is a serious impediment to digital transformation.
Business professionals no longer wonder if they'll migrate to the cloud; it's now a matter of when. The cloud environment has proved to be a major force in transitioning to an agile business model that enables quick decisions and fast implementation that solidify customer relationships. And when the cloud is combined with the power of cognitive computing, it drives innovation and transformation that achieves astounding competitive advantage.
As IoT continues to increase momentum, so does the associated risk. Secure Device Lifecycle Management (DLM) is ranked as one of the most important technology areas of IoT. Driving this trend is the realization that secure support for IoT devices provides companies the ability to deliver high-quality, reliable, secure offerings faster, create new revenue streams, and reduce support costs, all while building a competitive advantage in their markets. In this session, we will use customer use cases...
Digital Transformation: Preparing Cloud & IoT Security for the Age of Artificial Intelligence. As automation and artificial intelligence (AI) power solution development and delivery, many businesses need to build backend cloud capabilities. Well-poised organizations, marketing smart devices with AI and BlockChain capabilities prepare to refine compliance and regulatory capabilities in 2018. Volumes of health, financial, technical and privacy data, along with tightening compliance requirements by...
Andrew Keys is Co-Founder of ConsenSys Enterprise. He comes to ConsenSys Enterprise with capital markets, technology and entrepreneurial experience. Previously, he worked for UBS investment bank in equities analysis. Later, he was responsible for the creation and distribution of life settlement products to hedge funds and investment banks. After, he co-founded a revenue cycle management company where he learned about Bitcoin and eventually Ethereal. Andrew's role at ConsenSys Enterprise is a mul...
DXWorldEXPO LLC announced today that "Miami Blockchain Event by FinTechEXPO" has announced that its Call for Papers is now open. The two-day event will present 20 top Blockchain experts. All speaking inquiries which covers the following information can be submitted by email to [email protected] Financial enterprises in New York City, London, Singapore, and other world financial capitals are embracing a new generation of smart, automated FinTech that eliminates many cumbersome, slow, and expe...
DXWorldEXPO | CloudEXPO are the world's most influential, independent events where Cloud Computing was coined and where technology buyers and vendors meet to experience and discuss the big picture of Digital Transformation and all of the strategies, tactics, and tools they need to realize their goals. Sponsors of DXWorldEXPO | CloudEXPO benefit from unmatched branding, profile building and lead generation opportunities.
Evan Kirstel is an internationally recognized thought leader and social media influencer in IoT (#1 in 2017), Cloud, Data Security (2016), Health Tech (#9 in 2017), Digital Health (#6 in 2016), B2B Marketing (#5 in 2015), AI, Smart Home, Digital (2017), IIoT (#1 in 2017) and Telecom/Wireless/5G. His connections are a "Who's Who" in these technologies, He is in the top 10 most mentioned/re-tweeted by CMOs and CIOs (2016) and have been recently named 5th most influential B2B marketeer in the US. H...
The best way to leverage your Cloud Expo presence as a sponsor and exhibitor is to plan your news announcements around our events. The press covering Cloud Expo and @ThingsExpo will have access to these releases and will amplify your news announcements. More than two dozen Cloud companies either set deals at our shows or have announced their mergers and acquisitions at Cloud Expo. Product announcements during our show provide your company with the most reach through our targeted audiences.